CN103195214A - Wood roof cornice decking and concrete composite structure in archaized buildings and construction method thereof - Google Patents

Wood roof cornice decking and concrete composite structure in archaized buildings and construction method thereof Download PDF

Info

Publication number
CN103195214A
CN103195214A CN2013101435326A CN201310143532A CN103195214A CN 103195214 A CN103195214 A CN 103195214A CN 2013101435326 A CN2013101435326 A CN 2013101435326A CN 201310143532 A CN201310143532 A CN 201310143532A CN 103195214 A CN103195214 A CN 103195214A
Authority
CN
China
Prior art keywords
eave
rafter
reinforced concrete
fitting
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101435326A
Other languages
Chinese (zh)
Other versions
CN103195214B (en
Inventor
崔晨
赵坤
石律
师晓磊
党明
屈秉权
向少波
田颖南
李妍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Yatai Group Co Ltd
Original Assignee
Beijing Urban Construction Yatai Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Yatai Group Co Ltd filed Critical Beijing Urban Construction Yatai Group Co Ltd
Priority to CN201310143532.6A priority Critical patent/CN103195214B/en
Publication of CN103195214A publication Critical patent/CN103195214A/en
Application granted granted Critical
Publication of CN103195214B publication Critical patent/CN103195214B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

Disclosed are a wood roof cornice decking and concrete composite structure in archaized buildings and a construction method thereof. The wood roof cornice decking and concrete composite structure comprises a reinforced concrete roof deck, rafters and plank sheathing, wherein the rafters and the plank sheathing are disposed on the reinforced concrete roof deck. The front end of the reinforced concrete roof deck only extends to purlins. A stair is reserved in the front of the upper surface of the reinforced concrete roof deck, and at least two embedded parts are transversely disposed on the reinforced concrete roof deck below the stair. The rafters are wooden, are arranged on the reinforced concrete roof deck below the stair at intervals, and are fixed to the embedded parts through screws and nuts. The front end of each rafter extends to a sleep eave batten through the purlins. Wooden parts are used to replace concrete to build eaves, the sleep eave batten at the cornice can be lowered effectively, the thickness of the cornice is reduced effectively, the cornice is more attractive, and overall aesthetic effect of the building is improved. By the construction method combining ancient architecture woodwork with concrete, construction is simple and easy and workers have no need to turn up the face for operation during the whole construction process.

Description

Building in the style of the ancients roofing cornice plank base and concrete combined structure and job practices thereof
Technical field
The present invention relates to a kind of cornice structure and job practices thereof of building in the style of the ancients.
Background technology
The building in the style of the ancients roofing adopts concreting to form more at present, now more general way is to adopt concreting to go out eaves, its problem is that cornice Dalian eaves height degree will be much higher than the employing timber compoment and go out eaves, thereby influence the impression at building in the style of the ancients cornice position, and then influence the aesthetic effect of building integral.Simultaneously, adopt the mode of concreting to construct, members such as eave-rafter, flying-rafter can only be installed under the cornice concrete slab, and workman's operation of must facing upward is very inconvenient.
Based on above reason, need design a kind of new cornice structure and constructure scheme, to satisfy the designing requirement of engineering structures, reach reasonability and the requirement attractive in appearance of building in the style of the ancients outward appearance, shape system simultaneously, also need constructing operation easy, practical.
Summary of the invention
The invention provides a kind of building in the style of the ancients roofing cornice plank base and concrete combined structure and job practices thereof, solve the technical problem that existing concrete building in the style of the ancients cornice is blocked up, influence impression; And the unhandy technical problem of workman when solving members construction such as eave-rafter, flying-rafter.
The technical solution adopted for the present invention to solve the technical problems is:
This building in the style of the ancients roofing cornice plank base and concrete combined structure, comprise reinforced concrete roof board, and be installed in eave-rafter and wood sheathing on the reinforced concrete roof board, the reinforced concrete roof board front end only extends to the eaves purlin position, faulting of slab ends is left in reinforced concrete roof board upper surface front portion, and be horizontally arranged with twice built-in fitting at least at the reinforced concrete roof board of faulting of slab ends lower floor, described built-in fitting is the galvanized flat steel that soffit is welded with the reinforcing bar drag hook, the roofing reinforcing bar anchoring of reinforcing bar drag hook and reinforced concrete roof board inside.
Described eave-rafter is timber compoment, eave-rafter is spaced on the reinforced concrete roof board of faulting of slab ends lower floor, and fixed by screw rod and nut and built-in fitting, the built-in fitting upper surface is being connected to screw rod with eave-rafter intersection point place vertical welding, have screw on the eave-rafter and have be used to the groove that holds nut in eave-rafter upper surface correspondence, the eave-rafter front end extends to eaves position, Dalian through eaves purlin;
Described wood sheathing is laid and is fixed on the eave-rafter.
Described built-in fitting is along the elongated setting of reinforced concrete roof board.
Described nut upper surface is than the low 1~2mm of eave-rafter upper surface.
Adopt the epoxy adhesive shutoff in the groove of described eave-rafter.
The job practices of this described building in the style of the ancients roofing cornice plank base and concrete combined structure, construction sequence is as follows:
Step 1, colligation roofing reinforcing bar is buried built-in fitting underground;
Step 2, concreting, the reinforced concrete roof board front end is only constructed to the eaves purlin position, and reserves faulting of slab ends in reinforced concrete roof board upper surface front portion;
Step 3, after concrete construction is finished, the cleaning built-in fitting;
Step 4 ejects the eave-rafter center line at reinforced concrete roof board;
Step 5 is at built-in fitting upper surface and the vertical screw rod that welds in eave-rafter center line intersection point place;
Step 6 is installed in eave-rafter on the built-in fitting fastening nut;
Step 7 is followed closely wood sheathing at eave-rafter.
Described eave-rafter does not reveal the surface, where there is light and completely brushes anticorrisive agent.
Antirust processing is all done at described built-in fitting, screw rod and welding node place.
In the described step 6, the nut upper surface adopts the epoxy adhesive shutoff than the low 1~2mm of eave-rafter upper surface in the groove of eave-rafter.
Beneficial effect of the present invention is as follows:
Reinforced concrete roof of the present invention is only done to the eaves purlin position, and eaves purlin adopts the timber compoment construction to eaves position, Dalian.Reserve faulting of slab ends at reinforced concrete roof during construction, so that wood sheathing is installed the back and reinforced concrete roof board can be along upgrade.In the roofing steel bar layer, bury the elongated galvanized flat steel built-in fitting of twice underground, be used for the installation of eave-rafter timber compoment.Weld screw rod at built-in fitting and eave-rafter center line intersection point, in order to fixing eave-rafter.The eave-rafter upper surface is dug out groove in order to crouch into nut.The nut upper surface is than the lower slightly 1~2mm of eave-rafter upper surface, in order to adopt the epoxy adhesive shutoff in the eave-rafter groove.
The present invention replaces concreting to go out eaves with timber compoment, and structure satisfies the designing requirement of engineering, can reduce cornice Dalian eaves height degree, obviously reduces cornice thickness, makes the cornice position more attractive in appearance, improves the building integral aesthetic effect.
The job practices that the present invention adopts the ancient architecture carpentery workshop to combine with concrete, easy construction, easy row, eave-rafter are directly arranged and are fixed in the reinforced concrete roof upper surface, and whole construction course workman's operation that need not to face upward has improved convenience and the safety of constructing.
Description of drawings
The present invention is further described below in conjunction with drawings and Examples.
Fig. 1 is the structural representation at traditional building in the style of the ancients cornice position.
Fig. 2 is structural representation of the present invention.
Fig. 3 is the plane structure schematic diagram of built-in fitting.
Fig. 4 is the structural representation in built-in fitting cross section.
Fig. 5 is the schematic diagram of burying built-in fitting on the reinforced concrete roof board underground.
Fig. 6 is the schematic diagram that plays the eave-rafter center line on the reinforced concrete roof board.
Fig. 7 is the schematic diagram of welding screw rod on the built-in fitting.
Fig. 8 is the fixing schematic diagram of eave-rafter and built-in fitting.
Fig. 9 is the interior schematic diagram that adopts the epoxy adhesive shutoff of the groove of eave-rafter.
Reference numeral: 1-Dalian eaves, 2-eaves purlin, 3-eave-rafter, 4-faulting of slab ends, 5-wood sheathing, 6-reinforced concrete roof board, 7-built-in fitting, 7.1-galvanized flat steel, 7.2-reinforcing bar drag hook, 8-eave-rafter center line, 9-screw rod, 10-nut, 11-epoxy adhesive.
The specific embodiment
Embodiment is referring to shown in Fig. 2~9, this building in the style of the ancients roofing cornice plank base and concrete combined structure, comprise reinforced concrete roof board 6, and be installed in eave-rafter 3 and wood sheathing 5 on the reinforced concrete roof board 6, reinforced concrete roof board 6 front ends only extend to eaves purlin 2 positions, faulting of slab ends 4 is left in reinforced concrete roof board 6 upper surface front portions, and be horizontally arranged with twice built-in fitting 7 at least at the reinforced concrete roof board 6 of faulting of slab ends 4 lower floors, described built-in fitting 7 is along reinforced concrete roof board 6 elongated settings, described built-in fitting 7 is welded with the galvanized flat steel 7.1 of reinforcing bar drag hook 7.2, the roofing reinforcing bar anchoring of reinforcing bar drag hook and reinforced concrete roof board 6 inside for soffit.
Described eave-rafter 3 is timber compoment, eave-rafter 3 is spaced on the reinforced concrete roof board 6 of faulting of slab ends 4 lower floors, and it is fixing with built-in fitting 7 by screw rod 9 and nut 10, built-in fitting 7 upper surfaces are being connected to screw rod 9 with eave-rafter 3 intersection point place vertical weldings, have screw on the eave-rafter 3 and have be used to the groove that holds nut 10 in eave-rafter 3 upper surface correspondences, described nut 10 upper surfaces are than the low 1~2mm of eave-rafter 3 upper surfaces.Adopt epoxy adhesive 11 shutoff in the groove of eave-rafter 3.Eave-rafter 3 front ends extend to Dalian eaves 1 position through eaves purlin 2.
Described wood sheathing 5 is laid and is fixed on the eave-rafter 3.
Shown in Fig. 2~9, the job practices of this described building in the style of the ancients roofing cornice plank base and concrete combined structure, construction sequence is as follows:
Step 1, colligation roofing reinforcing bar is buried built-in fitting 7 underground;
Step 2, concreting, reinforced concrete roof board 6 front ends are only constructed to eaves purlin 2 positions, and reserve faulting of slab ends 4 in reinforced concrete roof board 6 upper surface front portions;
Step 3, after concrete construction is finished, cleaning built-in fitting 7;
Step 4 ejects eave-rafter center line 8 at reinforced concrete roof board 6, referring to shown in Figure 6;
Step 5 is at built-in fitting 7 upper surfaces and the vertical screw rod 9 that welds in eave-rafter center line 8 intersection point places, referring to shown in Figure 7;
Step 6 is installed in eave-rafter 3 on the built-in fitting 7, and fastening nut 10 is referring to shown in Figure 8;
Step 7 is at eave-rafter 3 nail wood sheathings 5.
Described eave-rafter 3 does not reveal the surface, where there is light and completely brushes anticorrisive agent.
Antirust processing is all done at described built-in fitting 7, screw rod 9 and welding node place.
In the described step 6, nut 10 upper surfaces adopt epoxy adhesive 11 shutoff than the low 1~2mm of eave-rafter 3 upper surfaces in the groove of eave-rafter 3.
Carry out flying-rafter after the described step 7, press constructions such as flying roof boarding, each layer all can be by ripe scheme construction afterwards.

Claims (8)

1. a building in the style of the ancients roofing cornice plank base and concrete combined structure, comprise reinforced concrete roof board (6), and be installed in eave-rafter (3) and wood sheathing (5) on the reinforced concrete roof board (6), it is characterized in that: reinforced concrete roof board (6) front end only extends to eaves purlin (2) position, faulting of slab ends (4) is left in reinforced concrete roof board (6) upper surface front portion, and be horizontally arranged with twice built-in fitting (7) at least at the reinforced concrete roof board (6) of faulting of slab ends (4) lower floor, described built-in fitting (7) is welded with the galvanized flat steel (7.1) of reinforcing bar drag hook (7.2) for soffit, the roofing reinforcing bar anchoring that reinforcing bar drag hook and reinforced concrete roof board (6) are inner;
Described eave-rafter (3) is timber compoment, eave-rafter (3) is spaced on the reinforced concrete roof board (6) of faulting of slab ends (4) lower floor, and it is fixing with built-in fitting (7) by screw rod (9) and nut (10), built-in fitting (7) upper surface is being connected to screw rod (9) with eave-rafter (3) intersection point place vertical welding, have screw on the eave-rafter (3) and have be used to the groove that holds nut (10) in eave-rafter (3) upper surface correspondence, eave-rafter (3) front end extends to Dalian eaves (1) position through eaves purlin (2);
Described wood sheathing (5) is laid and is fixed on the eave-rafter (3).
2. building in the style of the ancients roofing cornice plank base according to claim 1 and concrete combined structure, it is characterized in that: described built-in fitting (7) is along the elongated setting of reinforced concrete roof board (6).
3. building in the style of the ancients roofing cornice plank base according to claim 1 and concrete combined structure, it is characterized in that: described nut (10) upper surface is than the low 1~2mm of eave-rafter (3) upper surface.
4. building in the style of the ancients roofing cornice plank base according to claim 1 and concrete combined structure is characterized in that: adopt epoxy adhesive (11) shutoff in the groove of described eave-rafter (3).
5. job practices as building in the style of the ancients roofing cornice plank base as described in any one of the claim 1~4 and concrete combined structure is characterized in that construction sequence is as follows:
Step 1, colligation roofing reinforcing bar is buried built-in fitting (7) underground;
Step 2, concreting, reinforced concrete roof board (6) front end is only constructed to eaves purlin (2) position, and reserves faulting of slab ends (4) in reinforced concrete roof board (6) upper surface front portion;
Step 3, after concrete construction is finished, cleaning built-in fitting (7);
Step 4 ejects eave-rafter center line (8) at reinforced concrete roof board (6);
Step 5 is at the vertical screw rod (9) that welds with eave-rafter center line (8) intersection point place of built-in fitting (7) upper surface;
Step 6 is installed in eave-rafter (3) on the built-in fitting (7) fastening nut (10);
Step 7 is at eave-rafter (3) nail wood sheathing (5).
6. the job practices of building in the style of the ancients roofing cornice plank base according to claim 5 and concrete combined structure is characterized in that: described eave-rafter (3) does not reveal the surface, where there is light and completely brushes anticorrisive agent.
7. the job practices of building in the style of the ancients roofing cornice plank base according to claim 5 and concrete combined structure, it is characterized in that: antirust processing is all done at described built-in fitting (7), screw rod (9) and welding node place.
8. the job practices of building in the style of the ancients roofing cornice plank base according to claim 5 and concrete combined structure, it is characterized in that: in the described step 6, nut (10) upper surface adopts epoxy adhesive (11) shutoff than the low 1~2mm of eave-rafter (3) upper surface in the groove of eave-rafter (3).
CN201310143532.6A 2013-04-24 2013-04-24 Wood roof cornice decking and concrete composite structure in archaized buildings and construction method thereof Expired - Fee Related CN103195214B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310143532.6A CN103195214B (en) 2013-04-24 2013-04-24 Wood roof cornice decking and concrete composite structure in archaized buildings and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310143532.6A CN103195214B (en) 2013-04-24 2013-04-24 Wood roof cornice decking and concrete composite structure in archaized buildings and construction method thereof

Publications (2)

Publication Number Publication Date
CN103195214A true CN103195214A (en) 2013-07-10
CN103195214B CN103195214B (en) 2015-01-07

Family

ID=48718017

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310143532.6A Expired - Fee Related CN103195214B (en) 2013-04-24 2013-04-24 Wood roof cornice decking and concrete composite structure in archaized buildings and construction method thereof

Country Status (1)

Country Link
CN (1) CN103195214B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264918A (en) * 2014-10-09 2015-01-07 中建八局第四建设有限公司 Wood rafter mounting process and wood rafter connector assembly
CN105178520A (en) * 2015-06-08 2015-12-23 中国建筑西北设计研究院有限公司 Method for mounting hollow round rafter cornice structure for building
CN107165346A (en) * 2017-06-29 2017-09-15 苏州园林发展股份有限公司 A kind of sparrow place eaves roof structure and its construction method
CN107190983A (en) * 2017-06-02 2017-09-22 康博达节能科技有限公司 A kind of construction method of prefabricated assembled cornice
CN107816173A (en) * 2017-11-04 2018-03-20 北京房修建筑工程有限公司 Building in the style of the ancients wood eave-rafter and cast-in-situ steel reinforced concrete Guttr board monolithic construction method
CN109138150A (en) * 2018-10-22 2019-01-04 绍兴市园林建设有限公司 A kind of archaized building structure and its manufacturing method
CN109707111A (en) * 2019-01-22 2019-05-03 吉林建筑大学 Assembly concrete roofing modelled after an antique and its method of construction
CN110439194A (en) * 2019-07-22 2019-11-12 上海秦森园林股份有限公司 A kind of mounting structure and installation method of pseudo-classic architecture wood rafter
CN114351853A (en) * 2021-12-27 2022-04-15 中国建筑第八工程局有限公司 Complex antique attic steel-wood combined structure and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001020479A (en) * 1999-07-08 2001-01-23 Sumitomo Metal Steel Products Inc Purlin at eaves edge
CN1884734A (en) * 2006-07-06 2006-12-27 北京城建亚泰建设工程有限公司 Archaized architecture and its construction method
JP2010168890A (en) * 2008-12-25 2010-08-05 Misawa Homes Co Ltd Structure of edge of eaves
CN103046698A (en) * 2012-12-29 2013-04-17 陕西省第三建筑工程公司 Method of crack resistance and seepage prevention for concrete roof eave edging in archaized architectures
CN202882247U (en) * 2012-11-05 2013-04-17 左大刚 Archaized mechanism

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001020479A (en) * 1999-07-08 2001-01-23 Sumitomo Metal Steel Products Inc Purlin at eaves edge
CN1884734A (en) * 2006-07-06 2006-12-27 北京城建亚泰建设工程有限公司 Archaized architecture and its construction method
JP2010168890A (en) * 2008-12-25 2010-08-05 Misawa Homes Co Ltd Structure of edge of eaves
CN202882247U (en) * 2012-11-05 2013-04-17 左大刚 Archaized mechanism
CN103046698A (en) * 2012-12-29 2013-04-17 陕西省第三建筑工程公司 Method of crack resistance and seepage prevention for concrete roof eave edging in archaized architectures

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264918A (en) * 2014-10-09 2015-01-07 中建八局第四建设有限公司 Wood rafter mounting process and wood rafter connector assembly
CN105178520A (en) * 2015-06-08 2015-12-23 中国建筑西北设计研究院有限公司 Method for mounting hollow round rafter cornice structure for building
CN105178520B (en) * 2015-06-08 2017-11-10 中国建筑西北设计研究院有限公司 A kind of open circles rafter eave structure installation method for building
CN107190983B (en) * 2017-06-02 2019-08-30 康博达节能科技有限公司 A kind of construction method of prefabricated assembled cornice
CN107190983A (en) * 2017-06-02 2017-09-22 康博达节能科技有限公司 A kind of construction method of prefabricated assembled cornice
CN107165346A (en) * 2017-06-29 2017-09-15 苏州园林发展股份有限公司 A kind of sparrow place eaves roof structure and its construction method
CN107816173B (en) * 2017-11-04 2019-09-10 北京房修一建筑工程有限公司 Pseudo-classic architecture wood eave-rafter and cast-in-situ steel reinforced concrete Guttr board monolithic construction method
CN107816173A (en) * 2017-11-04 2018-03-20 北京房修建筑工程有限公司 Building in the style of the ancients wood eave-rafter and cast-in-situ steel reinforced concrete Guttr board monolithic construction method
CN109138150A (en) * 2018-10-22 2019-01-04 绍兴市园林建设有限公司 A kind of archaized building structure and its manufacturing method
CN109707111A (en) * 2019-01-22 2019-05-03 吉林建筑大学 Assembly concrete roofing modelled after an antique and its method of construction
CN109707111B (en) * 2019-01-22 2023-09-22 吉林建筑大学 Assembled concrete archaized roof and construction method thereof
CN110439194A (en) * 2019-07-22 2019-11-12 上海秦森园林股份有限公司 A kind of mounting structure and installation method of pseudo-classic architecture wood rafter
CN110439194B (en) * 2019-07-22 2021-10-08 上海秦森园林股份有限公司 Mounting structure and mounting method of wood rafters of antique building
CN114351853A (en) * 2021-12-27 2022-04-15 中国建筑第八工程局有限公司 Complex antique attic steel-wood combined structure and construction method thereof
CN114351853B (en) * 2021-12-27 2024-01-23 中国建筑第八工程局有限公司 Complex archaized attic steel-wood combined structure and construction method thereof

Also Published As

Publication number Publication date
CN103195214B (en) 2015-01-07

Similar Documents

Publication Publication Date Title
CN103195214B (en) Wood roof cornice decking and concrete composite structure in archaized buildings and construction method thereof
CN2921130Y (en) Dismounting light steel structure movable storied building
CN202706258U (en) Fully-assembled detachable concrete wallboard
KR100902642B1 (en) Arbor
CN106401040B (en) The method that the cladding tile structure of Qing Gang pitched roofs base and flat roof deck change pitched roof
CN105040812A (en) Aluminum alloy house
WO2017041517A1 (en) Movable aluminum alloy house
CN103711262A (en) Surface magnesium manganese alloy roof boarding system construction method
CN205637280U (en) Dry tile hanging structure of light steel slope roof basic level
CN204919801U (en) Aluminum alloy house
CN205637279U (en) Dry tile hanging structure of light steel slope roof basic level
CN100451257C (en) Concrete complex building of steel meshwork framework, and construction procedure
GB2504001A (en) Pitched Roof Structures and their Methods of Assembly and Construction
CN209308156U (en) A kind of prefabricated buildings that can be recycled
CN101886470B (en) Construction method of exposed concrete ribbed beams
CN204139316U (en) A kind of steel structure shear wall structure system
CN204919808U (en) Side direction facade system in aluminum alloy house
KR20110009882A (en) Tailor-made manufacturing method for furniture-style buildings and traditional korean-style structure
CN103485538A (en) Construction method of energy-saving insulation waterproof wood-trussed roof system
KR101292748B1 (en) Tailor-Made Manufacturing Method for Furniture-style Buildings and Traditional Korean-style Structure
CN202899319U (en) Waterproof panel point of side wall of existing building and roof of new-built building
CN205171857U (en) Ramp type structure that cornices
CN205206162U (en) Cornice structure
CN204311633U (en) Steel side bar wood dimension stock precast floor slab structure
CN203462631U (en) Energy-saving and heat-insulating waterproof wooden truss roofing system construction structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150107

Termination date: 20180424