CN110422580A - A kind of spraying pre-treatment conveying device - Google Patents

A kind of spraying pre-treatment conveying device Download PDF

Info

Publication number
CN110422580A
CN110422580A CN201910828408.0A CN201910828408A CN110422580A CN 110422580 A CN110422580 A CN 110422580A CN 201910828408 A CN201910828408 A CN 201910828408A CN 110422580 A CN110422580 A CN 110422580A
Authority
CN
China
Prior art keywords
crossbeam
guide rail
collector
suspender
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910828408.0A
Other languages
Chinese (zh)
Inventor
薛浩然
孙卫军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Tongda Conveying Equipment Co Ltd
Original Assignee
Wuxi Tongda Conveying Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Tongda Conveying Equipment Co Ltd filed Critical Wuxi Tongda Conveying Equipment Co Ltd
Priority to CN201910828408.0A priority Critical patent/CN110422580A/en
Publication of CN110422580A publication Critical patent/CN110422580A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G35/00Mechanical conveyors not otherwise provided for

Abstract

The present invention relates to a kind of spraying pre-treatment conveying devices;It is characterized by comprising crossbeam, suspender connector, guide rail, hoisting device and the first mounting brackets for supporting the crossbeam both ends;One end of the close crossbeam is vertically-mounted in first mounting bracket trolley;Current-collector is installed, the current-collector is embedded in the trolley on the crossbeam;The suspender connector connects the hoisting device, and the suspender connector drives the hoisting device to move along the guide rail, and the hoisting device drives the crossbeam-rotating.Short circuit can be occurred, lead to problems such as current-collector and trolley collide and lead to current-collector and trolley poor contact by solving in the insertion trolley of current-collector caused by existing scheme.

Description

A kind of spraying pre-treatment conveying device
Technical field
The present invention relates to conveying devices, and in particular to a kind of spraying pre-treatment conveying device.
Background technique
In general, in automobile production industry, pre-treating technology is the very crucial process of Painting Shop, workpiece need by Pre-treatment covers process processing more just can be carried out electrophoresis, spray painting, and the paint effect of equipment can just be met the requirements.Pre-treatment conveying equipment Power supply mode generally use slide wire power supply, the mounting means of trolley is extremely important.In preceding processing station, workpiece need through The techniques such as washing, degreasing, phosphatization, spray are crossed, thus generate a large amount of steam, steam encounters siding at the top of pre-treatment chamber body, condensation After form water droplet, drop onto other equipment, will lead to trolley internal water accumulation for a long time, once current collector for trolley conductor is immersed in water It is interior, it is easy to cause trolley short-circuit, damage trolley, therefore trolley waterproof problem is a key.Current-collector and cunning simultaneously Contact between touching line can also collide.How to solve these problems becomes difficult point.
Currently existing scheme, trolley are mounted on the top of mounting bracket, and current-collector is embedded in trolley from top to bottom.In this way Scheme have the following problems: (1) pre-treating technology generate water droplet can fall into trolley, current-collector be embedded in trolley in meeting Short circuit occurs;(2) crossbeam can shake when crossbeam-rotating, and current-collector is caused to collide with trolley;(3) peace of current-collector The installation site of holding position and trolley can not be adjusted, and lead to current-collector and trolley poor contact.
Summary of the invention
In view of the deficiencies of the prior art, the invention discloses a kind of spraying pre-treatment conveying devices, to solve the prior art Short circuit can occur in middle current-collector insertion trolley, cause current-collector and trolley to collide and lead to current-collector and trolley The problems such as poor contact.
The technical solution adopted in the present invention is as follows:
A kind of spraying pre-treatment conveying device;
Including crossbeam, suspender connector, guide rail, hoisting device and the first mounting bracket for supporting the crossbeam both ends; One end of the close crossbeam is vertically-mounted in first mounting bracket trolley;Current-collector is installed on the crossbeam, The current-collector is embedded in the trolley;The suspender connector connects the hoisting device, and the suspender connector drives The hoisting device is moved along the guide rail, and the hoisting device drives the crossbeam-rotating.
Further technical solution are as follows: be equipped with support the first installation branch around the lower end of first mounting bracket The studdle of frame;The studdle is mounted on bottom plate.
Further technical solution are as follows: the holding nut of the fixed studdle is provided on the studdle.
Further technical solution are as follows: the current-collector is mounted on the crossbeam by the second mounting bracket;Described Side in two mounting brackets close to the trolley is equipped with the current-collector;Far from the collection in second mounting bracket One end of electric appliance connects the crossbeam.
Further technical solution are as follows: the hoisting device includes the suspender shaft for being symmetrically disposed on the crossbeam both ends; The suspender shaft drives the both ends of the crossbeam to rotate along the center of the crossbeam.
Further technical solution are as follows: shifting roller group is provided on the guide rail, the shifting roller group is led described in Rail is mobile;The shifting roller group is connected close to one end of the guide rail on the suspender connector;The shifting roller group band The suspender connector is moved to move along the guide rail.
Further technical solution are as follows: the chain balladeur train for connecting the suspender connector is also equipped on the guide rail;Institute Stating chain balladeur train includes along the balladeur train idler wheel and the chain being connected on balladeur train idler wheel that the guide rail moves;The suspender connector The chain balladeur train is connected by the chain.
Further technical solution are as follows: the guide rail is fixedly mounted by guide rail mounting plate;The guide rail mounting plate is symmetrical It is set to the both ends of the guide rail.
Further technical solution are as follows: the suspender connector connects the hoisting device by spreader beam;The suspender Connector is symmetrically arranged on the both ends of the spreader beam;One end on the hoisting device far from the crossbeam connects the suspender Beam.
Beneficial effects of the present invention are as follows: the present invention devises a kind of spraying pre-treatment conveying device using studdle tune Save the mounting height of trolley.Crossbeam-rotating is driven using hoisting device.Spraying pre-treatment conveying device has brought following effect: (1) by adjusting the mounting height of the adjustable trolley of studdle, so that trolley and current-collector form good contact; (2) trolley is vertically installed at the outer surface of the first mounting bracket, and water droplet will not be drenched into the inside of trolley, current-collector insertion Short circuit will not occur in trolley;(3) roller group is connected using suspender connector, roller group is moved along guide rail so that crossbeam can be with Smoothly rotation, current-collector will not collide with trolley;The design of kidney slot is opened up in (4) second mounting brackets, it can be with Adjust the installation site of current-collector.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the side structure schematic view in Fig. 1 at A.
In figure: 1, the first mounting bracket;11, studdle;12, holding nut;13, bottom plate;2, trolley;3, current collection Device;4, the second mounting bracket;5, crossbeam;6, hoisting device;61, suspender shaft;7, suspender connector;8, guide rail;81, guide rail is pacified Loading board;82, chain;83, balladeur train idler wheel;84, chain balladeur train;9, shifting roller group;10, spreader beam.
Specific embodiment
With reference to the accompanying drawing, illustrate the specific embodiment of the present embodiment.
Fig. 1 is the structural diagram of the present invention.As shown in connection with fig. 1, the invention discloses a kind of spraying pre-treatment conveyings to fill It sets.The direction of X is the upper end of schematic structural view of the invention in figure, and the direction of Y is the right end of schematic structural view of the invention in figure.Spray Pre-treatment conveying device is applied to include crossbeam 5, suspender connector 7, guide rail 8, hoisting device 6 and support the first of 5 both ends of crossbeam Mounting bracket 1.
One end of close crossbeam 5 is vertically-mounted in first mounting bracket 1 trolley 2.Current-collector 3 is installed on crossbeam 5, Current-collector 3 is embedded in trolley 2.Suspender connector 7 connects hoisting device 6, and suspender connector 7 drives hoisting device 6 along guide rail 8 Mobile, hoisting device 6 drives crossbeam 5 to rotate.
Workpiece is needed before spray painting by multiple pretreatment procedures.Spray pre-treatment conveying device workpiece is mobile, work Part is needed by techniques such as washing, degreasing, phosphatization and sprays.According to different workpiece requirements, suspender etc. is provided on crossbeam 5 and is set The standby workpiece that hangs carries out technique processing.When spraying the work of pre-treatment conveying device, trolley 2 connects power supply.The insertion of current-collector 3 is slided It touches in line 2, current-collector 3 collects electric current on trolley 2.Current-collector 3 is the equipment power supply such as suspender in spraying pre-treatment conveying device.
The studdle 11 of the first mounting bracket 1 of support is installed around the lower end of the first mounting bracket 1.Studdle 11 Installation is on base 13.
Bottom plate 13 is mounted on the lower end of the first mounting bracket 1.Preferably, bottom plate 13 is straight panel.Preferably, studdle 11 It is multiple.Studdle 11 is mounted on the upper surface of bottom plate 13.The lower surface of studdle 11 and the upper surface of bottom plate 13 are affixed It closes.Studdle 11 passes through the lower end of the first mounting bracket 1.The upper end of studdle 11 passes through the first mounting bracket from bottom to top 1 lower end.
The holding nut 12 of fixed studdle 11 is provided on studdle 11.
There are two holding nuts 12 for setting on studdle 11.Holding nut 12 is symmetrically disposed under the first mounting bracket 1 The two sides up and down at end.By adjusting the holding nut 12 of lower end, the mounting height of adjustable first mounting bracket 1.Pass through tune The holding nut 12 of upper end is saved, it can be by studdle 11 and the first mounting bracket 1 is firm fixes.
First mounting bracket 1 is set to the left and right ends of crossbeam 5.First mounting bracket 1 is vertically-mounted.Crossbeam 5 is a left side Right direction is horizontally mounted.Trolley 2 is provided on the inside of 5 one end of crossbeam in first mounting bracket 1.Trolley 2 is vertical Installation.Close to the upper end of one end of the first mounting bracket 1 connection 1 outer surface of the first mounting bracket on trolley 2.
The selection of 2 model of trolley belongs to common knowledge.Those skilled in the art can be according to the working condition of device Selection, such as the trolley of model DHG-70 can be selected.
By adjusting the mounting height of the adjustable trolley 2 of holding nut 12, so that trolley 2 and the formation of current-collector 3 Good contact.Spray pre-treatment conveying device at work, workpiece can generate a large amount of water after carrying out pre-treating technology and steam Gas.Trolley 2 is vertically installed at the outer surface of the first mounting bracket 1, and the water droplet that vapor is formed will not be drenched into trolley 2 It is internal.The inside of trolley 2 not will form ponding, and current-collector 3 will not cause short circuit because of ponding.
Current-collector 3 is mounted on crossbeam 5 by the second mounting bracket 4.Close to the one of trolley 2 in second mounting bracket 4 Side is equipped with current-collector 3.Far from one end connecting cross beam 5 of current-collector 3 in second mounting bracket 4.
Second mounting bracket 4 is installed on the left and right sides of 5 lower surface of crossbeam.The upper end connecting cross beam 5 of second mounting bracket 4 Lower end.The upper surface of second mounting bracket 4 and the lower surface of crossbeam 5 fit.Second mounting bracket 4 is pacified by the first bolt Mounted in the lower end of crossbeam 5.The upper end of second mounting bracket 4 offers kidney slot.First bolt screws in crossbeam 5 after passing through kidney slot Lower end.
By the kidney slot opened up, the installation position of the second mounting bracket 4 adjustable second mounting bracket 4 during installation It sets, current-collector 3 is accurately embedded in trolley 2.
Current-collector 3 is mounted on the lower end of 4 outer surface of the second mounting bracket.Current-collector 3 is vertical direction installation.Current-collector 3 In level insertion trolley 2.
The selection of 3 model of current-collector belongs to common knowledge.Those skilled in the art can be according to the working condition of device Selection, such as the current-collector of model LLJD- (3-5) -100 can be selected.
Vertically-mounted current-collector 3, workpiece, will not be along current-collectors in the droplet for carrying out the formation of pre-treating technology vapor 3 are flowed into trolley 2.Current-collector 3 not will cause further ponding in trolley 2.
Hoisting device 6 includes the suspender shaft 61 for being symmetrically disposed on 5 both ends of crossbeam.Suspender shaft 61 drives the two of crossbeam 5 It holds and is rotated along the center of crossbeam 5.
Suspender shaft 61 is respectively arranged in the left and right ends of crossbeam 5.Suspender shaft 61 is in the left and right ends of crossbeam 5 to crossbeam 5 form upward pulling force, ensure that the left and right directions of crossbeam 5 is horizontally mounted.
Hoisting device 6 drives crossbeam 5 to rotate 180 ° along the central horizontal of crossbeam 5.It is left on crossbeam 5 after crossbeam 5 rotates The current-collector 3 at end is embedded in the trolley 2 of right end.The current-collector 3 of right end is embedded in the trolley 2 of left end on crossbeam 5.Suspender dress Set 6 ensure that crossbeam 5 rotate horizontally after, current-collector 3 still can keep good with trolley 2 and contact.
Fig. 2 is the side structure schematic view in Fig. 1 at A.Referring to figs. 1 and 2, hoisting device 6 is connected by suspender Part 7 connects guide rail 8.Suspender connector 7 connects hoisting device 6 by spreader beam 10.Far from hoisting device 6 on suspender connector 7 One end connect guide rail 8.
Suspender connector 7 connects hoisting device 6 by spreader beam 10.Suspender connector 7 is symmetrically arranged on spreader beam 10 Both ends.One end on hoisting device 6 far from crossbeam 5 connects spreader beam 10.
Spreader beam 10 is horizontally mounted for front-rear direction.Suspender connector 7 is installed on the rear and front end of spreader beam 10.Suspender connects The lower end of fitting 7 connects spreader beam 10.The upper end of suspender connector 7 connects shifting roller group 9.The upper end of hoisting device 6 connects The middle position of spreader beam 10.Hoisting device 6 is connect with spreader beam 10 using pin shaft.
Suspender connector 7 holds spreader beam 10 from the both ends of spreader beam 10, and suspender connector 7 sets 10 level of spreader beam It sets.Spreader beam 10 forms stable pulling force to crossbeam 5 by hoisting device 6.
Shifting roller group 9 is provided on guide rail 8, shifting roller group 9 is moved along guide rail 8.Close to guide rail on suspender connector 7 8 one end connects shifting roller group 9.Shifting roller group 9 drives suspender connector 7 to move along guide rail 8.
Shifting roller group 9 includes symmetrically arranged first idler wheel.Shifting roller group 9 is installed on the lower end of guide rail 8.First rolling Wheel rotation drives suspender connector 7 to move along guide rail 8, and suspender connector 7 drives crossbeam 5 to rotate horizontally by hoisting device 6.
The chain balladeur train 84 of connection suspender connector 7 is also equipped on guide rail 8.Chain balladeur train 84 includes moving along guide rail 8 Balladeur train idler wheel 83 and the chain 82 that is connected on balladeur train idler wheel 83.Suspender connector 7 connects chain balladeur train 84 by chain 82.
Balladeur train idler wheel 83 includes symmetrically arranged second idler wheel.Balladeur train idler wheel 83 is installed on the upper end of guide rail 8.Second idler wheel Chain 82 is driven to move along the upper end of guide rail 8.Chain 82 is set in guide rail 8.The upper end of chain 82 connects balladeur train idler wheel 83, chain The lower end of item 82 connects suspender connector 7.
Due to crossbeam 5 self weight and be mounted on the self weight of workpiece on crossbeam 5, the power of drop-down is formed to suspender connector 7.It moves The power of the dynamic unbearable suspender connector 7 of roller group 9 drop-down.Chain balladeur train 84 is arranged, and from the upper end of suspender connector 7, pulling is hung Have connector 7, reduces the endurance of shifting roller group 9.
Guide rail 8 is two interconnected tracks.The rear and front end of track is interconnected.Track is front-rear direction level peace Dress.Track is parallel to each other installation.Shifting roller group 9 is installed on the lower end of track.Balladeur train idler wheel 83 is installed on the upper end of track.
Shifting roller group 9 moves along track, and shifting roller group 9 drives suspender connector 7 mobile.Suspender connector 7 is logical Crossing spreader beam 10 drives hoisting device 6 mobile.The suspender shaft 61 for being set to 5 left end of crossbeam is moved to the right side for being set to crossbeam 5 End.The suspender shaft 61 for being set to 5 right end of crossbeam is moved to the left end for being set to crossbeam 5.The mobile drive of suspender shaft 61 is horizontal Beam 5 rotates horizontally 180 °.
Guide rail 8 is fixedly mounted by guide rail mounting plate 81.Guide rail mounting plate 81 is symmetrically disposed on the both ends of guide rail 8.
Preferably, guide rail mounting plate 81 is straight panel.Guide rail mounting plate 81 is two, fixes the both ends of guide rail 8 respectively.It leads The fixation that rail mounting plate 81 allows guide rail 8 firm.
The pulling force that the self weight of crossbeam 5 and the self weight for being mounted on workpiece on crossbeam 5 form suspender connector 7, passes through respectively Shifting roller group 9 and balladeur train idler wheel 83 are transmitted on guide rail 8.Fixation by guide rail mounting plate 81 to guide rail 8, improves guide rail 8 stress-bearing capability.Spraying pre-treatment conveying device is smoothly run.
In the present embodiment, described bottom plate 13 is straight panel, however, not limited to this, can be the model that can play its function The bottom plate of other shapes in enclosing.
In the present embodiment, described guide rail mounting plate 81 is straight panel, however, not limited to this, can be can play its function The guide rail mounting plate of other shapes in the range of energy.
In addition, the quantity such as " two " and " multiple " have been used in this specification, however, not limited to this, can be can send out Wave the other quantity in the range of its function.
Above description is explanation of the invention, is not intended to limit the invention, and limited range of the present invention is referring to right It is required that the present invention can make any type of modification without prejudice to basic structure of the invention.

Claims (9)

1. a kind of spraying pre-treatment conveying device, it is characterised in that: including crossbeam (5), suspender connector (7), guide rail (8), hang Tool device (6) and the first mounting bracket (1) for supporting the crossbeam (5) both ends;Close to institute on first mounting bracket (1) The one end for stating crossbeam (5) vertically-mounted has trolley (2);It is equipped with current-collector (3) on the crossbeam (5), the current-collector (3) It is embedded in the trolley (2);The suspender connector (7) connects the hoisting device (6), suspender connector (7) band It is mobile along the guide rail (8) to move the hoisting device (6), the hoisting device (6) drives crossbeam (5) rotation.
2. spraying pre-treatment conveying device according to claim 1, it is characterised in that: surround first mounting bracket (1) lower end is equipped with the studdle (11) for supporting first mounting bracket (1);The studdle (11) is mounted on bottom On plate (13).
3. spraying pre-treatment conveying device according to claim 2, it is characterised in that: be arranged on the studdle (11) There is the holding nut (12) of the fixed studdle (11).
4. spraying pre-treatment conveying device according to claim 1, it is characterised in that: the current-collector (3) passes through second Mounting bracket (4) is mounted on the crossbeam (5);Pacify side on second mounting bracket (4) close to the trolley (2) Equipped with the current-collector (3);One end on second mounting bracket (4) far from the current-collector (3) connects the crossbeam (5)。
5. spraying pre-treatment conveying device according to claim 1, it is characterised in that: the hoisting device (6) includes pair Claim the suspender shaft (61) for being set to the crossbeam (5) both ends;The suspender shaft (61) drives the both ends edge of the crossbeam (5) The center of the crossbeam (5) rotates.
6. spraying pre-treatment conveying device according to claim 1, it is characterised in that: be provided with shifting on the guide rail (8) Dynamic roller group (9), the shifting roller group (9) are mobile along the guide rail (8);It is led on the suspender connector (7) close to described One end of rail (8) connects the shifting roller group (9);The shifting roller group (9) drives the suspender connector (7) along described Guide rail (8) is mobile.
7. spraying pre-treatment conveying device according to claim 6, it is characterised in that: be also equipped on the guide rail (8) Connect the chain balladeur train (84) of the suspender connector (7);The chain balladeur train (84) includes the cunning mobile along the guide rail (8) Frame idler wheel (83) and the chain (82) being connected on balladeur train idler wheel (83);The suspender connector (7) passes through the chain (82) Connect the chain balladeur train (84).
8. spraying pre-treatment conveying device according to claim 1, it is characterised in that: the guide rail (8) is pacified by guide rail Loading board (81) is fixedly mounted;The guide rail mounting plate (81) is symmetrically disposed on the both ends of the guide rail (8).
9. spraying pre-treatment conveying device according to claim 1, it is characterised in that: the suspender connector (7) passes through Spreader beam (10) connects the hoisting device (6);The suspender connector (7) is symmetrically arranged on the two of the spreader beam (10) End;One end on the hoisting device (6) far from the crossbeam (5) connects the spreader beam (10).
CN201910828408.0A 2019-09-03 2019-09-03 A kind of spraying pre-treatment conveying device Pending CN110422580A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910828408.0A CN110422580A (en) 2019-09-03 2019-09-03 A kind of spraying pre-treatment conveying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910828408.0A CN110422580A (en) 2019-09-03 2019-09-03 A kind of spraying pre-treatment conveying device

Publications (1)

Publication Number Publication Date
CN110422580A true CN110422580A (en) 2019-11-08

Family

ID=68418664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910828408.0A Pending CN110422580A (en) 2019-09-03 2019-09-03 A kind of spraying pre-treatment conveying device

Country Status (1)

Country Link
CN (1) CN110422580A (en)

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT109452B (en) * 1927-05-16 1928-04-25 Eduard Ing Mader Device for the automatic lubrication of contact wire and pantograph slips on electric railways.
AT120020B (en) * 1928-05-11 1930-11-25 Felten & Guilleaume Carlswerk Sanding hanger arrangement for electric railways.
SU927660A1 (en) * 1979-10-30 1982-05-15 За витель Березовский и А. С. Шелудчёнко Transfer apparatus
CN2873725Y (en) * 2006-02-09 2007-02-28 常州市南港港口机械有限公司 Container lift sling suitable for gantry crane
CN101318610A (en) * 2008-07-17 2008-12-10 于国法 Electric gantry crane transferring method
CN101518771A (en) * 2009-04-02 2009-09-02 无锡市通达物流机械有限公司 Heavy intelligent frame coating transfer line
CN201415179Y (en) * 2009-04-02 2010-03-03 无锡市通达物流机械有限公司 Heavy-type intelligent vehicle frame coating transport line
JP2011083138A (en) * 2009-10-08 2011-04-21 Hitachi Plant Technologies Ltd Power supply system to carrier dolly in clean room
CN102770306A (en) * 2009-10-09 2012-11-07 富雷尔+弗赖股份公司 Power rail holder
US20130081915A1 (en) * 2011-09-29 2013-04-04 Martin Sommer Pressure Plate Assembly And Method For Power Transmission
CN202935878U (en) * 2012-11-29 2013-05-15 一重集团大连设计研究院有限公司 Trolley type steel coil transport system
CN203071380U (en) * 2013-02-04 2013-07-17 成都慧拓自动控制技术有限公司 Novel double-wire current collector
CN105584766A (en) * 2014-10-24 2016-05-18 深圳市科陆电子科技股份有限公司 Shuttle vehicle logistics system and power supply method thereof
CN205786167U (en) * 2016-07-12 2016-12-07 乌鲁木齐市三锐科技有限公司 A kind of trolley experiment detection device
CN205887318U (en) * 2016-08-08 2017-01-18 北京惠众智通机器人科技股份有限公司 Arm paint finishing
CN107758215A (en) * 2017-10-27 2018-03-06 安徽艾普智能装备有限公司 A kind of compressor vacuumizes suspension line
CN108906415A (en) * 2018-09-25 2018-11-30 海盐浦兴金属制品有限公司 A kind of efficient two-sided spray-painting plant
CN109130536A (en) * 2018-09-12 2019-01-04 嘉兴市芸芸纺织有限公司 A kind of ink discharge device of plastic products
CN208449697U (en) * 2018-04-26 2019-02-01 苏州市创诚金属制品有限公司 A kind of rotary spraying suspender of lampshade
CN210504412U (en) * 2019-09-03 2020-05-12 无锡市通达输送设备有限公司 Spraying pretreatment conveying device

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT109452B (en) * 1927-05-16 1928-04-25 Eduard Ing Mader Device for the automatic lubrication of contact wire and pantograph slips on electric railways.
AT120020B (en) * 1928-05-11 1930-11-25 Felten & Guilleaume Carlswerk Sanding hanger arrangement for electric railways.
SU927660A1 (en) * 1979-10-30 1982-05-15 За витель Березовский и А. С. Шелудчёнко Transfer apparatus
CN2873725Y (en) * 2006-02-09 2007-02-28 常州市南港港口机械有限公司 Container lift sling suitable for gantry crane
CN101318610A (en) * 2008-07-17 2008-12-10 于国法 Electric gantry crane transferring method
CN101518771A (en) * 2009-04-02 2009-09-02 无锡市通达物流机械有限公司 Heavy intelligent frame coating transfer line
CN201415179Y (en) * 2009-04-02 2010-03-03 无锡市通达物流机械有限公司 Heavy-type intelligent vehicle frame coating transport line
JP2011083138A (en) * 2009-10-08 2011-04-21 Hitachi Plant Technologies Ltd Power supply system to carrier dolly in clean room
CN102770306A (en) * 2009-10-09 2012-11-07 富雷尔+弗赖股份公司 Power rail holder
US20130081915A1 (en) * 2011-09-29 2013-04-04 Martin Sommer Pressure Plate Assembly And Method For Power Transmission
CN202935878U (en) * 2012-11-29 2013-05-15 一重集团大连设计研究院有限公司 Trolley type steel coil transport system
CN203071380U (en) * 2013-02-04 2013-07-17 成都慧拓自动控制技术有限公司 Novel double-wire current collector
CN105584766A (en) * 2014-10-24 2016-05-18 深圳市科陆电子科技股份有限公司 Shuttle vehicle logistics system and power supply method thereof
CN205786167U (en) * 2016-07-12 2016-12-07 乌鲁木齐市三锐科技有限公司 A kind of trolley experiment detection device
CN205887318U (en) * 2016-08-08 2017-01-18 北京惠众智通机器人科技股份有限公司 Arm paint finishing
CN107758215A (en) * 2017-10-27 2018-03-06 安徽艾普智能装备有限公司 A kind of compressor vacuumizes suspension line
CN208449697U (en) * 2018-04-26 2019-02-01 苏州市创诚金属制品有限公司 A kind of rotary spraying suspender of lampshade
CN109130536A (en) * 2018-09-12 2019-01-04 嘉兴市芸芸纺织有限公司 A kind of ink discharge device of plastic products
CN108906415A (en) * 2018-09-25 2018-11-30 海盐浦兴金属制品有限公司 A kind of efficient two-sided spray-painting plant
CN210504412U (en) * 2019-09-03 2020-05-12 无锡市通达输送设备有限公司 Spraying pretreatment conveying device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
于素芬: "跨座式单轨系统接触轨选型分析", 电气化铁道, 30 April 2018 (2018-04-30), pages 60 - 63 *
赵新风: "门吊滑触线分段供电对作业影响的原因分析与技术改造", 上海铁道科技., 30 April 2013 (2013-04-30), pages 137 - 139 *

Similar Documents

Publication Publication Date Title
CN203530431U (en) Intelligent phosphating processing system for metal surface
CN108176988A (en) A kind of metal sheet automatic assembly line
CN206615196U (en) A kind of movable type cleaning system
CN207765925U (en) A kind of deicing of high-voltage wires bird repellent double-duty plant
CN106890814A (en) A kind of movable type cleaning system
CN204294540U (en) A kind of pole plate brushing device
CN208912401U (en) A kind of aggregate motion formula robot automobile bumper coating device
CN205803625U (en) A kind of copper bar is walked about tinning stack continuously
CN110422580A (en) A kind of spraying pre-treatment conveying device
CN207903358U (en) A kind of truss robot for metal sheet intelligence production line
CN101884966A (en) Automatic metal thermal spraying device
CN206279257U (en) A kind of rail vehicle parts making galvanizing rig
CN205363032U (en) Vertical bar welding wire processing equipment
CN108201982A (en) Suspended automatic electrostatic spraying line
CN210504412U (en) Spraying pretreatment conveying device
CN209379606U (en) A kind of crate washer
CN208899011U (en) A kind of electroplating device of pcb plate production
CN105220115B (en) A kind of clean ion cleaning system secondary to coated product and its purification method
CN208470855U (en) A kind of integrated-type steel moald-cavity pinch mechanism
CN201755544U (en) Automatic metal thermal spraying device
CN208600240U (en) A kind of sheet metal overturning brushing device
CN208340980U (en) Suspended automatic electrostatic spraying line
CN109013493A (en) Cleaning device is used in a kind of production of hot galvanizing color coating cladding plate
CN113355623B (en) Hot galvanizing device and process for metal part production
CN105032806B (en) Passenger train axle box bore washing machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination