CN209066506U - A kind of poured band of outer wall of basement structure - Google Patents

A kind of poured band of outer wall of basement structure Download PDF

Info

Publication number
CN209066506U
CN209066506U CN201821752576.3U CN201821752576U CN209066506U CN 209066506 U CN209066506 U CN 209066506U CN 201821752576 U CN201821752576 U CN 201821752576U CN 209066506 U CN209066506 U CN 209066506U
Authority
CN
China
Prior art keywords
wall
post
outside
cast strip
basement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821752576.3U
Other languages
Chinese (zh)
Inventor
卢占宾
赵承民
张喆
程文甲
王凯飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Building And Mounting Engineering Co Ltd No12 Bureau Ministry Of Railways
Original Assignee
Building And Mounting Engineering Co Ltd No12 Bureau Ministry Of Railways
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Building And Mounting Engineering Co Ltd No12 Bureau Ministry Of Railways filed Critical Building And Mounting Engineering Co Ltd No12 Bureau Ministry Of Railways
Priority to CN201821752576.3U priority Critical patent/CN209066506U/en
Application granted granted Critical
Publication of CN209066506U publication Critical patent/CN209066506U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of poured band of outer wall of basement structures, including being laid in, Construction Later Casting Zone outside and plate thickness are the outside plate of 2~5mm, post-cast strip waterproof layer, the backfilling of earthwork layer being laid on the outside of the waterproof layer of post-cast strip and the framework of steel reinforcement being laid in institute's Construction Later Casting Zone, outside plate are divided into a middle part shaping area steel plate and two side attachment zones steel plates.The utility model structure is simple, design reasonable and easy construction, using effect is good, using outside plate as forming panel on the outside of post-cast strip, outside plate is fixedly secured on the outer wall of basement of post-cast strip two sides by lateral fastener, outside plate is fixed easy, firm and plugging effect is good, the outside plate later period is without removing, the bonding strength on the outside of post-cast strip between the outer wall of basement of two sides can effectively be increased, outside plate thickness is small simultaneously and the lateral wall of formed post-cast strip is concordant with the lateral wall of two sides outer wall of basement, convenient for external wall waterproof and backfill construction, it is economical and practical.

Description

A kind of poured band of outer wall of basement structure
Technical field
The utility model belongs to wall construction Technique of Late Poured Band field, more particularly, to a kind of poured band of outer wall of basement knot Structure.
Background technique
It is to prevent monolithic reinforced concrete structure since autogenous shrinkage is uneven or settles not that post-cast strip, which is in construction, Issuable harmful cracks stay what is set to face according to design or job specfication requirement in sole plate, wall, beam corresponding position When construction joint.The only earth-retaining effect that outer wall of basement refers to, does not do the wall that support uses, and outer wall of basement need to be stayed when constructing and be set Post-cast strip.Currently, being usually all made of plank sheathing as the molding on the outside of post-cast strip when constructing to poured band of outer wall of basement Template again removes plank sheathing after the pouring molding of post-cast strip, thus post-cast strip is needed just to can be carried out underground after the completion of pouring Room external wall waterproof and backfill construction, not only the construction period is long, and causes foundation pit sudden and violent due to that cannot carry out waterproof and backfill early The dew time is long, insecurity factor is more, the preceding foundation pit Yield rainfall relation of backfill is costly, outer wall of basement exposure duration length is also easy to produce crack, The problems such as influencing next procedure construction.
To carry out waterproof and backfill early, nowadays also appears on the outside of cast-in-site stripe and pour a cast-in-place concrete envelope in advance Closure plate replaces the rear pouring tape construction method of above-mentioned plank sheathing in the vertical precast concrete plugging plate of cast-in-site stripe lateral branch, but real When the construction of border there are problems in above two plugging plate.Wherein, the site operation process of cast-in-place concrete plugging plate is complicated, Construction period is longer, and needs individually to prop up vertical forming panel, and human and material resources input by scene, material cost are higher.And Though precast concrete plugging plate is formed without cast in situs, consolidating between precast concrete plugging plate and post-cast strip two sides wall Fixed connection is very big with closure difficulty, thus the construction quality of post-cast strip cannot be effectively ensured, while precast concrete blocks Plate own cost is higher, while scene need to complete the lifting of precast concrete plugging plate, fixation and block process, work progress compared with Complexity takes time and effort.Meanwhile the thickness of above two plugging plate is larger, correspondingly occupied space is larger, inevitably shadow Ring external wall waterproof and backfill construction.
Utility model content
The technical problem to be solved by the utility model is in view of the deficiency of the prior art, provide a kind of underground Room exterior wall late poured band structure, simple structure and reasonable design and easy construction, using effect are good, after being used as using outside plate Band outside forming panel is poured, outside plate is fixedly secured on the outer wall of basement of post-cast strip two sides by lateral fastener, outside Side Interal fixation is easy, firm and plugging effect is good, and the outside plate later period without removing, can effectively increase post-cast strip outside and two Bonding strength between the outer wall of basement of side, while outside plate thickness is small and lateral wall and the two sides underground of formed post-cast strip The lateral wall of room exterior wall is concordant, economical and practical convenient for external wall waterproof and backfill construction.
In order to solve the above technical problems, the technical solution adopted in the utility model is: a kind of poured band of outer wall of basement knot Structure, it is characterised in that: outside plate including being laid on the outside of Construction Later Casting Zone, the post-cast strip being laid on the outside of outside plate Waterproof layer, the backfilling of earthwork layer being laid on the outside of the waterproof layer of post-cast strip and the framework of steel reinforcement being laid in institute's Construction Later Casting Zone, institute Construction Later Casting Zone is located between the outer wall of basement of two preparatory construction moldings, outside institute's Construction Later Casting Zone and two basements Wall is arranged vertically and three is monolithic reinforced concrete structure, institute's Construction Later Casting Zone and two outer wall of basement Thickness is all the same and the rear wall of three is laid on same vertical plane;The outside plate be arranged vertically and with Institute's Construction Later Casting Zone is in the oblong flat steel plate laid in parallel, and the plate thickness of the outside plate is 2mm~5mm, described outer The height of side steel plate is not less than the height of institute's Construction Later Casting Zone, and the width of the outside plate is greater than the width of institute's Construction Later Casting Zone Degree;The outside plate is divided into two side attachment zones steel plates of a middle part shaping area steel plate and left and right, and two sides connect Connect the left and right sides that area's steel plate is located at middle part shaping area steel plate, middle part shaping area steel plate and two sides The height of bonding pad steel plate is all the same and three is rectangle;Middle part shaping area steel plate is located on the outside of institute's Construction Later Casting Zone And its width and institute Construction Later Casting Zone is of same size;Each side attachment zones steel plate is respectively positioned on outside the basement On the outside of wall, the inner sidewall of each side attachment zones steel plate is close to the lateral wall of outer wall of basement on its inside, Pass through multiple cross from top to bottom laid between each side attachment zones steel plate and outer wall of basement on its inside It is fastenedly connected and is integrated to fastener, the transverse direction fastener is in horizontal layout and itself and the perpendicular laying of outside plate.
