CN204753654U - Underground continuous wall reentrant corner position piping block structure - Google Patents

Underground continuous wall reentrant corner position piping block structure Download PDF

Info

Publication number
CN204753654U
CN204753654U CN201520436424.2U CN201520436424U CN204753654U CN 204753654 U CN204753654 U CN 204753654U CN 201520436424 U CN201520436424 U CN 201520436424U CN 204753654 U CN204753654 U CN 204753654U
Authority
CN
China
Prior art keywords
cofferdam
diaphragm wall
block structure
corner position
underground continuous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520436424.2U
Other languages
Chinese (zh)
Inventor
宣云干
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Research Institute of Building Science Co Ltd
Original Assignee
Jiangsu Research Institute of Building Science Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Research Institute of Building Science Co Ltd filed Critical Jiangsu Research Institute of Building Science Co Ltd
Priority to CN201520436424.2U priority Critical patent/CN204753654U/en
Application granted granted Critical
Publication of CN204753654U publication Critical patent/CN204753654U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model relates to an underground continuous wall reentrant corner position piping block structure, this block structure is through a little inserting the honeycomb duct leaking of reentrant corner position to building first cofferdam with the bagged cement, building second way cofferdam in the periphery in first cofferdam, insert the rubble in the hole capital after selling all securities of first cofferdam and underground continuous wall formation, the rubble top is equipped with the apron, covers the pressure with the bagged cement on the apron, builds sealing material in the hole capital after selling all securities of second way cofferdam and underground continuous wall formation. When this block structure can guarantee going on smoothly of foundation ditch engineering, when the piping appeared in diaphragm wall reentrant corner position, the timely shutoff of carrying on was handled, had guaranteed constructor's the person and property safety, provided necessary technical guarantee smoothly for the construction.

Description

Diaphragm wall internal corner part piping plugging structure
[technical field]
The utility model relates to a kind of diaphragm wall internal corner part piping plugging structure, belongs to deep foundation ditch waterproof and leaking stoppage technology field.
[background technology]
According to place hydrogeological conditions and the excavation of foundation pit degree of depth, larger on foundation ditch impact is shallow-layer diving and deep water in confined.When base pit engineering excavates; face severe artesian water problem; for the surrounding enviroment of protection construction; base pit engineering diaphragm wall enters rock stratum and cuts off artesian water inside and outside foundation ditch; but the underground water affecting base pit engineering is the diving of superficial part and the artesian water in deep, adopt two filter dewatering well to carry out precipitation for these two kinds of underground water, top filter is positioned at diving position; bottom filter is positioned at soil with confined aquifer, therefore the sealing performance of diaphragm wall seam is most important to excavation of foundation pit safety.If do not reach stagnant water effect, easily there is percolating water situation in diaphragm wall in Excavation Process, causes foundation ditch periphery earth's surface water level decreasing, cause ground settlement, crisis surrounding building safety, if process not in time, then develop into water burst risk.
In order to implement process to foundation ditch " water burst, gush sand " accident effectively in an orderly manner, " water burst, gush sand " degree is avoided to expand to greatest extent, make every effort to timely prevention " Sand " phenomenon, reduce the subsequent construction pressure of excavation of foundation pit, event harm is dropped to minimum point, proposes piping plugging structure outside a kind of deep foundation ditch diaphragm wall.
[utility model content]
The purpose of this utility model is: for defect and the deficiency of prior art, provide a kind of diaphragm wall internal corner part piping plugging structure, while this plugging structure can ensure carrying out smoothly of base pit engineering, when there is piping in diaphragm wall internal corner part, carry out shutoff and process timely, ensure that the person and the property safety of constructor, is the technical guarantee carrying out providing necessity smoothly of constructing.
For achieving the above object, the technical solution adopted in the utility model is:
A kind of diaphragm wall internal corner part piping plugging structure, comprise diaphragm wall, the excavation soil body, leakage point, mozzle, first cofferdam and second cofferdam, leakage point is positioned at the internal corner part of diaphragm wall and the excavation soil body, mozzle is inserted at the leakage point of internal corner part, mozzle front end is provided with valve, first cofferdam built by the cement that is simultaneously packed in bag, second cofferdam is built in the periphery in first cofferdam, wherein in the hole capital after selling all securities that first cofferdam and diaphragm wall are formed, insert rubble, cover plate is provided with above rubble, the cement that is on the cover board packed in bag again covers pressure, encapsulant is built in the hole capital after selling all securities that second cofferdam and diaphragm wall are formed.
In the utility model: described encapsulant is concrete or dual slurry, wherein said dual slurry is cement paste limit and water glass.
After adopting said method, the utility model beneficial effect is: while this plugging structure can ensure carrying out smoothly of base pit engineering, when there is piping in diaphragm wall internal corner part, carry out shutoff and process timely, ensure that the person and the property safety of constructor, is the technical guarantee carrying out providing necessity smoothly of constructing.
[accompanying drawing explanation]
Accompanying drawing described herein is used to provide to further understanding of the present utility model, forms a application's part, but does not form improper restriction of the present utility model, in the accompanying drawings:
Fig. 1 is structural representation of the present utility model.
In figure: 1. sacked cement; 2. encapsulant; 3. second cofferdam; 4. valve; 5. mozzle; 6. rubble; 7. first cofferdam; 8. leakage point; 9. diaphragm wall; 10. excavate the soil body; 11. cover plates.
[detailed description of the invention]
The utility model is described in detail, illustrative examples wherein and illustrate and be only used for explaining the utility model below in conjunction with accompanying drawing and specific embodiment, but not as to restriction of the present utility model.
As shown in Figure 1, a kind of diaphragm wall internal corner part piping plugging structure, comprise diaphragm wall 9, the excavation soil body 10, leakage point 8, mozzle 5, first cofferdam 7 and second cofferdam 3, leakage point 8 is positioned at the internal corner part of diaphragm wall 9 and the excavation soil body 10, mozzle 5 is inserted at the leakage point 8 of internal corner part, mozzle 5 front end is provided with valve 4, first cofferdam 7 built by the cement 1 that is simultaneously packed in bag, second cofferdam 3 is built in the periphery in first cofferdam 7, rubble 6 is inserted in the hole capital after selling all securities wherein formed with diaphragm wall 9 in first cofferdam 7, cover plate 11 is provided with above rubble 6, the cement 1 that is packed in bag on cover plate 11 again covers pressure, encapsulant 2 is built in the hole capital after selling all securities formed with diaphragm wall 9 in second cofferdam 3, described encapsulant 2 is concrete or dual slurry, and wherein said dual slurry is cement paste limit and water glass.
The injecting treatment method of the diaphragm wall internal corner part piping undertaken by above-mentioned plugging structure, is comprised the following steps:
(1), pick cutter cleaning leakage point: have comparatively obviously outstanding uneven phenomenon at diaphragm wall internal corner part, simply carry out picking cutter process, and clear up the foreign material of leakage point periphery;
(2), plug mozzle: caliber is installed on leakage point and is not less than Φ 100 mozzle, and install valve additional, make leakage point current unobstructed, contact closely with diaphragm wall leakage point simultaneously as far as possible;
(3), cofferdam: first cofferdam built by the cement that is packed in bag, and builds second cofferdam simultaneously;
(4), rubble is inserted: in the hole capital after selling all securities that first cofferdam and diaphragm wall are formed, insert rubble, then add a cover with plank, then the cement that is on the cover board packed in bag covers pressure;
(5), insert encapsulant: concreting in the hole capital after selling all securities that second cofferdam and diaphragm wall are formed, pouring concrete limit, limit pours into water glass, makes it rapid solidification; Or pouring into cement grout, pouring water glass in cement grouting limit, limit, makes it rapid solidification;
(6), valve-off;
(7), in the slip casting of diaphragm wall internal corner part: after valve closing, in cofferdam, peripheral place carries out concreting mortar, and makes it solidify.
The above is only better embodiment of the present utility model, therefore all equivalences done according to structure, feature and the principle described in the utility model patent claim change or modify, and are included in the utility model patent claim.

Claims (2)

1. a diaphragm wall internal corner part piping plugging structure, it is characterized in that: comprise diaphragm wall, the excavation soil body, leakage point, mozzle, first cofferdam and second cofferdam, leakage point is positioned at the internal corner part of diaphragm wall and the excavation soil body, mozzle is inserted at the leakage point of internal corner part, mozzle front end is provided with valve, first cofferdam built by the cement that is simultaneously packed in bag, second cofferdam is built in the periphery in first cofferdam, wherein in the hole capital after selling all securities that first cofferdam and diaphragm wall are formed, insert rubble, cover plate is provided with above rubble, the cement that is on the cover board packed in bag again covers pressure, encapsulant is built in the hole capital after selling all securities that second cofferdam and diaphragm wall are formed.
2. diaphragm wall internal corner part piping plugging structure according to claim 1, it is characterized in that: described encapsulant is concrete or dual slurry, wherein said dual slurry is cement paste limit and water glass.
CN201520436424.2U 2015-06-24 2015-06-24 Underground continuous wall reentrant corner position piping block structure Expired - Fee Related CN204753654U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520436424.2U CN204753654U (en) 2015-06-24 2015-06-24 Underground continuous wall reentrant corner position piping block structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520436424.2U CN204753654U (en) 2015-06-24 2015-06-24 Underground continuous wall reentrant corner position piping block structure

Publications (1)

Publication Number Publication Date
CN204753654U true CN204753654U (en) 2015-11-11

Family

ID=54468379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520436424.2U Expired - Fee Related CN204753654U (en) 2015-06-24 2015-06-24 Underground continuous wall reentrant corner position piping block structure

Country Status (1)

Country Link
CN (1) CN204753654U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895118A (en) * 2015-06-24 2015-09-09 江苏省建筑科学研究院有限公司 Underground diaphragm wall internal corner position piping plug structure and grouting processing method thereof
CN107761753A (en) * 2017-10-17 2018-03-06 山东大学 A kind of foundation ditch water burst rapid rescue slip casting method for blocking
CN110939150A (en) * 2019-12-12 2020-03-31 周希圣 Emergency rescue method for rapidly constructing large-hydraulic-slope-drop-ratio thin-wall structure in confined water inrush accident state

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895118A (en) * 2015-06-24 2015-09-09 江苏省建筑科学研究院有限公司 Underground diaphragm wall internal corner position piping plug structure and grouting processing method thereof
CN107761753A (en) * 2017-10-17 2018-03-06 山东大学 A kind of foundation ditch water burst rapid rescue slip casting method for blocking
CN107761753B (en) * 2017-10-17 2019-11-19 山东大学 A kind of foundation pit water burst rapid rescue slip casting method for blocking
CN110939150A (en) * 2019-12-12 2020-03-31 周希圣 Emergency rescue method for rapidly constructing large-hydraulic-slope-drop-ratio thin-wall structure in confined water inrush accident state

Similar Documents

Publication Publication Date Title
CN104895118A (en) Underground diaphragm wall internal corner position piping plug structure and grouting processing method thereof
CN104895098A (en) Piping blocking structure outside deep foundation pit underground diaphragm wall and grouting treatment method thereof
CN102797266B (en) Well sealing waterproof construction method for dewatering well
CN204728353U (en) Piping plugging structure outside deep foundation ditch diaphragm wall
CN202809665U (en) Blocking device for relief well of micro artesian water in foundation pit
CN103924987B (en) A kind of SMW engineering method stake tunnel shielding portal seepage-proof structure and construction method thereof
CN203569578U (en) Recharge well capable of preventing well casing blocking and water bursting
CN205387712U (en) Quick treatment device of foundation pit piping
CN103526766A (en) Method for plugging relief well of deep foundation pit
CN101245886A (en) Processing method for deep building pit piping
CN204753654U (en) Underground continuous wall reentrant corner position piping block structure
CN207537993U (en) A kind of diversion tunnel concrete plug
CN105625420B (en) A kind of extension type support with manually dug piles construction and its construction method
CN104929135A (en) Deep foundation pit underground diaphragm wall enclosure structure and chemical churning pile water stop construction method thereof
CN108755723A (en) A kind of removable dewatering well well mouth sealing device and slip casting plugging construction method
CN202730786U (en) Well-sealing waterproof construction structure of dewatering well
CN107700440A (en) A kind of diversion tunnel concrete plug and its construction method
CN105569062A (en) Dewatering method implemented through permeation, weakening and emission reduction
CN105178342B (en) Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing
CN104452664B (en) Reduction by Drainage kill-job renovation technique
CN203768925U (en) Seal device for dewatering well in foundation pit
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN104294806A (en) Excavation, diversion and drainage method for inter-pile water above water-resisting layer of deep foundation pit
CN204023592U (en) The advanced quick blocking structure of a kind of foundation ditch drainage well
CN206957765U (en) Water outburst treatment structure is built in a kind of vertical shaft pick

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151111

Termination date: 20160624

CF01 Termination of patent right due to non-payment of annual fee