CN110439194A - A kind of mounting structure and installation method of pseudo-classic architecture wood rafter - Google Patents

A kind of mounting structure and installation method of pseudo-classic architecture wood rafter Download PDF

Info

Publication number
CN110439194A
CN110439194A CN201910662620.4A CN201910662620A CN110439194A CN 110439194 A CN110439194 A CN 110439194A CN 201910662620 A CN201910662620 A CN 201910662620A CN 110439194 A CN110439194 A CN 110439194A
Authority
CN
China
Prior art keywords
rafter
flying
wooden
connecting hole
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910662620.4A
Other languages
Chinese (zh)
Other versions
CN110439194B (en
Inventor
刘明云
蒋涛
马金华
刘颖
杜少博
陈玉
杨琪
吴慧珏
王天慧
李茜
薛杨
刘晓辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qin Sen Gardens Shanghai Ltd Co
Original Assignee
Qin Sen Gardens Shanghai Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qin Sen Gardens Shanghai Ltd Co filed Critical Qin Sen Gardens Shanghai Ltd Co
Priority to CN201910662620.4A priority Critical patent/CN110439194B/en
Publication of CN110439194A publication Critical patent/CN110439194A/en
Application granted granted Critical
Publication of CN110439194B publication Critical patent/CN110439194B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/15Trimming strips; Edge strips; Fascias; Expansion joints for roofs
    • E04D13/158Trimming strips; Edge strips; Fascias; Expansion joints for roofs covering the overhang at the eave side, e.g. soffits, or the verge of saddle roofs

Abstract

The embodiment of the invention discloses the mounting structures and installation method of a kind of pseudo-classic architecture wood rafter.The mounting structure of pseudo-classic architecture wood rafter in the present invention, comprising: reinforced concrete member, the wooden rafter, flying-rafter, flying-rafter lattice baffle, roof boarding, connector and armored concrete roofing board;The reinforced concrete member is equipped with mounting groove, and the proximal end of the wood rafter is inserted into the mounting groove;The proximal end setting of the flying-rafter is on the upside of the wooden rafter;The flying-rafter lattice baffle is installed on the distal end of the flying-rafter;The roof boarding lid is located at the upside of the flying-rafter;One end of the connector is embedded in the armored concrete roofing board, and the other end is successively fixedly connected with the roof boarding, the flying-rafter with the wooden rafter;The armored concrete roofing board lid is located on the upside of the roof boarding, and is fixedly connected with the reinforced concrete member.By the way that the proximal end of the wooden rafter is embedded in the mounting groove, being fixedly connected for the wooden rafter and reinforced concrete member is realized.

Description

A kind of mounting structure and installation method of pseudo-classic architecture wood rafter
Technical field
The present invention relates to building engineering field more particularly to a kind of mounting structures and installation method of pseudo-classic architecture wood rafter.
Background technique
The ancient building of China is an architecture science of unique style in the world, is one in architecture Art treasure-house Bright jewel.With the development of Building technology and construction conditions and the expansion of aesthetic objects, built so that function fragrance becomes The important content of form is built, so that pseudo-classic architecture be made to rise.Rafter is installed under building roofing, flies son, is that Chinese ancient architecture is peculiar Form.
Rafter in ancient architecture is wooden, and flying-rafter main function are as follows: bear roof roof boarding and watt, flying-rafter is built in big formula Or in larger building, to increase the depth chosen and the effect for keeping tile water flow remote and beautiful.In pseudo-classic architecture, tie mostly Structure main body is concrete structure, and rafter is only used as ornamental element, plays beautiful and succession culture effect.In pseudo-classic architecture In, wooden rafter is installed, mode is generally two kinds: first is that rafter, winged son are followed closely extremely with long wire nail using electric hammer perforating It is fixed on timber;Second is that the pre-buried batten when pouring roofing concrete, fixes rafter with wire nail, flies son.
However, existing wooden rafter mounting means has the following problems: one is long construction period, is typically poured After roofing concrete, the concrete strengths such as 28 days install rafter etc. after reaching again excessively;The other is regardless of using electric hammer perforating, length Wire nail is fixed or pre-buried batten, wire nail are fixed, and due to wire nail corrosion easy to oxidize, decay of wood, rafter is caused to loosen, no Securely;Further more, exactly concrete embedded reinforcing bar is many times unsatisfactory for requiring, it has to repair even cutting just make it is wooden Rafter is installed.Problems above can undoubtedly hide security risk, drags slow project progress and then reduce construction efficiency.
Summary of the invention
The mounting structure and installation method for being designed to provide a kind of pseudo-classic architecture wood rafter of the embodiment of the present invention, solve Installation caused by existing pre-buried batten, the installation of long wire nail and electric hammer perforating, the installation of long wire nail is insecure, security risk is big, work The problem that time phase is long, construction efficiency is low, project cost is high.
The embodiment of the present invention provides a kind of mounting structure of pseudo-classic architecture wood rafter, comprising:
Reinforced concrete member, the wooden rafter, flying-rafter, flying-rafter lattice baffle, roof boarding, connector and armored concrete roofing board;
The reinforced concrete member is equipped with mounting groove, and the proximal end of the wood rafter is inserted into the mounting groove, makes the wood Rafter is fixedly connected with the reinforced concrete member;
The proximal end setting of the flying-rafter is on the upside of the wooden rafter, and the distal end of the flying-rafter overhangs out the remote of the wooden rafter End;
The flying-rafter lattice baffle plate setting has the first dovetail, flying-rafter distal end to be provided with and be adapted to first dovetail The second dovetail, first dovetail is fixedly connected with second dovetail;
The roof boarding lid is located at the upside of the flying-rafter, and the roof boarding side is butted on the flying-rafter lattice baffle, and the prestige It is concordant on the upside of the flying-rafter lattice baffle on the upside of plate;
The roof boarding, the flying-rafter are respectively arranged with the first connecting hole, the second connecting hole with the wooden rafter and connect with third Hole, one end of the connector are embedded in the armored concrete roofing board, and the other end sequentially passes through first connecting hole, institute The second connecting hole and the third connecting hole are stated, keeps the concrete roof deck, the roof boarding, the flying-rafter and the wooden rafter solid Fixed connection;
The armored concrete roofing board lid is located on the upside of the roof boarding, and is fixed and connected with the reinforced concrete member It connects.
Using above-mentioned mounting structure, the wooden rafter can be made by being embedded in the mounting groove, so realize the wooden rafter with The firm connection of reinforced concrete member makes the wooden rafter jail without being fixedly connected by for example long wire nail of other component etc. Securely determine, avoid generating loosening.
In a kind of feasible scheme, the proximal end of the wood rafter is provided with third dovetail, the third dovetail insertion In the mounting groove.
The third dovetail is set in the wooden rafter proximal end, the wooden rafter can be made to connect with the reinforced concrete member Contacting surface product increases, and prevents the wooden rafter proximal end from skidding off the mounting groove because outside is firmly excessive.
In a kind of feasible scheme, wood rafter distal end is arranged fluted, and the depth of the groove is from the wooden rafter Distal end to proximal end gradually increases;
The flying-rafter is provided with protrusion, and the protrusion is adapted with the groove of the wooden rafter, and the protrusion insertion is described recessed Slot, for being fixedly connected with the wooden rafter with the flying-rafter.
Groove and protrusion is respectively set on the wooden rafter and the flying-rafter, by the way that the protrusion is inserted into the groove, The wooden rafter can be positioned with the flying-rafter, and play obstruction when the wooden rafter and the flying-rafter position generate offset The effect of offset.
Optionally, the mounting structure further include: ball is positioned made of elastic material;
The groove is provided with the first hemispherical groove, and first hemispherical groove is symmetrically arranged in the groove Intermediate two sides position;
The protrusion is provided with the second hemispherical groove, and second hemispherical groove is symmetrically arranged in the protrusion Intermediate two sides position;
First hemispherical groove and second hemispherical groove form spherical hollow space;
The positioning ball is located in the spherical hollow space.
In the spherical hollow space setting ball is positioned made of elastic material, can it is described protrusion insertion described in After groove, further adjustment is made to the flying-rafter, so that the position of the flying-rafter meets the requirements, avoids the occurrence of the flying-rafter With the wooden rafter accurate positioning, but the undesirable situation in the flying-rafter position occurs on the whole.
Optionally, the connector is bolt;
The bolt includes: screw head, screw rod and nut;
The screw head is embedded in the concrete roof deck;
The screw rod sequentially passes through first connecting hole, second connecting hole and the third connecting hole;
The wood rafter is provided with counterbore, and the counterbore is set to the wooden one side of the rafter far from the flying-rafter, and described heavy Hole and the third connecting hole are coaxial;
The nut is located in the counterbore, and screws with the screw rod.
Use bolt as the connector, the roof boarding, the flying-rafter can be made to be fixedly connected more with the wooden rafter To be simple, and it is conveniently adjusted tightness.
Optionally, the mounting structure further include: sets of brackets on top of the columns column;
The sets of brackets on top of the columns column includes:
Pillar and the sets of brackets on top of the columns on the pillar;
The reinforced concrete member is set on the upside of the sets of brackets on top of the columns column.
Support construction using sets of brackets on top of the columns column as the concrete component can not only play a supporting role, but also can make to build Build the whole style for more meeting Chinese ancient architecture.
The present invention also provides a kind of installation methods of pseudo-classic architecture wood rafter, comprising:
S1, wooden rafter, flying-rafter, flying-rafter lattice baffle, roof boarding, connector, concrete fill, reinforced concrete member reinforcing bar are provided Cage, armored concrete roofing board steel reinforcement cage, reinforced concrete member mold and armored concrete roof board mold;The flying-rafter Distal end is provided with the first dovetail, and the flying-rafter lattice baffle plate setting has the second dovetail being adapted to first dovetail;Institute It states roof boarding, the flying-rafter and the wooden rafter and is respectively arranged with the first connecting hole, the second connecting hole and third connecting hole;
S2, the proximal end of the wooden rafter is inserted into the mounting groove of the reinforced concrete member steel reinforcement cage and is fixed;
S3, second dovetail that second dovetail of the flying-rafter is inserted into the flying-rafter lattice baffle, make institute Flying-rafter is stated to be fixedly connected with the flying-rafter lattice baffle;
S4, the connector is sequentially passed through to first connecting hole, second connecting hole and the third connecting hole, The flying-rafter, the roof boarding and the wooden rafter are fixedly connected;
S5, the armored concrete roofing board steel reinforcement cage lid is located on the upside of the roof boarding, and keeps the connector close One end of the roof boarding and the reinforced concrete member steel reinforcement cage are fixed with the armored concrete roofing board steel reinforcement cage respectively Connection;
S6, armored concrete roof board mold is installed on the outside of the armored concrete roofing board steel reinforcement cage, shape At the first cavity for pouring the armored concrete roofing board;The reinforced concrete member mold is installed on the steel On the outside of reinforced concrete member reinforcing steel bar cage, the second cavity for pouring the reinforced concrete member is formed, and described first is empty Chamber and second cavity perforation;
S7, concreting in first cavity and second cavity and is solidified;
S8, armored concrete roof board mold and the reinforced concrete member mold are removed.
Using above-mentioned installation method, so that the proximal end of the wood rafter is embedded in the peace of the concrete member steel bar cage In tankage, by concreting, solidification, it is firmly combined between the concrete component together, avoids the occurrence of loosening etc. Phenomenon;Simultaneously as the wood rafter, the flying-rafter, the flying-rafter lattice baffle and the roof boarding are installed on the armored concrete Before component and the armored concrete roofing board casting concrete, reduces difficulty of construction, shortens construction period.
In a kind of feasible scheme, the connector is bolt, and the bolt includes: screw head, screw rod and nut;
The wood rafter is provided with counterbore, and the nut is located in the counterbore;
And in the step S4, specifically further include:
S401, the armored concrete roofing board steel reinforcement cage is mounted on by the screw head crotch, and by the crotch;
S402, the screw rod is sequentially inserted into first connecting hole, second connecting hole and the third connecting hole, With the nut screwing being located in the counterbore;
S403, the crotch and the armored concrete roofing board steel reinforcement cage are welded together.
Using bolt as the connector, by the head crotch of the screw rod of the bolt and it is welded in the reinforcing bar On concrete roof deck steel reinforcement cage, on the one hand, so that the wood rafter, the flying-rafter are directly fixedly connected more with the roof boarding Fastening, while certain supporting role is played, on the other hand, bolt is easily installed and dismantles, can be in subsequent use process The bolt is adjusted as needed.
In a kind of feasible scheme, wood rafter distal end is arranged fluted, and the depth of the groove is from the wooden rafter Distal end to proximal end gradually increases;
The flying-rafter is provided with protrusion, and the protrusion is adapted with the groove of the wooden rafter, and the protrusion insertion is described recessed Slot, for being fixedly connected with the wooden rafter with the flying-rafter;
And in the step S4, specifically further include:
S401, will the flying-rafter the protrusion insertion wooden rafter groove in;
S402, it the connector is sequentially passed through to first connecting hole, second connecting hole is connected with the third Hole is fixedly connected the flying-rafter, the roof boarding and the wooden rafter.
The protrusion is set on the flying-rafter, and the protrusion is inserted in the groove being arranged with the wooden rafter, it can Play the role of fixed, limit with the connection to the flying-rafter and the wooden rafter, at the same the flying-rafter and the wood rafter because by When power or deformation generate displacement, certain inhibition is played.
In a kind of feasible scheme, the groove of the wood rafter is provided with the first hemispherical groove, and described the first half Spherical groove is symmetrically arranged the two sides position among the groove;
The protrusion of the flying-rafter is provided with the second hemispherical groove, and second hemispherical groove is symmetrically arranged In protrusion intermediate two sides position;
First hemispherical groove and second hemispherical groove form spherical hollow space;
Positioning ball is made by elastic material, and the positioning ball is located in the spherical hollow space;
And in the step S4, specifically further include:
S401, the positioning ball is softened;
S402, when the positioning ball is in soft state, the protrusion is inserted into the groove, keeps the positioning ball In the spherical hollow space;
S403, the positioning ball hardening before, adjust the position of the flying-rafter;
S404, it the connector is sequentially passed through to first connecting hole, second connecting hole is connected with the third Hole is fixedly connected the flying-rafter, the roof boarding and the wooden rafter.
The spherical hollow space and the positioning ball, Ke Yi is arranged in position among the two sides of the protrusion and the groove The cooperation of the flying-rafter and the wooden rafter through the protrusion and the groove and after positioning, to the flying-rafter and the wood rafter Further adjustment is made in position, so that the position of the flying-rafter meets certain requirement on the whole.
Based on above scheme it is found that the present invention is by being directly embedded into the reinforced concrete member reinforcing bar for the wooden rafter In cage, then by processes such as concreting, solidifications, so that the wood rafter and armored concrete firm connection, no longer need The possibility wanted for example long wire nail of other component etc. to carry out secondary fixation, and then loosened caused by avoiding because of oxidation of the component etc., And due to the installation of the wooden rafter, the flying-rafter, the flying-rafter lattice baffle and the roof boarding, it is in concreting, solidifies it Before, can effectively shorten construction period, improve construction efficiency, and then reduce project cost.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is this hair Bright some embodiments for those of ordinary skill in the art without any creative labor, can be with It obtains other drawings based on these drawings.
Fig. 1 is the mounting structure signal of the wooden rafter in the embodiment of the present invention one;
Fig. 2 is the mounting structure schematic diagram of the wooden rafter and reinforced concrete member in the embodiment of the present invention one;
Fig. 3 be the embodiment of the present invention one in the wooden rafter, flying-rafter and roof boarding structural schematic diagram;
Fig. 4 be the embodiment of the present invention one in the wooden rafter, flying-rafter and roof boarding mounting structure schematic diagram;
Fig. 5 is the structural schematic diagram of the flying-rafter in the embodiment of the present invention one;
Fig. 6 is the structural schematic diagram of the flying-rafter lattice baffle in the embodiment of the present invention one;
Fig. 7 is the partial enlarged view of the wooden rafter mounting structure in the embodiment of the present invention one;
Fig. 8 is that the sets of brackets on top of the columns column in the embodiment of the present invention one supports schematic diagram;
Fig. 9 is the flow chart of the installation method of the pseudo-classic architecture wood rafter in the embodiment of the present invention two.
Figure label:
1, reinforced concrete member;101, reinforced concrete member steel reinforcement cage;102, mounting groove;103, armored concrete structure Part mold;104, the steel reinforcement cage of the connecting portion of reinforced concrete member steel reinforcement cage and armored concrete roofing board steel reinforcement cage;2, The wooden rafter;201, third dovetail;202, third connecting hole;203, groove;204, counterbore;3, flying-rafter;301, the second connecting hole; 302, raised;4, roof boarding;401, the first connecting hole;5, flying-rafter lattice baffle;6, armored concrete roofing board;601, armored concrete Roofing board steel reinforcement cage;7, bolt;701, nut;702, screw rod;703, screw head;8, sets of brackets on top of the columns column;801, sets of brackets on top of the columns;802, column Son.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art Every other embodiment obtained without creative efforts, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that, term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside", " axial direction ", " radial direction ", " circumferential direction " etc. The orientation or positional relationship of instruction is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of the description present invention and letter Change description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with specific orientation construct and Operation, therefore be not considered as limiting the invention.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc. Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, and be also possible to integral;It can be Mechanical connection, is also possible to be electrically connected, is also possible to communication connection;It can be and be directly connected to, intermediary can also be passed through It is indirectly connected with, can be the connection inside two elements or the interaction relationship of two elements, unless otherwise restricted clearly. For the ordinary skill in the art, can understand as the case may be above-mentioned term in the present invention specifically contain Justice.
Technical solution of the present invention is described in detail with specifically embodiment below.These specific implementations below Example can be combined with each other, and the same or similar concept or process may be repeated no more in some embodiments.
Embodiment one
The purpose of the present embodiment is that providing a kind of mounting structure of pseudo-classic architecture wood rafter, make the wooden rafter in concrete structure It is more firmly mounted, while shortening the construction period, reducing cost.
Fig. 1 is the mounting structure signal of the wooden rafter in the embodiment of the present invention one, and Fig. 2 is the wooden rafter in the embodiment of the present invention one With the mounting structure schematic diagram of reinforced concrete member, Fig. 3 be the embodiment of the present invention one in the wooden rafter, flying-rafter and roof boarding structure Schematic diagram, Fig. 4 are the mounting structure schematic diagram of the wooden rafter, flying-rafter and roof boarding in the embodiment of the present invention one, and Fig. 5 is that the present invention is implemented The structural schematic diagram of flying-rafter in example one, Fig. 6 are the structural schematic diagram of the flying-rafter lattice baffle in the embodiment of the present invention one, and Fig. 7 is The partial enlarged view of the wooden rafter mounting structure in the embodiment of the present invention one, Fig. 8 are the sets of brackets on top of the columns column support in the embodiment of the present invention one Schematic diagram.
As shown in Figure 1, the mounting structure of pseudo-classic architecture wood rafter in the present embodiment includes: reinforced concrete member 1, wood Rafter 2, flying-rafter 3, flying-rafter lattice baffle 5, roof boarding 4, connector and armored concrete roofing board 6.Wooden rafter 2 is close to reinforced concrete member 1 one end is proximal end, and one end far from reinforced concrete member 1 is distal end.Flying-rafter 2 is close to one end of reinforced concrete member 1 For proximal end, one end far from reinforced concrete member 1 is distal end.
As shown in Fig. 2, reinforced concrete member 1 includes reinforced concrete member steel reinforcement cage 101 and mounting groove 102.The wooden rafter 2 Proximal end be inserted into mounting groove 102, be embedded in reinforced concrete member 1, and connect by the way that concrete and rebar concrete component 1 is fixed It connects.
As shown in figure 3, the wooden rafter 2 is provided with third connecting hole 202, flying-rafter 3 is provided with the second connecting hole 301, and roof boarding 4 is arranged There is the first connecting hole 401.As shown in Figure 1, Figure 7 shows, it is preferable that connector is bolt 7.Bolt 7 includes screw head 703, screw rod 702 and nut 701, and 703 crotch of screw head and clasp joint are in the steel reinforcement cage 601 of armored concrete roofing board 6.The spiral shell of bolt 7 The other end of bar 702 sequentially passes through the first connecting hole 401, the second connecting hole 301 and third connecting hole 202, to the wooden rafter 2, flying-rafter 3, roof boarding 4 serves with armored concrete roofing board 6 and is fixedly connected.Preferably, the wooden rafter 2 is at the position matched with nut 701 It is provided with counterbore 204, nut 701 and screw rod are located in counterbore 204 after screwing, both nut 701 can be positioned and be protected Shield, can also increase the aesthetic effect of building.
As shown in Figure 5, Figure 6, the distal end of flying-rafter 3 is provided with the second dovetail 303, flying-rafter lattice baffle 5 is provided with the first swallow Tail tenon 503.First dovetail 503 of flying-rafter lattice baffle 5 is inserted in the second dovetail 303 of flying-rafter 3, make flying-rafter lattice baffle 5 with Flying-rafter 3 is fixedly connected.
As shown in fig. 7, roof boarding 4 covers the upside for being located at flying-rafter 3,4 side of roof boarding is butted on flying-rafter lattice baffle 5, and 4 upside of roof boarding It is concordant with 3 upside of flying-rafter lattice baffle.
As shown in Fig. 2, Fig. 7, the lid of armored concrete roofing board 6 is located at 4 upside of roof boarding, and connects with reinforced concrete member 1 It connects, and the steel reinforcement cage of 1 connecting portion of armored concrete roofing board 6 and reinforced concrete member is 104.
Through the above it is not difficult to find that the wooden rafter 2 is by being not necessarily to the mounting groove of proximal end insertion reinforced concrete member 1 Other such as long wire nails are reused to carry out secondary fixations the wooden rafter 2 can be realized being fixedly connected with reinforced concrete member 1.This peace Assembling structure is simple, secured, simultaneously because the package of concrete structure, can effectively avoid rotting for the wooden rafter, extend making for the wooden rafter Use the time limit.
Optionally, in the present embodiment, as shown in Figure 3, Figure 4, the wooden rafter 2 is additionally provided with third dovetail 201.Third dovetail Tenon 201 is embedded in reinforced concrete member 1, increases the contact area of the proximal end of reinforced concrete member 1 and the wooden rafter 2, into And it increases and effect is fixedly connected to the wooden rafter 2.
Optionally, in the present embodiment, as shown in fig. 7, the mounting structure of the pseudo-classic architecture wood rafter in the present embodiment also wraps Include sets of brackets on top of the columns column 8.Sets of brackets on top of the columns column 8 includes sets of brackets on top of the columns 801 and pillar 802, and reinforced concrete member 1 is located at 8 upside of sets of brackets on top of the columns column.Sets of brackets on top of the columns column 8 Support fixed function, while representative structure of the sets of brackets on top of the columns structure as Chinese ancient architecture are played to reinforced concrete member 1, had rich Rich aesthetic values, also increase the artistic value of the mounting structure of the pseudo-classic architecture wood rafter in the present embodiment.
Optionally, in the present embodiment, as shown in figure 4, fluted 203, flying-rafter 3, which is arranged, in the wooden rafter 2 is provided with protrusion 302. The depth of groove 203 is gradually increased from the distal end of the wooden rafter to proximal end, and protrusion 302 is matched with groove 203, to the wooden rafter 2 and flying-rafter 3 Play the role of limiting and be fixedly connected.Roof boarding, flying-rafter and the wooden rafter are consolidated in raised 302,7 collective effect of groove 203 and bolt Fixed connection.
Optionally, in addition, the first hemispherical groove, the setting of the intermediate two sides of groove 203 are provided among the two sides of protrusion 302 There is the second hemispherical groove, positioning ball is located at the first hemispherical groove made of elastic material and the second hemispherical groove is constituted Spherical hollow space in.Positioning ball can after installing flying-rafter and the wooden rafter, if the position of flying-rafter and wood rafter need to carry out it is micro- It adjusts, then can play the role of buffering, positioning and fixation.
Embodiment two
The purpose of the present embodiment is to provide a kind of installation method of pseudo-classic architecture wood rafter, as shown in figure 9, including following step It is rapid:
S1, wooden rafter, flying-rafter, flying-rafter lattice baffle, roof boarding, connector, concrete fill, reinforced concrete member reinforcing bar are provided Cage, armored concrete roofing board steel reinforcement cage, reinforced concrete member mold and armored concrete roof board mold;The flying-rafter Distal end is provided with the first dovetail, and the flying-rafter lattice baffle plate setting has the second dovetail being adapted to first dovetail;Institute It states roof boarding, the flying-rafter and the wooden rafter and is respectively arranged with the first connecting hole, the second connecting hole and third connecting hole.
In step S1, the various assemblies such as wooden rafter, flying-rafter when the installation of pseudo-classic architecture wood rafter are provided, is additionally provided Concrete fill etc., is ready work.It should be strongly noted that flying-rafter lattice baffle is matched with roof boarding place into Row measurement, and it is perfect to cooperate flying-rafter lattice baffle and roof boarding, so that flying-rafter lattice baffle is matched after flying-rafter lattice baffle and roof boarding installation Height at conjunction is consistent with the thickness of roof boarding.
S2, the proximal end of the wooden rafter is inserted into the mounting groove of the reinforced concrete member steel reinforcement cage and is fixed.
In S2, the proximal end of the wooden rafter is inserted into the mounting groove of reinforcing bar armored concrete member reinforcing steel bar cage, and make the wooden rafter Proximal end is fixedly connected with the reinforcing bar of steel reinforcement cage, and a kind of possible mode being fixedly connected tightens for steel wire.
S3, second dovetail that second dovetail of the flying-rafter is inserted into the flying-rafter lattice baffle, make institute Flying-rafter is stated to be fixedly connected with the flying-rafter lattice baffle.
In step s3, the second dovetail is mutually adapted with the first dovetail, and the second dovetail is inserted into the first dovetail, It is fixedly connected with the second dovetail with the first dovetail.A kind of possible mode is to smear the second dovetail matching part viscous Glue, and it is inserted into the first dovetail, after viscose glue solidification, the second dovetail is made to be fixedly connected more firm with the first dovetail Gu.
S4, the connector is sequentially passed through to first connecting hole, second connecting hole and the third connecting hole, The roof boarding, the flying-rafter and the wooden rafter are fixedly connected.
In step s 4, connector one end sequentially passes through roof boarding, flying-rafter and the wooden rafter, consolidates to roof boarding, flying-rafter and the wooden rafter It is fixed.A kind of possible mode is that connector is bolt, by the screw head crotch of bolt, and nut is screwed.
S5, the armored concrete roofing board steel reinforcement cage lid is located on the upside of the roof boarding, and keeps the connector close One end of the roof boarding and the reinforced concrete member steel reinforcement cage are fixed with the armored concrete roofing board steel reinforcement cage respectively Connection.
In step s 5, reinforced concrete member steel reinforcement cage is bound first and is completed, then by armored concrete roof slab Muscle cage lid is located on the upside of roof boarding and binds completion, then by reinforced concrete member steel reinforcement cage and armored concrete roofing board reinforcing bar Cage connects, and connecting portion still binds into steel reinforcement cage, makes reinforced concrete member steel reinforcement cage and armored concrete roof slab Muscle cage is fixedly connected.
S6, armored concrete roof board mold is installed on the outside of the armored concrete roofing board steel reinforcement cage, shape At the first cavity for pouring the armored concrete roofing board;The reinforced concrete member mold is installed on the steel On the outside of reinforced concrete member reinforcing steel bar cage, the second cavity for pouring the reinforced concrete member is formed, and described first is empty Chamber and second cavity perforation.
S7, concreting in first cavity and second cavity and is solidified.
In step S6, S7, firstly, respectively by reinforced concrete member steel reinforcement cage and armored concrete roofing board steel reinforcement cage It is installed with corresponding mold, is respectively formed cavity, and the first cavity being respectively formed and the second cavity will penetrate through, so that mixed Solidifying soil is known as one in the first cavity and the second cavity, increases reinforced concrete member and connects with armored concrete roofing board Firmness.
Secondly, to pass through certain curing time after concreting, it should be according to the property of concrete within curing time Carry out necessary maintenance.
S8, armored concrete roof board mold and the reinforced concrete member mold are removed.
In step s 8, after concrete reaches requirement, related die is removed.
Above-mentioned steps are used to realize the wooden rafter, flying-rafter, flying-rafter lattice baffle, roof boarding, connector, reinforced concrete member and steel The installation of reinforced concrete roofing board, on the one hand, the wooden rafter can be made to be fixedly connected with reinforced concrete member, avoid reusing it For example long wire nail of his accessory is attached, and on the other hand, it is difficult to install to also avoid the wooden rafter for occurring occurring in existing mounting means And the underproof problem in position, namely first poured reinforced concrete member, the wooden rafter is installed again, caused reinforcing bar is because of concrete Extruding and construction technology and deform, shift, and then the problems such as make the wooden rafter that can not install or offset is installed.Meanwhile in this reality It applies in example, since the installation of the wooden rafter etc. is may not necessarily to wait until concreting, cured mistake in this way before concreting Journey, so that it may which the installation for carrying out wooden rafter etc. in advance can shorten the construction period, speed up the work, effectively improve engineering efficiency.
Preferably, when being fixedly connected to the wooden rafter and flying-rafter, in order to increase the degree of cooperation of the wooden rafter and flying-rafter, and Facilitate installation, following improvement can be used: in wooden rafter distal end setting groove, the depth of groove from the distal end of the wooden rafter to proximal end gradually Increase;In the cooperation position of flying-rafter, protrusion is set, the raised groove with the wooden rafter is adapted, protrusion is inserted into aforementioned grooves, For being fixedly connected with the wooden rafter with the flying-rafter.Meanwhile in the step S4 in corresponding the present embodiment, can specifically it use Following steps:
S401, will the flying-rafter the protrusion insertion wooden rafter groove in;
S402, it the connector is sequentially passed through to first connecting hole, second connecting hole is connected with the third Hole is fixedly connected the flying-rafter, the roof boarding and the wooden rafter.
By the cooperation of above-mentioned groove and protrusion, the installation of the wooden rafter and flying-rafter can be made more convenient, and after mounting, by In the presence of protrusion and groove, the position of the wooden rafter and flying-rafter can be made to avoid shifting, and then the wooden rafter is hindered to be sent out with flying-rafter Raw deformation improves the service life of the wooden structures in archaized architecture.
It preferably,, can be to the position of flying-rafter in order to make in installation process when being fixedly connected to the wooden rafter and flying-rafter It is finely adjusted, so that the position that flying-rafter is presented on the whole meets certain requirement and is finely adjusted to flying-rafter, also acts as simultaneously Certain positioning action can take following improvement on the basis of measures first mentioned: be arranged at the intermediate two sides position of the groove First hemispherical groove, the second hemispherical groove, first hemispherical groove is arranged in position among the two sides of the protrusion Spherical hollow space is formed with second hemispherical groove;Positioning ball is made by elastic material again, and the positioning ball is placed in institute It states in spherical hollow space.And in abovementioned steps S4, following improve is carried out:
S401, the positioning ball is softened.The temperature of positioning ball softening, time are determined according to material property.
S402, when the positioning ball is in soft state, the protrusion is inserted into the groove, keeps the positioning ball In the spherical hollow space.A kind of possible mode is, first heating and softening on one side to positioning ball, in positioning ball one After thin-skinnedization, the softening face of the positioning ball is sticked in the second hemispherical groove of protrusion with viscose glue, and by flying-rafter and positions ball It heats together.When the entirety of ball to be positioned is softened to a certain extent, it will be inserted into wood rafter with the flying-rafter of positioning ball, and be guaranteed at The positioning ball of soft state is located in the spherical hollow space.
S403, the positioning ball hardening before, adjust the position of the flying-rafter.When positioning ball is placed into spherical hollow space Afterwards, the position of flying-rafter is finely adjusted, so that the position of flying-rafter on the whole meets certain requirement, and keeps the position, until Position ball hardening.
S404, it the connector is sequentially passed through to first connecting hole, second connecting hole is connected with the third Hole is fixedly connected the flying-rafter, the roof boarding and the wooden rafter.
After positioning ball hardening, positioning action is played, the installation of part can be attached, is successively worn using connector The corresponding connecting hole for crossing roof boarding, flying-rafter and the wooden rafter, is fixedly connected it.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (10)

1. a kind of mounting structure of pseudo-classic architecture wood rafter characterized by comprising reinforced concrete member, flying-rafter, flies at the wooden rafter Rafter lattice baffle, roof boarding, connector and armored concrete roofing board;
The reinforced concrete member is equipped with mounting groove, and the proximal end of the wood rafter is inserted into the mounting groove, make the wooden rafter with The reinforced concrete member is fixedly connected;
The proximal end setting of the flying-rafter is on the upside of the wooden rafter, and the distal end of the flying-rafter overhangs out the distal end of the wooden rafter;
The flying-rafter lattice baffle plate setting has the first dovetail, flying-rafter distal end to be provided with the be adapted to first dovetail Two dovetails, first dovetail are fixedly connected with second dovetail;
The roof boarding lid is located at the upside of the flying-rafter, and the roof boarding side is butted on the flying-rafter lattice baffle, and on the roof boarding Side is concordant on the upside of the flying-rafter lattice baffle;
The roof boarding, the flying-rafter and the wooden rafter are respectively arranged with the first connecting hole, the second connecting hole and third connecting hole, institute The one end for stating connector is embedded in the armored concrete roofing board, and the other end sequentially passes through first connecting hole, described Two connecting holes and the third connecting hole make the concrete roof deck, the roof boarding, the flying-rafter and the fixed company of the wooden rafter It connects;
The armored concrete roofing board lid is located on the upside of the roof boarding, and is fixedly connected with the reinforced concrete member.
2. mounting structure according to claim 1, which is characterized in that the proximal end of the wood rafter is provided with third dovetail, The third dovetail is embedded in the mounting groove.
3. mounting structure according to claim 1, which is characterized in that fluted, the groove is arranged in wood rafter distal end Depth gradually increased from distal end to the proximal end of the wooden rafter;
The flying-rafter is provided with protrusion, and the protrusion is adapted with the groove of the wooden rafter, and the protrusion is inserted into the groove, uses In being fixedly connected with the wooden rafter with the flying-rafter.
4. mounting structure according to claim 3, which is characterized in that further include: ball is positioned made of elastic material;
The groove is provided with the first hemispherical groove, and first hemispherical groove is symmetrically arranged among the groove Two sides position;
The protrusion is provided with the second hemispherical groove, and second hemispherical groove is symmetrically arranged intermediate in the protrusion Two sides position;
First hemispherical groove and second hemispherical groove form spherical hollow space;
The positioning ball is located in the spherical hollow space.
5. mounting structure according to claim 1, which is characterized in that the connector is bolt;
The bolt includes: screw head, screw rod and nut;
The screw head is embedded in the concrete roof deck;
The screw rod sequentially passes through first connecting hole, second connecting hole and the third connecting hole;
The wood rafter is provided with counterbore, and the counterbore is set to the wooden one side of the rafter far from the flying-rafter, and the counterbore with The third connecting hole is coaxial;
The nut is located in the counterbore, and screws with the screw rod.
6. mounting structure according to claim 1, which is characterized in that further include: sets of brackets on top of the columns column;
The sets of brackets on top of the columns column includes: pillar and the sets of brackets on top of the columns on the pillar;
The reinforced concrete member is set on the upside of the sets of brackets on top of the columns column.
7. a kind of installation method of pseudo-classic architecture wood rafter characterized by comprising
S1, provide the wooden rafter, flying-rafter, flying-rafter lattice baffle, roof boarding, connector, concrete fill, reinforced concrete member steel reinforcement cage, Armored concrete roofing board steel reinforcement cage, reinforced concrete member mold and armored concrete roof board mold;The flying-rafter it is remote End is provided with the first dovetail, and the flying-rafter lattice baffle plate setting has the second dovetail being adapted to first dovetail;It is described Roof boarding, the flying-rafter and the wooden rafter are respectively arranged with the first connecting hole, the second connecting hole and third connecting hole;
S2, the proximal end of the wooden rafter is inserted into the mounting groove of the reinforced concrete member steel reinforcement cage and is fixed;
S3, second dovetail that second dovetail of the flying-rafter is inserted into the flying-rafter lattice baffle make described fly Rafter is fixedly connected with the flying-rafter lattice baffle;
S4, the connector is sequentially passed through to first connecting hole, second connecting hole and the third connecting hole, to institute Flying-rafter, the roof boarding and the wooden rafter is stated to be fixedly connected;
S5, the armored concrete roofing board steel reinforcement cage lid is located on the upside of the roof boarding, and makes the connector close to described One end of roof boarding and the reinforced concrete member steel reinforcement cage are fixedly connected with the armored concrete roofing board steel reinforcement cage respectively;
S6, armored concrete roof board mold is installed on the outside of the armored concrete roofing board steel reinforcement cage, is formed and is used In the first cavity for pouring the armored concrete roofing board;The reinforced concrete member mold is installed on the reinforcing bar to mix On the outside of solidifying soil member reinforcing steel bar cage, forms the second cavity for pouring the reinforced concrete member, and first cavity with The second cavity perforation;
S7, concreting in first cavity and second cavity and is solidified;
S8, armored concrete roof board mold and the reinforced concrete member mold are removed.
8. according to installation method as claimed in claim 7, which is characterized in that the connector is bolt, and the bolt includes: screw rod Head, screw rod and nut;
The wood rafter is provided with counterbore, and the nut is located in the counterbore;
And in the step S4, specifically further include:
S401, the armored concrete roofing board steel reinforcement cage is mounted on by the screw head crotch, and by the crotch;
S402, the screw rod is sequentially inserted into first connecting hole, second connecting hole and the third connecting hole, with position The nut screwing in the counterbore;
S403, the crotch and the armored concrete roofing board steel reinforcement cage are welded together.
9. according to installation method as claimed in claim 7, which is characterized in that it is described wood rafter distal end be arranged it is fluted, the groove Depth is gradually increased from distal end to the proximal end of the wooden rafter;
The flying-rafter is provided with protrusion, and the protrusion is adapted with the groove of the wooden rafter, and the protrusion is inserted into the groove, uses In being fixedly connected with the wooden rafter with the flying-rafter;
And in the step S4, specifically further include:
S401, will the flying-rafter the protrusion insertion wooden rafter groove in;
S402, the connector is sequentially passed through to first connecting hole, second connecting hole and the third connecting hole, it is right The flying-rafter, the roof boarding and the wooden rafter are fixedly connected.
10. according to installation method as claimed in claim 9, which is characterized in that the groove of the wood rafter is provided with the first hemisphere Connected in star, first hemispherical groove are symmetrically arranged the two sides position among the groove;
The protrusion of the flying-rafter is provided with the second hemispherical groove, and second hemispherical groove is symmetrically arranged in institute State two sides position among protrusion;
First hemispherical groove and second hemispherical groove form spherical hollow space;
Positioning ball is made by elastic material, and the positioning ball is located in the spherical hollow space;
And in the step S4, specifically further include:
S401, the positioning ball is softened;
S402, when the positioning ball is in soft state, the protrusion is inserted into the groove, the positioning ball is kept to be located at In the spherical hollow space;
S403, the positioning ball hardening before, adjust the position of the flying-rafter;
S404, the connector is sequentially passed through to first connecting hole, second connecting hole and the third connecting hole, it is right The flying-rafter, the roof boarding and the wooden rafter are fixedly connected.
CN201910662620.4A 2019-07-22 2019-07-22 Mounting structure and mounting method of wood rafters of antique building Active CN110439194B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910662620.4A CN110439194B (en) 2019-07-22 2019-07-22 Mounting structure and mounting method of wood rafters of antique building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910662620.4A CN110439194B (en) 2019-07-22 2019-07-22 Mounting structure and mounting method of wood rafters of antique building

Publications (2)

Publication Number Publication Date
CN110439194A true CN110439194A (en) 2019-11-12
CN110439194B CN110439194B (en) 2021-10-08

Family

ID=68431038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910662620.4A Active CN110439194B (en) 2019-07-22 2019-07-22 Mounting structure and mounting method of wood rafters of antique building

Country Status (1)

Country Link
CN (1) CN110439194B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4183085B2 (en) * 2003-12-22 2008-11-19 積水ハウス株式会社 Eaves structure with ventilation function
CN103195214A (en) * 2013-04-24 2013-07-10 北京城建亚泰建设集团有限公司 Wood roof cornice decking and concrete composite structure in archaized buildings and construction method thereof
CN103216050A (en) * 2013-05-08 2013-07-24 内蒙古兴泰建筑有限责任公司 Construction method for mounting eave rafters of antique buildings
CN203782997U (en) * 2014-02-20 2014-08-20 中国建筑第八工程局有限公司 Pseudo-classic architecture rafter structure
CN204343563U (en) * 2014-12-12 2015-05-20 苏州规划设计研究院股份有限公司 The building in the style of the ancients cornice node that a kind of wooden construction is combined with concrete structure
CN105927674A (en) * 2016-06-22 2016-09-07 朱德伟 Spherical hinge transmission shaft
CN205857553U (en) * 2016-06-22 2017-01-04 南京园林建设总公司 A kind of building in the style of the ancients roofing eave rafter is hoped
CN207260320U (en) * 2017-09-30 2018-04-20 南京市园林规划设计院有限责任公司 A kind of pseudo-classic architecture verandah structure
CN208088623U (en) * 2018-04-04 2018-11-13 苏州规划设计研究院股份有限公司 The outer eaves structure of pseudo-classic architecture element
CN109138150A (en) * 2018-10-22 2019-01-04 绍兴市园林建设有限公司 A kind of archaized building structure and its manufacturing method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4183085B2 (en) * 2003-12-22 2008-11-19 積水ハウス株式会社 Eaves structure with ventilation function
CN103195214A (en) * 2013-04-24 2013-07-10 北京城建亚泰建设集团有限公司 Wood roof cornice decking and concrete composite structure in archaized buildings and construction method thereof
CN103216050A (en) * 2013-05-08 2013-07-24 内蒙古兴泰建筑有限责任公司 Construction method for mounting eave rafters of antique buildings
CN203782997U (en) * 2014-02-20 2014-08-20 中国建筑第八工程局有限公司 Pseudo-classic architecture rafter structure
CN204343563U (en) * 2014-12-12 2015-05-20 苏州规划设计研究院股份有限公司 The building in the style of the ancients cornice node that a kind of wooden construction is combined with concrete structure
CN105927674A (en) * 2016-06-22 2016-09-07 朱德伟 Spherical hinge transmission shaft
CN205857553U (en) * 2016-06-22 2017-01-04 南京园林建设总公司 A kind of building in the style of the ancients roofing eave rafter is hoped
CN207260320U (en) * 2017-09-30 2018-04-20 南京市园林规划设计院有限责任公司 A kind of pseudo-classic architecture verandah structure
CN208088623U (en) * 2018-04-04 2018-11-13 苏州规划设计研究院股份有限公司 The outer eaves structure of pseudo-classic architecture element
CN109138150A (en) * 2018-10-22 2019-01-04 绍兴市园林建设有限公司 A kind of archaized building structure and its manufacturing method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
马相楠 等: "仿古建筑中混凝土柱与木梁连接技术研究", 《施工技术》 *

Also Published As

Publication number Publication date
CN110439194B (en) 2021-10-08

Similar Documents

Publication Publication Date Title
CN108590166B (en) Assembled cast-in-place concrete shear wall template system
CN102003069A (en) Construction method and pouring device for framework masonry infill wall structure
EP2261430B1 (en) Constructing an overhang
CN211257804U (en) Novel vertical concrete vibration thermoregulation template
CN110439194A (en) A kind of mounting structure and installation method of pseudo-classic architecture wood rafter
CN208586892U (en) Assembled steel skeleton template
JP2010138614A (en) Panel used as form, and construction structure and construction method of concrete wall using the same
CN106758563B (en) Sleeper construction and construction method for non-fragment orbit linking new and old concrete
CN206110331U (en) Prefabricated assembly building of lightweight steel construction lightweight concrete
CN105422140B (en) Erecting device is used in the construction of well lane engineering concrete support
CN112343243B (en) ALC light partition board, manufacturing method thereof and assembled wall body
CN105442628B (en) Construction method for cantilever foundation side wall heavy embedded part
CN209538423U (en) Exterior wall pours heat insulation formwork
CN202164555U (en) Bottom support of concrete box culvert template bracket post
CN207419714U (en) A kind of new fixed steel tie bar embedded part steel plate structure
KR100850230B1 (en) A standing type sleeve structure and installing method thereof
CN214785432U (en) Extruded polystyrene board for roof insulation
CN205476469U (en) Two -sided clear water inclined wall large -span opening in a wall template system
CN113530230B (en) Disposable concrete formwork connecting system based on split screw
KR100398707B1 (en) A method of executing a building using an iron reinforcing rod
CN216948932U (en) Prefabricated concrete dismantling-free hollow wall with built-in back edges
CN209649020U (en) It is a kind of to position framed and framed comprising positioning vertical die
CN108822876A (en) Coke oven divides flue bent pipe construction method of installation and dedicated wooden box
JP3159996B2 (en) Precast beam fixing structure
JPH0734534A (en) Prefabricated structure for reinforced concrete-made offset beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant