CN110439612A - A kind of mould bag barricade and construction method - Google Patents
A kind of mould bag barricade and construction method Download PDFInfo
- Publication number
- CN110439612A CN110439612A CN201910830404.6A CN201910830404A CN110439612A CN 110439612 A CN110439612 A CN 110439612A CN 201910830404 A CN201910830404 A CN 201910830404A CN 110439612 A CN110439612 A CN 110439612A
- Authority
- CN
- China
- Prior art keywords
- barricade
- mould bag
- layer
- steel wire
- filling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/005—Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/02—Supporting means, e.g. shuttering, for filling-up materials
- E21F15/04—Stowing mats; Goaf wire netting; Partition walls
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Revetment (AREA)
Abstract
The present invention is a kind of mould bag barricade and construction method, discloses the method that barricade is built in soft substrate, this method constitutes barricade using mould bag, including following steps: the first step selectes the position for building barricade;Second step, the fixing anchor bar in the ore-rock around barricade position;Third step, the metal binding wire on anchor pole form steel wire;4th step cleans up barricade bottom surface, and tile first floor mould bag;5th step fills charges into first floor mould bag, and consolidation is waited to complete, and second layer mould bag is placed on first floor mould bag, fills charges, and consolidation is waited to complete, and repeats, until blocking entire barricade region.The present invention utilizes filling filling slurry in mould bag, barricade is formed after equal filling slurries consolidation, the barricade can sink with the softening of soft substrate, and then make to be not in spillage mouth between barricade and substrate, again because barricade is made of that the case where barricade avalanche will not occur using filling slurry is filled in mould bag.
Description
Technical field
The present invention relates to underground mine production techniques, more particularly, to a kind of mould bag barricade and construction method.
Background technique
Current country advocates the construction in green circulatory mine energetically, to reduce the accumulation of earth's surface barren rock and controlling due to opening
Caused Ground pressure activity is adopted, in existing underground metal mine, the mode of afterwards filling is mostly used to carry out Mined-out Area control.And mined out
Before area's processing, dead zone lower part need to be blocked with filling counterfort, the flowing of slurry is controlled with this, realize stope filling process
Safety and stability.
Current barricade is constructed in stable ore-rock region more, and it is steady that filling safety can be effectively ensured in reasonable barrier wall structure parameter
It is fixed, and be applied on flexible subserate, a series of problems will occur.Though by the applicable cases of domestic and international filling counterfort it is found that barricade
Stability is good, but since slurry is under the action of head pressure, acts on to structural weak region, easily weakens flexible subserate and is formed
Liquefaction area destroys barricade lower part ground, and slurry channel is led in formation, and as the height of filling slurry increases, the increase of slurry pressure, pole has
Slurry leakage hazard may occur in the later period, seriously jeopardize downhole safety operation.
Therefore, how filling counterfort is constructed on flexible subserate, be a technical problem to be solved urgently.
Summary of the invention
The technical problem to be solved by the present invention is a kind of mould bag barricade is overcome the deficiencies of the prior art and provide, barricade benefit
With filling slurry is poured in mould bag, barricade is formed after slurry consolidation to be filled, if soft substrate is due to filling water softening, mould bag gear
Wall can also sink therewith, not occur spillage mouth.
The technical solution adopted by the present invention to solve the technical problems is: a kind of construction method of mould bag barricade, including such as
Lower step:
Include the following steps:
The first step selectes the position for building barricade;
Second step, the fixing anchor bar in the ore-rock around barricade position;
Third step, the metal binding wire on anchor pole form steel wire;
4th step cleans up barricade bottom surface, and tile first layer mould bag;
5th step fills filler into first layer mould bag, waits the filler in first layer mould bag to consolidate and completes, then first
Second layer mould bag is placed on layer mould bag, continues to fill filler to second layer mould bag, waits the filler in second layer mould bag solid
Knot is completed, then places third layer mould bag, is repeated, until blocking entire barricade region.
