CN110439171A CN201910593546.5A CN201910593546A CN110439171A CN 110439171 A CN110439171 A CN 110439171A CN 201910593546 A CN201910593546 A CN 201910593546A CN 110439171 A CN110439171 A CN 110439171A
Authority
CN
China
Prior art keywords
unit module
carried out
installation
assembled
ceiling joist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910593546.5A
Other languages
Chinese (zh)
Inventor
徐冬
徐枫
李光波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201910593546.5A priority Critical patent/CN110439171A/en
Publication of CN110439171A publication Critical patent/CN110439171A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention belongs to construction engineering technical field, specially a kind of anti-ceiling joist installation method of assembled, comprising the following steps: (1) modeled using BIM, the three-dimensional data of the anti-ceiling joist installation of profiled metal is extracted by modeling;(2) assembled installation simulation is carried out using BIM technology;(3) lifting construction is carried out to unit module, realizes that the whole of unit module is promoted using electric roller by three pulley blocks;(4) when unit module, which is promoted to, to be required in the range of elevation control error 20cm, three coordinate solid spaces is carried out in conjunction with total station and are accurately positioned;(5) secondary joist carried out between two unit modules welds installation, completes the anti-integral installation for hanging keel.The present invention effectively solves the anti-furred ceiling of long-span deformed steel construction in the construction process, because keel size, positioning etc. cannot get precise information, so as to cause deviation, repeats to do over again, influences the low problem of anti-ceiling joist construction quality, construction efficiency.

Description

A kind of anti-ceiling joist installation method of assembled
Technical field
The invention belongs to construction engineering technical field, specially a kind of anti-ceiling joist installation method of assembled.
Background technique
With Modernized City Construction advance by leaps and bounds and requirement of the people to the aesthetics of architecture is continuously improved, in stadium In the design of shop class public building, there are more support long-span deformed steel constructions to realize special architectural image.In this kind In venue class structural steelwork, often there is the anti-ceiling joist construction of more abnormity, and this kind of keel of tradition are in work progress In, keel size, positioning etc. cannot get precise information so as to cause deviation, even repeat the case where doing over again, this kind of situation tradition Construction installation method easily influences the construction quality of anti-furred ceiling, and construction efficiency is low.
Summary of the invention
For the technical problems in the prior art, the purpose of the present invention is to provide a kind of anti-ceiling joists of assembled Installation method.To achieve the goals above, the technical scheme adopted by the invention is as follows:
A kind of anti-ceiling joist installation method of assembled, comprising the following steps:
(1) it is modeled using BIM, the three-dimensional data of the anti-ceiling joist installation of profiled metal is extracted by modeling;
(2) assembled installation simulation is carried out using BIM technology, determines that each unit module hangs dragon entire metal Roof is counter The space orientation and size of bone, manufacturer are in advance in the good each unit module of factory process or straight at the scene according to dimension data Connect production;
(3) lifting construction is carried out to unit module, four fixed points is chosen specially on unit module, wherein three are Vertical lifting point, a level control points, and the successively mounting finished product chain block on four control points pass through three cunnings later Wheel group realizes that the whole of unit module is promoted using electric roller;
(4) when unit module, which is promoted to, to be required in the range of elevation control error 20cm, each mould is extracted according to BIM modeling Each point three-dimensional coordinate numerical value of block carries out essence in conjunction with three coordinate solid spaces are carried out by total station using finished product chain block Determine position, it is ensured that each module mounting location accuracy;
(5) secondary joist carried out between two unit modules welds installation, completes the anti-integral installation for hanging keel.
Preferably, scene directly production unit module then carries out unit mould using the adjustable assembled operating platform of Three Dimensional Ground The production of block.
Preferably, the level control points realize horizontal location by personnel control.
The present invention efficiently solves the anti-furred ceiling of long-span deformed steel construction and was constructing compared with traditional construction method Cheng Zhong, keel size, positioning etc. cannot get precise information so as to cause deviation, even repeat the case where doing over again, easily influence counter to hang Push up the low problem of keel construction quality, construction efficiency.
Specific embodiment
A kind of anti-ceiling joist installation method of assembled to further describe the present invention, below makees furtherly it It is bright.
A kind of anti-ceiling joist installation method of assembled, comprising the following steps:
(1) it is modeled using BIM, the three-dimensional data of the anti-ceiling joist installation of profiled metal is extracted by modeling;
(2) assembled installation simulation is carried out using BIM technology, determines that each unit module hangs dragon entire metal Roof is counter The space orientation and size of bone, manufacturer are in advance in the good each unit module of factory process or straight at the scene according to dimension data Production is connect, scene directly production unit module then carries out the production of unit module using the adjustable assembled operating platform of Three Dimensional Ground;
(3) lifting construction is carried out to unit module, four fixed points is chosen specially on unit module, wherein three are Vertical lifting point, a level control points, and the successively mounting finished product chain block on four control points pass through three cunnings later Wheel group realizes that the whole of unit module is promoted using electric roller, and it is horizontal fixed that a level control points are realized by personnel control Position;
(4) when unit module, which is promoted to, to be required in the range of elevation control error 20cm, each mould is extracted according to BIM modeling Each point three-dimensional coordinate numerical value of block carries out essence in conjunction with three coordinate solid spaces are carried out by total station using finished product chain block Determine position, it is ensured that each module mounting location accuracy;
(5) secondary joist carried out between two unit modules welds installation, completes the anti-integral installation for hanging keel.
The above content is just an example and description of the concept of the present invention, affiliated those skilled in the art It makes various modifications or additions to the described embodiments or is substituted in a similar manner, without departing from invention Design or beyond the scope defined by this claim, be within the scope of protection of the invention.

Claims (3)

1. a kind of anti-ceiling joist installation method of assembled, which comprises the following steps:
(1) it is modeled using BIM, the three-dimensional data of the anti-ceiling joist installation of profiled metal is extracted by modeling;
(2) assembled installation simulation is carried out using BIM technology, determines each unit module in the anti-keel that hang of entire metal Roof Space orientation and size, manufacturer directly make in the good each unit module of factory process or at the scene in advance according to dimension data Make;
(3) lifting construction is carried out to unit module, four fixed points is chosen specially on unit module, wherein three are vertical Lifting point, a level control points, and the successively mounting finished product chain block on four control points pass through three pulley blocks later Realize that the whole of unit module is promoted using electric roller;
(4) when unit module, which is promoted to, to be required in the range of elevation control error 20cm, it is each that each module is extracted according to BIM modeling Point three-dimensional coordinate numerical value accurately determine in conjunction with three coordinate solid spaces are carried out by total station using finished product chain block Position, it is ensured that each module mounting location accuracy;
(5) secondary joist carried out between two unit modules welds installation, completes the anti-integral installation for hanging keel.
2. the anti-ceiling joist installation method of a kind of assembled according to claim 1, which is characterized in that the step (2) Live directly production unit module is the production that unit module is carried out using the adjustable assembled operating platform of Three Dimensional Ground.
3. the anti-ceiling joist installation method of a kind of assembled according to claim 1, which is characterized in that the horizontal control Point realizes horizontal location by personnel control.
CN201910593546.5A 2019-07-03 2019-07-03 A kind of anti-ceiling joist installation method of assembled Pending CN110439171A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910593546.5A CN110439171A (en) 2019-07-03 2019-07-03 A kind of anti-ceiling joist installation method of assembled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910593546.5A CN110439171A (en) 2019-07-03 2019-07-03 A kind of anti-ceiling joist installation method of assembled

Publications (1)

Publication Number Publication Date
CN110439171A true CN110439171A (en) 2019-11-12

Family

ID=68429352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910593546.5A Pending CN110439171A (en) 2019-07-03 2019-07-03 A kind of anti-ceiling joist installation method of assembled

Country Status (1)

Country Link
CN (1) CN110439171A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102839747A (en) * 2012-09-24 2012-12-26 中国建筑第八工程局有限公司 Construction method for steel structure truss of super high-rise special structure
CN107558642A (en) * 2017-08-22 2018-01-09 中国十七冶集团有限公司 A kind of method in the large-scale open stone curtain wall installation based on BIM
CN108661325A (en) * 2018-04-02 2018-10-16 中国十七冶集团有限公司 A kind of large-scale steel structure rotation ramp inversion construction method based on BIM
CN109025286A (en) * 2018-07-20 2018-12-18 中建三局第三建设工程有限责任公司 A kind of construction method of large span high-altitude three-dimensional canopy of the heavens steel construction
CN109784004A (en) * 2019-04-02 2019-05-21 中国十七冶集团有限公司 A kind of profiled metal roofing construction method of installation based on BIM technology

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102839747A (en) * 2012-09-24 2012-12-26 中国建筑第八工程局有限公司 Construction method for steel structure truss of super high-rise special structure
CN107558642A (en) * 2017-08-22 2018-01-09 中国十七冶集团有限公司 A kind of method in the large-scale open stone curtain wall installation based on BIM
CN108661325A (en) * 2018-04-02 2018-10-16 中国十七冶集团有限公司 A kind of large-scale steel structure rotation ramp inversion construction method based on BIM
CN109025286A (en) * 2018-07-20 2018-12-18 中建三局第三建设工程有限责任公司 A kind of construction method of large span high-altitude three-dimensional canopy of the heavens steel construction
CN109784004A (en) * 2019-04-02 2019-05-21 中国十七冶集团有限公司 A kind of profiled metal roofing construction method of installation based on BIM technology

Similar Documents

Publication Publication Date Title
CN104612307B (en) Ceiling system and its construction method
Lawson et al. Sustainability and process benefits of modular construction
CN106337500A (en) Modularized assembly type steel structure house building system
Hough et al. Design and construction of high-rise modular buildings based on recent projects
CN104912340A (en) Construction method for double-curve triangular aluminum plate unit type hanging ceiling
CN109441034A (en) A kind of construction technology of BIM auxiliary hyperboloid Special-Shaped Column set square installation
CN110512790B (en) High and large space multi-curvature suspended ceiling structure and construction method thereof
CN204414305U (en) A kind of prefab-form system for many casees corrugated steel web case beam that broadens
KR102135343B1 (en) Construction Method of Pipe Rack Structure
CN104763157A (en) Large stadium pipe truss and spiral duct modularization installation method and combination structure
WO2023272593A1 (en) Bim-technology-based large-area complex-shape suspended ceiling construction method
CN107491619A (en) A kind of old project steel construction that changes based on BIM technology positions construction method for hanging
CN111058661B (en) Modular assembly type machine room pipeline construction method
CN102864859B (en) Curtain wall steel support structure, construction method thereof and lifting device for construction
CN102864867A (en) Method for ceiling hyperboloidal arch
CN110439171A (en) A kind of anti-ceiling joist installation method of assembled
CN113323153A (en) Bending-twisting aluminum alloy structure in existing complex space and construction method
CN112926114A (en) Electromechanical and steel structure integrated construction method
CN115434515B (en) Construction method of hyperboloid cornice keel for station building engineering
CN114753649A (en) Construction method of hyperbolic roof cornice curtain wall based on BIM scaffold free building
CN212077591U (en) Component hoisting walking foundation under complex environment of large railway station house
CN214461679U (en) Finished product furred ceiling falls grade mounting structure
CN116628795A (en) Multi-curved-surface combined high and large template installation method based on BIM modeling technology
CN104389348A (en) Installing method of arch structure with skin
CN104763150A (en) Construction method of assembled type prefabricated laminated slab for building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191112