CN110417625A - A kind of agenda managing method based on intelligent appliance - Google Patents

A kind of agenda managing method based on intelligent appliance Download PDF

Info

Publication number
CN110417625A
CN110417625A CN201810398998.3A CN201810398998A CN110417625A CN 110417625 A CN110417625 A CN 110417625A CN 201810398998 A CN201810398998 A CN 201810398998A CN 110417625 A CN110417625 A CN 110417625A
Authority
CN
China
Prior art keywords
schedule
cooking
item
family
intelligent appliance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810398998.3A
Other languages
Chinese (zh)
Other versions
CN110417625B (en
Inventor
朱泽春
金露
朱广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Joyoung Co Ltd
Original Assignee
Joyoung Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Joyoung Co Ltd filed Critical Joyoung Co Ltd
Priority to CN201810398998.3A priority Critical patent/CN110417625B/en
Publication of CN110417625A publication Critical patent/CN110417625A/en
Application granted granted Critical
Publication of CN110417625B publication Critical patent/CN110417625B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G10MUSICAL INSTRUMENTS; ACOUSTICS
    • G10LSPEECH ANALYSIS TECHNIQUES OR SPEECH SYNTHESIS; SPEECH RECOGNITION; SPEECH OR VOICE PROCESSING TECHNIQUES; SPEECH OR AUDIO CODING OR DECODING
    • G10L17/00Speaker identification or verification techniques
    • G10L17/22Interactive procedures; Man-machine interfaces
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/28Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
    • H04L12/2803Home automation networks
    • H04L12/2816Controlling appliance services of a home automation network by calling their functionalities
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/28Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
    • H04L12/2803Home automation networks
    • H04L12/2816Controlling appliance services of a home automation network by calling their functionalities
    • H04L12/2821Avoiding conflicts related to the use of home appliances
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/28Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
    • H04L12/2803Home automation networks
    • H04L12/2823Reporting information sensed by appliance or service execution status of appliance services in a home automation network
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/28Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
    • H04L12/2803Home automation networks
    • H04L12/2823Reporting information sensed by appliance or service execution status of appliance services in a home automation network
    • H04L12/2825Reporting to a device located outside the home and the home network
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L9/00Cryptographic mechanisms or cryptographic arrangements for secret or secure communications; Network security protocols
    • H04L9/32Cryptographic mechanisms or cryptographic arrangements for secret or secure communications; Network security protocols including means for verifying the identity or authority of a user of the system or for message authentication, e.g. authorization, entity authentication, data integrity or data verification, non-repudiation, key authentication or verification of credentials
    • H04L9/3226Cryptographic mechanisms or cryptographic arrangements for secret or secure communications; Network security protocols including means for verifying the identity or authority of a user of the system or for message authentication, e.g. authorization, entity authentication, data integrity or data verification, non-repudiation, key authentication or verification of credentials using a predetermined code, e.g. password, passphrase or PIN
    • H04L9/3231Biological data, e.g. fingerprint, voice or retina

Landscapes

  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Computer Security & Cryptography (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Audiology, Speech & Language Pathology (AREA)
  • Human Computer Interaction (AREA)
  • Physics & Mathematics (AREA)
  • Acoustics & Sound (AREA)
  • Multimedia (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the invention discloses a kind of agenda managing method based on intelligent appliance, this method may include: to carry out semantic parsing to the schedule about intelligent appliance;The schedule may include the item of time and the execution needed for the time;The intelligent appliance and corresponding execution time and required execution item that schedule is related to are obtained according to semantic parse;The history service condition of intelligent appliance is obtained after reaching between when being executed;Item is executed needed for confirming when history service condition matches with required execution item to be completed, and required execution item is handled according to first method;Item is executed needed for confirmation when history service condition and required execution item mismatch not complete, and issues prompting message in a second manner.By the example scheme, realizes and determine whether current schedule is completed for the schedule of setting is associated with intelligent appliance equipment, improve the validity of schedule setting, avoid user and miss material particular, improve user experience.

Description

A kind of agenda managing method based on intelligent appliance
Technical field
The present embodiments relate to intelligent household appliance control technology, espespecially a kind of agenda managing method based on intelligent appliance.
Background technique
Current schedule management software is usually that user's adding schedule on mobile terminal or other smart machines (generally comprises The information such as time, place, event).Software time according to set by user reminds user, if alreadyd exceed default Time be then determined as that schedule is completed, or need user confirm schedule whether complete.It is this that schedule is only carried out by the time The mode of management is inaccurate sometimes, such as when the time of user preset arrives, equipment just not at one's side, and schedule management Software thinks that schedule is completed, and user is easy to cause to miss some material particulars in this way.Additionally by the scheme that user confirms, give User brings additional operation, and user experience is bad.
Summary of the invention
In order to solve the above-mentioned technical problem, the embodiment of the invention provides a kind of schedule management sides based on intelligent appliance Whether method can be completed the schedule of setting is associated with intelligent appliance equipment with the current schedule of determination, improve schedule setting Validity, and material particular can be missed to avoid user, improve user experience.
In order to reach purpose of the embodiment of the present invention, the embodiment of the invention provides a kind of schedule managements based on intelligent appliance Method, this method may include:
Semantic parsing is carried out to the schedule about intelligent appliance pre-established;Wherein the schedule may include the time and The item of the execution needed for the time;
It is parsed according to semanteme and obtains intelligent appliance and execution time corresponding with intelligent appliance and institute involved in schedule Item need to be executed;
The history service condition of intelligent appliance is obtained after reaching between when being executed;
When history service condition and required execution item match, item is executed needed for confirming and is completed, and according to pre- If first method required execution item is automatically processed;When history service condition and required execution item mismatch, Item is executed needed for confirmation not complete, and is issued the user with preset second method about the required prompting letter for executing item Breath.
Optionally, being parsed according to semanteme and obtaining intelligent appliance involved in schedule may include: to be obtained according to semanteme parsing The function that the required realization means for executing item and/or needs are realized, and according to realization means and/or the function of realizing is needed to obtain Take the one or more intelligent appliances that can be realized the function.
Optionally, required execution item automatically process according to preset first method may include: will be in schedule Item is executed needed for completed to be deleted or marked as being completed;And corresponding notification information is sent to user;
Being issued the user with preset second method about the required prompting message for executing item may include: to user's Mobile terminal sends prompting message;Wherein, which may include: the required execution item that whether will not be completed in schedule The inquiry message deleted or postponed.
Optionally, intelligent appliance may include family's shared device;
This method can also include: when First Family's shared device in family's shared device is related to multiple and different schedules When, it public is set parsing the second family of one or more involved in each schedule with the linkage of First Family's shared device After standby, in the case where determining that First Family's shared device has been started up by history service condition, multiple and different schedules are detected In second family's shared device in arbitrary first schedule with the linkage of First Family's shared device whether have been started up, work as detection When having been started up into the first schedule with second family's shared device of First Family's shared device linkage, the first schedule of confirmation is Through completing;When detecting inactive with second family's shared device of First Family's shared device linkage in the first schedule, really Recognize the first schedule not completing.
Optionally, family's shared device may include cooking equipment, and executing the time may include cooking time, required execution Item may include: cooking food;
This method can also include: in the one or more cooking equipment involved in schedule any one When corresponding cooking time has been turned on, determine that the cooking equipment having been turned on has executed corresponding cooking operation, and involved One or more cooking equipments all starting after confirmation cooking food items execution is completed;When related one or At least one of multiple cooking equipments confirm that the item of cooking food does not complete and hold when corresponding cooking time is inactive Row.
Optionally, required execution item includes: cooking food;The realization way of item is executed needed for obtaining according to semantic parsing The function that diameter and/or needs are realized, and according to realization means and/or the function of realizing acquisition is needed to can be realized the one of the function A or multiple intelligent appliances include:
The cooking menu of cooking food needed for being obtained according to semantic parsing;
Cooking function needed for completing cooking menu is parsed according to cooking menu;
The cooking function according to needed for cooking menu determines one or more cooking equipments needed for completing cooking function, As cooking equipment corresponding with cooking menu.
Optionally, this method can also include: and work as to determine that cooking equipment corresponding with cooking menu mutually links When multiple cooking equipments, determine that each culinary art is set in the multiple cooking equipments mutually to link according to the operation order of cooking menu Standby cooking time and required cooking food;
Wherein, when in the operation order of cooking menu including unrelated one or more sub- sequences, by sub- sequence The execution time be set as being performed simultaneously or be executed within the preset period, and using the execution time of sub- sequence as execute the son The execution time of the cooking equipment of sequence.
Optionally, this method can also include: that required food is determined according to required cooking food before executing schedule Material, and detect the storage condition of food materials;When the currently stored situation for determining food materials is not able to satisfy the demand of cooking food, remind User supplements food materials;And according to the transaction of the update of later period food materials storage condition, the location information of user and/or user Information judges whether user has supplemented food materials.
Optionally, this method can also include: that the identity of the user using family's shared device is obtained according to speech recognition, When in family different user establish schedule involved in family's shared device clash when, according to the user of different identity Different priority levels determine the access right of the family's shared device clashed.
Optionally, this method can also include: according to preset daily schedule and machine learning as a result, when obtaining default The item that number alreadys exceed preset frequency threshold value is not completed in section, and when schedule is written again in the item, in the item The execution time reach before issue the user with emphasis prompting.
The beneficial effect of the embodiment of the present invention may include:
1. the agenda managing method based on intelligent appliance in the embodiment of the present invention may include: to pre-establish about The schedule of intelligent appliance carries out semantic parsing;Wherein the schedule may include the item of time and the execution needed for the time; It is parsed according to semanteme and obtains intelligent appliance and execution time corresponding with intelligent appliance and required execution thing involved in schedule ;The history service condition of intelligent appliance is obtained after reaching between when being executed;When history service condition and required execution item When matching, item is executed needed for confirming and is completed, and required execution item is located automatically according to preset first method Reason;When history service condition and required execution item mismatch, item is executed needed for confirming and is not completed, and with preset second Mode is issued the user with about the required prompting message for executing item.By the example scheme, realize the schedule of setting It is associated with intelligent appliance equipment to determine whether current schedule is completed, improve the validity of schedule setting, and can be to avoid User misses material particular, further improves user experience.
2. obtaining intelligent appliance involved in schedule according to semanteme parsing in the embodiment of the present invention may include: according to semanteme The function that parsing executes the realization means of item needed for obtaining and/or needs are realized, and according to realization means and/or need to realize Function obtain and can be realized one or more intelligent appliances of the function.By the example scheme, for the schedule that will be set It is associated with intelligent appliance equipment to provide technical foundation.
3. required execution item automatically process according to preset first method in the embodiment of the present invention may include: Item is executed needed for will be completed in schedule to be deleted or marked as being completed;And corresponding notification information is sent to user;With It may include: to send out to the mobile terminal of user that preset second method, which is issued the user with about the required prompting message for executing item, Send prompting message;Wherein, whether which may include: the required execution item not completed in schedule to be deleted or postponed Inquiry message.By the example scheme, reasonable place can be made respectively to completed item and unfinished item Reason can also be proposed to remind, be further ensured that avoid interference of the item to unfinished item is completed to unfinished item The validity of schedule setting, avoids user and misses material particular, improve user experience.
4. intelligent appliance may include family's shared device in the embodiment of the present invention;This method can also include: to work as family When First Family's shared device in shared device is related to multiple and different schedules, parse involved in each schedule with After the second family of one or more shared device of First Family's shared device linkage, first is being determined by history service condition In the case that family's shared device has been started up, detect public with First Family in arbitrary first schedule in multiple and different schedules Whether second family's shared device of equipment linkage has been started up, and joins when detecting in the first schedule with First Family's shared device When second dynamic family's shared device has been started up, the first schedule of confirmation has been completed;When detecting in the first schedule with first When second family's shared device of family's shared device linkage is inactive, the first schedule of confirmation is not completed.Pass through the embodiment side Case, to schedule executive condition when can exclude not set family's shared device that the domestic consumer of schedule is related to using schedule Judgement interference, ensure that the accuracy to the judgement of schedule executive condition.
5. required execution item includes: cooking food in the embodiment of the present invention;Thing is executed needed for obtaining according to semanteme parsing The function that the realization means and/or needs of item are realized, and according to realization means and/or the function of realizing acquisition is needed to can be realized One or more intelligent appliances of the function include: the cooking menu of cooking food needed for being obtained according to semantic parsing;According to cooking Cooking function needed for recipe of preparing food parses completion cooking menu;The cooking function according to needed for cooking menu is determined to complete to cook One or more cooking equipments needed for function of preparing food, as cooking equipment corresponding with cooking menu.By the example scheme, It is associated with family cooking equipment to realize schedule executive condition.
6. the method in the embodiment of the present invention can also include: to be determined before executing schedule according to required cooking food Required food materials, and detect the storage condition of food materials;When determining that the currently stored situation of food materials is not able to satisfy the need of cooking food When asking, user is reminded to supplement food materials;And according to the update of later period food materials storage condition, user location information and/or The Transaction Information of user judges whether user has supplemented food materials.Pass through the example scheme, it is ensured that set schedule It is normal to execute, further improve user experience.
7. the method in the embodiment of the present invention can also include: to obtain the use for using family's shared device according to speech recognition The identity at family, when in family different user establish schedule involved in family's shared device clash when, according to difference The different priority levels of the user of identity determine the access right of the family's shared device clashed.Pass through the embodiment Scheme can solve family's shared device by using permission and use collision problem in set schedule, further It ensures performing effectively for schedule, improves user experience.
8. the method in the embodiment of the present invention can also include: according to preset daily schedule and machine learning as a result, It obtains unfinished number in preset period of time and alreadys exceed the item of preset frequency threshold value, and schedule is written again in the item When, emphasis prompting is issued the user with before the execution time of the item reaches.By the example scheme, use is effectively corrected for Family is to certain schedules regular the phenomenon that forgetting, it is ensured that any schedule normally executes.
The other feature and advantage of the embodiment of the present invention will illustrate in the following description, also, partly from explanation It is become apparent in book, or understand through the implementation of the invention.The purpose of the embodiment of the present invention and other advantages can pass through Specifically noted structure is achieved and obtained in the specification, claims and drawings.
Detailed description of the invention
Attached drawing is used to provide one for further understanding technical solution of the embodiment of the present invention, and constituting specification Point, it is used to explain the present invention the technical solution of embodiment together with embodiments herein, does not constitute to the embodiment of the present invention The limitation of technical solution.
Fig. 1 is the agenda managing method flow chart based on intelligent appliance of the embodiment of the present invention;
Fig. 2 is that being parsed according to semanteme for the embodiment of the present invention obtains the required realization means for executing item and/or need reality Existing function, and it is intelligent according to realization means and/or the one or more for needing the function of realizing acquisition to can be realized the function The method flow diagram of household electrical appliances.
Specific embodiment
Understand in order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with attached drawing pair The embodiment of the present invention is described in detail.It should be noted that in the absence of conflict, embodiment and reality in the application The feature applied in example can mutual any combination.
Step shown in the flowchart of the accompanying drawings can be in a computer system such as a set of computer executable instructions It executes.Also, although logical order is shown in flow charts, and it in some cases, can be to be different from herein suitable Sequence executes shown or described step.
Embodiment one
A kind of agenda managing method based on intelligent appliance, as shown in Figure 1, this method may include S101-S104:
S101, semantic parsing is carried out to the schedule about intelligent appliance pre-established;When wherein the schedule may include Between and the execution needed for the time item.
In embodiments of the present invention, user can be arranged accordingly using schedule directly on intelligent appliance, can also lead to The control device of intelligent appliance is crossed the schedule of each intelligent appliance is arranged, and each intelligent appliance is issued to by control device In, which can be any one intelligent appliance in multiple intelligent appliances, be also possible to independently of intelligent appliance with Outer special control equipment;The control device can be the mobile terminal of user.
In embodiments of the present invention, the schedule management system before executing schedule, in each intelligent appliance or control device System can parse the semanteme of each schedule, with information such as the time, place, the events that obtain the schedule.
It in embodiments of the present invention, can be with for example, if schedule is " noon cooks rice and Tomato omelette " Semantic parsing is carried out to the schedule, the execution time for obtaining the schedule is this noon (for example, between 11:30-13:00), institute Item need to be executed are as follows: steamed rice does Tomato omelette.If a schedule is " I has a bath at night ", can be according to the day Journey transfers common bathtime in family, such as 21:00, and can be determined that needs are automatic in 20:30 according to the bathtime Starting water heater is heated, therefore the execution time of the schedule is 20:30, and executing item is to start for water heating, and in water Temperature is kept the temperature when reaching preset temperature, and closes curtain or the corresponding music of opening etc. in 21:00.
In embodiments of the present invention, which can include but is not limited to: intelligent refrigerator, service robot, intelligence Cooking machine, intelligent range hood, Intelligent steamer, smart television, intelligent water heater, intelligent curtain etc..
S102, intelligent appliance and the execution time corresponding with intelligent appliance involved in acquisition schedule are parsed according to semanteme With required execution item.
In embodiments of the present invention, it is completed since each schedule is required to corresponding intelligent appliance, in order to true It protects schedule to be timely completed, intelligent appliance involved in schedule can be obtained according to above-mentioned semantic parsing, so as to subsequent to these Intelligent appliance is monitored, to supervise the performance of schedule.
Optionally, being parsed according to semanteme and obtaining intelligent appliance involved in schedule may include: to be obtained according to semanteme parsing The function that the required realization means for executing item and/or needs are realized, and according to realization means and/or the function of realizing is needed to obtain Take the one or more intelligent appliances that can be realized the function.
In embodiments of the present invention, it for example, in above-mentioned schedule " noon cooks rice and Tomato omelette ", completes " to steam The intelligent cooking equipment that the item of rice " needs to have cooking function, for example, pressure cooker, Intelligent steamer etc., determine it is several The cooking equipment that steamed rice is most-often used in family, such as Intelligent steamer can be obtained according to history service condition after option, The intelligent appliance of the current item of execution as final choice, in addition can also be according to the degree of specialization of each intelligent appliance Select the intelligent appliance equipment, it, can be using the intelligent appliance as steaming for example, intelligent electric cooker is generally dedicated for steamed rice The preferred unit of rice.In addition, the intelligent cooking equipment for needing that there are the functions such as pan-fried, fried, stir-fry for " doing Tomato omelette ", For example, intelligent frying pan, intelligent frying pan, intelligent machine for stir-frying dishes etc..It can specifically be selected according to the equipment possessed in family, such as There is intelligent machine for stir-frying dishes in fruit family, it can be using the intelligent machine for stir-frying dishes as the first choice for executing " doing Tomato omelette " this item Equipment.
S103, when being executed between reach after obtain intelligent appliance history service condition.
It in embodiments of the present invention, can be in the execution of each schedule after obtaining intelligent appliance relevant to schedule Time obtains the history service condition of intelligent appliance after reaching, and is judged according to the history service condition in the execution of schedule Between the corresponding smart machine whether have been started up.
In embodiments of the present invention, intelligent appliance has the function of recording itself service condition, and can be generated corresponding Log be sent to schedule management system in real time, using the judgment basis as schedule executive condition.
In embodiments of the present invention, it for example, after reaching 20:30, can be looked by the history usage log of water heater Water heater whether is had been started up when asking 20:30 to be heated, and can be inquired by the history usage log of intelligent curtain 21: Whether it has been automatically closed, can whether have automatically been inquired by the history usage log of intelligent sound in 21:00 when 00 It opens, plays scheduled music.
In embodiments of the present invention, smart machine can also according to the schedule of setting, execute accordingly the time reach with Afterwards, and perform it is corresponding execute item after, actively to the implementing result of schedule management system push item, with notice days Thread management system has been completed to execute item accordingly.
S104, when history service condition and required executions item match, execution item needed for confirmation is completed, and root Required execution item is automatically processed according to preset first method;When history service condition and required execution item mismatch When, item is executed needed for confirming and is not completed, and is issued the user with preset second method about the required prompting for executing item Information.
In embodiments of the present invention, it is executed in the time if determined according to the history service condition of intelligent appliance accordingly It is acted accordingly, then can determine that the log has executed, whereas if not carried out executing in the time accordingly Corresponding movement, then can determine that the log is not performed.
Optionally, required execution item automatically process according to preset first method may include: will be in schedule Item is executed needed for completed to be deleted or marked as being completed;And corresponding notification information is sent to user;
Being issued the user with preset second method about the required prompting message for executing item may include: to user's Mobile terminal sends prompting message;Wherein, which may include: the required execution item that whether will not be completed in schedule The inquiry message deleted or postponed.
In embodiments of the present invention, it by the example scheme, realizes the schedule of setting and intelligent appliance equipment phase Whether association is completed with the current schedule of determination, improves the validity of schedule setting, and can miss material particular to avoid user, Further improve user experience.
Embodiment two
The embodiment gives processing scheme when intelligent appliance is family's shared device on the basis of example 1.
Optionally, intelligent appliance may include family's shared device.
In embodiments of the present invention, which can include but is not limited to: intelligent cooking equipment, intelligence wash shield Equipment, smart television, intelligent curtain, intelligent refrigerator etc., the main distinction is in household person smart machine, for example, personal wearable Equipment (wrist-watch, earphone, accessories etc.), PC, self-study equipment etc..
Optionally, this method can also include: when First Family's shared device in family's shared device be related to it is multiple When different schedules, one or more second involved in each schedule with the linkage of First Family's shared device is being parsed After the shared device of front yard, in the case where determining that First Family's shared device has been started up by history service condition, detect multiple Whether second family's shared device in different schedules in arbitrary first schedule with the linkage of First Family's shared device has opened It is dynamic, when detecting that the second family's shared device to link in the first schedule with First Family's shared device has been started up, confirmation First schedule has been completed;When detect in the first schedule with First Family's shared device linkage second family's shared device not When starting, the first schedule of confirmation is not completed.
In embodiments of the present invention, due to family's shared device towards be family whole member, kinsfolk exists It may be related to one or more family's shared devices when establishing schedule, and same family's shared device may be simultaneously It appears in multiple schedules.After a schedule terminates, wherein family's shared device involved in multiple schedules may The history usage log having been turned on can be generated, or sends corresponding starting notice, at this time log management to schedule management system System is which schedule is completed for determination, the starting situation of armamentarium associated with the schedule can be examined It examines, and just determines that journey on some other day is completed when armamentarium associated with the schedule starts.
In embodiments of the present invention, for example, schedule 2 is that " I will learn at night if schedule 1 is " I will learn dancing at night " It sings ".Family's shared device involved in schedule 1 includes: smart television, intelligent dance rug, intelligent sound etc.;Involved by schedule 2 And family's shared device include: smart television, intelligent sound etc..If current schedule 2 when being executed between when reaching, intelligence electricity Depending on having been started up with intelligent sound box, it can determine that current schedule 2 has been completed.For schedule 1, although working as Preceding smart television and intelligent sound have been started up, but intelligent dance rug is inactive, then can determine that schedule 1 does not complete.
In embodiments of the present invention, for the above embodiments, if having had been started up intelligent electricity when executing schedule 1 Depending on, whole related intelligent appliances such as intelligent dance rug, intelligent sound, it can determine that schedule 1 has been completed.At this time due to intelligent electricity Depending on having been started up with intelligent sound, but the also intelligent dance rug therewith started is related to for the setting of schedule 2 Family's shared device only has smart television and intelligent sound box, and schedule management system may further determine that the execution of schedule 2 at this time Time, or further determine that the executor of schedule 2, if execution time and execution with current smart television and intelligent sound Whether person matches, if mismatched, can determine that schedule 2 is not yet completed;Matched in addition, executing time and executor, feelings Condition is generally not present, and the schedule that such case illustrates that the same person formulates conflicts with each other, and conflict can be issued when formulating schedule It reminds.
In embodiments of the present invention, which can have cross one another family public to avoid in multiple schedules Schedule conflict is generated when equipment to provide so that the management to schedule causes confusion to be related to the schedule management of family's shared device Orderliness clear, effective Managed Solution realizes pair to combine with the confirmation scheme for executing time and executor Effective supervision of schedule executive condition.
Embodiment three
The embodiment gives processing scheme when family's shared device is cooking equipment on the basis of example 2.
Optionally, family's shared device may include cooking equipment, and executing the time may include cooking time, required execution Item may include: cooking food.
Optionally, as shown in Fig. 2, executing the realization means of item needed for obtaining according to semantic parsing and/or needing to realize Function, and according to realization means and/or need the function realized to obtain to can be realized the intelligent families of one or more of the function Electricity may include S201-S203:
S201, the cooking menu that required cooking food is obtained according to semantic parsing;
S202, according to cooking menu parse complete cooking menu needed for cooking function;
S203, the cooking function according to needed for cooking menu determine that one or more needed for completing cooking function is cooked Equipment, as cooking equipment corresponding with cooking menu.
In embodiments of the present invention, for example, if a schedule is " the birthday dinner for preparing father at night ", to the implementation Example carries out semantic parsing, can know that targeted personnel are " father ", therefore can transfer the preferred diet and taboo of " father " Avoid, and matches corresponding cooking menu, such as: " mushroom rape ", " frying spring bamboo ", " stewed chop " etc..In addition, due to being " raw Day dinner ", it may be considered that cooking menu may further include production birthday cake.According to the cooking menu, available completion Cooking function needed for the recipe includes: to fry, stew, steaming, is roasting etc., therefore the intelligent cooking equipment of order of months in the year may include: intelligent stir-fry Dish pot, intelligent saucepan, Intelligent oven, Intelligent steamer, intelligent electric cooker etc..
In embodiments of the present invention, through the above scheme can by carrying out semantic parsing to the built schedule of user, from And obtain corresponding cooking equipment.
In embodiments of the present invention, it should be noted that above-described embodiment is the place provided according to corresponding birthday scene Reason scheme, can also occur in schedule in other embodiments technical dates (such as red-letter day, birthday, wedding anniversary) and More concrete condition or combination historical record obtains accordingly when specific demand (such as classmate's party, family dinner party, small-sized Party) Cooking menu, and obtain involved in cooking equipment.
Optionally, this method can also include: to work as appointing in one or more cooking equipment involved in a schedule Meaning one determines that the cooking equipment having been turned on has executed corresponding cooking operation when corresponding cooking time has been turned on, and Confirm that execution is completed in the item of cooking food after related one or more cooking equipments all starting;When involved At least one of one or more cooking equipments when corresponding cooking time is inactive, confirm the item of cooking food not It completes to execute.
In embodiments of the present invention, the above-mentioned schedule birthday dinner of father " prepare at night " be related to intelligent frying pan, The intelligent cookings equipment such as intelligent saucepan, Intelligent oven, Intelligent steamer, intelligent electric cooker is confirming that above-mentioned intelligent cooking equipment is equal It just can be confirmed that the schedule may have been completed when starting within the corresponding time, it is complete otherwise can to directly determine some other day Cheng Wei At.
Optionally, this method can also include: and work as to determine that cooking equipment corresponding with cooking menu mutually links When multiple cooking equipments, determine that each culinary art is set in the multiple cooking equipments mutually to link according to the operation order of cooking menu Standby cooking time and required cooking food;
Wherein, when in the operation order of cooking menu including unrelated one or more sub- sequences, by sub- sequence The execution time be set as being performed simultaneously or be executed within the preset period, and using the execution time of sub- sequence as execute the son The execution time of the cooking equipment of sequence.
In embodiments of the present invention, be still illustrated with the above embodiments, due to " mushroom rape ", " fry spring bamboo " this two A execution item all refers to intelligent frying pan, in order to avoid intelligent frying pan only performs in " mushroom rape " and " frying spring bamboo " An item just sent to schedule management system and execute the completed notice of item so that one of dish is not cooked, It causes to execute item careless omission, " mushroom rape " and " frying spring bamboo " the two execution items can be confirmed as two sub- items, and Determine that two are just hoped to execute sequence, to prevent item from slipping.
In embodiments of the present invention, " production birthday cake " and cooking do not conflict in above-mentioned execution item.It can be same Shi Zhihang equally it can be identified as one and just hoped, and determine sub- item it can thus be avoided item is slipped Execution event exercises supervision.
Example IV
The embodiment gives the first additional project embodiment of schedule management on the basis of embodiment three.
Optionally, this method can also include: that required food is determined according to required cooking food before executing schedule Material, and detect the storage condition of food materials;When the currently stored situation for determining food materials is not able to satisfy the demand of cooking food, remind User supplements food materials;And according to the transaction of the update of later period food materials storage condition, the location information of user and/or user Information judges whether user has supplemented food materials.
In embodiments of the present invention, it is smoothly completed to supervise established schedule, it can be to the necessity for completing the schedule Condition exercises supervision.For example, whether corresponding food materials are complete for culinary art, and can be into one when confirming that food materials are inadequate Step supervises user to purchase as early as possible, and exercises supervision to the buying situation of user.The example scheme is realized to culinary art schedule Effectively supervision, improves the implementation effect of schedule.
Embodiment five
The embodiment gives second of additional project embodiment of schedule management on the basis of example 2.
Optionally, this method can also include: that the identity of the user using family's shared device is obtained according to speech recognition, When in family different user establish schedule involved in family's shared device clash when, according to the user of different identity Different priority levels determine the access right of the family's shared device clashed.
In embodiments of the present invention, by aforementioned schemes it is found that working as difference for being related to the schedule of family's shared device User when establishing schedule, conflict may be generated between family's shared device.For example, user 1 establish schedule be " I at night 21:00 will have a bath ", it is " my evening 21:00 will wash hair " that user 2, which establishes schedule, which can may be all related to To intelligent water heater, Intelligent blower, can be logged in front of establishing schedule by speech recognition or user in response to this Information determines the corresponding user of schedule, and is made according to the user of the different identity pre-established in family to family's shared device The preferential right of intelligent water heater and Intelligent blower is determined with priority, to solve schedule conflict.Correspondingly, it determines Prompting message can be issued to the user used rearward after preferential right, so that user learns the adjustment of schedule.
Embodiment six
The embodiment gives the third additional project embodiment of schedule management on the basis of above-mentioned any embodiment.
Optionally, this method can also include: according to preset daily schedule and machine learning as a result, when obtaining default The item that number alreadys exceed preset frequency threshold value is not completed in section, and when schedule is written again in the item, in the item The execution time reach before issue the user with emphasis prompting.
In embodiments of the present invention, since certain user can forget to execute to certain one kind item regularly, for example, on time Take medicine, get up on time, taking exercise on time etc..For these items, can be obtained by the daily daily schedule of foundation, it can also be with It is obtained by deep learning, and emphasis prompting is carried out to these items, for example, remind or reminded by particular music repeatedly, with User is supervised to execute item on time.
The beneficial effect of the embodiment of the present invention may include:
1. the agenda managing method based on intelligent appliance in the embodiment of the present invention may include: to pre-establish about The schedule of intelligent appliance carries out semantic parsing;Wherein the schedule may include the item of time and the execution needed for the time; It is parsed according to semanteme and obtains intelligent appliance and execution time corresponding with intelligent appliance and required execution thing involved in schedule ;The history service condition of intelligent appliance is obtained after reaching between when being executed;When history service condition and required execution item When matching, item is executed needed for confirming and is completed, and required execution item is located automatically according to preset first method Reason;When history service condition and required execution item mismatch, item is executed needed for confirming and is not completed, and with preset second Mode is issued the user with about the required prompting message for executing item.By the example scheme, realize the schedule of setting It is associated with intelligent appliance equipment whether to be completed with the current schedule of determination, improve the validity of schedule setting, and can be to avoid User misses material particular, further improves user experience.
2. obtaining intelligent appliance involved in schedule according to semanteme parsing in the embodiment of the present invention may include: according to semanteme The function that parsing executes the realization means of item needed for obtaining and/or needs are realized, and according to realization means and/or need to realize Function obtain and can be realized one or more intelligent appliances of the function.By the example scheme, for the schedule that will be set It is associated with intelligent appliance equipment to provide technical foundation.
3. required execution item automatically process according to preset first method in the embodiment of the present invention may include: Item is executed needed for will be completed in schedule to be deleted or marked as being completed;And corresponding notification information is sent to user;With It may include: to send out to the mobile terminal of user that preset second method, which is issued the user with about the required prompting message for executing item, Send prompting message;Wherein, whether which may include: the required execution item not completed in schedule to be deleted or postponed Inquiry message.By the example scheme, reasonable place can be made respectively to completed item and unfinished item Reason can also be proposed to remind, be further ensured that avoid interference of the item to unfinished item is completed to unfinished item The validity of schedule setting, avoids user and misses material particular, improve user experience.
4. intelligent appliance may include family's shared device in the embodiment of the present invention;This method can also include: to work as family When First Family's shared device in shared device is related to multiple and different schedules, parse involved in each schedule with After the second family of one or more shared device of First Family's shared device linkage, first is being determined by history service condition In the case that family's shared device has been started up, detect public with First Family in arbitrary first schedule in multiple and different schedules Whether second family's shared device of equipment linkage has been started up, and joins when detecting in the first schedule with First Family's shared device When second dynamic family's shared device has been started up, the first schedule of confirmation has been completed;When detecting in the first schedule with first When second family's shared device of family's shared device linkage is inactive, the first schedule of confirmation is not completed.Pass through the embodiment side Case, to schedule executive condition when can exclude not set family's shared device that the domestic consumer of schedule is related to using schedule Judgement interference, ensure that the accuracy to the judgement of schedule executive condition.
5. required execution item includes: cooking food in the embodiment of the present invention;Thing is executed needed for obtaining according to semanteme parsing The function that the realization means and/or needs of item are realized, and according to realization means and/or the function of realizing acquisition is needed to can be realized One or more intelligent appliances of the function include: the cooking menu of cooking food needed for being obtained according to semantic parsing;According to cooking Cooking function needed for recipe of preparing food parses completion cooking menu;The cooking function according to needed for cooking menu is determined to complete to cook One or more cooking equipments needed for function of preparing food, as cooking equipment corresponding with cooking menu.By the example scheme, It is associated with family cooking equipment to realize schedule executive condition.
6. the method in the embodiment of the present invention can also include: to be determined before executing schedule according to required cooking food Required food materials, and detect the storage condition of food materials;When determining that the currently stored situation of food materials is not able to satisfy the need of cooking food When asking, user is reminded to supplement food materials;And according to the update of later period food materials storage condition, user location information and/or The Transaction Information of user judges whether user has supplemented food materials.Pass through the example scheme, it is ensured that set schedule It is normal to execute, further improve user experience.
7. the method in the embodiment of the present invention can also include: to obtain the use for using family's shared device according to speech recognition The identity at family, when in family different user establish schedule involved in family's shared device clash when, according to difference The different priority levels of the user of identity determine the access right of the family's shared device clashed.Pass through the embodiment Scheme can solve family's shared device by using permission and use collision problem in set schedule, further It ensures performing effectively for schedule, improves user experience.
8. the method in the embodiment of the present invention can also include: according to preset daily schedule and machine learning as a result, It obtains unfinished number in preset period of time and alreadys exceed the item of preset frequency threshold value, and schedule is written again in the item When, emphasis prompting is issued the user with before the execution time of the item reaches.By the example scheme, use is effectively corrected for Family is to certain schedules regular the phenomenon that forgetting, it is ensured that any schedule normally executes.
It will appreciated by the skilled person that whole or certain steps, system, dress in method disclosed hereinabove Functional module/unit in setting may be implemented as software, firmware, hardware and its combination appropriate.In hardware embodiment, Division between the functional module/unit referred in the above description not necessarily corresponds to the division of physical assemblies;For example, one Physical assemblies can have multiple functions or a function or step and can be executed by several physical assemblies cooperations.Certain groups Part or all components may be implemented as by processor, such as the software that digital signal processor or microprocessor execute, or by It is embodied as hardware, or is implemented as integrated circuit, such as specific integrated circuit.Such software can be distributed in computer-readable On medium, computer-readable medium may include computer storage medium (or non-transitory medium) and communication media (or temporarily Property medium).As known to a person of ordinary skill in the art, term computer storage medium is included in for storing information (such as Computer readable instructions, data structure, program module or other data) any method or technique in the volatibility implemented and non- Volatibility, removable and nonremovable medium.Computer storage medium include but is not limited to RAM, ROM, EEPROM, flash memory or its His memory technology, CD-ROM, digital versatile disc (DVD) or other optical disc storages, magnetic holder, tape, disk storage or other Magnetic memory apparatus or any other medium that can be used for storing desired information and can be accessed by a computer.This Outside, known to a person of ordinary skill in the art to be, communication media generally comprises computer readable instructions, data structure, program mould Other data in the modulated data signal of block or such as carrier wave or other transmission mechanisms etc, and may include any information Delivery media.

Claims (10)

1. a kind of agenda managing method based on intelligent appliance, which is characterized in that the described method includes:
Semantic parsing is carried out to the schedule about intelligent appliance pre-established;Wherein the schedule includes time and described The item executed needed for time;
Intelligent appliance and execution corresponding with the intelligent appliance involved in the schedule are obtained according to the semantic parsing Time and required execution item;
The history service condition of the intelligent appliance is obtained after the execution time reaches;
When the history service condition and the required execution item match, confirm that the required item that executes is completed, And the required execution item is automatically processed according to preset first method;When the history service condition and the institute When need to execute item mismatch, confirm that the required item that executes does not complete, and pass is issued the user with preset second method In the required prompting message for executing item.
2. the agenda managing method according to claim 1 based on intelligent appliance, which is characterized in that described according to institute's predicate It includes: to obtain the required execution item according to the semantic parsing that justice, which parses intelligent appliance involved in the acquisition schedule, The function that realization means and/or needs are realized, and according to the realization means and/or the function of realizing acquisition is needed to can be realized One or more intelligent appliances of the function.
3. the agenda managing method according to claim 1 based on intelligent appliance, which is characterized in that
It is described the required execution item automatically process according to preset first method include: will be complete in the schedule At it is described needed for execute item be deleted or marked as being completed;And corresponding notification information is sent to user;
Described issued the user with preset second method about the required prompting message for executing item includes: to user's Mobile terminal sends the prompting message;Wherein, the prompting message includes: whether the institute that will not be completed in the schedule The inquiry message that item is deleted or postponed need to be executed.
4. the agenda managing method based on intelligent appliance according to claim 1 to 3, which is characterized in that described Intelligent appliance includes family's shared device;
The method also includes: when First Family's shared device in family's shared device is related to multiple and different schedules When, it is public with the second family of one or more of First Family's shared device linkage involved in each schedule parsing After equipment, in the case where determining that First Family's shared device has been started up by the history service condition, detection The second family to link in arbitrary first schedule with First Family's shared device in the multiple difference schedule is public to be set It is standby whether to have been started up, it is public with the second family of First Family's shared device linkage in first schedule when detecting When equipment has been started up, confirm that first schedule has been completed;When detect in first schedule with the First Family When second family's shared device of shared device linkage is inactive, confirm that first schedule does not complete.
5. the agenda managing method according to claim 4 based on intelligent appliance, which is characterized in that the family is public to be set Standby includes cooking equipment, and the execution time includes cooking time, and executing item needed for described includes: cooking food;
The method also includes: any one in the one or more cooking equipment involved in the schedule is corresponding When cooking time has been turned on, determine that the cooking equipment having been turned on has executed corresponding cooking operation, and at related one Or all starting confirms that execution is completed in the item of cooking food to multiple cooking equipments later;When related one or more At least one of a cooking equipment confirms that the item of cooking food does not complete and executes when corresponding cooking time is inactive.
6. the agenda managing method according to claim 2 based on intelligent appliance, which is characterized in that execute thing needed for described Item includes: cooking food;It is described that the required realization means for executing item are obtained according to the semantic parsing and/or need reality Existing function, and the one or more that can be realized the function is obtained according to the function that the realization means and/or needs are realized Intelligent appliance includes:
The cooking menu of cooking food needed for being obtained according to the semantic parsing;
Cooking function needed for completing the cooking menu is parsed according to the cooking menu;
Determine that one or more needed for completing the cooking function is cooked according to cooking function needed for the cooking menu Equipment, as cooking equipment corresponding with the cooking menu.
7. the agenda managing method according to claim 6 based on intelligent appliance, which is characterized in that the method is also wrapped It includes: when determining cooking equipment corresponding with the cooking menu is the multiple cooking equipments mutually to link, being cooked according to described The operation order of recipe of preparing food determines the cooking time of each cooking equipment and institute in the multiple cooking equipments mutually to link Need cooking food;
Wherein, when in the operation order of the cooking menu including unrelated one or more sub- sequences, by the son The execution time of sequence is set as being performed simultaneously or execute within the preset period, and using the execution time of the sub- sequence as Execute the execution time of the cooking equipment of the sub- sequence.
8. according to the agenda managing method based on intelligent appliance described in claim 5-7 any one, which is characterized in that described Method further include: before executing the schedule, required food materials are determined according to required cooking food, and detect the food materials Storage condition;When the currently stored situation for determining the food materials is not able to satisfy the demand of cooking food, remind user to described Food materials are supplemented;And location information and/or the user of the update of food materials storage condition, the user according to the later period Transaction Information judge whether user has supplemented the food materials.
9. the agenda managing method according to claim 4 based on intelligent appliance, which is characterized in that the method is also wrapped It includes: obtaining the identity of the user using family's shared device according to speech recognition, when the day that different user is established in family When family's shared device involved in journey clashes, the hair is determined according to the different priority levels of the user of different identity The access right of family's shared device of raw conflict.
10. the agenda managing method based on intelligent appliance according to claim 1 to 3, which is characterized in that institute State method further include: number has not been completed as a result, obtaining in preset period of time according to preset daily schedule and machine learning More than the item of preset frequency threshold value, and when schedule is written again in the item, before the execution time of the item reaches Issue the user with emphasis prompting.
CN201810398998.3A 2018-04-28 2018-04-28 Schedule management method based on intelligent household electrical appliance Active CN110417625B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810398998.3A CN110417625B (en) 2018-04-28 2018-04-28 Schedule management method based on intelligent household electrical appliance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810398998.3A CN110417625B (en) 2018-04-28 2018-04-28 Schedule management method based on intelligent household electrical appliance

Publications (2)

Publication Number Publication Date
CN110417625A true CN110417625A (en) 2019-11-05
CN110417625B CN110417625B (en) 2021-10-08

Family

ID=68357243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810398998.3A Active CN110417625B (en) 2018-04-28 2018-04-28 Schedule management method based on intelligent household electrical appliance

Country Status (1)

Country Link
CN (1) CN110417625B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111831925A (en) * 2020-07-20 2020-10-27 上海博泰悦臻电子设备制造有限公司 Backup method based on information sharing of other people, electronic equipment and readable storage medium
CN112350903A (en) * 2020-10-26 2021-02-09 深圳Tcl新技术有限公司 Appointment prompting method, device and medium for household appliance
CN113762903A (en) * 2020-06-02 2021-12-07 云米互联科技(广东)有限公司 Backlog processing method, household electrical appliance and storage medium
CN113947873A (en) * 2020-07-17 2022-01-18 青岛海尔洗衣机有限公司 Timing reminding method and device and electronic equipment
WO2022247383A1 (en) * 2021-05-28 2022-12-01 荣耀终端有限公司 Prompt method, graphical user interface, and related apparatus

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104580738A (en) * 2015-01-22 2015-04-29 小米科技有限责任公司 Method and device for setting information reminding modes
US20150135088A1 (en) * 2013-11-12 2015-05-14 Microsoft Corporation Aggregating and presenting event information
CN105912392A (en) * 2016-04-11 2016-08-31 广东欧珀移动通信有限公司 Method, device and mobile terminal for calendar reminding
CN107294818A (en) * 2016-04-05 2017-10-24 北京小米移动软件有限公司 Alarm clock prompting method and device
CN107703893A (en) * 2017-09-18 2018-02-16 广东美的制冷设备有限公司 Household electric appliance control method, device and computer-readable recording medium based on schedule

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150135088A1 (en) * 2013-11-12 2015-05-14 Microsoft Corporation Aggregating and presenting event information
CN104580738A (en) * 2015-01-22 2015-04-29 小米科技有限责任公司 Method and device for setting information reminding modes
CN107294818A (en) * 2016-04-05 2017-10-24 北京小米移动软件有限公司 Alarm clock prompting method and device
CN105912392A (en) * 2016-04-11 2016-08-31 广东欧珀移动通信有限公司 Method, device and mobile terminal for calendar reminding
CN107703893A (en) * 2017-09-18 2018-02-16 广东美的制冷设备有限公司 Household electric appliance control method, device and computer-readable recording medium based on schedule

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113762903A (en) * 2020-06-02 2021-12-07 云米互联科技(广东)有限公司 Backlog processing method, household electrical appliance and storage medium
CN113947873A (en) * 2020-07-17 2022-01-18 青岛海尔洗衣机有限公司 Timing reminding method and device and electronic equipment
CN113947873B (en) * 2020-07-17 2023-11-21 青岛海尔洗衣机有限公司 Timing reminding method and device and electronic equipment
CN111831925A (en) * 2020-07-20 2020-10-27 上海博泰悦臻电子设备制造有限公司 Backup method based on information sharing of other people, electronic equipment and readable storage medium
CN111831925B (en) * 2020-07-20 2023-12-15 博泰车联网科技(上海)股份有限公司 Backup method based on information sharing of other people, electronic equipment and readable storage medium
CN112350903A (en) * 2020-10-26 2021-02-09 深圳Tcl新技术有限公司 Appointment prompting method, device and medium for household appliance
WO2022247383A1 (en) * 2021-05-28 2022-12-01 荣耀终端有限公司 Prompt method, graphical user interface, and related apparatus

Also Published As

Publication number Publication date
CN110417625B (en) 2021-10-08

Similar Documents

Publication Publication Date Title
CN110417625A (en) A kind of agenda managing method based on intelligent appliance
US20200336326A1 (en) Method for data communication with a domestic appliance by a mobile computer device, mobile computer device and domestic appliance
CN109798545B (en) Kitchen range, fire control method and device thereof and storage medium
CN110706131A (en) Method and device for creating electronic menu, electronic equipment and storage medium
CN104199495A (en) Device and method for automatically regulating cooking temperature
CN108244984A (en) Realize method, cooking apparatus and the computer storage media of frying function
CN105476441A (en) Cooking appliance, heat preservation control method of cooking appliance and heat preservation control device of cooking appliance
CN106444451A (en) Method and device for reminding food extraction in intelligent electric cooker
CN108594673A (en) Menu generation method and kitchen appliance
CN106569411A (en) Intelligent cooking kitchen ware reminding method and device
CN109426191A (en) Cooking appliance, data processing method and system thereof, storage medium and processor
CN108415308A (en) A kind of reservation cooking control method and device, cooking pot
CN108433516B (en) Cooking learning method
CN109695898A (en) A kind of control method and intelligent gas-burning stove cooker of gas stove cooker
CN109464019A (en) A kind of cooking methods and cooking equipment
US11893396B2 (en) Domestic appliance, domestic appliance system, and method for operating a domestic appliance
CN211403268U (en) Constant temperature circuit for frying pan
CN112120524B (en) Cooking appliance, heating control method and heating control device
WO2018133850A1 (en) Cooking method and device, display method and apparatus for control interface, and storage medium
CN110856596B (en) Control method and device of cooking equipment, cooking equipment and storage medium
CN111722549B (en) Control method, device and system
KR20160146270A (en) Soaking time control method of electric cooker
CN110822490A (en) Vibration prompting method of intelligent cooker and cooker system with vibration prompting function
CN110376906A (en) Period configuration method, device, equipment and readable storage medium storing program for executing based on power
CN112965542B (en) Intelligent cooking equipment control method, control equipment and intelligent terminal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant