CN110439048A - A kind of hydraulicking strand suction device and method for inner support base pit engineering - Google Patents

A kind of hydraulicking strand suction device and method for inner support base pit engineering Download PDF

Info

Publication number
CN110439048A
CN110439048A CN201910811579.2A CN201910811579A CN110439048A CN 110439048 A CN110439048 A CN 110439048A CN 201910811579 A CN201910811579 A CN 201910811579A CN 110439048 A CN110439048 A CN 110439048A
Authority
CN
China
Prior art keywords
hydraulicking
inner support
twists
mobile jib
support base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910811579.2A
Other languages
Chinese (zh)
Inventor
张军
葛晓永
徐玉桂
王志华
衣睿博
沈光明
高洪梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Jiangbei New Area Central Area Development Co Ltd
Nanjing Tech University
Original Assignee
Nanjing Jiangbei New Area Central Area Development Co Ltd
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Jiangbei New Area Central Area Development Co Ltd, Nanjing Tech University filed Critical Nanjing Jiangbei New Area Central Area Development Co Ltd
Priority to CN201910811579.2A priority Critical patent/CN110439048A/en
Publication of CN110439048A publication Critical patent/CN110439048A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/88Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
    • E02F3/90Component parts, e.g. arrangement or adaptation of pumps
    • E02F3/92Digging elements, e.g. suction heads
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/88Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
    • E02F3/90Component parts, e.g. arrangement or adaptation of pumps
    • E02F3/92Digging elements, e.g. suction heads
    • E02F3/9212Mechanical digging means, e.g. suction wheels, i.e. wheel with a suction inlet attached behind the wheel
    • E02F3/9218Mechanical digging means, e.g. suction wheels, i.e. wheel with a suction inlet attached behind the wheel with jets
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/88Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
    • E02F3/90Component parts, e.g. arrangement or adaptation of pumps
    • E02F3/92Digging elements, e.g. suction heads
    • E02F3/9212Mechanical digging means, e.g. suction wheels, i.e. wheel with a suction inlet attached behind the wheel
    • E02F3/9225Mechanical digging means, e.g. suction wheels, i.e. wheel with a suction inlet attached behind the wheel with rotating cutting elements
    • E02F3/9231Suction wheels with axis of rotation parallel to longitudinal axis of the suction pipe

Abstract

It is twisted the present invention provides a kind of hydraulicking for inner support base pit engineering and inhales device and method, it includes mobile jib that hydraulicking, which twists suction equipment, power device, twin shaft twists native device, it further include the dredging tube being nested in mobile jib, and setting accesses above power device and extends the giant of insertion fixed plate in mobile jib two sides;It the described method comprises the following steps: surface layer soil excavation;The installation of the i-beam track of the construction and electric block of first concrete inner support;Pipeline is laid with;Workload arrangement;Hydraulicking construction.The invention has the benefit that the configuration of the present invention is simple, it is easy to operate, maintenance is easy and expense is low, for the progress weak soil excavation in the base pit engineering there are inner support, efficiency is obviously improved compared with conventional excavators, a large amount of durations for shortening earth work, reduce the problems such as fugitive dust bring influences, solves dregs transportation.

Description

A kind of hydraulicking strand suction device and method for inner support base pit engineering
Technical field
The present invention relates to earth excavation equipment technical fields more particularly to a kind of for there are the equipment of inner support is mobile empty Between the hydraulicking of lesser base pit engineering twist and inhale equipment and application method.
Background technique
Now, aboveground space starts to rapidly develop close to saturation, underground space engineering, and most engineerings require foundation pit Supporting, especially Soft Soil Foundation Pit require setting supporting construction, however it is narrow to arrange the foundation pit activity space after inner support, pole The normal work of large excavator is limited greatly, causes earth excavation rate slow, while the earthwork needs ancillary equipment to transport again It is outer that machine transports hole, extends the duration and can generate security risk again, and dregs transportation is costly while also by time restriction, separately Outside, can also generate fugitive dust influences environment, brings many influences to engineering thus.
There is strand suction suction dredge inhaling mud apparatus field, major function is all to clear up mud and be embedded in water-bed silt, It is not suitable for the earth excavation of land.Chinese patent, Patent No. 201820676270.8 disclose a kind of " strand suction suction mud Machine " drives two drawing out soil equipment of downlink by power device, adds ring flat-plate and wing plate on drill bit, increase and cut native ability, for big Type open caisson soil extracting efficiency in circle gravel soil layer, clay layer is splendid, is widely used in open caisson suck sediment subsidence engineering.The equipment can only The soil body for inhaling that water content is big or intensity is small is twisted, and arranges suction dredge generally by cargo ship, is not suitable for land foundation pit earth The excavation of body.
Chinese patent CN207998850 discloses " a kind of pit earthwork hydraulicking system that borders on the sea near a river ", including waterpower Rush digging machine structure and slurry transportation mechanism two parts.The hydraulicking system reduces temporary project construction, and the construction period is short, economical Environmental protection.However hydraulicking and slurry transportation are separated independent progress by the patent, are considered without integration, in addition the system for Punching is dug efficiency and will be substantially reduced when soil mass of foundation pit property is preferable, foundation pit area is big.
How to solve above-mentioned technical problem is the project that the present invention faces.
Summary of the invention
It is narrow for construction space that the purpose of the present invention is to provide one kind, is especially in the presence of the water of the deep basal pit of inner support Power punching, which digs to twist, inhales device and method.
The present invention is realized by following measure: a kind of hydraulicking strand suction equipment for inner support base pit engineering, Including mobile jib, the power device being connected in the mobile jib and fixed beam twists native device by the twin shaft that the power device drives, The twin shaft twists native device and runs through and be connected in the fixed beam and fixed plate, and two axial symmetry that the twin shaft twists native device are set Set, it includes hydraulic motor that each twin shaft, which twists native device, the hydraulic motor bottom end be axially connected be driven by it is dynamic Power output shaft, the power output shaft are connected with reamer head, further include the dredging tube being nested in the mobile jib, and setting exists The mobile jib two sides are accessed above the power device and extend the giant for being inserted into the fixed plate.
As a kind of hydraulicking strand suction equipment side of advanced optimizing for inner support base pit engineering provided by the invention Case, it includes the hydraulic motor that the twin shaft, which twists each axis in native device, the hydraulic motor lower end by screw with it is described Fixed beam connection;The hydraulic motor bottom end is connected with the power output shaft being driven by it, and the power output shaft is straight down Extend;The reamer head is fixed on the power output shaft lower end, drives its rotation by the power output shaft.
As a kind of hydraulicking strand suction equipment side of advanced optimizing for inner support base pit engineering provided by the invention Case, the reamer head lower part are double-helix drill bit, and middle part is several reamer tooths, several described reamer tooths are spiral point Cloth, the reamer between cog are equipped with groove along reamer head generatrix direction;Top is wing plate, and the wing plate is four and is mutually perpendicular to, and Section is trapezoidal up-narrow and down-wide steel plate composition, is welded and fixed together between the wing plate by outer fixed ring.
As a kind of hydraulicking strand suction equipment side of advanced optimizing for inner support base pit engineering provided by the invention Case, the mobile jib are hollow thin-wall steel pipe, and upper end inner wall is equipped with screw thread, can increase the length of the mobile jib, institute with threaded sleeve Stating threaded sleeve is that the dredging tube is nested in the mobile jib, and dredging tube upper section outlet end is connect with dredge pump, lower end Across fixed plate certain length but the not up to described reamer head horizontal position, tail portion is connected with mud-suction nozzle.
As a kind of hydraulicking strand suction equipment side of advanced optimizing for inner support base pit engineering provided by the invention Case, the mud-suction nozzle are connected to dredging tube bottom end entrance, and lower end import is circular cone shape, are built-in with grid gear Plate;Grid baffle can prevent rubble from entering in dredging tube.
As a kind of hydraulicking strand suction equipment side of advanced optimizing for inner support base pit engineering provided by the invention Case, the giant are arranged in the mobile jib two sides, and upper section input end is connect with high-pressure hydraulic pump, middle part and the power device It is fixed by lock, lower end passes through the fixing board card in U-type groove, and is higher by the mud-suction nozzle horizontal position;The pressure water Rifle lower end pass through fixing board card in U-type groove certain length but be higher than mud-suction nozzle horizontal position.
As a kind of hydraulicking strand suction equipment side of advanced optimizing for inner support base pit engineering provided by the invention Case, the twin shaft twist native device and sequentially pass through the fixed beam and the fixed plate, be connected with the mobile jib, the fixed beam It is welded on the mobile jib with the fixed plate.
Further, it further includes clump weight that the hydraulicking, which twists suction equipment, and the clump weight is stuck in institute for symmetrical two pieces Mobile jib two sides are stated, and are stacked upwards in turn using the fixed plate as bottom surface.
In order to which the purpose of the present invention is better achieved, the present invention also provides a kind of hydraulickings of inner support base pit engineering Twist the application method for inhaling equipment, comprising the following steps:
1) sundries such as foundation pit surface layer miscellaneous fill are removed by mechanical excavation, and dug to first of inner support bottom surface;
2) first of concrete inner support and reserved bolt are poured, continues to excavate 2m downwards, i-beam track and electricity is installed Dynamic cucurbit;
3) suction equipment is twisted using the electric block handling arrangement hydraulicking in step 2) to march into the arena;
4) excavation construction is rushed using first center, the sequence of excavation of rear surrounding, is excavated to lower one downwards using hydraulicking Bottom surface is supportted, one of concrete inner support and reserved bolt is poured down, continues to dig 2m to undershoot, electric block and hydraulicking are installed It twists and inhales equipment;And so on, hydraulicking is stopped using when being excavated to from substrate 0.3m, is completed by artificial clear bottom.
Excavation construction is rushed in the step 4) using first center, the digging mode of rear surrounding, it then follows " be layered, be uniform, is symmetrical " Excavation principle.
The invention has the benefit that
(1) the configuration of the present invention is simple, easy to operate, maintenance is easy and expense is low, for there are the foundation pit works of inner support Weak soil excavation is carried out in journey, efficiency is obviously improved compared with conventional excavators, a large amount of durations for shortening earth work, reduces fugitive dust The problems such as bring influences, and solves dregs transportation.
(2) present invention twists native device synchronization job using twin shaft, and reamer head is divided into four functional areas, and lower part is double helix brill Head can creep into and rub hard soil layer;Several reamer tooth protrusions in middle part are simultaneously distributed around bit interface spiral, can be effective It rubs the soil body and expands shoveling area and twist the soil body to reamer head top;It is carved with groove along generatrix direction reamer between cog, favorably In preventing the soil body or filler from blocking reamer tooth;Top is wing plate, and wing plate section is native mixing water continuation trapezoidal, that strand is come up Mud is stirred into, the non-deformability that the design of trapezoid cross section not only increases wing plate simultaneously can also be to soil vertical force component in stirring The soil being stirred is pushed away to upper layer constantly, is closer to dredging tube, and the wing plate of large area can increase and the contact of soil Area, which improves, twists native efficiency, and final cooperating equipment realizes that punching digs to twist and inhales function.
(3) dredging tube is integrated with equipment with giant in the present invention, can carry out punching simultaneously and dig strand suction, largely simple The complexity for having changed construction can will rush excavation method and improve working efficiency and the scope of application in conjunction with strand absorbing method.
(4) hydraulic motor is used in the present invention, revolving speed is low, and it can directly be connect with operating mechanism, not need deceleration device, Greatly simplify transmission mechanism, the output torque of low speed hydraulic motor is larger.
(5) equipment mobile jib length is increased using threaded sleeve in the present invention, it is easy to operate, applicability is high.
(6) replaceable mud-suction nozzle is used in the present invention, grid baffle built in mud-suction nozzle can prevent bulk rubble or hard soil Block enters dredging tube, guarantees that suction dredge operates normally.
(7) equipment used in the present invention is light, can be in any position operation of foundation pit, and work progress can control leaching Water area reduces the raising of water content of soil in cheating as far as possible.
(8) noise and poplar dirt in the construction process of the invention is all smaller, is not necessarily to earthwork transportation energy conservation and environmental protection.
(9) method used in the present invention can significantly improve the mechanization degree of weak soil place foundation pit earth excavation, dig Soil is high-efficient, and can continue working for 24 hours, can significantly shorten the earth excavation duration;In addition, project cost is also compared with conventional method Have and significantly reduces.
Detailed description of the invention
Fig. 1 is the structural front view of the embodiment of the present invention;
Fig. 2 is the structure left view of the embodiment of the present invention;
Fig. 3 is the cross-sectional view of the line A-A along Fig. 1;
Fig. 4 is the partial enlargement diagram in Fig. 1 at B;
Fig. 5 is the main view in Fig. 1 at B;
Fig. 6 is the C direction view of Fig. 5;
Fig. 7 is the D direction view of Fig. 5;
Fig. 8 is the structural schematic diagram of mud-suction nozzle in the embodiment of the present invention;
Fig. 9 is threaded sleeve main view in the embodiment of the present invention;
Figure 10 is the assembling structure schematic diagram of hydroexcavation equipment and internal support of foundation pit in the embodiment of the present invention;
Wherein, appended drawing reference are as follows: 1, mobile jib;2, power device;3, hydraulic motor;4, power output shaft;5, fixed plate;6, Dredging tube;6-1, mud-suction nozzle;7, giant;8, reamer head;8-1, double-helix drill bit;8-2, reamer tooth;8-3, wing plate;8-4, Groove;8-5, outer fixed ring;9, fixed beam;10, it latches;11, U-type groove;12, threaded sleeve;13, electric block;14, I-steel Track;15, inner support.
Specific embodiment
In order to clarify the technical characteristics of the invention, being illustrated below by specific embodiment to this programme.
Referring to Fig. 1 to Figure 10, the present invention is: a kind of hydraulicking strand suction equipment for inner support base pit engineering, including Mobile jib 1, the power device 2 being connected in mobile jib 1 and fixed beam 9 twist native device by the twin shaft that power device 2 drives, and twin shaft twists Native device runs through and is connected in fixed beam 9 and fixed plate 5, and twin shaft twists the two axial symmetry setting of native device, and each twin shaft twists soil Device includes hydraulic motor 3, and hydraulic motor bottom end is axially connected with the power output shaft 4 being driven by it, and power output shaft 4 connects It is connected to reamer head 8, further includes the dredging tube 6 being nested in mobile jib 1, and is arranged in 1 two sides of mobile jib, above power device 2 Access and extend the giant 7 of insertion fixed plate 5.
Specifically, it includes hydraulic motor 3 that twin shaft, which twists each axis in native device, and 3 lower end of hydraulic motor is by screw and admittedly Determine the connection of beam 9;3 bottom end of hydraulic motor is connected with the power output shaft 4 being driven by it, and power output shaft 4 extends straight down;It twists Cutter head 8 is fixed on 4 lower end of power output shaft, drives its rotation by power output shaft 4.
Specifically, 8 lower part of reamer head is double-helix drill bit 8-1, and middle part is several reamer tooths 8-2, several reamers Tooth 8-2 is Spiral distribution, is equipped with groove 8-4 along 8 generatrix direction of reamer head between reamer tooth 8-2;Top is wing plate 8-3, wing plate 8-3 It is mutually perpendicular to for four, and section is trapezoidal up-narrow and down-wide steel plate composition, is welded between wing plate 8-3 by outer fixed ring 8-5 It is fixed together;
8 maximum gauge 50cm of reamer head, reamer head 8 divide for three parts upper in lower, and lower part is double-helix drill bit 8-1 high 5cm; Middle part is reamer tooth 8-2, and it is one group of reamer tooth 8-2, about every group two reamer tooth 8-2 that reamer tooth, which is every 45 ° of Spiral distribution, respectively The groove 8-4 of width 2cm, deep 0.5cm are equipped between group reamer tooth 8-2 along 8 generatrix direction of reamer head;Top is wing plate 8-3, wing plate 8- 3 for four orthogonal sections be trapezoidal upper width be 1.5cm, and lower width is the steel plate of 5cm.
The working principle of reamer head 8: lower part double-helix drill bit 8-1 can easily creep into hard soil layer;Middle spiral rises While the reamer tooth 8-2 of distribution can expand shoveling area, soil is tentatively rubbed and shifts 8 top of reamer head onto;Top wing plate 8-3, which will twist the native mixing water to come up, to be continued to stir into mud, and the non-deformability that the setting of trapezoid cross section not only increases wing plate 8-3 is same When can also to soil vertical force component stirring when constantly the soil being stirred be pushed away to upper layer, be closer to dredging tube 6, finally match It closes equipment and realizes that punching digs strand and inhales function;Reamer can be effectively prevented in groove 8-4, and 8-2 is filled object blocking.
Specifically, mobile jib 1 is hollow thin-wall steel pipe, and upper end inner wall is equipped with screw thread, can increase mobile jib 1 with threaded sleeve 12 Length, threaded sleeve 12 are that dredging tube 6 is nested in mobile jib 1, and 6 upper section outlet end of dredging tube is connect with dredge pump, that is to say down Across 5 certain length of fixed plate but not up to 8 horizontal position of reamer head, lower end passes through fixed plate 5, and is lower than 8 water of reamer head at end Prosposition is set, and tail portion is connected with mud-suction nozzle 6-1;Wherein, mobile jib 1 is outer diameter 22cm, and the hollow thin-wall steel pipe of internal diameter 18.5cm is inhaled 6 diameter of mud pipe is that 18cm is nested in mobile jib 1, and 6 the top outlet end of dredging tube is connect with dredge pump, and lower end passes through fixed plate 5 Certain length but not up to 8 horizontal position of reamer head, tail portion are connected to mud-suction nozzle 6-1, and dredge pump selects NL125-20.0, flow 200m3/ h, make the best use of the advantages 20m, match power 22kw.
Specifically, mud-suction nozzle 6-1 is connected to 6 bottom end entrance of dredging tube, and lower end import is circular cone shape, is built-in with Grid baffle;Grid baffle can prevent rubble from entering in dredging tube 6.Wherein, the import of the lower end mud-suction nozzle 6-1 is the circular cone of high 2cm Mesa-shaped, built-in grid baffle are 2cm × 2cm cuboid, and grid baffle can effectively prevent rubble to enter dredging tube 6.
Specifically, giant 7 is arranged in 10 two sides of mobile jib, and upper section input end is connect with high-pressure hydraulic pump, middle part and power Device 2 is fixed by lock 10, and lower end passes through fixed beam 9 and is stuck in U-type groove 11, and is higher by the horizontal position mud-suction nozzle 6-1;Namely It is that 7 lower end of giant is stuck in certain length in U-type groove 11 across fixed beam 9 but is higher than the horizontal position mud-suction nozzle 6-1, high pressure water Pump selects 3BP-57, flow 50m3/ h, make the best use of the advantages 57m, match power 15kw.
It further include clump weight, clump weight is symmetrical two pieces and is stuck in 1 two sides of mobile jib and is that bottom is folded upwards in turn with fixed plate 5, The long 35cm wide 17cm thickness 10cm of clump weight, inside hollow part are the semicircle of diameter 22cm.
It further include outer diameter 22cm, the more threaded sleeves of long 1m are sequentially connected from beginning to end for increasing by 1 length of equipment mobile jib, It is easy to operate, applicability is high.
Specifically, twin shaft twists native device and sequentially passes through fixed beam 9 and fixed plate 5, is connected with mobile jib 1, fixed beam 9 with consolidate Fixed board 5 is welded on mobile jib 1, and provides the vertical holding power for bearing to twist native device self weight and Percussion counter-force.
In order to which the purpose of the present invention is better achieved, the present invention also provides a kind of hydraulickings of inner support base pit engineering Twist the application method for inhaling equipment, comprising the following steps:
1) sundries such as foundation pit surface layer miscellaneous fill are removed by mechanical excavation, and dug to first of 15 bottom surface of inner support;
2) first of concrete inner support 15 and reserved bolt are poured, continues to excavate 2m downwards, i-beam track 14 is installed And electric block 13;
3) suction equipment is twisted using 13 handling of the electric block arrangement hydraulicking in step 2) to march into the arena;
4) excavation construction is rushed using first center, the sequence of excavation of rear surrounding, is excavated to lower road support downwards using hydraulicking Bottom surface pours down one of concrete inner support 15 and reserved bolt, continues to dig 2m to undershoot, installs electric block 13 and waterpower punching It digs to twist and inhales equipment;And so on, hydraulicking is stopped using when being excavated to from substrate 0.3m, it is complete by artificial clear bottom At.
A kind of hydraulicking of inner support base pit engineering provided by the invention twists the application method for inhaling equipment, specific main packet Include the following contents:
1) surface layer soil excavation: removing the sundries such as foundation pit surface layer miscellaneous fill by mechanical excavation, and is excavated to first and mixes 15 bottom surface of solidifying soil inner support;
2) construction and the installation of the i-beam track 14 of CD1 type electric block 13 of first of concrete inner support: interior branch Support 15 setting need to I-steel additional load 205kN/m-479kN/m, inner support 15 construct when need to reserve bolt, bull headction Road 14 is fixedly connected by bolt with inner support 15, it is rear electric block 13 is installed and disposes punching dig for marching into the arena;
3) pipeline is laid with: feed-line is laid with along land flat terrain, and pipeline is answered flat straight, and camber makes every effort to gently, keep away Exempt from dog leg;Mud discharge pipe joint should fasten tightly, and entire pipeline and connector must not leak mud leak, discovery leakage, should repair in time or Replacement;The fixed bracket of sludge pipe must be solid and reliable, must not tilt and shake;
4) workload arrangement: the mud flow rate of separate unit hydroexcavation equipment is 200m3/ h, with mud: water=1: 5 calculate, often The daily maximal workload of platform equipment is 800m3;According to on-site actual situations and construction schedule arrangement, waterpower punching is arranged The working time of standby quantity and hydraulicking is dug, guarantees that pit earthwork excavates continuous effective and carries out;
5) hydraulicking is constructed: being excavated to lower road support bottom surface downwards using hydraulicking and is poured down in one of concrete Support and reserve bolt installation i-beam track, it is rear to continue punching downwards and dig 2m, electric block is installed and punching digs standby, punching digs standby Using electric block mobile construction in foundation pit by i-beam track, punching dig directly with punching dig for from water head site (river or Running water pipe) water is extracted, carry out punching digging;Punching digs down the dredging tube extraction that the mud come is fixed in equipment, is transported by pipeline It transports in the interim mud pit by foundation pit and carries out preliminary sedimentation, afterwards through pipeline mud into the mud carrier of riverside harbour, And secondary precipitation carrying out in mud carrier to further decrease mud moisture content, transport is rushed to spoil area after mud carrier is fully loaded Excavation construction is using first center, the digging mode of rear surrounding, it then follows the excavation principle of " be layered, be uniform, symmetrical " reduces foundation pit to the greatest extent The soaking time on periphery, foundation pit slope angle and slope surface reserve a part of soil body using mechanical engagement man-handling of materials, excavation of foundation pit extremely From hydraulicking is stopped using at substrate 0.3m, all using hand excavation.
Technical characteristic of the present invention without description can realize that details are not described herein by or using the prior art, certainly, The above description is not a limitation of the present invention, and the present invention is also not limited to the example above, the ordinary skill of the art The variations, modifications, additions or substitutions that personnel are made within the essential scope of the present invention also should belong to protection model of the invention It encloses.

Claims (9)

1. a kind of hydraulicking for inner support base pit engineering, which twists, inhales equipment, which is characterized in that including mobile jib (1), be connected to Power device (2) on the mobile jib (1) and fixed beam (9) twists native device, institute by the twin shaft of the power device (2) driving It states the native device of twin shaft strand to run through and be connected in the fixed beam (9) and fixed plate (5), the twin shaft twists two axis pair of native device Claim setting, it includes hydraulic motor (3) that each twin shaft, which twists native device, and the hydraulic motor bottom end is axially connected with by its drive Dynamic power output shaft (4), the power output shaft (4) are connected with reamer head (8), further include being nested in the mobile jib (1) Dredging tube (6), and setting is in the mobile jib (1) two sides, from the power device (2) above access and extend described in insertion The giant (7) of fixed plate (5).
2. the hydraulicking according to claim 1 for inner support base pit engineering, which twists, inhales equipment, which is characterized in that described It includes the hydraulic motor (3) that twin shaft, which twists each axis in native device, hydraulic motor (3) lower end by screw with it is described solid Determine beam (9) connection;Hydraulic motor (3) bottom end is connected with the power output shaft (4) being driven by it, the power output shaft (4) extend straight down;The reamer head (8) is fixed on the power output shaft (4) lower end, by the power output shaft (4) Drive its rotation.
3. the hydraulicking according to claim 1 or 2 for inner support base pit engineering, which twists, inhales equipment, which is characterized in that Reamer head (8) lower part is double-helix drill bit (8-1), and middle part is several reamer tooths (8-2), several described reamer tooths (8-2) is Spiral distribution, is equipped with groove (8-4) along reamer head (8) generatrix direction between the reamer tooth (8-2);Top is wing plate (8-3), the wing plate (8-3) are four and are mutually perpendicular to, and section is trapezoidal up-narrow and down-wide steel plate composition, the wing plate It is welded and fixed between (8-3) by outer fixed ring (8-5).
4. the hydraulicking according to claim 1-3 for inner support base pit engineering, which twists, inhales equipment, feature It is, the mobile jib (1) is hollow thin-wall steel pipe, and upper end inner wall is equipped with screw thread, connection screw thread casing on the mobile jib (1) (12), the threaded sleeve (12) is that the dredging tube (6) are nested in the mobile jib (1), dredging tube (6) the upper section outlet End is connect with dredge pump, and lower end passes through the fixed plate (5), and is lower than the reamer head (8) horizontal position, and tail portion is connected with Mud-suction nozzle (6-1).
5. the hydraulicking according to claim 1-4 for inner support base pit engineering, which twists, inhales equipment, feature It is, the mud-suction nozzle (6-1) is connected to the dredging tube (6) bottom end entrance, and lower end import is circular cone shape, built in There is grid baffle.
6. the hydraulicking according to claim 1-5 for inner support base pit engineering, which twists, inhales equipment, feature Be, the giant (7) is arranged in the mobile jib (1) two sides, and upper section input end is connect with high-pressure hydraulic pump, middle part with it is described Power device (2) is fixed by lock (10), and lower end passes through the fixed beam (9) and is stuck in U-type groove (11), and is higher by the suction The horizontal position mud mouth (6-1).
7. the hydraulicking according to claim 1-6 for inner support base pit engineering, which twists, inhales equipment, feature It is, the twin shaft twists native device and sequentially passes through the fixed beam (9) and the fixed plate (5), is connected with the mobile jib (1) It connects, the fixed beam (9) and the fixed plate (5) are welded on the mobile jib (1).
8. the hydraulicking according to claim 1-7 for inner support base pit engineering, which twists, inhales equipment, feature It is, it further includes clump weight that the hydraulicking, which twists suction equipment, and the clump weight is symmetrical two pieces and is stuck in the mobile jib (1) two Side, and be that bottom surface stacks upwards in turn with the fixed plate (5).
9. a kind of hydraulicking based on the described in any item inner support base pit engineerings of claim 1-8 twists the user for inhaling equipment Method, which comprises the following steps:
1) sundries such as foundation pit surface layer miscellaneous fill are removed by mechanical excavation, and dug to first of inner support (15) bottom surface;
2) first of concrete inner support (15) and reserved bolt are poured, continues to excavate 2.5m downwards, i-beam track is installed (14) and electric block (13);
3) suction equipment is twisted using electric block (13) the handling arrangement hydraulicking in step (2) to march into the arena;
4) excavation construction is rushed using first center, the sequence of excavation of rear surrounding, is excavated to down support bottom together downwards using hydraulicking Face pours down one of concrete inner support (15) and reserved bolt, continues to dig 2m to undershoot, install electric block (13) and waterpower Punching, which digs to twist, inhales equipment;And so on, hydraulicking is stopped using when being excavated to from substrate 0.3m, it is complete by artificial clear bottom At.
CN201910811579.2A 2019-08-29 2019-08-29 A kind of hydraulicking strand suction device and method for inner support base pit engineering Pending CN110439048A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910811579.2A CN110439048A (en) 2019-08-29 2019-08-29 A kind of hydraulicking strand suction device and method for inner support base pit engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910811579.2A CN110439048A (en) 2019-08-29 2019-08-29 A kind of hydraulicking strand suction device and method for inner support base pit engineering

Publications (1)

Publication Number Publication Date
CN110439048A true CN110439048A (en) 2019-11-12

Family

ID=68438410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910811579.2A Pending CN110439048A (en) 2019-08-29 2019-08-29 A kind of hydraulicking strand suction device and method for inner support base pit engineering

Country Status (1)

Country Link
CN (1) CN110439048A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112253000A (en) * 2020-10-21 2021-01-22 简永海 Built-in thick liquid tubular drill rod subassembly
CN112921943A (en) * 2020-12-17 2021-06-08 南京工业大学 Hydraulic burying and monitoring device for soil displacement and using method thereof

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4322898A (en) * 1978-05-11 1982-04-06 Reba B.V. Cutter head with adjustable suction nozzle
CN101078215A (en) * 2007-04-18 2007-11-28 上海市第二市政工程有限公司 Deep foundation ditch soil excavating and dumping construction device and construction method thereof
DE202010007757U1 (en) * 2010-06-09 2010-10-07 Tröndle, Karl-Heinz Underwater foundation excavators
CN102477744A (en) * 2010-11-23 2012-05-30 中国二十冶集团有限公司 Pit excavation method in large-area pit with internal support under condition of soft soil foundation
CN202467844U (en) * 2012-01-18 2012-10-03 李胜新 Silo excavator
CN104294872A (en) * 2014-09-11 2015-01-21 中国船舶重工集团公司第十二研究所 Reamer head for environmental protection dredging
CN204753676U (en) * 2015-06-23 2015-11-11 深圳滨海万盈海洋工程技术有限公司 Utilize water pump to erode sludger of mud layer
CN206829216U (en) * 2017-05-24 2018-01-02 中交天航滨海环保浚航工程有限公司 A kind of cutter suction dredger Novel rimmer
CN108118728A (en) * 2017-12-29 2018-06-05 上海建工集团股份有限公司 The efficient earth-moving equipment of special-shaped deep basal pit and shoveling method
CN208183839U (en) * 2018-05-07 2018-12-04 中铁大桥局集团第一工程有限公司 A kind of strand suction suction dredge
CN210766939U (en) * 2019-08-29 2020-06-16 南京江北新区中心区发展有限公司 Hydraulic flushing, digging, reaming and sucking equipment for inner support foundation pit engineering

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4322898A (en) * 1978-05-11 1982-04-06 Reba B.V. Cutter head with adjustable suction nozzle
CN101078215A (en) * 2007-04-18 2007-11-28 上海市第二市政工程有限公司 Deep foundation ditch soil excavating and dumping construction device and construction method thereof
DE202010007757U1 (en) * 2010-06-09 2010-10-07 Tröndle, Karl-Heinz Underwater foundation excavators
CN102477744A (en) * 2010-11-23 2012-05-30 中国二十冶集团有限公司 Pit excavation method in large-area pit with internal support under condition of soft soil foundation
CN202467844U (en) * 2012-01-18 2012-10-03 李胜新 Silo excavator
CN104294872A (en) * 2014-09-11 2015-01-21 中国船舶重工集团公司第十二研究所 Reamer head for environmental protection dredging
CN204753676U (en) * 2015-06-23 2015-11-11 深圳滨海万盈海洋工程技术有限公司 Utilize water pump to erode sludger of mud layer
CN206829216U (en) * 2017-05-24 2018-01-02 中交天航滨海环保浚航工程有限公司 A kind of cutter suction dredger Novel rimmer
CN108118728A (en) * 2017-12-29 2018-06-05 上海建工集团股份有限公司 The efficient earth-moving equipment of special-shaped deep basal pit and shoveling method
CN208183839U (en) * 2018-05-07 2018-12-04 中铁大桥局集团第一工程有限公司 A kind of strand suction suction dredge
CN210766939U (en) * 2019-08-29 2020-06-16 南京江北新区中心区发展有限公司 Hydraulic flushing, digging, reaming and sucking equipment for inner support foundation pit engineering

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112253000A (en) * 2020-10-21 2021-01-22 简永海 Built-in thick liquid tubular drill rod subassembly
CN112253000B (en) * 2020-10-21 2022-11-29 简永海 Built-in thick liquid tubular drill rod subassembly
CN112921943A (en) * 2020-12-17 2021-06-08 南京工业大学 Hydraulic burying and monitoring device for soil displacement and using method thereof
WO2022127136A1 (en) * 2020-12-17 2022-06-23 南京工业大学 Device for monitoring soil displacement by means of hydraulic burying, and use method thereof

Similar Documents

Publication Publication Date Title
CN103114577B (en) Rotary excavating hole-forming construction method for building pile foundation
CN104153352A (en) Karst geology rotary-drilling bored concrete pile hole forming process
JPH11107686A (en) Long distance driving method in semishield method
CN108868678A (en) For clearing up the hole cleaning device and method of Punching Borehole Cast-in-place Concrete Pile bottom hole sediment
CN103031839A (en) Construction method of hand-dug piles
CN110439048A (en) A kind of hydraulicking strand suction device and method for inner support base pit engineering
CN105155519A (en) Rotary-excavating under-reamed bored pile constructing method
CN104532853A (en) Deep foundation pit supporting method and system characterized by steel reinforced cement-soil piles, bolts easy to detach and automatic monitoring and early warning
JP4974364B2 (en) Pile burying method
CN203403404U (en) High-efficiency cast-in-place pile device
CN202467651U (en) High-speed rotating drilling machine
CN202467652U (en) High speed rotary drilling machine
CN210766939U (en) Hydraulic flushing, digging, reaming and sucking equipment for inner support foundation pit engineering
CN113404044A (en) Hierarchical pore-forming construction method for rotary digging cast-in-place pile
CN1024029C (en) Direct sink-and-insert method and equipment for constructing underground building with combined and interlocked prefabricated concrete components
EP2098642B1 (en) Screw equipment for digging to construct diaphragms
CN109653266B (en) Scraper chain type grooving machine
JP2726621B2 (en) Caisson laying method and caisson blade structure
CN109898515A (en) Support of Foundation Pit Excavation method of the slope in conjunction with tubular pole
GB2137678A (en) Method and apparatus for pile construction
CN105781557B (en) A kind of construction method of bored tunnel chemical grouting consolidation layer of sand
JPH08199566A (en) Construction method of pile
CN218712956U (en) Multifunctional full-sleeve pile planting machine
JP7248545B2 (en) Construction method of drilling rig and monopile foundation
CN209324250U (en) A kind of rectangle friction pile excavation equipment of adjustable dimension

Legal Events