Above-mentioned a kind of poured band of outer wall of basement structure, it is characterized in that: the plate thickness of the outside plate is 3mm.
Above-mentioned a kind of poured band of outer wall of basement structure, it is characterized in that: the framework of steel reinforcement includes reinforcing bar in post-cast strip Frame and the framework of steel reinforcement outside the post-cast strip on the outside of framework of steel reinforcement in the post-cast strip, framework of steel reinforcement and described in the post-cast strip Framework of steel reinforcement is symmetrically arranged outside post-cast strip and the two is respectively positioned in institute's Construction Later Casting Zone;
The structure snd size of framework of steel reinforcement are all the same outside framework of steel reinforcement and the post-cast strip in the post-cast strip and the two is equal Post-cast strip vertical reinforcement and the M being laid in from left to right including the road N along the length direction of institute's Construction Later Casting Zone on same vertical plane Road is from top to bottom laid in the post-cast strip longitudinal reinforcement on same vertical plane, the post-cast strip longitudinal reinforcement in horizontal layout and its Length direction along post-cast strip is laid, and post-cast strip longitudinal reinforcement described in per pass, which is fastened with post-cast strip vertical reinforcement described in the road N, to be connected It connects;Wherein, N is the total quantity of post-cast strip vertical reinforcement in framework of steel reinforcement in the post-cast strip, and N is positive integer and N >=3;M is institute The total quantity of post-cast strip longitudinal reinforcement in framework of steel reinforcement in post-cast strip is stated, M is positive integer and M >=3;
Be located at described in the twice in same level in the framework of steel reinforcement between the longitudinal reinforcement of post-cast strip by the road N by The post-cast strip transverse steel that left-to-right is laid in same level is fastenedly connected, and the post-cast strip transverse steel is in horizontal layout And itself and the perpendicular laying of outside plate;It is perpendicular with the post-cast strip together inside and outside post-cast strip transverse steel described in per pass It is fastenedly connected to reinforcing bar.
Above-mentioned a kind of poured band of outer wall of basement structure, it is characterized in that: the outer end of post-cast strip transverse steel described in per pass is equal It is fixedly welded on the inner sidewall of outside plate.
Above-mentioned a kind of poured band of outer wall of basement structure, it is characterized in that: the transverse direction fastener is furred ceiling nailing.
Above-mentioned a kind of poured band of outer wall of basement structure, it is characterized in that: the backfilling of earthwork layer is from outside to inside to outside The outside-supporting layer that steel plate is supported, the post-cast strip waterproof layer is between outside plate and backfilling of earthwork layer.
Above-mentioned a kind of poured band of outer wall of basement structure, it is characterized in that: being provided on the outside of two outer wall of basement Wall waterproof layer, the wall waterproof layer and post-cast strip waterproof layer are coil waterproof layer, the post-cast strip waterproof layer and two Wall waterproof layer on the outside of the outer wall of basement is connected as one and forms external wall waterproof layer.
Above-mentioned a kind of poured band of outer wall of basement structure, it is characterized in that: being provided on the outside of two outer wall of basement Wall outer side backfills layer, and the wall outer side backfill layer on the outside of the backfilling of earthwork layer and two outer wall of basement is connected as one Body simultaneously forms exterior wall backfill layer;
Waterproof protective layer is provided between the external wall waterproof layer and exterior wall backfill layer.
Above-mentioned a kind of poured band of outer wall of basement structure, it is characterized in that: outside institute's Construction Later Casting Zone and two basements Steel plate for sealing water is provided between wall.
Above-mentioned a kind of poured band of outer wall of basement structure, it is characterized in that: the width of the side attachment zones steel plate is not less than 20cm。
Compared with the prior art, the utility model has the following advantages:
1, simple structure and reasonable design and input cost is lower.
2, easy construction, construction efficiency are high and using effect is good, using outside plate as forming panel on the outside of post-cast strip, Outside plate is fixedly secured on the outer wall of basement of post-cast strip two sides by lateral fastener, the fixed easy, jail of outside plate It leans on and plugging effect is good, the outside plate later period without removing, can effectively increase on the outside of post-cast strip between the outer wall of basement of two sides Bonding strength, while outside plate thickness is small and the lateral wall of formed post-cast strip and the lateral wall of two sides outer wall of basement are flat Together, economical and practical convenient for external wall waterproof and backfill construction.
Below by drawings and examples, the technical solution of the utility model is described in further detail.
Detailed description of the invention
Fig. 1 is the floor map of the utility model.
Fig. 2 is the connection status diagram of the utility model outside plate and two outer wall of basement.
Description of symbols:
1-institute's Construction Later Casting Zone;2-outside plates;3-post-cast strip waterproof layers;
4-backfilling of earthwork layers;5-outer wall of basement;6-lateral fasteners;
7-post-cast strip longitudinal reinforcements;8-post-cast strip transverse steels;9-wall waterproof layers;
10-wall outer sides backfill layer;11-waterproof protective layers;12-steel plate for sealing water;
13-wall vertical reinforcements;14-wall longitudinal reinforcements;15-post-cast strip vertical reinforcements.
Specific embodiment
As shown in Figure 1 and Figure 2, the utility model includes the outside plate 2 for being laid in 1 outside of institute's Construction Later Casting Zone, is laid in The post-cast strip waterproof layer 3 in the outside of outside plate 2, the backfilling of earthwork layer 4 for being laid in 3 outside of post-cast strip waterproof layer and being laid in is applied Framework of steel reinforcement in work post-cast strip 1, institute's Construction Later Casting Zone 1 are located between the outer wall of basement 5 of two preparatory construction moldings, are applied Work post-cast strip 1 and two outer wall of basement 5 are arranged vertically and three is monolithic reinforced concrete structure, is applied The thickness of work post-cast strip 1 and two outer wall of basement 5 is all the same and the rear wall of three is laid on same vertical plane; The outside plate 2 is described to be arranged vertically and with institute Construction Later Casting Zone 1 in the parallel oblong flat steel plate laid The plate thickness of outside plate 2 is 2mm~5mm, and the height of the outside plate 2 is not less than the height of institute's Construction Later Casting Zone 1, described outer The width of side steel plate 2 is greater than the width of institute's Construction Later Casting Zone 1;The outside plate 2 divides for a middle part shaping area steel plate and a left side Right two side attachment zones steel plates, two side attachment zones steel plates are located at the left and right two of middle part shaping area steel plate The height of side, middle part shaping area steel plate and two side attachment zones steel plates is all the same and three is rectangle;Institute State middle part shaping area steel plate be located on the outside of institute's Construction Later Casting Zone 1 and its width and institute Construction Later Casting Zone 1 it is of same size;Each institute It states side attachment zones steel plate and is respectively positioned on 5 outside of outer wall of basement, the inner sidewall of each side attachment zones steel plate It is close to the lateral wall of outer wall of basement 5 on its inside, each side attachment zones steel plate and on its inside It is fastenedly connected and is integrated by multiple lateral fasteners 6 from top to bottom laid between outer wall of basement 5, the laterally fastening Part 6 is in horizontal layout and itself and the perpendicular laying of outside plate 2.
To further increase waterproof effect, each side attachment zones steel plate and outer wall of basement 5 on its inside Between be provided with sealing strip or waterproof protective layer.
In the present embodiment, the plate thickness of the outside plate 2 is 3mm.
When practice of construction, according to specific needs, the plate thickness of outside plate 2 is adjusted accordingly.Due to outside plate 2 Thickness it is small, not only on-site hoisting is easy, and is fixedly connected with simplicity with outer wall of basement 5 after lifting in place, need to pass through cross It is attached to fastener 6.
In the present embodiment, the transverse direction fastener 6 is furred ceiling nailing.Thus, when practical fixed, it need to only be beaten using nailing device Enter furred ceiling nailing.When practice of construction, according to specific needs, quantity and installation position to the furred ceiling nailing carry out phase It should adjust.By actual measurement, the furred ceiling nailing is able to satisfy the fixed demand of outside plate 2, and fixed, firm.
Since the thickness of outside plate 2 is small, and the rear wall of institute's Construction Later Casting Zone 1 and two outer wall of basement 5 Rear wall it is concordant, thus outside plate 2 will not influence substantially external wall waterproof and backfill construction.
As shown in Figure 1, the framework of steel reinforcement include in post-cast strip framework of steel reinforcement and be located at the post-cast strip in framework of steel reinforcement Framework of steel reinforcement outside the post-cast strip in outside, in the post-cast strip outside framework of steel reinforcement and the post-cast strip framework of steel reinforcement be symmetrically arranged and The two is respectively positioned in institute's Construction Later Casting Zone 1;
The structure snd size of framework of steel reinforcement are all the same outside framework of steel reinforcement and the post-cast strip in the post-cast strip and the two is equal The post-cast strip vertical reinforcement 15 being laid in from left to right including the road N along the length direction of institute's Construction Later Casting Zone 1 on same vertical plane It is from top to bottom laid in the post-cast strip longitudinal reinforcement 7 on same vertical plane with the road M, the post-cast strip longitudinal reinforcement 7 is in horizontal cloth And if its length direction along post-cast strip 1 is laid, post-cast strip longitudinal reinforcement 7 described in per pass with post-cast strip vertical steel described in the road N Muscle 15 is fastenedly connected;Wherein, N is the total quantity of post-cast strip vertical reinforcement 15 in framework of steel reinforcement in the post-cast strip, and N is positive integer And N >=3;M is the total quantity of post-cast strip longitudinal reinforcement 7 in framework of steel reinforcement in the post-cast strip, and M is positive integer and M >=3;
It is located between post-cast strip longitudinal reinforcement 7 described in the twice in same level in the framework of steel reinforcement and passes through the road N The post-cast strip transverse steel 8 being laid in same level from left to right is fastenedly connected, and the post-cast strip transverse steel 8 is in level It lays and itself and the perpendicular laying of outside plate 2;Inside and outside post-cast strip transverse steel 8 described in per pass with it is described together after Band vertical reinforcement 15 is poured to be fastenedly connected.
In the present embodiment, wall steel bar cage is provided in two outer wall of basement 5, the wall steel bar cage includes Framework of steel reinforcement and the framework of steel reinforcement outside the wall on the outside of framework of steel reinforcement in the wall in wall, framework of steel reinforcement in the wall With framework of steel reinforcement is arranged vertically outside the wall and the two is symmetrically arranged.Framework of steel reinforcement and the wall in the wall The structure snd size of External tendons skeleton are all the same and the two include multiple tracks along outer wall of basement 5 length direction from left to right The wall vertical reinforcement 13 and the road M being laid on same vertical plane are from top to bottom laid in the wall longitudinal direction steel on same vertical plane Muscle 14, the wall longitudinal reinforcement 14 in horizontal layout and its lay along the length direction of outer wall of basement 5, wall described in per pass Longitudinal reinforcement 14 is fastenedly connected with wall vertical reinforcement 13 described in multiple tracks.The installation position of wall longitudinal reinforcement 14 described in the road M It is corresponded respectively with the installation position of post-cast strip longitudinal reinforcement 7 described in the road M, post-cast strip longitudinal reinforcement 7 described in per pass is all connected with Between the wall longitudinal reinforcement 14 being located at left and right sides of it, and post-cast strip longitudinal reinforcement 7 described in per pass is connect with it Twice described in wall longitudinal reinforcement 14 laid in coaxial.Thus, institute's Construction Later Casting Zone 1 and two undergrounds can be effectively ensured The bonding strength of room exterior wall 5.
To further ensure that bonding strength and connection reliability between outside plate 2 and institute's Construction Later Casting Zone 1, this implementation In example, the outer end of post-cast strip transverse steel 8 described in per pass is fixedly welded on the inner sidewall of outside plate 2.
In the present embodiment, the backfilling of earthwork layer 4 is the outside-supporting layer being supported from outside to inside to outside plate 2, The post-cast strip waterproof layer 3 is between outside plate 2 and backfilling of earthwork layer 4.
Wall waterproof layer 9 is provided on the outside of two outer wall of basement 5, the wall waterproof layer 9 and post-cast strip are anti- Water layer 3 is coil waterproof layer, and the wall waterproof layer 9 in the post-cast strip waterproof layer 3 and two 5 outsides of outer wall of basement connects It is connected in one and forms external wall waterproof layer.
Also, wall outer side backfill layer 10, the backfilling of earthwork layer 4 are provided on the outside of two outer wall of basement 5 It is connected as one with the wall outer side backfill layer 10 in two 5 outsides of outer wall of basement and forms exterior wall backfill layer;
Waterproof protective layer 11 is provided between the external wall waterproof layer and exterior wall backfill layer.
In the present embodiment, steel plate for sealing water 12 is provided between institute's Construction Later Casting Zone 1 and two outer wall of basement 5.
In the present embodiment, the width of the side attachment zones steel plate is not less than 20cm.
When practice of construction, according to specific needs, the width of the side attachment zones steel plate is adjusted accordingly.
In the present embodiment, the height of the outside plate 2 is identical as the height of outer wall of basement 5.
When practice of construction, pouring molding is first carried out respectively to two outer wall of basement 5, then outside plate 2 is fixed Between two outer wall of basement 5 and make to be fastenedly connected on the outside of outside plate 2 and two outer wall of basement 5;To outer After side steel plate 2 is fixed, construct respectively to the external wall waterproof layer, waterproof protective layer 11 and the exterior wall backfill layer immediately, Exterior wall backfill layer (specifically backfilling of earthwork layer 4) that construction is completed, which can synchronize, is supported outside plate 2, further mentions The stability and plugging effect of high outside plate 2, thus energy is easy, waterproof is rapidly completed and backfill construction.Meanwhile it being constructed Collateral vertical inner side template in post-cast strip 1, and institute's Construction Later Casting Zone 1 is poured.
The above is only the preferred embodiment of the utility model, not imposes any restrictions to the utility model, all According to any simple modification to the above embodiments of the utility model technical spirit, change and equivalent structural changes, still Belong in the protection scope of technical solutions of the utility model.

Claims (10)

1. a kind of poured band of outer wall of basement structure, it is characterised in that: the outside including being laid on the outside of Construction Later Casting Zone (1) Steel plate (2), the post-cast strip waterproof layer (3) being laid on the outside of outside plate (2), the soil being laid on the outside of post-cast strip waterproof layer (3) Side's backfill layer (4) and the framework of steel reinforcement being laid in institute's Construction Later Casting Zone (1), institute's Construction Later Casting Zone (1) is located at two to be applied in advance Between the molding outer wall of basement of work (5), institute's Construction Later Casting Zone (1) and two outer wall of basement (5) are in vertically to cloth And if three is monolithic reinforced concrete structure, institute's Construction Later Casting Zone (1) and the thickness of two outer wall of basement (5) are equal Identical and three rear wall is laid on same vertical plane;The outside plate (2) by be arranged vertically and with applied Work post-cast strip (1) is in the oblong flat steel plate laid in parallel, and the plate thickness of the outside plate (2) is 2mm~5mm, described outer The height of side steel plate (2) is not less than the height of institute's Construction Later Casting Zone (1), and the width of the outside plate (2) is greater than after constructing Pour the width of band (1);The outside plate (2) is divided into two side attachment zones steel plates of a middle part shaping area steel plate and left and right, Two side attachment zones steel plates are located at the left and right sides of middle part shaping area steel plate, middle part shaping area steel plate All the same and three is rectangle with the height of two side attachment zones steel plates;Middle part shaping area steel plate is located at institute On the outside of Construction Later Casting Zone (1) and its width and institute's Construction Later Casting Zone (1) it is of same size;Each side attachment zones steel plate is equal On the outside of the outer wall of basement (5), the inner sidewall of each side attachment zones steel plate with it is on its inside The lateral wall of outer wall of basement (5) is close to, each side attachment zones steel plate and outer wall of basement (5) on its inside it Between be fastenedly connected and be integrated by multiple lateral fasteners (6) from top to bottom laid, the transverse direction fastener (6) is in level It lays and itself and outside plate (2) perpendicular laying.
2. a kind of poured band of outer wall of basement structure described in accordance with the claim 1, it is characterised in that: the outside plate (2) Plate thickness be 3mm.
3. a kind of poured band of outer wall of basement structure according to claim 1 or 2, it is characterised in that: the framework of steel reinforcement Including framework of steel reinforcement in post-cast strip and the framework of steel reinforcement outside the post-cast strip on the outside of framework of steel reinforcement in the post-cast strip, poured after described It is symmetrically arranged with framework of steel reinforcement outside interior framework of steel reinforcement and the post-cast strip and the two is respectively positioned in institute's Construction Later Casting Zone (1);
The structure snd size of framework of steel reinforcement are all the same outside framework of steel reinforcement and the post-cast strip in the post-cast strip and the two includes N Road along the length direction of institute's Construction Later Casting Zone (1) be laid in from left to right post-cast strip vertical reinforcement (15) on same vertical plane and The road M is from top to bottom laid in the post-cast strip longitudinal reinforcement (7) on same vertical plane, and the post-cast strip longitudinal reinforcement (7) is in level Lay and its length direction along post-cast strip (1) laid, post-cast strip longitudinal reinforcement (7) described in per pass with post-cast strip described in the road N Vertical reinforcement (15) is fastenedly connected;Wherein, N is the sum of post-cast strip vertical reinforcement (15) in framework of steel reinforcement in the post-cast strip Amount, N are positive integer and N >=3;M is the total quantity of post-cast strip longitudinal reinforcement (7) in framework of steel reinforcement in the post-cast strip, and M is positive whole Number and M >=3;
Be located at described in the twice in same level in the framework of steel reinforcement between post-cast strip longitudinal reinforcement (7) by the road N by The post-cast strip transverse steel (8) that left-to-right is laid in same level is fastenedly connected, and the post-cast strip transverse steel (8) is in water Plain cloth is set and itself and outside plate (2) perpendicular laying;Inside and outside post-cast strip transverse steel (8) described in per pass and together The post-cast strip vertical reinforcement (15) is fastenedly connected.
4. a kind of poured band of outer wall of basement structure described in accordance with the claim 3, it is characterised in that: post-cast strip described in per pass is horizontal It is fixedly welded on the inner sidewall of outside plate (2) to the outer end of reinforcing bar (8).
5. a kind of poured band of outer wall of basement structure according to claim 1 or 2, it is characterised in that: the laterally fastening Part (6) is furred ceiling nailing.
6. a kind of poured band of outer wall of basement structure according to claim 1 or 2, it is characterised in that: the backfilling of earthwork Layer (4) is the outside-supporting layer being supported from outside to inside to outside plate (2), and the post-cast strip waterproof layer (3) is located at outside Between steel plate (2) and backfilling of earthwork layer (4).
7. a kind of poured band of outer wall of basement structure according to claim 1 or 2, it is characterised in that: two undergrounds It is provided with wall waterproof layer (9) on the outside of room exterior wall (5), the wall waterproof layer (9) and post-cast strip waterproof layer (3) are coiled material Waterproof layer, the post-cast strip waterproof layer (3) are connected as one with the wall waterproof layer (9) on the outside of two outer wall of basement (5) Body simultaneously forms external wall waterproof layer.
8. a kind of poured band of outer wall of basement structure according to claim 7, it is characterised in that: outside two basements Wall outer side backfill layer (10), the backfilling of earthwork layer (4) and two outer wall of basement (5) are provided on the outside of wall (5) Wall outer side backfill layer (10) in outside is connected as one and forms exterior wall backfill layer;
Waterproof protective layer (11) are provided between the external wall waterproof layer and exterior wall backfill layer.
9. a kind of poured band of outer wall of basement structure according to claim 1 or 2, it is characterised in that: institute's Construction Later Casting Zone (1) steel plate for sealing water (12) are provided between two outer wall of basement (5).
10. a kind of poured band of outer wall of basement structure according to claim 1 or 2, it is characterised in that: the side connection The width of area's steel plate is not less than 20cm.
CN201821752576.3U 2018-10-26 2018-10-26 A kind of poured band of outer wall of basement structure Expired - Fee Related CN209066506U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821752576.3U CN209066506U (en) 2018-10-26 2018-10-26 A kind of poured band of outer wall of basement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821752576.3U CN209066506U (en) 2018-10-26 2018-10-26 A kind of poured band of outer wall of basement structure

Publications (1)

Publication Number Publication Date
CN209066506U true CN209066506U (en) 2019-07-05

Family

ID=67096303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821752576.3U Expired - Fee Related CN209066506U (en) 2018-10-26 2018-10-26 A kind of poured band of outer wall of basement structure

Country Status (1)

Country Link
CN (1) CN209066506U (en)

Similar Documents

Publication Publication Date Title
CN106869172B (en) In-situ deposited prefabricated split-mounting type subway underground station construction method
CN106677049B (en) Assembled steel-concrete combined structure bridge and construction method
CN106223360B (en) Using the open cut cast in place and precast construction subway station construction method of stake supporting system
CN106592426B (en) The construction method of transverse prestress overall with reinforced concrete bridge deck plate prefab-form system
CN207878747U (en) A kind of laminated floor slab prefabricated board
CN106436893A (en) Fully-prefabricated structure and construction method thereof
CN104358337B (en) Light-weight composite floor slab structure for assembling integral prefabricated double thin plates, and construction method
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN101240570A (en) Double-side in-situ placing construction method for CL structure system composite wall board concrete
CN209194768U (en) A kind of lightweight concrete slat door separation structure of the window
CN108265623A (en) A kind of prefabricated superposed type anti-collision wall and its construction method for urban viaduct
CN108086353A (en) A kind of hollow wallboard spliced with cast-in-place hidden girder mixes prefabricated assembled pipe gallery and its construction method
CN107806114A (en) Basement roof closes late poured band structure and construction method in advance
CN103806659B (en) Super thick prestressing force change-over panel individual layer comprehensively supports and splits temperature control construction technology with control
CN107090908A (en) A kind of new vertical prefabricated components joint connecting method
CN108951840A (en) Based on setting bracket single side formwork basement arc external wall construction method
CN206052778U (en) A kind of steel and Combined concrete piping lane
CN208430661U (en) A kind of vertical piece construction of line-styled self-heat conserving overlapped shear wall
CN110318427A (en) A kind of prefabricated pipe gallery construction method of segmentation
CN110173127A (en) The ruggedized construction and its construction technology of parts of shear wall structure wall body concrete replacement
CN107083776B (en) A kind of basement raft foundation rear pouring tape construction method
CN208039821U (en) Floor slab back casting band shuttering supporting reinforcement system
CN110106915A (en) One kind exempts from that support is inverse to make underground engineering construction method and underground construction structure
CN105649259B (en) A kind of wallboard structural system of the dark framework of band of precast concrete wall panel and its structure
CN209066506U (en) A kind of poured band of outer wall of basement structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190705

CF01 Termination of patent right due to non-payment of annual fee