CN110409804A - A kind of gasbag-type concrete blocking apparatus and its application method for building structure floor slab construction seam - Google Patents
A kind of gasbag-type concrete blocking apparatus and its application method for building structure floor slab construction seam Download PDFInfo
- Publication number
- CN110409804A CN110409804A CN201910740970.8A CN201910740970A CN110409804A CN 110409804 A CN110409804 A CN 110409804A CN 201910740970 A CN201910740970 A CN 201910740970A CN 110409804 A CN110409804 A CN 110409804A
- Authority
- CN
- China
- Prior art keywords
- air bag
- longitudinal reinforcement
- construction joint
- construction
- floor slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/04—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for structures of spherical, spheroid or similar shape, or for cupola structures of circular or polygonal horizontal or vertical section; Inflatable forms
- E04G11/045—Inflatable forms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/365—Stop-end shutterings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention belongs to the construction intercept process technical fields of concrete floor, more particularly to a kind of gasbag-type concrete blocking apparatus and its application method for building structure floor slab construction seam, the device includes construction joint air bag, the construction joint air bag is internally provided with air bag liner, the outer wall of the air bag liner is provided with the outer gallbladder of air bag, and the inflating catheter for inflation is accommodated in the inside of the air bag liner through one end of gallbladder outside the air bag;The horizontally arranged of construction joint air bag has multiple horizontal fixed drag hooks, and construction joint air bag unilateral side vertical plane is provided with multiple mobile fixed drag hooks;The outer gallbladder of air bag is evenly equipped with multiple conic convex structures.Construction joint air bag of the invention is easy for construction, can repeatedly be used in turn, and reduces material cost, environmentally protective.
Description
Technical field
The invention belongs to the construction intercept process technical fields of concrete floor, and in particular to one kind is used for building structure building
The gasbag-type concrete blocking apparatus and its application method of plate construction joint.
Background technique
Construction joint refers in concreting process, because design requirement or construction are needed to be segmented and be poured, and one after another
Seam is formed by between the concrete poured.Construction joint is not a kind of " seam " of necessary being, it is mixed because first pouring
Solidifying soil is more than the presetting period, as soon as and there are a faying face, the faying face referred to as construction joints between the concrete of after-pouring.
The intercept process of the construction joint of concrete floor at present is generally bound using steel mesh, or uses zigzag mould
The methods of plate, worker's constructional difficulties, construction is slow, and secondary dismounting is difficult, and intercepting material can not have enough to meet the need, while construction joint intercepts and implements
Effect is poor, and it is big that concrete secondary picks chisel amount.
Summary of the invention
The purpose of the present invention is to provide it is a kind of for building structure floor slab construction seam gasbag-type concrete blocking apparatus,
To solve the problems mentioned in the above background technology.
To achieve the above object, the invention provides the following technical scheme: a kind of gas for building structure floor slab construction seam
Bellows concrete blocking apparatus, including construction joint air bag, the construction joint air bag are internally provided with air bag liner, the air bag
The outer wall of liner is provided with the outer gallbladder of air bag, and the inflating catheter for inflation is accommodated in the gas through one end of gallbladder outside the air bag
The inside of intracapsular gallbladder;The horizontally arranged of construction joint air bag has multiple horizontal fixed drag hooks, construction joint air bag unilateral side vertical plane
It is provided with multiple mobile fixed drag hooks;The outer gallbladder of air bag is evenly equipped with multiple conic convex structures.
Preferably, the thickness of the outer gallbladder of the air bag is not less than 3mm, and conic convex structure and the outer gallbladder of air bag be all made of it is compound
Rubber material, so that conic convex structure and the outer gallbladder of air bag have puncture resistance and flexibility simultaneously.
Preferably, after air bag liner inflation upper row longitudinal reinforcement of the diameter not less than steel mesh on concrete floor and
The height of lower row's longitudinal reinforcement, the length is 8m-10m.
Another object of the present invention is to provide a kind of gasbag-type concrete interception dress for building structure floor slab construction seam
The application method set, comprising the following steps:
S1, before floor concrete casting, first install floor slab bottoms template, steel mesh be set in floor slab bottoms template,
The opposite sides of construction joint is corresponding with upper row's longitudinal reinforcement of steel mesh and lower row's longitudinal reinforcement, and construction joint air bag is in steel mesh
Lamination at gap between the upper row's longitudinal reinforcement and lower row's longitudinal reinforcement of steel mesh, and the both ends of construction joint air bag are adopted
It is connected and is fixed on reinforcing bar with iron wire;Meanwhile setting intercepts steel wire at beam slab;
S2, fixed supervisor is equipped on upper row's longitudinal reinforcement, the fixed drag hook of the level of construction joint air bag, which is hung, to be closed corresponding
On fixed supervisor, the both ends of the mobile fixed drag hook of construction joint air bag, which are hung, is closed in corresponding fixed supervisor and lower row's longitudinal reinforcement
On;
After S3, the both ends for completing construction joint air bag and outside are fixed, inflated by inflating catheter to air bag liner, air bag
Outer gallbladder forced expansion deformation, the gap between the row's of being crowded with longitudinal reinforcement and lower row's longitudinal reinforcement;
S4, casting area is poured and is cooled and shaped, after to be formed, the gas in air bag liner is led by inflation
Pipe outlet restores the original shape of the construction joint air bag, removes fixed upper row's longitudinal reinforcement, lower row's longitudinal reinforcement and iron
Silk is extracted construction joint air bag out by the reinforcing bar mesh of steel mesh, i.e. the intercept process of completion mixed mud floor slab construction seam.
Preferably, the construction joint gasbag ektexine is all provided with respectively close to the end face of upper row's longitudinal reinforcement and lower row's longitudinal reinforcement
It is equipped with protective layer and intercepts sheet rubber, protective layer intercepts sheet rubber and indulged the row's of wrapping longitudinal reinforcement and lower row by compressional deformation
To reinforcing bar, protective layer intercepts sheet rubber and plays to concrete interception function.
Preferably, the horizontal fixed drag hook and mobile fixed drag hook are arranged in the interval of 500mm on fixed supervisor.
Compared with prior art, the beneficial effects of the present invention are:
1, construction joint air bag is easy for construction, only need to simply fix, inflation filling construction gap both can, when dismounting, only needs to put
Gas extraction both can, greatly reduce cost of labor;
2, construction joint air bag can be repeatedly used in turn, and reduce material cost, environmentally protective;
3, construction joint air bag itself is waterproof, and the gap for reducing concrete slurry is lost, and reduces concrete waste, simultaneously
Air bag side sheet rubber has accomplished the interception sealing function of steel mesh top and the bottom, construction joint is high-quality, reduces the secondary chisel that picks
Cost.
Detailed description of the invention
Fig. 1 is construction joint air bag plane arrangement schematic diagram of the invention;
Fig. 2 is the cross-sectional view of A-A in Fig. 1;
Fig. 3 is the cross-sectional view of B-B in Fig. 1;
Fig. 4 is structural schematic diagram when movable type of the invention fixes pull hook operation;
In figure: 1, construction joint air bag;101, air bag liner;102, the outer gallbladder of air bag;103, inflating catheter;2, steel wire;3,
Upper row's longitudinal reinforcement;4, lower row's longitudinal reinforcement;501, horizontal fixed drag hook;502, mobile fixed drag hook;6, protective layer intercepts rubber
Film;7, floor slab bottoms template;8, fixed supervisor.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Fig. 1-4 is please referred to, the present invention is the following technical schemes are provided: a kind of gasbag-type for building structure floor slab construction seam
Concrete blocking apparatus, including including construction joint air bag 1, the construction joint air bag 1 is internally provided with air bag liner 101, institute
The outer wall for stating air bag liner 101 is provided with the outer gallbladder 102 of air bag, and the inflating catheter 103 for inflation is through gallbladder 102 outside the air bag
One end be accommodated in the inside of the air bag liner 101;The horizontally arranged of construction joint air bag 1 has multiple horizontal fixed drag hooks
501, the unilateral vertical plane of construction joint air bag 1 is provided with multiple mobile fixed drag hooks 502;The outer gallbladder 102 of air bag is evenly equipped with multiple circles
Bore bulge-structure.
Further, the thickness of the outer gallbladder 102 of air bag is not less than 3mm, and conic convex structure and the outer gallbladder 102 of air bag are all made of
Compounded rubber material, so that conic convex structure and the outer gallbladder 102 of air bag have puncture resistance and flexibility simultaneously.Conic convex
Structure can prevent the outer thin place of gallbladder 102 of air bag directly frayed, and outer surface generally has the compounded rubber material of puncture resistance
Matter, and there is ductility, it can be when construction joint air bag 1 be constructed and is inflated, after bulk expansion, the outer gallbladder 102 of air bag does not rupture.
Further, upper row longitudinal reinforcement 3 of the diameter not less than steel mesh on concrete floor after air bag liner 101 is inflated
With the height of lower row's longitudinal reinforcement 4, the length is 8m-10m.
As example: the filling construction of construction joint air bag 1 gap after inflation carries out interception barrier to concrete slurry, subtracts
Few concrete waste, while construction joint Forming Quality is good, reduces the secondary cost for picking chisel.
The present invention also provides a kind of uses of gasbag-type concrete blocking apparatus for building structure floor slab construction seam
Method, which comprises the following steps:
S1, first install floor slab bottoms template 7, steel mesh be set in floor slab bottoms template 7, the opposite sides of construction joint with
Upper row's longitudinal reinforcement 3 of steel mesh and lower row's longitudinal reinforcement 4 are corresponding, and construction joint air bag 1 runs through steel at the lamination of steel mesh
Gap between upper row's longitudinal reinforcement 3 of muscle net and lower row's longitudinal reinforcement 4, and the both ends of construction joint air bag 1 are connected using iron wire
It is fixed on reinforcing bar;Meanwhile setting intercepts steel wire 2 at beam slab;
S2, fixed supervisor 8 is equipped on upper row's longitudinal reinforcement 3, the fixed drag hook 501 of the level of construction joint air bag 1, which is hung, to be closed
Corresponding fixation is responsible on 8, and the both ends of the mobile fixed drag hook 502 of construction joint air bag 1, which hang to close, is responsible for 8 under in corresponding fixation
It arranges on longitudinal reinforcement 4;
After S3, the both ends for completing construction joint air bag 1 and outside are fixed, filled by inflating catheter 103 to air bag liner 101
Gas, air bag 102 forced expansion deformation of outer gallbladder, the gap between the row's of being crowded with longitudinal reinforcement 3 and lower row's longitudinal reinforcement 4;
S4, casting area is poured and is cooled and shaped, after to be formed, by the gas in air bag liner 101 by filling
103 outlet of airway restores the original shape of the construction joint air bag 1, removes fixed upper row's longitudinal reinforcement 3, lower row longitudinal direction
Reinforcing bar 4 and iron wire are extracted construction joint air bag 1 out by reinforcing bar mesh, i.e. the intercept process of completion mixed mud floor slab construction seam.
Further, 1 outer wall of construction joint air bag is equal respectively close to the end face of upper row's longitudinal reinforcement 3 and lower row's longitudinal reinforcement 4
Matcoveredn is set and intercepts sheet rubber 6, protective layer intercepts sheet rubber 6 will 3 He of the row's of wrapping longitudinal reinforcement by compressional deformation
Lower row's longitudinal reinforcement 4, protective layer intercept sheet rubber 6 and play to concrete interception function.
Further, horizontal fixed drag hook 501 and mobile fixed drag hook 502 are in the interval of 500mm on fixed supervisor 8
Setting.
In summary: the invention by utilize construction joint air bag 1 itself flexible concertina filling capacity, gassy or
Gap (the present embodiment is filled using gas) after liquid between the row's of being crowded with longitudinal reinforcement 3 and lower row's longitudinal reinforcement 4, construction joint
After concrete setting, by discharge gas or liquid, directly go out to extract out from steel wire, construction reinforcement is convenient and efficient, has saved people
Between working hour and material cost, guarantee quality are environmentally protective.
Specifically, the row's of being equipped with longitudinal reinforcement 3 and lower row's longitudinal reinforcement 4 at construction joint, steel wire 2 is mounted at beam slab
Side to casting area forms baffling device;Steel wire 2, upper row's longitudinal reinforcement 3 and lower row's longitudinal reinforcement 4 can be using normal
General improving bud grafting is fixed, and horizontally disposed fixed supervisor 8 is laid on upper row's longitudinal reinforcement 3.The outer wall of fixed supervisor 8 is hitched
Equipped with multiple moveable horizontal fixed drag hooks 501 and moveable vertically fixed drag hook 502, level is fixed drag hook 501 and is erected
To the fixed mating arrangement of drag hook 502, the fixed drag hook 501 of level, which is fixed, arranges longitudinal reinforcement 3, under vertical fixed drag hook 502 is fixed
Arrange longitudinal reinforcement 4.Spacing distance is 500mm between the horizontal fixed drag hook 501 of adjacent two or mobile fixed drag hook 502, left
The mobile fixed drag hook 502 and 1 lateral wall interval of construction joint air bag that the fixed drag hook 501 of the level moved right and left and right move up and down
It is fixed.
Meanwhile construction joint air bag 1 is controlled by the fixed drag hook 501 of sliding level and is moved left and right in 2 interlayer of steel mesh;It is logical
It crosses mobile fixed drag hook 502 and controls the left and right multi-direction movement up and down in 2 interlayer of steel mesh of construction joint air bag 1.
It is worth noting that, the end face of construction joint air bag 1, which is embedded with the protective layer with deformation nature, intercepts sheet rubber 6,
Construction joint air bag 1 can be crowded with the gap between two layers of steel mesh 2, while construction joint air bag 1 leans on the protection up and down of concrete side
Layer intercept sheet rubber 6 by squeeze will the row's of wrapping longitudinal reinforcement 3 and lower row's longitudinal reinforcement 4, the sheet rubber between reinforcing bar rises
To concrete interception function, concrete and rebar mixed-forming is prevented to be difficult to remove, while can be by lower protective layer on reinforcing bar
Gap intercepts, and reduces the loss of concrete slurry, reduces the secondary of concrete construction joint facade and picks chisel.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (6)
1. a kind of gasbag-type concrete blocking apparatus for building structure floor slab construction seam, it is characterised in that: including construction joint
Air bag (1), the construction joint air bag (1) are internally provided with air bag liner (101), and the outer wall of the air bag liner (101) is set
It is equipped with the outer gallbladder (102) of air bag, the inflating catheter (103) for inflation is accommodated in institute through one end of the outer gallbladder (102) of the air bag
State the inside of air bag liner (101);The horizontally arranged of construction joint air bag (1) has multiple horizontal fixed drag hook (501), construction
The unilateral vertical plane of seam air bag (1) is provided with multiple mobile fixed drag hook (502);The outer gallbladder (102) of air bag is evenly equipped with multiple circular cones
Bulge-structure.
2. a kind of gasbag-type concrete blocking apparatus for building structure floor slab construction seam according to claim 1,
Be characterized in that: the thickness of the outer gallbladder (102) of the air bag is not less than 3mm, and conic convex structure and the outer gallbladder (102) of air bag are all made of
Compounded rubber material, so that conic convex structure and the outer gallbladder (102) of air bag have puncture resistance and flexibility simultaneously.
3. a kind of gasbag-type concrete blocking apparatus for building structure floor slab construction seam according to claim 1,
It is characterized in that: upper row longitudinal reinforcement (3) of the diameter not less than steel mesh on concrete floor after air bag liner (101) inflation
With the height of lower row's longitudinal reinforcement (4), the length is 8m-10m.
4. the gasbag-type concrete blocking apparatus according to claim 1-3 for building structure floor slab construction seam
Application method, which comprises the following steps:
S1, before floor concrete casting, first install floor slab bottoms template (7), reinforcing bar be set on floor slab bottoms template (7)
The opposite sides of net, construction joint is corresponding with upper row's longitudinal reinforcement (3) of steel mesh and lower row longitudinal reinforcement (4), construction joint gas
Gap of the capsule (1) between the upper row's longitudinal reinforcement (3) and lower row's longitudinal reinforcement (4) at the lamination of steel mesh through steel mesh,
And the both ends of construction joint air bag (1) are connected using iron wire and are fixed on reinforcing bar;Meanwhile setting intercepts steel wire at beam slab;
S2, fixed supervisor (8) is equipped on upper row's longitudinal reinforcement (3), the level fixed drag hook (501) of construction joint air bag (1) is hung
It closes on corresponding fixed supervisor (8), the both ends of the mobile fixed drag hook (502) of construction joint air bag (1), which are hung, closes corresponding solid
On fixed supervisor (8) and lower row's longitudinal reinforcement (4);
S3, the both ends for completing construction joint air bag (1) and outside it is fixed after, by inflating catheter (103) to air bag liner (101)
Inflation, outer gallbladder (102) the forced expansion deformation of air bag, the seam between the row's of being crowded with longitudinal reinforcement (3) and lower row's longitudinal reinforcement (4)
Gap;
S4, casting area is poured and is cooled and shaped, after to be formed, the gas in air bag liner (101) is passed through into inflation
Conduit (103) outlet restores the original shape of the construction joint air bag (1), removes fixed upper row's longitudinal reinforcement (3), lower row
Longitudinal reinforcement (4) and iron wire are extracted construction joint air bag (1) out by reinforcing bar mesh, i.e., what completion mixed mud floor slab construction stitched blocks
Cut processing.
5. according to the described in any item gasbag-type concrete blocking apparatus for building structure floor slab construction seam of claim 4
Application method, it is characterised in that: construction joint air bag (1) outer wall is respectively close to upper row's longitudinal reinforcement (3) and lower row longitudinal direction steel
The end face of muscle (4) is provided with protective layer and intercepts sheet rubber (6), and protective layer intercepts sheet rubber (6) and will be wrapped up by compressional deformation
The row's of living in longitudinal reinforcement (3) and lower row's longitudinal reinforcement (4), protective layer intercept sheet rubber (6) and play to concrete interception function.
6. according to the described in any item gasbag-type concrete blocking apparatus for building structure floor slab construction seam of claim 4
Application method, it is characterised in that: the level fixed drag hook (501) and mobile fixed drag hook (502) are responsible on (8) fixed
It is arranged in the interval of 500mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910740970.8A CN110409804A (en) | 2019-08-12 | 2019-08-12 | A kind of gasbag-type concrete blocking apparatus and its application method for building structure floor slab construction seam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910740970.8A CN110409804A (en) | 2019-08-12 | 2019-08-12 | A kind of gasbag-type concrete blocking apparatus and its application method for building structure floor slab construction seam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110409804A true CN110409804A (en) | 2019-11-05 |
Family
ID=68367078
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910740970.8A Pending CN110409804A (en) | 2019-08-12 | 2019-08-12 | A kind of gasbag-type concrete blocking apparatus and its application method for building structure floor slab construction seam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110409804A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112727075A (en) * | 2020-12-29 | 2021-04-30 | 浙江恒鸿建设有限公司 | Integrated pouring structure of inclined roof and flat roof and construction method |
CN113802701A (en) * | 2021-10-20 | 2021-12-17 | 中国十七冶集团有限公司 | Cast-in-place concrete plugging air bag device and using method |
CN114016741A (en) * | 2021-11-05 | 2022-02-08 | 广东腾越建筑工程有限公司 | Construction method for preventing high-low grade concrete from being mixed and poured |
CN114718299A (en) * | 2022-04-30 | 2022-07-08 | 北京中铁建建筑科技有限公司 | Recyclable filling template and method for building construction |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4678157A (en) * | 1984-08-30 | 1987-07-07 | Robert Fondiller | Apparatus for the construction of a low cost structure |
CN104251016A (en) * | 2013-06-27 | 2014-12-31 | 中国二十冶集团有限公司 | Fast-easy setback processing method for construction joint of channel steel |
KR20180003072A (en) * | 2016-06-30 | 2018-01-09 | 주식회사 선우씨앤에스 | Finishing the structure of the building materials salvage pathway for building construction |
CN107700846A (en) * | 2017-11-14 | 2018-02-16 | 中建四局第六建筑工程有限公司 | A kind of post-cast strip concrete arrester and its application method |
CN207277845U (en) * | 2017-09-29 | 2018-04-27 | 上海森信建设集团有限公司 | Floor vertical construction joint plate bottom mortar leakage prevention constructing structure |
-
2019
- 2019-08-12 CN CN201910740970.8A patent/CN110409804A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4678157A (en) * | 1984-08-30 | 1987-07-07 | Robert Fondiller | Apparatus for the construction of a low cost structure |
CN104251016A (en) * | 2013-06-27 | 2014-12-31 | 中国二十冶集团有限公司 | Fast-easy setback processing method for construction joint of channel steel |
KR20180003072A (en) * | 2016-06-30 | 2018-01-09 | 주식회사 선우씨앤에스 | Finishing the structure of the building materials salvage pathway for building construction |
CN207277845U (en) * | 2017-09-29 | 2018-04-27 | 上海森信建设集团有限公司 | Floor vertical construction joint plate bottom mortar leakage prevention constructing structure |
CN107700846A (en) * | 2017-11-14 | 2018-02-16 | 中建四局第六建筑工程有限公司 | A kind of post-cast strip concrete arrester and its application method |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112727075A (en) * | 2020-12-29 | 2021-04-30 | 浙江恒鸿建设有限公司 | Integrated pouring structure of inclined roof and flat roof and construction method |
CN113802701A (en) * | 2021-10-20 | 2021-12-17 | 中国十七冶集团有限公司 | Cast-in-place concrete plugging air bag device and using method |
CN113802701B (en) * | 2021-10-20 | 2022-09-16 | 中国十七冶集团有限公司 | Cast-in-place concrete plugging air bag device and using method |
CN114016741A (en) * | 2021-11-05 | 2022-02-08 | 广东腾越建筑工程有限公司 | Construction method for preventing high-low grade concrete from being mixed and poured |
CN114718299A (en) * | 2022-04-30 | 2022-07-08 | 北京中铁建建筑科技有限公司 | Recyclable filling template and method for building construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110409804A (en) | A kind of gasbag-type concrete blocking apparatus and its application method for building structure floor slab construction seam | |
CN105927249B (en) | A kind of construction method for pouring tunnel double-lining self-compacting concrete | |
CN106638999A (en) | Waterstop structure for air bag and waterstop method of structure | |
CN106958313A (en) | Floor closed system and its construction method are poured after a kind of pipe well | |
CN114150875A (en) | Concrete anti-mixed pouring device for beam-column joints with different strength grades and construction method | |
CN109339089A (en) | A kind of rim of a cup isolated footing cup core forming method | |
CN105862929B (en) | Construction method with raised sealing swaging die vertical with the concrete works movement joint of reinforcing fiber | |
CN109025294A (en) | A kind of post-cast strip inflatable arc angle rectangular section hose side form installs construction method | |
CN104213728B (en) | Oblique beam for grandstand of stadium and construction process for oblique beam | |
CN105370032B (en) | Construction method for air bag type concrete project deformation joint water stop cavity mold | |
CN104452826B (en) | A kind of concrete works swaging die air bag and manufacture method thereof | |
CN206174149U (en) | Gasbag stagnant water structure | |
CN205691309U (en) | A kind of big than chi assembled integral Shear wall tube structure structure | |
CN114776013A (en) | Wall column beam node concrete pouring construction method with different strength grades | |
CN104314047B (en) | Water-bag type concrete works movement joint sealing swaging die and its manufacture and construction method | |
CN107299596A (en) | Support beam template system and its construction method under concrete support trestle plate | |
CN211421832U (en) | Masonry wall constructional column pouring device | |
CN107587723A (en) | Top plate spool protection device and its construction method | |
CN209620275U (en) | A kind of prefabricated steel column node connecting structure of assembled architecture | |
CN209066507U (en) | Poured band of outer wall of basement formwork erecting structure based on steel form | |
CN208068535U (en) | A kind of mobile prostrate piping lane segment spray maintenance device | |
CN105507475A (en) | Continuous alternative semiconical roof and construction method thereof | |
CN209066506U (en) | A kind of poured band of outer wall of basement structure | |
CN106013254A (en) | Construction method of cavity die with framework in concrete engineering | |
CN108943327A (en) | Prefabricated toilet caisson production method, prefabricated toilet caisson and prefabricated toilet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191105 |