CN109898515A - Support of Foundation Pit Excavation method of the slope in conjunction with tubular pole - Google Patents

Support of Foundation Pit Excavation method of the slope in conjunction with tubular pole Download PDF

Info

Publication number
CN109898515A
CN109898515A CN201910302443.9A CN201910302443A CN109898515A CN 109898515 A CN109898515 A CN 109898515A CN 201910302443 A CN201910302443 A CN 201910302443A CN 109898515 A CN109898515 A CN 109898515A
Authority
CN
China
Prior art keywords
foundation pit
tubular pole
wall body
support
body structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910302443.9A
Other languages
Chinese (zh)
Inventor
王代发
李宇龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201910302443.9A priority Critical patent/CN109898515A/en
Publication of CN109898515A publication Critical patent/CN109898515A/en
Pending legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The present invention relates to Support of Foundation Pit Excavation method in construction, Support of Foundation Pit Excavation method of specifically a kind of slope in conjunction with tubular pole.Include the following steps: A, whole excavation;B, surveying setting-out;C, drive piles D, the filling slip casting of stake core;E, crown beam is constructed;F, upper wall body structure construction;G, lower section earth excavation;H, lower section wall body structure is constructed;I, step G, H is repeated, the depth of design structure bottom plate is arrived until excavating.Sloping coefficient of the present invention reduces, and earth excavation relative quantity is small;Duration accelerates, environmentally protective, at low cost.

Description

Support of Foundation Pit Excavation method of the slope in conjunction with tubular pole
Technical field
The present invention relates to Support of Foundation Pit Excavation method in construction, foundation pit of specifically a kind of slope in conjunction with tubular pole is opened Dig method for protecting support.
Background technique
It is well known that often meeting deep basal pit basis in earth work, how guaranteeing that the earthwork is smoothly excavated, base area It surveys data, hydrological geological conditions, ambient enviroment and comprehensively considers duration, safety and cost, generally there is heavy excavation (slope), soil Nail wall, diaphram wall, steel-pipe pile, steel sheet pile, cast-in-situ bored pile, anchor cable and various support forms combine.For compared with Deep underground reinforced concrete wall structure (such as whirling well, sedimentation basin), how to carry out safety support is just even more to seem especially It is important.
Summary of the invention
A kind of Support of Foundation Pit Excavation method that the technical problem to be solved in the present invention is to provide slopes in conjunction with tubular pole, the party Method earthwork excavated volume is small, and safety coefficient is high, and the construction period is short.
The technical solution used to solve the technical problems of the present invention is that:
A kind of Support of Foundation Pit Excavation method of slope in conjunction with tubular pole, includes the following steps:
A, whole to excavate
According to foundation pit size, mechanical work face is reserved, it is whole by earth excavation certain depth;
B, surveying setting-out
Foundation pit surrounding is released to need to drive piles the line of supporting;
C, it drives piles
According to the unwrapping wire of step B, using hammering method or static pressure method, gradually it is close to squeeze into tubular pole;
D, stake core fills slip casting
Tubular pole, which is squeezed into, to be finished, and the steel reinforcement cage made is put into an in-core, the upper end of steel reinforcement cage is inserted into crown beam, the filling of stake in-core Concrete;
E, crown beam is constructed
Steel reinforcement cage connect to form entirety with top crown beam, is preced with beam steel bar colligation and form for seal, crown beam concreting;
F, upper wall body structure construction
The construction of upper wall body structure is carried out in crown beam structure;
G, lower section earth excavation
Excavator cooperation suspension bucket is transported earth excavation in foundation pit using crane, and setting sump cooperates pumping equipment row in foundation pit Water;
H, lower section wall body structure is constructed
Lower section wall body structure is carried out to tie up muscle, upper end and reserved reinforcing bar, which are bound, to be overlapped, and lower end overlap is inserted into certain thickness Sand in, carry out form for seal, upper wall body structure and crown beam connecting portion template-setup concreting horn mouth pour It is cut after complete concrete demoulding;
I, step G, H is repeated, the depth of design structure bottom plate is arrived until excavating.
The present invention by adopting the above technical scheme, compared with prior art, beneficial effect is:
1, sloping coefficient reduces, and earth excavation relative quantity is small;
2, for Relative perfusion stake, the duration accelerates, and no drilling slurry retaining wall is environmentally protective;
3, tubular pole has additional supporting waterproof double action, advantageous to underground structure ontology waterproof and resistance lateral pressure;
4, relatively relatively low for cost Relative perfusion stake supporting;
5, reverse construction no longer needs to setting anchor cable and intermediate supports, constructs convenient for earth excavation and structure hoisting;
6, it is built especially suitable for Responses of An Underground Round, crown beam and upper body structure play inner support jointly and reinforce resistance to compression work With forming entirety with tube pile structure;Crown beam and barrel load suspended tubes stake top portion, without having to worry about differential settlement;
7, fill concrete in tubular pole, similar " concrete filled steel tube ", tubular pole overall stiffness improve.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the embodiment of the present invention;
Fig. 2 is the floor map of the embodiment of the present invention;
Fig. 3 is the A-A view of Fig. 2;
Fig. 4 is the B point enlarged drawing of Fig. 3;
In figure: tubular pole 1;Crown beam 2;Upper wall body structure 3;Stake core 4;Lower wall body structure 5;Second of foundation pit wall 5-1;Third Secondary foundation pit wall 5-2;4th foundation pit wall 5-3;Bottom plate 6;First time foundation pit 7;Second of foundation pit 8;Third time foundation pit 9;The Four foundation pits 10;Steel reinforcement cage 11.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawings and examples.
Referring to Fig. 1, Fig. 2, a kind of Support of Foundation Pit Excavation method of slope in conjunction with tubular pole carries out as follows:
A, whole to excavate
According to foundation pit size, mechanical work face is reserved, carries out the excavation of first time foundation pit 7, it is whole by earth excavation certain depth, 3 to 5 meters are excavated according to the actual situation, not only can be reduced comprehensive heavy excavation earth moving amount in this way, but also can be reduced a cubic metre of earth lateral pressure;
B, surveying setting-out
The line for the supporting that needs to drive piles is put in the surrounding of first time foundation pit 7;
C, it drives piles
According to the unwrapping wire of step B, using hammering method or static pressure method, gradually it is close to squeeze into a circle PHC tubular pole 1, between PHC tubular pole 1 Clear distance 100mm, PHC tubular pole 1 can be single, can also front and back intersection progress;
D, stake core fills slip casting
PHC tubular pole 1, which is squeezed into, to be finished, and the steel reinforcement cage 11 made is put into a core 4, and the upper surface of steel reinforcement cage 11 is managed higher than PHC The upper end of the upper surface of stake 1, steel reinforcement cage 11 is inserted into crown beam 2, fill concrete in stake core 4;If groundwater resources are abundant, High pressure jet grouting is carried out between PHC tubular pole 1, prevents the infiltration of underground water;Otherwise slip casting is not had to;
E, crown beam is constructed
Steel reinforcement cage 11 connect formation entirety, steel reinforcement cage 11 and 2 link enhancement of the crown beam integral rigidity of structure with top crown beam 2; After the binding of 2 reinforcing bar of crown beam and form for seal, 2 concreting of crown beam;
F, upper wall body structure construction
Continue the normal construction of upper wall body structure 3 in crown beam structure 2, upper wall body structure 3 can root after constructing Partially or completely backfilling of earthwork is carried out according to actual conditions, it is convenient convenient for mechanical work occupy-place and manual work;
G, lower section earth excavation
According to circumstances, mini-excavator is hung in foundation pit with crane, excavator cooperates suspension bucket to utilize crane by the earthwork in foundation pit Excavation transports, and setting sump cooperates suction pump in time to exclude rainwater in foundation pit;
H, lower section wall body structure is constructed
Lower section wall body structure 5 is carried out to tie up muscle, upper end and reserved reinforcing bar, which are bound, to be overlapped, and lower end overlap is inserted into certain thickness Sand in, carry out form for seal, top and 2 connecting portion template-setup concreting horn mouth of crown beam have poured coagulation It is cut after native demoulding;
I, step G, H is repeated, the depth of design structure bottom plate is arrived until excavating, finally carries out the construction of structure base slab.
The present embodiment from top to bottom successively passes through first time foundation pit 7, second of foundation pit 8, third time foundation pit 9 and the 4th base The excavation in hole 10, reaches design structure bottom plate 6, after the completion of second of foundation pit 8, carries out the construction of second of foundation pit wall 5-1, the Three times after the completion of foundation pit 9, the construction of third time foundation pit wall 5-2 is carried out, after the completion of the 4th foundation pit 10, carries out the 4th foundation pit The construction of wall 5-3 finally carries out the construction of structure base slab 6.When the certain altitude of excavation down, upper end lower part is reserved in It overlap joint reinforcing bar in sand and connects a batch face work surface and is cleared up, high pressure water flushing can be used.
The foregoing is merely preferably feasible embodiment of the invention, not thereby limiting the scope of the invention, It is all to change with equivalent structure made by description of the invention and accompanying drawing content, it is intended to be included within the scope of the present invention.

Claims (4)

1. a kind of Support of Foundation Pit Excavation method of slope in conjunction with tubular pole, which comprises the steps of:
A, whole to excavate
According to foundation pit size, mechanical work face is reserved, it is whole by earth excavation certain depth;
B, surveying setting-out
Foundation pit surrounding is released to need to drive piles the line of supporting;
C, it drives piles
According to the unwrapping wire of step B, using hammering method or static pressure method, gradually it is close to squeeze into tubular pole;
D, stake core fills slip casting
Tubular pole, which is squeezed into, to be finished, and the steel reinforcement cage made is put into an in-core, the upper end of steel reinforcement cage is inserted into crown beam, the filling of stake in-core Concrete;
E, crown beam is constructed
Steel reinforcement cage connect to form entirety with top crown beam, is preced with beam steel bar colligation and form for seal, crown beam concreting;
F, upper wall body structure construction
The construction of upper wall body structure is carried out in crown beam structure;
G, lower section earth excavation
Excavator cooperation suspension bucket is transported earth excavation in foundation pit using crane, and setting sump cooperates pumping equipment row in foundation pit Water;
H, lower section wall body structure is constructed
Lower section wall body structure is carried out to tie up muscle, upper end and reserved reinforcing bar, which are bound, to be overlapped, and lower end overlap is inserted into certain thickness Sand in, carry out form for seal, upper wall body structure and crown beam connecting portion template-setup concreting horn mouth pour It is cut after complete concrete demoulding;
I, step G, H is repeated, the depth of design structure bottom plate is arrived until excavating.
2. Support of Foundation Pit Excavation method of the slope according to claim 1 in conjunction with tubular pole, it is characterised in that: in step A Cutting depth be 3 to 5 meters.
3. Support of Foundation Pit Excavation method of the slope according to claim 1 in conjunction with tubular pole, it is characterised in that: in step C Tubular pole between 100 millimeters of clear distance.
4. Support of Foundation Pit Excavation method of the slope according to claim 1 in conjunction with tubular pole, it is characterised in that: tubular pole is PHC tubular pole.
CN201910302443.9A 2019-04-16 2019-04-16 Support of Foundation Pit Excavation method of the slope in conjunction with tubular pole Pending CN109898515A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910302443.9A CN109898515A (en) 2019-04-16 2019-04-16 Support of Foundation Pit Excavation method of the slope in conjunction with tubular pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910302443.9A CN109898515A (en) 2019-04-16 2019-04-16 Support of Foundation Pit Excavation method of the slope in conjunction with tubular pole

Publications (1)

Publication Number Publication Date
CN109898515A true CN109898515A (en) 2019-06-18

Family

ID=66954880

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910302443.9A Pending CN109898515A (en) 2019-04-16 2019-04-16 Support of Foundation Pit Excavation method of the slope in conjunction with tubular pole

Country Status (1)

Country Link
CN (1) CN109898515A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111663540A (en) * 2020-06-29 2020-09-15 河北建设勘察研究院有限公司 Foundation pit supporting structure and wall formwork integrated construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105033A (en) * 2007-07-31 2008-01-16 华丰建设股份有限公司 Method for supporting and protecting building foundation pit by employing transverse-diaphragm prestressing concrete pipe pile
CN101457526A (en) * 2009-01-07 2009-06-17 中冶天工建设有限公司 Circular deep foundation ditch concrete pile arranging support and major structure inversing construction method
CN103628487A (en) * 2013-11-28 2014-03-12 中冶天工集团有限公司 Circular deep foundation pit retaining wall reverse construction method
CN107034898A (en) * 2017-06-05 2017-08-11 上海大学 A kind of combined type foundation ditch concrete supporting structure
CN107558494A (en) * 2017-10-16 2018-01-09 西南交通大学 A kind of Underground Station structure and its method of construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105033A (en) * 2007-07-31 2008-01-16 华丰建设股份有限公司 Method for supporting and protecting building foundation pit by employing transverse-diaphragm prestressing concrete pipe pile
CN101457526A (en) * 2009-01-07 2009-06-17 中冶天工建设有限公司 Circular deep foundation ditch concrete pile arranging support and major structure inversing construction method
CN103628487A (en) * 2013-11-28 2014-03-12 中冶天工集团有限公司 Circular deep foundation pit retaining wall reverse construction method
CN107034898A (en) * 2017-06-05 2017-08-11 上海大学 A kind of combined type foundation ditch concrete supporting structure
CN107558494A (en) * 2017-10-16 2018-01-09 西南交通大学 A kind of Underground Station structure and its method of construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111663540A (en) * 2020-06-29 2020-09-15 河北建设勘察研究院有限公司 Foundation pit supporting structure and wall formwork integrated construction method thereof

Similar Documents

Publication Publication Date Title
JP2022502586A (en) Grouting consolidation method of ready-made piles guided by all-casing excavation, and the ready-made piles
US20140026518A1 (en) Construction method for root-type foundation anchorage and bored, root-type cast in-situ pile with anchor bolts
CN106930321B (en) The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
US20160376762A1 (en) Construction method for planting hollow columns in a seabed of a marine environment for supporting waterborne structures thereon
CN109440778A (en) Active inclined in two-way method for supporting and protecting row pile pit
CN109630015A (en) A kind of friction pile mechanical hole building method
CN110735600B (en) Mechanical pore-forming pile construction process for karst geology
CN106958254A (en) Latch steel pipe and reinforced concrete combination pile cofferdam and its construction method
CN107513994A (en) One kind segmentation becomes supporting rotary digging stake and its construction method without leave
CN110130427A (en) The reinforcement means and organizational pile foundation of precast hollow tubular pole
CN110158630A (en) A kind of deep covering layer area large-span arch bridge annular ground continuous wall base
CN106869138A (en) A kind of load retaining wall Retaining Structure with Double-row Piles and its foundation ditch excavation method
CN114108649A (en) Foundation pit reinforcing construction method for mucky soil layer
CN110896644B (en) Grouting consolidation method for full-casing drilling guide precast pile
CN106498951B (en) A kind of shaft excavation construction method
CN207484290U (en) The hollow clump of piles anchorage of super-large diameter
CN113832991A (en) Reverse construction method of pile plate wall
CN109440779A (en) Active X-shaped foundation pit supporting method with double rows of piles
CN210658340U (en) Prefabricated dado
CN109898515A (en) Support of Foundation Pit Excavation method of the slope in conjunction with tubular pole
CN105155421B (en) Complete embedding circular construction method in a kind of single pile Single column pier river course shallow water
CN109989346A (en) Bridge major diameter precast concrete tubular column basis and its construction method
CN110144881A (en) One kind is drowned oneself type precast hollow friction pile and its construction method
CN110397044A (en) The prominent foundation ditch construction method and foundation pit structure gushed of anti-artesian water

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190618

RJ01 Rejection of invention patent application after publication