Further, in third step, the steel wire bound on anchor pole is two layers.The double-deck setting of steel wire can be thick using one
One is thin, forms steel wire frame first with thick steel wire, is forming steel wire on frame with finer wire.
Further, in third step, one layer of geotextiles are covered on the surface of steel wire.
Further, in the 5th step, charges are filling slurry, and stowing operation is that extender paste, drainage, benefit are filled into mould bag
Slurry, drainage wait filling slurry consolidation in mould bag to complete.
The present invention further solves technical solution used by its technical problem: a kind of mould bag barricade, including mould bag sheet
Body, mould bag body interior fill filler, and multiple mould bag ontology hierarchies stack to form barricade, which builds in soft substrate,
Barricade and the siding of surrounding are closely adjacent to together.
Further, the filler is filling slurry.
Further, the ore-rock is equipped with anchor pole.
Further, metal binding wire net on the anchor pole, the steel wire are located at the side of barricade.
Further, the reinforcing bar net surface is equipped with geotextiles.
Further, the soft substrate in side of the barricade far from steel wire is equipped with collecting gutter.
Further, mould bag is laid in the soft substrate of side of the barricade far from steel wire.In the present embodiment, barricade
The substrate direction of side far from steel wire is on the outside of stope, and corresponding on the outside of stope is on the inside of stope, and stope inside exists
It is region to be filled in the present invention, will be separated on the inside of stope with stope outside using barricade, barricade forms region to be filled
The sealing space of portion's opening, filling slurry are launched downwards into region to be filled from top, finally fill area to be filled domain.At this
In embodiment, by also layer overlay mould bag in the substrate on the outside of stope, a part of barricade is become, liquid can be made in this way
Filling slurry enter region to be filled after, will not be leaked from the substrate on the outside of stope.
Beneficial effects of the present invention:
The present invention forms barricade after waiting filling slurries to consolidate, which can be with soft base using filling slurry is filled in mould bag
The softening at bottom and sink, and then make to be not in spillage mouth between barricade and substrate, and because barricade is to utilize filling in mould bag
Filling slurry is made, and barricade avalanche will not occurs.It is laid with one layer of mould bag in the substrate on the outside of stope again, can be prevented wait fill out
The filling slurry for filling region is leaked from the substrate on the outside of stope.
Detailed description of the invention
Fig. 1-is the diagrammatic cross-section that mould bag barricade is connect with top plate and side plate;
Fig. 2-is A-A view;
Fig. 3-is the top view on the outside of stope.
In figure: the soft substrate of 1-, 2- mould bag, 3- side plate, 4- anchor pole, 5- top plate, 6- steel wire, 7- collecting gutter, 21- first
Layer mould bag, 22- second layer mould bag, 23- third layer mould bag.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and embodiments.
Referring to Fig.1 ~ Fig. 3: a kind of mould bag barricade, including mould bag ontology, mould bag body interior fill filler, multiple mould bags
Ontology hierarchy stacks to form barricade, which builds in soft substrate 1, and the ore-rock of barricade and surrounding is closely adjacent to together.
In the present embodiment, the position of barricade is built in regional choice to be filled in advance, the ore-rock around barricade can be by
Locality is divided into top plate 5, side plate 3 and soft substrate 1.Region to be filled is the subsequent region for carrying out filling slurry filling, is
The sealing space of upper opening will be formed with filling region using barricade, filling slurry is launched downwards from top into area to be filled
Area to be filled domain is finally filled in domain.
Bolthole is dug in top plate 5 and 3 top of side plate, anchor pole 4 is inserted into bolthole, is provided for subsequent metal binding wire net
Supporting point, the anchor pole are with screw-thread steel or impressed anchor pole 4 without particular/special requirement, but for convenience of binding steel wire 6 and geotextiles
Preferably.Steel wire can be using the double-deck setting, and the double-deck setting of steel wire can be carefully combined using one thick one, first with thick
Steel wire forms steel wire frame, steel wire is being formed on frame with finer wire, specifically, the diameter of thicker wire can be 6mm.
Steel wire is bound on anchor pole, specifically, bundling steel wire on anchor pole, steel wire is not required to cover entire section,
If the distance of top plate to soft substrate is more than five meters or more, the setting position at the top of steel wire is from the downward 1.5m of top plate
To be suitable, and corner must have affluence, and steel wire is to increase to be attached between steel wire and side plate there are rich purpose
Add the bonding strength of steel wire Yu surrounding ore-rock.After the completion of steel wire binding, one layer of geotextiles are covered on the surface of steel wire,
Particularly geotextiles are equipped with close to the side in region to be filled in steel wire.Geotextiles, also known as geotextile, it is by synthesizing
Water penetration geosynthetics made of fiber is pierced or woven by needle, the purpose that geotextiles are arranged here is in order to subsequent
When keeping out filling slurry in region to be filled, water can be allowed to filter out, without allowing filling slurry to filter out.
The large rock mass or sharp objects that will be laid at mould bag 2 are cleaned, to prevent filling filling slurry rear mold into mould bag
Bag is punctured by object, so that filling slurry flows out.Tile first layer mould bag 21 in soft substrate after cleaning, then to mould bag
In fill up filling slurry, the water of filling slurry can overflow outward in mould bag, in order to which water to be discharged, can be catchmented with setting on the outside of stope
Water can be guided to storage area by collecting gutter 7 by ditch 7, be side of the barricade far from steel wire on the outside of stope, on the outside of stope with
Separated between region to be filled by barricade.Specifically, barricade determines barricade ruler with three width, height and thickness sizes
Very little, collecting gutter 7 is arranged along the width direction of barricade, and the water filtered out in mould bag is collected into collecting gutter as far as possible, then passes through
Diversion pipe or diversion trench discharge.
After the water discharge of filling slurry in mould bag, it will appear unsaturation in mould bag, at this moment continue to fill out into mould bag
Filling slurry is filled, the water of slurry to be filled is discharged again, waits filling slurry consolidation.
After the filling slurry consolidation in first layer mould bag, carries out second layer mould bag and be laid with 22, filled in second layer mould bag
The mode of filling slurry is identical as first layer mould bag, also passes through and fills up filling slurry, drainage, the process for mending slurry and drainage, most
After waiting filling slurry consolidation afterwards, the laying of third layer mould bag 23 is carried out.General entire barricade can pass through three layers of mould bag or four layers
Mould bag composition carries out the laying of the 4th layer of mould bag if the laying of third layer mould bag is not bonded with top plate also, until and top plate
It fits together.
Mould bag is successively laid with, and is because if once multilayer film bag while being laid with and being filled, when most rear mold bag
In filling slurry consolidation after, mould bag barricade can be presented a kind of both ends and stick up, the low shape in middle part so that mould bag barricade and top plate and
Side plate connection is not close, needs subsequent remedy.
And complete one layer of mould bag filling process after, then carry out next layer mould bag filling, until reach top plate because filling
The mobility of extender paste at the beginning, final mould bag and top plate and side plane contact face are close together, and keep out subsequent wait fill out
When filling the filling slurry filled in region, filling slurry will not be made to flow out from the junction of mould bag barricade and top plate and side plate.
In the present embodiment, it can be laid with one layer of mould bag in the soft substrate on the outside of stope, carry out filling material in mould bag
The filling of slurry, when can make in this way to area filling filling slurry to be filled, even if filling slurry is from the base in region to be filled
Bottom is corroded to the base lower portion on the outside of stope, as the blocking of mould bag will not leak.
After mould bag barricade is built, filling slurry can be filled into region to be filled.The advantages of mould bag barricade
It is: if traditional barricade is built in soft substrate, when the water in filling slurry erodes soft substrate, so that soft
Substrate softens, and traditional barricade will appear damage, and when the filling slurry flowed in region to be filled increases, traditional barricade may go out
Now collapse;And compared with traditional barricade, mould bag barricade can be built in soft substrate, because if soft substrate is by water erosion
Soften, that mould bag barricade can sink, and can block filling slurry in the same old way, and bottom edge and side are not in spillage
Mouthful, and top will appear the phenomenon that being detached from top plate, need subsequent filling, but not opposite area filling filling material to be filled
Slurry has an impact because only gap can occur on barricade top, and in region to be filled fill filling slurry be all from bottom to
On start to pour, finally can just reach top, can suspend during this period to region to be filled pour filling slurry, or using point
It criticizes to region to be filled and pours filling slurry, i.e., using first part filling slurry is poured to region to be filled, to the filling of this part
After slurry solidification, then to region to be filled pouring part filling slurry, until area filling to be filled is expired.Both modes are equal
The time in the gap between the filling of mould bag barricade and top plate can be given.In addition, filling filling slurry in mould bag is selected to form barricade,
It is that the moisture of filling slurry in mould bag can be made to overflow, without overflowing because mould bag has extraordinary dehydration property and block pulp
Filling slurry out, while the moisture of the filling slurry in region to be filled can also be spilled over to collecting gutter by geotextiles and mould bag,
And then it is discharged into storage area.
A kind of construction method of mould bag barricade, includes the following steps:
The first step selectes the position for building barricade;
Second step, the fixing anchor bar in the ore-rock around barricade position;
Third step, the metal binding wire on anchor pole form steel wire;
4th step cleans up barricade bottom surface, and tile first floor mould bag;
5th step fills filling slurry into first floor mould bag, and consolidation is waited to complete, and second layer mould bag is placed on first floor mould bag,
Filling slurry is filled, consolidation is waited to complete, is repeated, until blocking entire barricade region.
Claims (10)
1. a kind of construction method of mould bag barricade, characterized by the following steps:
The first step selectes the position for building barricade;
Second step, the fixing anchor bar in the ore-rock around barricade position;
Third step, the metal binding wire on anchor pole form steel wire;
4th step cleans up barricade bottom surface, and tile first layer mould bag;
5th step fills filler into first layer mould bag, waits the filler in first layer mould bag to consolidate and completes, then first
Second layer mould bag is placed on layer mould bag, continues to fill filler to second layer mould bag, waits the filler in second layer mould bag solid
Knot is completed, then places third layer mould bag, is repeated, until blocking entire barricade region.
2. a kind of construction method of mould bag barricade according to claim 1, it is characterised in that: in third step, bound on anchor pole
Steel wire be two layers.
3. a kind of construction method of mould bag barricade according to claim 1, it is characterised in that: in third step, in steel wire
Surface covers one layer of geotextiles.
4. a kind of construction method of mould bag barricade according to claim 1, it is characterised in that: in the 5th step, the charges
For filling slurry, stowing operation is to fill extender paste into mould bag, drainage, mend slurry, drainage, waits filling slurry consolidation in mould bag
It completes.
5. a kind of mould bag barricade, it is characterised in that: including mould bag ontology, mould bag body interior fills filler, multiple mould bag sheets
Body layer stack forms barricade, which builds in soft substrate, and the ore-rock of barricade and surrounding is closely adjacent to together.
6. a kind of mould bag barricade according to claim 5, it is characterised in that: the filler is filling slurry.
7. a kind of mould bag barricade according to claim 5, it is characterised in that: the ore-rock is equipped with anchor pole.
8. a kind of mould bag barricade according to claim 7, it is characterised in that: metal binding wire net on the anchor pole, the steel wire
Net is located at the side of barricade, and the reinforcing bar net surface is equipped with geotextiles.
9. a kind of mould bag barricade according to claim 8, it is characterised in that: the soft base in side of the barricade far from steel wire
Bottom is equipped with collecting gutter.
10. a kind of mould bag barricade according to claim 8, it is characterised in that: the pine of side of the barricade far from steel wire
Mould bag is laid on flexible subserate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910830404.6A CN110439612A (en) | 2019-09-04 | 2019-09-04 | A kind of mould bag barricade and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910830404.6A CN110439612A (en) | 2019-09-04 | 2019-09-04 | A kind of mould bag barricade and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110439612A true CN110439612A (en) | 2019-11-12 |
Family
ID=68439036
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910830404.6A Pending CN110439612A (en) | 2019-09-04 | 2019-09-04 | A kind of mould bag barricade and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110439612A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110721492A (en) * | 2019-11-15 | 2020-01-24 | 中化重庆涪陵化工有限公司 | Method for plugging sulfur leakage of liquid in rectification tank |
CN112899475A (en) * | 2021-03-25 | 2021-06-04 | 长沙矿山研究院有限责任公司 | Multistage linkage collection device and method for mineral leaching liquid of metal mine dump leaching field |
CN116842623A (en) * | 2023-08-30 | 2023-10-03 | 武汉科技大学 | Method and system for calculating, analyzing and reinforcing stability of filling retaining wall |
-
2019
- 2019-09-04 CN CN201910830404.6A patent/CN110439612A/en active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110721492A (en) * | 2019-11-15 | 2020-01-24 | 中化重庆涪陵化工有限公司 | Method for plugging sulfur leakage of liquid in rectification tank |
CN112899475A (en) * | 2021-03-25 | 2021-06-04 | 长沙矿山研究院有限责任公司 | Multistage linkage collection device and method for mineral leaching liquid of metal mine dump leaching field |
CN116842623A (en) * | 2023-08-30 | 2023-10-03 | 武汉科技大学 | Method and system for calculating, analyzing and reinforcing stability of filling retaining wall |
CN116842623B (en) * | 2023-08-30 | 2023-11-10 | 武汉科技大学 | Method and system for calculating, analyzing and reinforcing stability of filling retaining wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110439612A (en) | A kind of mould bag barricade and construction method | |
CN110158389A (en) | A kind of light soil road structure and its construction method | |
CN105002927B (en) | A kind of construction method of execavated rockmass barricade loaded filter | |
CN207079638U (en) | The waterproof construction of gravity dam retaining wall retaining design high-low bay sole plate | |
CN108755319A (en) | A kind of road construction method and the road built using the engineering method | |
CN106498959A (en) | Gutter for deep overburden | |
CN204174631U (en) | A kind of foundation ditch falls the water drainage structure in dark region | |
CN210216254U (en) | Concrete guardrail structure | |
CN113073656B (en) | Soil protection structure between support piles and construction method thereof | |
CN103321258A (en) | PFF integral composite reversed filtering layer and construction method thereof | |
CN110670613B (en) | Foundation pit elevator shaft water seepage prevention structure and construction method thereof | |
CN219410355U (en) | Flexible side-width structure of high-fill embankment of existing railway | |
CN205604266U (en) | River course or construction cofferdam bank protection | |
CN105544463B (en) | A kind of construction method of geomembrane face dam composite panel | |
CN111663389A (en) | Drainage structure for soft rock filling roadbed and roadbed construction method | |
CN108894206B (en) | Sandbar sewage pipe and well anti-floating system and construction method | |
CN110424202A (en) | Border on the sea roadbed wave prevention structure and its construction method | |
CN206189430U (en) | A escape canal for deep overburden ground | |
CN113152633B (en) | Construction method of permeable structural system | |
CN105113483B (en) | A kind of cellularpiston composite water draining board and its construction method | |
CN108999053A (en) | A kind of composite assembly cement concrete pavement structure and construction method | |
CN211008743U (en) | Mould bag retaining wall | |
CN209482302U (en) | Sanitary filling field laying assembled anchor structure | |
CN210827346U (en) | Flexible frost heaving resistant and scour resistant channel protection facility | |
CN209412844U (en) | A kind of assembled resin concrete drainage ditch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |