CN110410090A CN201910076457.3A CN201910076457A CN110410090A CN 110410090 A CN110410090 A CN 110410090A CN 201910076457 A CN201910076457 A CN 201910076457A CN 110410090 A CN110410090 A CN 110410090A
Authority
CN
China
Prior art keywords
arm
platform
telescoping tube
machine
bolter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910076457.3A
Other languages
Chinese (zh)
Inventor
杨仁树
李晔
李杨
岳中文
邓娅杰
唐福新
龚良发
李凯
刘艳
叶子辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Jingxiang Machinery And Equipment Technology Co Innovation Co ltd
China University of Mining and Technology Beijing CUMTB
Jiangxi Lanxiang Heavy Industries Co Ltd
Original Assignee
Jiangxi Jingxiang Machinery And Equipment Technology Co Innovation Co ltd
China University of Mining and Technology Beijing CUMTB
Jiangxi Lanxiang Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Jingxiang Machinery And Equipment Technology Co Innovation Co ltd, China University of Mining and Technology Beijing CUMTB, Jiangxi Lanxiang Heavy Industries Co Ltd filed Critical Jiangxi Jingxiang Machinery And Equipment Technology Co Innovation Co ltd
Priority to CN201910076457.3A priority Critical patent/CN110410090A/en
Publication of CN110410090A publication Critical patent/CN110410090A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/34Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with bucket-arms, i.e. a pair of arms, e.g. manufacturing processes, form, geometry, material of bucket-arms directly pivoted on the frames of tractors or self-propelled machines
    • E02F3/3402Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with bucket-arms, i.e. a pair of arms, e.g. manufacturing processes, form, geometry, material of bucket-arms directly pivoted on the frames of tractors or self-propelled machines the arms being telescopic
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • E21B7/026Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting having auxiliary platforms, e.g. for observation purposes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • E21B7/027Drills for drilling shallow holes, e.g. for taking soil samples or for drilling postholes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms
    • E21D9/126Loading devices or installations

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of, and the multi-arm with stretching structure bores dress anchor all-in-one machine, including vehicle frame, convey groove body, excacation arm, creeper undercarriage, electrical system and hydraulic system, excacation arm one or both sides front and rear is respectively arranged with preceding roof-bolter and rear roof-bolter, drill arm mechanism is provided on the outside of preceding roof-bolter, delivery chute body is located at vehicle frame rear end middle position, scaling platform is respectively arranged on conveying groove body two sides vehicle frame, it stretches out platform and is connected by drill boom attachment base with translation oil cylinder and support arm translation oil cylinder, translation oil cylinder and support arm translation oil cylinder are connected with telescopic arm and pass through swing cylinder seat to be connected with oscillating oil cylinder, oscillating oil cylinder is connected with balladeur train forward beam, scaling platform includes fixed platform and is connected with fixed platform and telescopic stretching platform, job area is wide, it is able to achieve tunneling boring and excavates loading, Blast hole drilling and anchor shaft anchor cable eye is beaten, front and back drill boom can synchronize operation, be the Novel drill dress anchor all-in-one machine for realizing rock gangway speedy drivage.

Description

A kind of multi-arm with stretching structure bores dress anchor all-in-one machine more
Technical field
The present invention relates to a kind of coal mining drills to fill anchor all-in-one machine, bores more particularly, to a kind of multi-arm with stretching structure more Bore dress anchor all-in-one machine.
Background technique
It is general at present in the large-scale stone head tunneling construction of the departments such as coal mine, non-coal mine, railway, highway and water power Tunnelling is carried out all over using drilling and blasting method, the equipment 1) this form of construction work has the disadvantage that needed for is more: hydraulic drill rig+anchor Bar machine+the equipment of backhoe loader three, or bore dress two equipment of all-in-one machine+roof-bolter;2) operating efficiency is low: in work progress Due to repeatedly to replace more exchange device, equipment disengaging place of working needs to occupy many times;3) construction cost is high: the more personnel of equipment Also just more, it in addition also specially to be beaten in tunnel every a certain distance and park the cavern of equipment or do lay-by etc.;4) it deposits In security risk: equipment will frequently intersect in road lane to be driven into or exits, and every equipment is all using motor drive, lane Light is bad in road, and connecting cable is again more, in addition staff is also more, so there are various safety such as equipment and the person are hidden Suffer from;5) the existing drill boom for boring dress all-in-one machine and boring dress (anchor) all-in-one machine and excacation arm job area are little, and when operation There are local interferences can not achieve tunneling boring operation;The brill dress all-in-one machine outer dimension then used for large-scale tunnel is bigger, But the dismounting of this big type, go into the well, underground transportation and assembling etc. it is all inconvenient.
Summary of the invention
For it is above-mentioned the problems of in the prior art, the present invention provides a kind of collection to bore blast hole, bores anchor shaft anchor cable The functions such as hole and excavation loading bore brill more and fill anchor all-in-one machine in one, the big stretching structure multi-arm of adaptation tunnel range.
The technical problem to be solved in the present invention is adopted the technical scheme that: a kind of multi-arm with stretching structure bores more Anchor all-in-one machine is filled, it includes vehicle frame, conveying groove body, excacation arm, creeper undercarriage, electrical system and hydraulic system, institute It states excacation arm one or both sides front and rear and is respectively arranged with preceding roof-bolter and rear roof-bolter, in the outside of preceding roof-bolter It is provided with drill arm mechanism, delivery chute body is located at vehicle frame rear end middle position, and the drill arm mechanism includes power head, the power head It is arranged on balladeur train forward beam, balladeur train forward beam is located at the two sides of excacation arm, on the vehicle frame below conveying groove body two sides It is respectively arranged with scaling platform, scaling platform includes the fixed platform being fixed on vehicle frame and is connected with fixed platform and scalable Stretching platform, drill boom or anchor pole arm mounting base, the stretching platform pass through piston before being provided on described stretching platform one end Push rod is connected with the hydraulic cylinder that inside fixed platform or outside is arranged in.
Further, the stretching platform includes the telescoping tube that can be moved in fixed platform, and the telescoping tube passes through work Plug push rod is connected with the hydraulic cylinder that inside fixed platform or outside is arranged in.
Further, the telescoping tube includes that an at least second level telescoping tube, the three-level being connected with second level telescopic movable are stretched The draw and the level-one telescoping tube being movably connected with fixed platform, three-level telescoping tube one end are provided with attachment base, the three-level Telescoping tube is connected by piston push rod with the hydraulic cylinder that inside fixed platform or outside is arranged in.
Present invention is mainly used for the large-scale stone head of the departments such as coal mine, non-coal mine, railway, highway and water power drivings to apply Work, product are mainly made of creeper undercarriage, vehicle frame, transport groove body, excacation arm, electric system and hydraulic system, this Invention increases scaling platform, preceding drill arm mechanism and preceding roof-bolter and rear roof-bolter (optional), cable drum on this basis (optional) and water system and air-channel system etc..Complete machine has fully demonstrated advance, reliability, energy saving, low noise, function The features such as more, high-efficient.It has following characteristics:
1) one group or two groups of more multi-stage expansion platform structures are used, the long wide coverage of stroke is stretched out, retraction size is small, has Working space is conceded conducive to excacation arm.
2) telescopic shoveling arm working range is big, and excavating resistance is small, operator's sight is good, can tunneling boring skim operation, clear Except " float stone ", the good operating stability of at the top of tunnel and two sides, hydraulic breaking hammer can be installed additional.
3) complete machine use modularized design, drill boom and anchor pole arm mounting base are general, can assemble according to actual needs drill boom or Anchor pole arm, rear portion can also install tail portion or side portion's roof-bolter additional as needed, be also equipped with reassembling type service platform, can face as needed When be mounted on the balladeur train of drill boom, so as to personnel station in this platform carry out Anchor Care operation;Complete machine integrates multiple functions, energy Meet a variety of different operating condition job requirements.
4) creeper undercarriage uses cast steel track structure, is driven with the imported hydraulic motor integrated with speed reducer Dynamic, performance is good, and failure rate is low.Track tensioning oil cylinder is placed on track frame side, maintains easily.Creeper tread uses high duty alloy material Expect it is thermally treated harden, guarantee that its wearability is good, reliable for operation, the service life is long.
5) structural member is all welded using high-strength steel sheet, and complete machine intensity is high, and rigidity is good.
6) hydraulic system uses load-sensitive hydraulic system, and hydraulic cylinder uses two end buffer structures, and movement is precisely soft Without impact, there is mutual interlocking gear between drill boom, anchor pole arm and excacation arm, can prevent maloperation, safety is good, high reliablity.
7) electrical system has a variety of overload protections and malfunction coefficient and storage, and defencive function is strong, there are also operating condition detection and Fault diagnosis functions.
8) multi-joint telescoping platform front end is mounted on using the drill boom of telescopic arm structure and anchor pole arm, drilling covering model when work It encloses extensively, positioning is quasi-, speed is fast, high-efficient.
The present invention before the machine among telescopic excacation arm is housed, two sides respectively fill one group of scaling platform group, often The front end of group scaling platform can fill two or more drill booms or anchor pole arm, and two side of rear portion can also respectively fill an anchor pole as needed Arm, this equipment operation range is wide, is able to achieve tunneling boring excavates and loads, blast hole drilling and beats anchor shaft anchor cable eye, and front and back drill boom can be into Row synchronization job is the Novel drill dress anchor all-in-one machine for realizing rock gangway speedy drivage.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the invention,
Fig. 2 is overlooking structure diagram of the invention,
Fig. 3 is the schematic view of the front view of excacation arm of the present invention,
Fig. 4 is the schematic view of the front view of scaling platform of the present invention,
Fig. 5 is the overlooking structure diagram of scaling platform of the present invention,
Fig. 6 is the schematic view of the front view of preceding drill boom of the present invention,
Fig. 7 is the schematic cross-sectional view of scaling platform of the present invention.
1, excacation arm 2, balladeur train forward beam 3, oscillating oil cylinder 4, translation oil cylinder 5, support arm translation oil cylinder in the figure 6, attachment base 7, preceding drill boom station 8, rear roof-bolter station 9, conveying groove body 10, cable drum 11, rear roof-bolter 12, vehicle frame 13, fixed platform 14, stretching platform 15, creeper undercarriage 16, preceding roof-bolter station 17, mounting base 18, service platform 19, piston push rod 20, three-level telescoping tube 21, supporting plate 22, movable groove body 23, pressing plate 24, second level are flexible Pipe 25, level-one telescoping tube 26, lubricating and wear-resisting block 27, bracket 28, hydraulic cylinder 29, gasket 30, screw washer 31, Support plate 32, telescopic arm 33, preceding roof-bolter 34, swing cylinder seat 35, lift slot oil cylinder.
Specific embodiment
A kind of multi-arm with stretching structure bores dress anchor all-in-one machine more and includes vehicle frame 12, conveying groove body 9, digs in the figure Working arm 1, creeper undercarriage 15, electrical system and hydraulic system are dug, excacation arm one or both sides front is with after Portion is respectively arranged with preceding roof-bolter 33 and rear roof-bolter 11, and the lower end (leaning on excacation arm) of preceding roof-bolter is provided with drill boom machine Structure, delivery chute body are located at vehicle frame rear end middle position, convey under groove body (preceding) end as movable groove body 22, the drill arm mechanism packet Drill boom head is included, the drill boom head is arranged on balladeur train forward beam 2, and balladeur train forward beam is located at the two sides of excacation arm, is conveying Scaling platform is respectively arranged on vehicle frame below groove body two sides, the scaling platform includes fixed platform 13 and stretching platform 14, the platform that stretches out includes the three-level telescoping tube 20 that a section is matched with fixed platform;Stretching out platform can also be including at least One section second level telescoping tube 24 and the second level telescoping tube three-level telescoping tube 20 being movably connected and the level-one being movably connected with fixed platform Telescoping tube 25, for second level telescoping tube except being a section in the present embodiment, the stretching platform includes a second level telescoping tube 24 and second level The level-one telescoping tube 25 that the three-level telescoping tube 20 and fixed platform that telescoping tube is movably connected are movably connected, second level telescoping tube remove this example In be one, second level telescoping tube can not also be set, as single-stage scaling platform when not setting second level telescoping tube, if one or two or more Be multi-stage expansion platform when second level telescoping tube, stretch out platform by (preceding drill boom or anchor pole arm) attachment base 6 and translation oil cylinder 4 and Support arm is translatable, and oil cylinder 5 is connected, and translation oil cylinder and support arm translation oil cylinder are connected with telescopic arm 32, and telescopic arm passes through swing cylinder seat 34 It is connected with oscillating oil cylinder 3, oscillating oil cylinder is connected by bracket 27 with balladeur train forward beam, and service is movably set on balladeur train forward beam Platform 18, the activity groove body 22 are connected with lift 35 one end of slot oil cylinder, and lift slot oil cylinder other end hinge pin is connected with vehicle frame, described Scaling platform includes the fixed platform 13 being fixed on vehicle frame and is connected with fixed platform and telescopic stretching platform 14, fixed Rear roof-bolter station 8 and mounting base 17 are provided on platform, roof-bolter station 16 before being provided on stretching out platform is described Stretching out platform includes the three-level telescoping tube 20 and fixed platform activity that a second level telescoping tube 24 and second level telescoping tube are movably connected Connected level-one telescoping tube 25, second level telescoping tube can not also set second level telescoping tube, not set second level telescoping tube except being one in this example When be single-stage scaling platform, if when one or two or more second level telescoping tube being multi-stage expansion platform, described first three is flexible Pipe is provided with (preceding drill boom or anchor pole arm) attachment base 6 on one end, preceding drill boom or anchor pole arm mounting base pass through again swing font 34 with Oscillating oil cylinder 3 is connected, and oscillating oil cylinder passes through bracket 27 again and is connected with balladeur train forward beam 2, balladeur train forward beam equipped with drill boom head or Anchor pole head is provided with drill boom before being fixed on or the supporting plate 21 in anchor pole arm mounting base above three-level telescoping tube, sets on supporting plate Drill boom station 7 before being equipped with, three-level telescoping tube is interior to be equipped with support plate 31, and support plate is connected with 19 one end of piston push rod, and piston pushes away The bar other end is connected with the hydraulic cylinder 28 being fixed in fixed platform, and conveying groove body tail portion is provided with cable drum 10, institute Stating telescoping tube is cast tube or welded pipe, and telescoping tube cross section is preferably rectangular (being also possible to round or other polygons), rectangular to stretch The draw is easily fabricated, processes and assembles, and stretches more stable, radial-play is small when mutually flexible.Between the telescoping tube radially Interval setting lubricating and wear-resisting block (telescoping tube only has end contact, and centre does not contact (flexible tube wall is at a distance of at 5 millimeters or more), The lubricating and wear-resisting block that can be in contact with telescoping tube surfaces externally and internally is provided in its spaced radial one end, when telescoping tube is rectangular When, lubricating and wear-resisting block 26 is equipped on each side, and lubricating and wear-resisting block is screwed on outer telescopic tube wall, resistance to when lubricating When abrading block 26 wears larger, its gap size can be adjusted by screw;The third is to prevent rubble or dust from entering and stretching In the draw, telescoping tube one end is provided with gasket, the gasket 29 is fixed on telescoping tube with screw washer 30 and pressing plate 23 It is contacted on one end and with flexible tube outer surface.
A kind of stretching structure multi-arm bores dress anchor all-in-one machine more, and collection bores blast hole, drilling anchor bar anchor cable hole, excavates and loads and rock Stone is transported to the functions such as machine rear portion in one, and a machine can substitute the operation function of two or three equipment, this product Each component layouts and outside shaped like 1~Fig. 7 of attached drawing.
1, using one group or two groups of multi-stage expansion platforms (specifically can be determine according to actual needs), every group flexible or multistage is stretched The outer cylinder at contracting platform rear portion is fixed, and its internal flexible inner arm can be made into single branch multistage telescopic arm according to actual needs Or more (two or more) telescopic arms, the front of conveying trough is projected over when all stretching out, and have one between every telescopic arm Fixed safe distance guarantees to stretch out or not interfere with each other when retracting.The mounting base of every telescopic arm front end is identical, can both fill drill boom, Anchor pole arm can also be filled, is determined with specific reference to actual needs.
2, front uses telescopic drill boom or telescopic type anchoring-bolt arm, stretches out the long wide coverage of stroke, makees when working in this way Industry coverage area is wider, and since front drill boom or anchor pole arm station are arranged in the front end of scaling platform, station is close from drill boom And make operator's sight clear, it operates intuitive and convenient.It is small that current drill boom or anchor pole arm retract size when collapsing, and can be with stretching Contracting platform returns to the rear portion of excacation arm, will not generate interference to the operation loaded is excavated.
3, using removable service platform, this service platform can be mounted at any time on drill boom balladeur train as needed, in platform The Anchor Cares such as drill steel, Anchor Agent part and necessary tool etc. can be placed, operating personnel stands in service platform, with lifting for drill boom And rise near roof-bolter, facilitate and install the operations such as anchor pole, dress Anchor Agent or locking anchor pole additional, sometimes for guarantee service platform Stability, adjustable drill boom state withstood on the suitable position such as tunnel ground or side.
4, using telescopic excacation arm, i.e. large arm and forearm is telescopic structure, when working arm stretches out, is excavated Load working range to significantly increase, " float stone " of at the top of tunnel and two sides can be excluded, can carry out tunneling boring skim operation, load High-efficient, good operating stability can also install hydraulic breaking hammer additional and carry out second-time breakage to large rock mass to transport.
5, hydraulic oil container, magnetic starter and rear portion roof-bolter station are arranged on the fixed outer cylinder of scaling platform, To operate more intuitive more convenient because station is close from rear portion roof-bolter, it is more compact to be arranged so complete machine structure, outer dimension Smaller, equipment is transported convenient in tunnel.
6, walking uses cast steel crawler belt, and walking mechanism is born a heavy burden, and ability is strong, and center of gravity is lower, and stability is more preferable when work.In addition There are also the components such as front/rear frame, conveying trough assembly, hydraulic system, water system, air-channel system, electrical system and hood in complete machine; There is mutual interlocking gear between drill boom, anchor pole arm and excacation arm, maloperation can be prevented.
Finally it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Invention is explained in detail referring to previous examples, those skilled in the art should understand that: it still can be with It modifies the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features;And These are modified or replaceed, do not make corresponding technical solution essence be detached from technical solution of various embodiments of the present invention spirit and Range.

Claims (4)

1. a kind of multi-arm with stretching structure bores dress anchor all-in-one machine more, it includes vehicle frame (12), conveying groove body (9), excavates Working arm (1), creeper undercarriage (15), electrical system and hydraulic system, it is characterized in that: excacation arm side or two Forequarter and rear portion are respectively arranged with preceding roof-bolter (33) and rear roof-bolter (11), and drill boom machine is provided on the outside of preceding roof-bolter Structure, delivery chute body are located at vehicle frame rear end middle position, and the drill arm mechanism includes drill boom head, and the drill boom head setting is pushed away in balladeur train Into on beam (2), balladeur train forward beam is located at the two sides of excacation arm, is respectively arranged on the vehicle frame below conveying groove body two sides Scaling platform, scaling platform include the fixed platform (13) being fixed on vehicle frame and are connected with fixed platform and telescopic stretching Platform (14), described stretching platform one end are provided with attachment base (6), and the stretching platform is existed by piston push rod (19) and setting Inside fixed platform or the hydraulic cylinder (28) in outside is connected.
2. a kind of multi-arm with stretching structure according to claim 1 bores dress anchor all-in-one machine more, it is characterized in that: described Stretching out platform includes the telescoping tube that can be moved in fixed platform, and the telescoping tube is by piston push rod (19) and is arranged in fixation Platform interior or the hydraulic cylinder (28) in outside are connected.
3. a kind of multi-arm with stretching structure according to claim 1 or 2 bores dress anchor all-in-one machine more, it is characterized in that: Three-level telescoping tube (20) He Yugu that the telescoping tube includes an at least second level telescoping tube (24), is connected with second level telescopic movable The level-one telescoping tube (25) that fixed platform is movably connected, the three-level telescoping tube is by piston push rod and is arranged inside fixed platform Or the hydraulic cylinder in outside is connected.
4. dress anchor all-in-one machine is bored according to a kind of multi-arm of tool stretching structure as claimed in claim 3, it is characterized in that: described stretch more Draw cross section is rectangular, radially spaced setting lubricating and wear-resisting block (26) between telescoping tube.
CN201910076457.3A 2019-01-26 2019-01-26 A kind of multi-arm with stretching structure bores dress anchor all-in-one machine more Pending CN110410090A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910076457.3A CN110410090A (en) 2019-01-26 2019-01-26 A kind of multi-arm with stretching structure bores dress anchor all-in-one machine more

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910076457.3A CN110410090A (en) 2019-01-26 2019-01-26 A kind of multi-arm with stretching structure bores dress anchor all-in-one machine more

Publications (1)

Publication Number Publication Date
CN110410090A true CN110410090A (en) 2019-11-05

Family

ID=68357514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910076457.3A Pending CN110410090A (en) 2019-01-26 2019-01-26 A kind of multi-arm with stretching structure bores dress anchor all-in-one machine more

Country Status (1)

Country Link
CN (1) CN110410090A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042827A (en) * 2019-12-26 2020-04-21 中联重科股份有限公司 Multi-arm heading machine
CN111997621A (en) * 2020-08-10 2020-11-27 中国煤炭科工集团太原研究院有限公司 Drilling and blasting method construction and post-supporting transportation method for drilling, loading and anchoring integrated machine of narrow and short roadway
CN117646602A (en) * 2023-12-11 2024-03-05 冀凯河北机电科技有限公司 Arm that drilling equipment was used
CN117646602B (en) * 2023-12-11 2024-06-04 冀凯河北机电科技有限公司 Arm that drilling equipment was used

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101858213A (en) * 2010-04-09 2010-10-13 闫振东 Drilling, loading, transporting and anchoring integrated machine with dual platforms and four arms for coal roadway
CN102094579A (en) * 2011-01-28 2011-06-15 武汉市天宝工程机械有限责任公司 Full-hydraulic tire rock drilling anchoring drill carriage
CN201934100U (en) * 2011-03-23 2011-08-17 三一重型装备有限公司 Sliding mechanism of boring machine airborne equipment
CN104564112A (en) * 2014-12-13 2015-04-29 中国煤炭科工集团太原研究院有限公司 Single-arm onboard roof bolter for underground coal mine
CN205503122U (en) * 2016-03-29 2016-08-24 中国矿业大学 Chisel dress anchor all -in -one
CN107165630A (en) * 2017-07-19 2017-09-15 山西天巨重工机械有限公司 A kind of colliery quick digging and anchoring all-in-one
CN207111144U (en) * 2017-07-06 2018-03-16 廊坊景隆重工机械有限公司 A kind of scaling platform and apply its Anchor Care drill carriage
CN108049877A (en) * 2018-01-11 2018-05-18 中煤第三建设(集团)有限责任公司 All-hydraulic intelligence bores dress anchor all-in-one machine
CN208106415U (en) * 2018-04-13 2018-11-16 无锡华瀚能源装备科技有限公司 A kind of anchor driving machine drill boom transverse direction double-telescopic mechanism
CN209799973U (en) * 2019-01-26 2019-12-17 江西蓝翔重工有限公司 Multi-arm multi-drill anchor loading all-in-one machine with telescopic structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101858213A (en) * 2010-04-09 2010-10-13 闫振东 Drilling, loading, transporting and anchoring integrated machine with dual platforms and four arms for coal roadway
CN102094579A (en) * 2011-01-28 2011-06-15 武汉市天宝工程机械有限责任公司 Full-hydraulic tire rock drilling anchoring drill carriage
CN201934100U (en) * 2011-03-23 2011-08-17 三一重型装备有限公司 Sliding mechanism of boring machine airborne equipment
CN104564112A (en) * 2014-12-13 2015-04-29 中国煤炭科工集团太原研究院有限公司 Single-arm onboard roof bolter for underground coal mine
CN205503122U (en) * 2016-03-29 2016-08-24 中国矿业大学 Chisel dress anchor all -in -one
CN207111144U (en) * 2017-07-06 2018-03-16 廊坊景隆重工机械有限公司 A kind of scaling platform and apply its Anchor Care drill carriage
CN107165630A (en) * 2017-07-19 2017-09-15 山西天巨重工机械有限公司 A kind of colliery quick digging and anchoring all-in-one
CN108049877A (en) * 2018-01-11 2018-05-18 中煤第三建设(集团)有限责任公司 All-hydraulic intelligence bores dress anchor all-in-one machine
CN208106415U (en) * 2018-04-13 2018-11-16 无锡华瀚能源装备科技有限公司 A kind of anchor driving machine drill boom transverse direction double-telescopic mechanism
CN209799973U (en) * 2019-01-26 2019-12-17 江西蓝翔重工有限公司 Multi-arm multi-drill anchor loading all-in-one machine with telescopic structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042827A (en) * 2019-12-26 2020-04-21 中联重科股份有限公司 Multi-arm heading machine
CN111997621A (en) * 2020-08-10 2020-11-27 中国煤炭科工集团太原研究院有限公司 Drilling and blasting method construction and post-supporting transportation method for drilling, loading and anchoring integrated machine of narrow and short roadway
CN117646602A (en) * 2023-12-11 2024-03-05 冀凯河北机电科技有限公司 Arm that drilling equipment was used
CN117646602B (en) * 2023-12-11 2024-06-04 冀凯河北机电科技有限公司 Arm that drilling equipment was used

Similar Documents

Publication Publication Date Title
CN101858213B (en) Drilling, loading, transporting and anchoring integrated machine with dual platforms and four arms for coal roadway
CN101832102B (en) Movable two-platform partitioned four-arm hanging wall anchor rod and anchor cable construction drill carriage
CN212359776U (en) Multifunctional hard rock tunneling integrated machine
WO2009155776A1 (en) A dilling, loading, transporting and anchoring integration machine for laneway in coal mine
CN208578571U (en) A kind of impact grinding combination tup of rock tunnelling bolting combined machine
CN111485900A (en) Rock tunnel boring machine
CN106948826B (en) Multifunctional tunnel repairing machine
CN206655700U (en) High inclination-angle development machine with auxiliary climbing apparatus
CN109026048A (en) A kind of climbing control method of high inclination-angle development machine
CN112412450A (en) Drilling, loading and anchoring integrated machine
CN101975077B (en) High-outburst coal mine coal roadway drilling-loading-bolting integrated machine
CN107130656A (en) Mine underground bores anchor broken rock integrated digging formula loading machine
CN110410090A (en) A kind of multi-arm with stretching structure bores dress anchor all-in-one machine more
CN113216836A (en) Crawler-type chassis module and anchor rod drill carriage
CN202055821U (en) Two-arm top slope anchor rod and anchor rope construction drill wagon with movable lifting platform
CN210460652U (en) Automatic four-arm tunneling and anchoring integrated machine for coal mine
CN212744006U (en) Crank arm type tunneling and anchoring all-in-one machine with random support
CN106869956B (en) A kind of high inclination-angle development machine with auxiliary climbing apparatus
CN209799973U (en) Multi-arm multi-drill anchor loading all-in-one machine with telescopic structure
CN201696041U (en) Double-platform four-arm drilling, loading, conveying and anchoring integrated machine for coal roadways
CN204609879U (en) A kind of pick anchor all-in-one
CN209799865U (en) Roadway excavation of taking extending structure is with boring dress anchor all-in-one
CN110424891A (en) A kind of brill dress anchor all-in-one machine of the tunnelling with stretching structure
CN212389344U (en) Hard rock cantilever tunneling machine
CN209799866U (en) Drilling, loading and anchoring all-in-one machine with full-section drilling telescopic platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination