CN208333482U - A kind of instrument support suitable for steel construction measurement correction - Google Patents

A kind of instrument support suitable for steel construction measurement correction Download PDF

Info

Publication number
CN208333482U
CN208333482U CN201820687861.5U CN201820687861U CN208333482U CN 208333482 U CN208333482 U CN 208333482U CN 201820687861 U CN201820687861 U CN 201820687861U CN 208333482 U CN208333482 U CN 208333482U
Authority
CN
China
Prior art keywords
instrument
steel
connector
measurement correction
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820687861.5U
Other languages
Chinese (zh)
Inventor
张洲
龚应波
赵虎军
杨小军
李庆达
赵立志
张裕海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201820687861.5U priority Critical patent/CN208333482U/en
Application granted granted Critical
Publication of CN208333482U publication Critical patent/CN208333482U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a kind of instrument supports suitable for steel construction measurement correction, including steel plate fixing bracket and instrument fixing rack;Steel plate fixing bracket includes fixing piece and connector;Fixing piece and connector integrally connected;Fixing piece is fixed with girder steel;Connector is detachably connected with instrument fixing rack;Instrument fixing rack includes: connecting plate, instrument mounting platform and reception target;Connecting plate and instrument mounting platform and reception target are fixed, and connecting plate is detachably connected with connector;Instrument mounting platform is oppositely arranged by support plate with target is received.The utility model not only constructs reliable and stable instrument mounting platform in the space in high-altitude no operatton face by above-mentioned setting, but also steel plate fixing bracket and instrument fixing rack are detachably connected, and turnover is flexible, easy to assembly, high recycling rate;Site welding is not needed simultaneously, avoids the generation of toxic and harmful gas and light pollution, it is environment friendly and pollution-free, the investment of welding equipment is reduced, artificial and material cost is thereby reduced.

Description

A kind of instrument support suitable for steel construction measurement correction
Technical field
The utility model relates to be full steel structure, steel reinforced concrete frame structure, steel reinforced concrete core for structure type Heart barrel structure etc. is related to the field of engineering technology of girder steel, steel column installation correction, more particularly to a kind of to be suitable for steel The instrument support of structure measurement correction.
Background technique
With the fast development of country, the quickening of urban construction process, super high-rise building is more and more, and most of superelevation Layer building is all made of Construction of Steel Structure technique, steel column and girder steel, therefore its measurement is corrected particularly important;Super high-rise building Construction generally uses the structure type of Core Walls Structure and outline border cylinder, and core tube construction is prior to outline border tube construction;Vertical steel column installation is wanted It,, can not be in a conventional manner since high-altitude does not have work surface after steel column and steel girder erection earlier than the installation of horizontal floor girder steel Total station, which is set up, using tripod carries out the positioning of steel column Coordinate setting-out.
Have in the prior art using one instrument mounting platform of site welding building on steel column;But above scheme is scarce Falling into is first, need site welding, and site welding will cause pollution;The second, site welding difficulty is bigger, needs repeatedly Measurement welding benchmark, it is time-consuming;Although third, due to instrument platform and the welded increase stability of steel column, adjust each time It is inconvenient to turn instrument platform disassembly.
Therefore how to solve the problems, such as that above-mentioned technical problem is those skilled in the art's urgent need to resolve.
Summary of the invention
In view of this, the present invention provides a kind of instrument supports suitable for steel construction measurement correction, at least solve Above-mentioned technical problem.
To achieve the goals above, the utility model adopts the following technical solution:
A kind of instrument support suitable for steel construction measurement correction, comprising: steel plate fixing bracket and instrument fixing rack;
Steel plate fixing bracket includes fixing piece and connector;Fixing piece and connector integrally connected;Fixing piece is fixed with girder steel;
Instrument fixing rack includes: connecting plate, instrument mounting platform and reception target;Connecting plate and instrument mounting platform and reception Target is fixed, and connecting plate is detachably connected with connector;Instrument mounting platform is connected by support plate and instrument mounting platform The reception target being oppositely arranged.
It can be seen via above technical scheme that compared with prior art, the utility model, which discloses, to be provided one kind and is suitable for The instrument support of steel construction measurement correction, since the connecting plate on the connector and instrument fixing rack on steel plate fixing bracket is detachable Connection, steel plate fixing bracket are fixed on girder steel by fixing piece, are not only constructed in the space in high-altitude no operatton face reliable and stable Instrument mounting platform, and steel plate fixing bracket and instrument fixing rack are detachably connected, and turnover is flexibly, easy to assembly, repeat benefit With rate height;Site welding is not needed simultaneously, avoids the generation of toxic and harmful gas and light pollution, it is environment friendly and pollution-free, it reduces The investment of welding equipment thereby reduces artificial and material cost.
Preferably, steel plate fixing bracket and instrument fixing rack are that the waste and old steel plate of recycling is formed by connecting;Using this scheme Effect: improving the utilization rate of waste and old plate, further reduced the cost of equipment Alignment investment.
Preferably, fixing piece includes bottom plate and grab;Bottom plate one end and grab weld;Grab is fixed with girder steel;Bottom plate is another One end connects connector.Wherein grab is similar to reverse U shape, and one end and bottom plate weld, and the other end hooks on girder steel and has Certain depth ensure that fixed fastness.
Preferably, there is through-hole, bolt is fixed bottom plate and girder steel by through-hole on grab;Further by bottom plate and girder steel It is fixed, provide the accurately premise of measurement and calibration.
A kind of instrument support suitable for steel construction measurement correction provided by the utility model, further includes auxiliary fixing member, Auxiliary fixing member is connect with fixing piece in the angle α;Wherein auxiliary fixing member and fixing piece can be welded directly or movable Connection, under the premise of guaranteeing that bracket stable is fixed on girder steel, α is 40 ° -60 °, preferably 45 °.
Preferably, auxiliary fixing member includes auxiliary backplane and auxiliary grab;Auxiliary backplane one end and auxiliary grab welding;Separately It is connected between one end and bottom plate in the angle α;Preferably, assist that there is hole on grab, bolt through hole consolidates auxiliary backplane and girder steel It is fixed, it is further provided the accurately premise of measurement and calibration.
Preferably, there is mounting groove on instrument mounting platform, be used for retainer instrument pedestal;Wherein mounting groove is strip groove, Not only facilitate fixed various instrument bases, while instrument base opposite can receive target and be adjusted in a certain range.
Preferably, strip-shaped hole is all had on connector and connecting plate;High-strength bolt passes through two strip-shaped holes for connector It is fixed with connecting plate;Wherein the length of the strip-shaped hole on connector is 300-350mm, and bar shaped hole length is 250- on connecting plate 280mm;Using the effect of this scheme: the connection distance between steel plate fixing bracket and instrument fixing rack is sufficiently increased in design, The steel plate that can be stretched by two strip-shaped holes adjusts the position of laser pick-off target, and maximal dilation distance may be implemented up to 725mm Multiple project recyclings, save material and processing charges, improve social benefit.
The measurement method of a kind of instrument support suitable for steel construction measurement correction provided by the utility model are as follows: work as superelevation It, can be using following method to steel column when the vertical steel column construction of layer Construction of Steel Structure Core Walls Structure is synchronous with horizontal floor steel girder erection It is corrected:
S1 establishes survey station
S11 assembles the instrument support for being suitable for steel construction measurement correction, and instrument is installed flat fix by fixing piece On girder steel;
S12 sets laser plummet in the lower part measuring basis layer frame of girder steel and axis point is thrown to the reception target surveyed to instrument support On, carry out point position mark;
S13 sets up total station: total station is set up on instrument mounting platform;Total station centering leveling;
S2 establishes backsight
S21 assembles two instrument supports for being suitable for steel construction measurement correction in backsight corresponding position again, passes through fixing piece Instrument installation is put down and is fixed on girder steel;
S22 sets laser plummet in the lower part measuring basis layer frame of girder steel and axis point is thrown to the reception target surveyed to instrument support On, carry out point position mark;
S23, it sets up prism base: setting up prism base on instrument mounting platform;Prism base centering leveling;
S3 is established after survey station and backsight using erection total station in step S1 and S2 and prism and be can be directed to, and polar coordinates are utilized The correction of method progress steel column and girder steel.
When the vertical steel column construction of Core Walls Structure is faster than steel girder erection, total station is set up when correcting steel column on girder steel, due to Height difference is excessive, and the instrument elevation angle is excessive, can be corrected at this time using following method:
S1 establishes backsight
S11 assembles two or more instrument supports suitable for steel construction measurement correction in backsight corresponding position, leads to It crosses fixing piece and instrument is installed into flat be fixed on girder steel;
S12 sets laser plummet in the lower part measuring basis layer frame of girder steel and axis point is thrown to the reception target surveyed to instrument support On, carry out point position mark;
S13, it sets up prism base: setting up prism base on instrument mounting platform;Prism base centering leveling;
S2 establishes survey station
If the above method assembles instrument support and sets up total station, wherein (this position is needed at an arbitrary position for total station erection Simultaneously can be with two or more rearscope pedestal intervisibilities), survey station is established using Free Station with Total Station electronic Thacheometer function;
S3 establishes backsight using erection prism in step S1 and S2 and total station and establishes i.e. orientable after voluntary intake, benefit The correction of steel column and girder steel is carried out with method of polar coordinates.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is the embodiments of the present invention, for those of ordinary skill in the art, without creative efforts, also Other attached drawings can be obtained according to the attached drawing of offer.
Fig. 1 attached drawing is a kind of main view of instrument support suitable for steel construction measurement correction provided by the utility model;
Fig. 2 attached drawing is a kind of top view of instrument support suitable for steel construction measurement correction provided by the utility model;
Fig. 3 attached drawing is that a kind of instrument of instrument support suitable for steel construction measurement correction provided by the utility model is fixed The structural schematic diagram of frame;
Fig. 4 attached drawing is a kind of Interal fixation of instrument support suitable for steel construction measurement correction provided by the utility model The structural schematic diagram of frame.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model embodiment discloses a kind of instrument support suitable for steel construction measurement correction, and turnover is flexible, group Dress is convenient, high recycling rate.
A kind of instrument support suitable for steel construction measurement correction provided by the utility model, referring to attached drawing 1-4, comprising: Steel plate fixing bracket 2 and instrument fixing rack 1;Steel plate fixing bracket 2 includes fixing piece 21 and connector 22;Fixing piece 21 and connector 22 Integrally connected;Fixing piece 21 is fixed with girder steel;Connector 22 is detachably connected with instrument fixing rack 1;Instrument fixing rack 1 includes: Connecting plate 11, instrument mounting platform 12 and reception target 13;Connecting plate 11 and instrument mounting platform 12 and reception target 13 are fixed, and Connecting plate 11 is detachably connected with connector 22;Instrument mounting platform 12 is oppositely arranged by support plate with target 13 is received.
The utility model, which discloses, provides a kind of instrument support suitable for steel construction measurement correction, due to steel plate fixing bracket 2 and instrument fixing rack 1 be detachably connected, steel plate fixing bracket 2 is fixed on girder steel by fixing piece 21, not only in high-altitude no operatton The space in face constructs reliable and stable instrument mounting platform, and steel plate fixing bracket 2 and instrument fixing rack 1 are detachably connected, Turnover is flexible, easy to assembly, high recycling rate;Site welding is not needed simultaneously, avoids toxic and harmful gas and light pollution Generation, it is environment friendly and pollution-free, reduce the investment of welding equipment, thereby reduce artificial and material cost.
In one embodiment of the utility model, steel plate fixing bracket 2 and instrument fixing rack 1 are the waste and old steel plate of recycling It is welded;The utilization rate for improving waste and old plate further reduced the cost of equipment Alignment investment.
In one embodiment of the utility model, fixing piece 21 includes bottom plate 211 and grab 212;211 one end of bottom plate with Grab 212 welds;The other end connects connector 22;Wherein grab is similar to reverse U shape, and one end and bottom plate 211 weld, another End hook enters on girder steel and has certain depth, ensure that fixed fastness.
Specifically, having through-hole 2121 on grab 212, bolt is fixed bottom plate 211 with girder steel by through-hole 2121;Into one Step fixes bottom plate and girder steel, provides the accurately premise of measurement and calibration.
It further include auxiliary fixing member 23, auxiliary fixing member 23 and fixing piece in another embodiment of the utility model 21 connect in the angle α;Wherein auxiliary fixing member 23 and fixing piece 21 can be welded directly or movable connection, guaranteed Under the premise of bracket stable is fixed on girder steel, α is 40 ° -60 °, preferably 45 °.
Advantageous, auxiliary fixing member 23 includes auxiliary backplane 231 and auxiliary grab 232;231 one end of auxiliary backplane and auxiliary Grab 232 welds;The other end is connected on bottom plate 211.
It is more favorable, assist that there is hole 2321 on grab 232, bolt through hole 2321 is auxiliary by auxiliary backplane 231 and girder steel Help fixation, it is further provided the accurately premise of measurement and calibration.
In other embodiments of the utility model, there is mounting groove 121 on instrument mounting platform 12, is used for retainer instrument Pedestal;Wherein mounting groove 121 is strip groove, not only facilitates fixed various instrument bases, while instrument base opposite can receive Target is adjusted in a certain range.
In other embodiments of the utility model, strip-shaped hole 24 is all had on connector 22 and connecting plate 11;It is high-intensitive Bolt passes through two strip-shaped holes 24, and connector 22 and connecting plate 11 is fixed;Wherein the length of the strip-shaped hole on connector is 300- 350mm, bar shaped hole length is 250-280mm on connecting plate;Using the effect of this scheme: sufficiently increasing Interal fixation in design Connection distance between frame and instrument fixing rack, the steel plate that can be stretched by two strip-shaped holes adjust the position of laser pick-off target, Maximal dilation distance may be implemented multiple project recyclings, save material and processing charges, improve society up to 725mm Benefit.
The utility model additionally provides a kind of measurement method of instrument support suitable for steel construction measurement correction: working as superelevation It, can be using following method to steel column when the vertical steel column construction of layer Construction of Steel Structure Core Walls Structure is synchronous with horizontal floor steel girder erection It is corrected:
S1 establishes survey station
S11 assembles the instrument support for being suitable for steel construction measurement correction, and instrument is installed flat fix by fixing piece On girder steel;
S12 sets laser plummet in the lower part measuring basis layer frame of girder steel and axis point is thrown to the reception target surveyed to instrument support On, carry out point position mark;
S13 sets up total station: total station is set up on instrument mounting platform;Total station centering leveling;
S2 establishes backsight
S21 assembles two instrument supports for being suitable for steel construction measurement correction in backsight corresponding position again, passes through fixing piece Instrument installation is put down and is fixed on girder steel;
S22 sets laser plummet in the lower part measuring basis layer frame of girder steel and axis point is thrown to the reception target surveyed to instrument support On, carry out point position mark;
S23, it sets up prism base: setting up prism base on instrument mounting platform;Prism base centering leveling;
S3 is established after survey station and backsight using erection total station in step S1 and S2 and prism and be can be directed to, and polar coordinates are utilized The correction of method progress steel column and girder steel.
When the vertical steel column construction of Core Walls Structure is faster than steel girder erection, total station is set up when correcting steel column on girder steel, due to Height difference is excessive, and the instrument elevation angle is excessive, can be corrected at this time using following method:
S1 establishes backsight
S11 assembles two or more instrument supports suitable for steel construction measurement correction in backsight corresponding position, leads to It crosses fixing piece and instrument is installed into flat be fixed on girder steel;
S12 sets laser plummet in the lower part measuring basis layer frame of girder steel and axis point is thrown to the reception target surveyed to instrument support On, carry out point position mark;
S13, it sets up prism base: setting up prism base on instrument mounting platform;Prism base centering leveling;
S2 establishes survey station
If the above method assembles instrument support and sets up total station, wherein (this position is needed at an arbitrary position for total station erection Simultaneously can be with two or more rearscope pedestal intervisibilities), survey station is established using Free Station with Total Station electronic Thacheometer function;
S3 establishes backsight using erection prism in step S1 and S2 and total station and establishes i.e. orientable after voluntary intake, benefit The correction of steel column and girder steel is carried out with method of polar coordinates.
The application of the utility model: Circulated utilization instrument support provided by the utility model is successfully applied to Beijing The plot CBD core space Z14 trade financing project, the project are made of two 45 floor Super High high buildings, height 238m, southern on the ground, Northern high building is steel reinforced concrete frame+Reinforced Concrete Core Walls Structure+semi-girder truss+annulus truss structure.In view of two high buildings As a flowing water segment sync construction, every high building does 3 such brackets, can meet live steel construction surveying setting-out and want It asks.
The effect that the utility model obtains: such Circulated utilization instrument support installation and disassembly are easy, compared to conventional Tripod erection stability of instrument is good, and measurement accuracy is easily guaranteed that, and can be reused, it can be ensured that Steel Structure Installation precision And live steel column measurement correction progress can be accelerated, owner's favorable comment consistent with supervisor is obtained in this project.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.For device disclosed in embodiment For, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is said referring to method part It is bright.
The foregoing description of the disclosed embodiments can be realized professional and technical personnel in the field or using originally practical new Type.Various modifications to these embodiments will be readily apparent to those skilled in the art, and determine herein The General Principle of justice can be realized in other embodiments without departing from the spirit or scope of the present utility model.Cause This, the present invention will not be limited to the embodiments shown herein, and is to fit to and principles disclosed herein The widest scope consistent with features of novelty.

Claims (9)

1. a kind of instrument support suitable for steel construction measurement correction characterized by comprising steel plate fixing bracket (2) and instrument Fixed frame (1);
The steel plate fixing bracket (2) includes fixing piece (21) and connector (22);The fixing piece (21) and the connector (22) integrally connected;The fixing piece (21) is fixed with girder steel;
The instrument fixing rack (1) includes: connecting plate (11), instrument mounting platform (12) and receives target (13);The connecting plate (11) fixed with the instrument mounting platform (12) and the reception target (13), and the connecting plate (11) and the connector (22) it is detachably connected;The instrument mounting platform (12) connects set opposite with the instrument mounting platform (12) by support plate The reception target (13) set.
2. a kind of instrument support suitable for steel construction measurement correction according to claim 1, which is characterized in that the steel Plate fixed frame (2) and the instrument fixing rack (1) are that the waste and old steel plate of recycling is formed by connecting.
3. a kind of instrument support suitable for steel construction measurement correction according to claim 1, which is characterized in that described solid Determining part (21) includes bottom plate (211) and grab (212);Described bottom plate (211) one end and the grab (212) are welded, the card Hook (212) is fixed with girder steel;Connector (22) described in bottom plate (211) other end integrally connected.
4. a kind of instrument support suitable for steel construction measurement correction according to claim 3, which is characterized in that the card There are through-hole (2121) on hook (212), bolt is fixed bottom plate (211) with girder steel by the through-hole (2121).
5. a kind of instrument support suitable for steel construction measurement correction according to claim 3, which is characterized in that further include Auxiliary fixing member (23), the auxiliary fixing member (23) connect with the fixing piece (21) in the angle α.
6. a kind of instrument support suitable for steel construction measurement correction according to claim 5, which is characterized in that described auxiliary Helping fixing piece (23) includes auxiliary backplane (231) and auxiliary grab (232);Described auxiliary backplane (231) one end and the auxiliary Grab (232) welding;It is connect between the other end and the bottom plate (211) in the angle α.
7. a kind of instrument support suitable for steel construction measurement correction according to claim 6, which is characterized in that described auxiliary Helping on grab (232) has hole (2321), and bolt is fixed auxiliary backplane (231) with girder steel by the hole (2321).
8. a kind of instrument support suitable for steel construction measurement correction according to claim 1-7, feature exist In with mounting groove (121) on the instrument mounting platform (12), for retainer instrument pedestal.
9. a kind of instrument support suitable for steel construction measurement correction according to claim 1-7, feature exist In all having strip-shaped hole (24) on the connector (22) and the connecting plate (11);High-strength bolt passes through two items Shape hole (24) is fixed by the connector (22) and the connecting plate (11).
CN201820687861.5U 2018-05-04 2018-05-04 A kind of instrument support suitable for steel construction measurement correction Active CN208333482U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820687861.5U CN208333482U (en) 2018-05-04 2018-05-04 A kind of instrument support suitable for steel construction measurement correction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820687861.5U CN208333482U (en) 2018-05-04 2018-05-04 A kind of instrument support suitable for steel construction measurement correction

Publications (1)

Publication Number Publication Date
CN208333482U true CN208333482U (en) 2019-01-04

Family

ID=64777172

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820687861.5U Active CN208333482U (en) 2018-05-04 2018-05-04 A kind of instrument support suitable for steel construction measurement correction

Country Status (1)

Country Link
CN (1) CN208333482U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110440770A (en) * 2018-05-04 2019-11-12 中建三局集团有限公司 A kind of instrument support and its measurement method suitable for steel construction measurement correction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110440770A (en) * 2018-05-04 2019-11-12 中建三局集团有限公司 A kind of instrument support and its measurement method suitable for steel construction measurement correction

Similar Documents

Publication Publication Date Title
CN106638318B (en) The localization method and cable guide pipe installation method of cable-stayed bridge beam-ends anchor point
CN109594474A (en) A kind of limited bracket construction method of Long span S-shaped steel box-girder
CN103114732A (en) Cast steel penetration pipe node space positioning method
CN107090775A (en) A kind of full framing space beam-ends cable guide pipe construction localization method
CN208333482U (en) A kind of instrument support suitable for steel construction measurement correction
CN206562667U (en) A kind of quick pedestal anchor bolt structure in place
CN209369328U (en) A kind of removable die carrier structure of lateral wall mould
CN110440770A (en) A kind of instrument support and its measurement method suitable for steel construction measurement correction
CN201927268U (en) Practice teaching platform for steel structure installation
CN213714311U (en) City view both arms lamp leveling centering device
CN209367607U (en) A kind of mounting structure that people's goods elevator attached wall lengthening rods are fixed
CN210513117U (en) Pole gradient measuring tool
CN106988293B (en) A kind of ship lift main equipment room steel lattice column construction method and installation accuracy control method
CN206554273U (en) A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN220336055U (en) Sewer positioning device for building civil engineering construction
CN206677863U (en) The quick assembly tool of photo-thermal sulculus
CN217980326U (en) Quick centering device
CN214171879U (en) Platform device is laid to attached measuring apparatu
CN206459649U (en) A kind of absolute altitude copies survey device and copies survey system
CN201233232Y (en) Passenger transport dedicated line railway foundation pile control network height measurement sign device
CN209026411U (en) A kind of fixed device of portable instrument
CN213629743U (en) A portable ultrasonic ranging device for civil engineering
CN214498355U (en) Reinforcing apparatus for construction frame
CN216116004U (en) Pipeline levelness detection device for municipal works
CN216387540U (en) Small prism support device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant