CN110424435A - For the cut-pff wall in deep covering layer - Google Patents

For the cut-pff wall in deep covering layer Download PDF

Info

Publication number
CN110424435A
CN110424435A CN201910796095.5A CN201910796095A CN110424435A CN 110424435 A CN110424435 A CN 110424435A CN 201910796095 A CN201910796095 A CN 201910796095A CN 110424435 A CN110424435 A CN 110424435A
Authority
CN
China
Prior art keywords
cut
wall
pff wall
pff
copper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910796095.5A
Other languages
Chinese (zh)
Inventor
高玉生
王立成
吕振
毛深秋
韩治国
秦玉龙
曹荣国
王莉
肖俊和
孙其臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Water Resources Beifang Investigation Design and Research Co Ltd
Original Assignee
China Water Resources Beifang Investigation Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Water Resources Beifang Investigation Design and Research Co Ltd filed Critical China Water Resources Beifang Investigation Design and Research Co Ltd
Priority to CN201910796095.5A priority Critical patent/CN110424435A/en
Publication of CN110424435A publication Critical patent/CN110424435A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material

Abstract

The invention discloses a kind of cut-pff walls for deep covering layer, core-wall is set inside the local material dam body built on deep covering layer, cut-pff wall lower part is embedded in basement rock, filter material and transition zone is respectively arranged in core-wall upstream and downstream side, core-wall lower part is connected with cut-pff wall, framework of steel reinforcement is set in cut-pff wall, parting on cut-pff wall is flexibly connected by copper seal, copper seal is fixed on framework of steel reinforcement, copper seal is using round copper lug, hard PVC stick is set inside round copper lug, wraps up pitch spunyarn outside hard PVC stick.The present invention uses the handling flexibly of cut-pff wall parting, using the excellent ductility of Copper water stop, can effectively avoid cut-pff wall caused by the water pressure of library crack leak the phenomenon that.

Description

For the cut-pff wall in deep covering layer
Technical field
The present invention relates to a kind of leakage proof wall, especially a kind of cut-pff wall in deep covering layer.
Background technique
Cut-pff wall is the main vertical seepage control technology in current shot shape stratum, and it is anti-that it serves not only as permanent ground Seep, to just leak and there are the dike of dangerous situation, dam carry out leak-stopping processing, also act as at the antiseepage to Temporary Cofferdam, foundation pit etc. Reason, barricade, anti-scour wall etc. as building are occurred sedimentation by dam body gravity pressure, library water lateral pressure, soil at both sides and generated Additional lateral pressure and head difference bring horizontal thrust etc. so that wall is pressurized, cuts, curved effect, wall is caused to be opened It splits, ultimately causes leakage proof wall leak.
Therefore, such as make cut-pff wall in use, prevent wall leakage, be a urgent problem.
Summary of the invention
The technical problem to be solved by the invention is to provide a kind of cut-pff wall in deep covering layer, leakage proof walls Crack is preset, copper sheet sealing is set at crack in advance, so that leakage proof wall cracking position is clear, well in advance antiseepage is arranged It applies, the later period effectively can avoid cut-pff wall from leaking.
To solve the above-mentioned problems, the technical scheme adopted by the invention is that: a kind of antiseepage in deep covering layer Core-wall is arranged inside the local material dam body built on deep covering layer in wall, and cut-pff wall is embedded in lower part basement rock, core-wall upstream and downstream Side setting filter material and transition zone, core-wall lower part are connected with cut-pff wall, which is characterized in that framework of steel reinforcement is set in cut-pff wall, Parting is set on cut-pff wall, the parting on cut-pff wall is flexibly connected by copper seal, and copper seal is fixed on framework of steel reinforcement, only Hard PVC stick is set inside the round copper lug of water copper sheet, wraps up pitch spunyarn outside hard PVC stick.
For cut-pff wall with a thickness of 80~120cm, parting height spacing is 6~8m.
Copper seal 3~5mm of thickness, 40~50cm of width, copper seal installation position is antiseepage wall thickness 1/3 and 2/3 Place.
The hard PVC stick diameter being arranged inside round copper lug among copper seal is 50~80mm, outsourcing pitch spunyarn With a thickness of 10~15mm.Copper lug internal diameter is equal with the cylinder diameter that PVC stick and its outsourcing pitch spunyarn form.
Beneficial effects of the present invention: parting is set on cut-pff wall in advance when construction, copper sheet sealing is set on parting, will be prevented Handling flexibly at wall parting is seeped, wall when external force at parting by being preferentially subjected to displacement, the good ductility of copper sheet sealing Can to avoid by drawing crack, play the role of preventing leakage.The present invention uses the handling flexibly of cut-pff wall parting, excellent using Copper water stop Ductility, can effectively avoid cut-pff wall caused by the water pressure of library crack leak the phenomenon that.
Detailed description of the invention
Fig. 1 is of the invention for the cut-pff wall schematic diagram in deep covering layer.
Fig. 2 is that copper sheet sealing, hard PVC stick and the pitch spunyarn for the cut-pff wall in deep covering layer of the invention shows It is intended to.
Specific embodiment
Invention is further described in detail with reference to the accompanying drawings and detailed description:
As shown in Figure 1, 2, the cut-pff wall in deep covering layer of the invention, the locality built on deep covering layer 10 Core-wall 3 is set inside material dam body 1, and cut-pff wall 4 is embedded in lower part basement rock 9, and filter material 2 and transition zone is arranged in 3 upstream and downstream side of core-wall 12,3 lower part of core-wall is connected with cut-pff wall 4, and framework of steel reinforcement 13 is arranged in cut-pff wall 4, sets parting 5, cut-pff wall 4 on cut-pff wall 4 On parting 5 be flexibly connected by copper seal 6, copper seal 6 is fixed on framework of steel reinforcement 13, the round copper of copper seal 6 Hard PVC stick 7 is set inside nose 11, wraps up pitch spunyarn 8 outside hard PVC stick 7.
For cut-pff wall 4 with a thickness of 80~120cm, 5 height spacing of parting is 6~8m.
6 3~5mm of thickness of copper seal, 40~50cm of width, 6 installation position of copper seal is 4 thickness of cut-pff wall, 1/3 He At 2/3.
7 diameter of hard PVC stick being arranged inside round copper lug 11 among copper seal 6 is 50~80mm, outsourcing pitch Spunyarn 8 is with a thickness of 10~15mm.The cylinder diameter phase that 11 internal diameter of copper lug is formed with PVC stick 7 and its outsourcing pitch spunyarn 8 Deng.
Hard PVC stick 7 and pitch spunyarn 8 play a supporting role to the round copper lug of copper seal, anti-to guarantee to pour Copper seal circle copper lug is not by concrete compressive strain when seeping wall.
The above embodiments are merely to illustrate technical idea and feature of the invention, and its object is to make skill in the art Art personnel only cannot limit the scope of the patents of the invention with the present embodiment it will be appreciated that the contents of the present invention and implement accordingly, Same changes or modifications made by i.e. all disclosed spirit, still fall in the scope of the patents of the invention.

Claims (4)

1. a kind of cut-pff wall in deep covering layer, the local material dam body (1) built on deep covering layer (10) is internal It is arranged core-wall (3), cut-pff wall (4) is embedded in lower part basement rock (9), and filter material (2) and transition zone is arranged in core-wall (3) upstream and downstream side (12), core-wall (3) lower part is connected with cut-pff wall (4), which is characterized in that framework of steel reinforcement (13) is arranged in cut-pff wall (4), antiseepage It is set on wall (4) parting (5), the parting (5) on cut-pff wall (4) is flexibly connected by copper seal (6), and copper seal (6) is fixed In on framework of steel reinforcement (13), hard PVC stick (7) are set inside the round copper lug (11) of copper seal (6), hard PVC stick (7) Outside package pitch spunyarn (8).
2. according to claim 1 for the cut-pff wall in deep covering layer, which is characterized in that cut-pff wall (4) is with a thickness of 80 ~120cm, parting (5) height spacing are 6~8m.
3. according to claim 1 for the cut-pff wall in deep covering layer, which is characterized in that copper seal (6) thickness 3~ 5mm, 40~50cm of width, copper seal (6) installation position are at cut-pff wall (4) thickness 1/3 and 2/3.
4. according to claim 1 for the cut-pff wall in deep covering layer, which is characterized in that copper seal (6) middle circle Hard PVC stick (7) diameter being arranged inside shape copper lug (11) is 50~80mm, outsourcing pitch spunyarn (8) with a thickness of 10~ 15mm, copper lug (11) internal diameter are equal with the cylinder diameter that PVC stick (7) and its outsourcing pitch spunyarn (8) form.
CN201910796095.5A 2019-08-27 2019-08-27 For the cut-pff wall in deep covering layer Pending CN110424435A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910796095.5A CN110424435A (en) 2019-08-27 2019-08-27 For the cut-pff wall in deep covering layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910796095.5A CN110424435A (en) 2019-08-27 2019-08-27 For the cut-pff wall in deep covering layer

Publications (1)

Publication Number Publication Date
CN110424435A true CN110424435A (en) 2019-11-08

Family

ID=68416218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910796095.5A Pending CN110424435A (en) 2019-08-27 2019-08-27 For the cut-pff wall in deep covering layer

Country Status (1)

Country Link
CN (1) CN110424435A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622180A (en) * 2020-05-28 2020-09-04 中国电建集团中南勘测设计研究院有限公司 Salt pan dam foundation seepage-proof hydraulic balance structure system and control method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007096934A1 (en) * 2006-02-20 2007-08-30 Izaki Kogyo Co., Ltd. Crack inducing waterproofing method
CN103225283A (en) * 2013-04-24 2013-07-31 黄河勘测规划设计有限公司 Connection structure of barrage foundation diaphragm wall and gate dam building
CN103924622A (en) * 2014-04-16 2014-07-16 黄河勘测规划设计有限公司 Parting water-stop design method of concrete cast-in-situ diaphragm wall of deep overburden layer dam foundation
CN106013263A (en) * 2016-07-16 2016-10-12 黄河勘测规划设计有限公司 Impermeable method of clay core wall dam foundation of deep river valley with deep sand gravel layer
CN106223352A (en) * 2016-09-05 2016-12-14 中国电建集团成都勘测设计研究院有限公司 Deep covering layer foundation anti-seepage wall construction
CN210621731U (en) * 2019-08-27 2020-05-26 中水北方勘测设计研究有限责任公司 Impervious wall for deep covering layer

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007096934A1 (en) * 2006-02-20 2007-08-30 Izaki Kogyo Co., Ltd. Crack inducing waterproofing method
CN103225283A (en) * 2013-04-24 2013-07-31 黄河勘测规划设计有限公司 Connection structure of barrage foundation diaphragm wall and gate dam building
CN103924622A (en) * 2014-04-16 2014-07-16 黄河勘测规划设计有限公司 Parting water-stop design method of concrete cast-in-situ diaphragm wall of deep overburden layer dam foundation
CN106013263A (en) * 2016-07-16 2016-10-12 黄河勘测规划设计有限公司 Impermeable method of clay core wall dam foundation of deep river valley with deep sand gravel layer
CN106223352A (en) * 2016-09-05 2016-12-14 中国电建集团成都勘测设计研究院有限公司 Deep covering layer foundation anti-seepage wall construction
CN210621731U (en) * 2019-08-27 2020-05-26 中水北方勘测设计研究有限责任公司 Impervious wall for deep covering layer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622180A (en) * 2020-05-28 2020-09-04 中国电建集团中南勘测设计研究院有限公司 Salt pan dam foundation seepage-proof hydraulic balance structure system and control method thereof

Similar Documents

Publication Publication Date Title
CN202689046U (en) Closed advanced water sealing post-cast strip
CN109339029B (en) Construction method for resisting uplift deformation in excavation of foundation pit above existing tunnel
CN104711994A (en) Foundation pit deep well rainfall and plugging construction method
CN104452809A (en) Ultra-shallow buried tunnel cover-excavation construction method
CN205012288U (en) Embankment dam pitch core -wall base
CN105484204A (en) Stone masonry dam or concrete dam sealing anti-seepage reinforcement structure and construction method thereof
CN110424435A (en) For the cut-pff wall in deep covering layer
CN104088263A (en) Self-adaptive deforming impermeable channel applied to mining
CN110158542A (en) The Lossless connection structure and construction method of cut-pff wall and nut cap concrete
CN203768925U (en) Seal device for dewatering well in foundation pit
CN105507950A (en) Waterproof airtight structure with arched cushion wall
CN105350575A (en) Reverse construction method for underground continuous wall
CN105605335A (en) Large-caliber prestressed steel cylinder concrete pipe for jacking construction
CN101942820A (en) Impervious structure of arch dam and construction method thereof
CN204753654U (en) Underground continuous wall reentrant corner position piping block structure
CN204212168U (en) A kind of dam water-retaining structure utilizing solution cavity to combine to build a dam
CN207727514U (en) A kind of library basin antiseepage is anti-to lift structure
CN210621731U (en) Impervious wall for deep covering layer
CN201972711U (en) Device for controlling deformation of near metro tunnel caused by super-deep foundation pit evacuation in soft soil areas
CN205314056U (en) It seals prevention of seepage reinforced structure to grout masonry dam or concrete dam
CN205329735U (en) Foundation ditch excavation closes on existing shallow foundation protection architecture
CN203977385U (en) Be applied to the self adaptation distortion anti-seepage channel of minery
CN201809749U (en) Anti-seepage structure of arch dam
CN210315409U (en) Lossless type connection structure of cut-off wall and block concrete
CN103850246A (en) End part protective shoe sleeve of steel plate pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination