CN110409298A - A kind of equipment for the construction of bridge bottom wall - Google Patents
A kind of equipment for the construction of bridge bottom wall Download PDFInfo
- Publication number
- CN110409298A CN110409298A CN201910560753.0A CN201910560753A CN110409298A CN 110409298 A CN110409298 A CN 110409298A CN 201910560753 A CN201910560753 A CN 201910560753A CN 110409298 A CN110409298 A CN 110409298A
- Authority
- CN
- China
- Prior art keywords
- extension support
- forearm
- strut
- large arm
- bottom wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/10—Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
- E01D19/106—Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a kind of equipment for the construction of bridge bottom wall, its structure includes mounting seat, reinforcing bar, large arm, forearm, hydraulic stem, railing, central strut, Extension support, large arm one end and mounting seat installation connection, the large arm other end and small arm axle connect, forearm is vertically installed with Extension support far from the terminal horizontal of large arm, hydraulic stem is equipped at the switching of Extension support and forearm and forearm and large arm, railing is set to Extension support two sides, Extension support and railing are vertically fixed, Extension support is equipped with central strut far from the end of forearm, the present invention passes through the common cooperation such as negative pressure cylinder and telescopic rod, while enhancing the connection of negative pressure cylinder and bridge floor bottom wall using negative-pressure adsorption principle, support construction as two frame Extension support connecting points, improve the endurance of two frame Extension supports, this central strut movable can also be hidden, clear up ring increase central strut and The leakproofness and stability of bridge floor bottom wall connection.
Description
Technical field
The present invention relates to field of bridge construction, particularly with regard to a kind of equipment for the construction of bridge bottom wall.
Background technique
Bridge is across the main tool in river, the building for making traffic etc. that can smoothly pass through, bridge be located at it is waterborne,
After being infiltrated for a long time by steam again by solar exposure, bridge floor, which is easy to happen, to burst apart, need periodically to be safeguarded or repaired, to bridge floor
Bottom wall is the emphasis position of maintenance, maintenance for bridge floor bottom wall or is detected on the water surface by elevator lifting, disadvantage
It is to be located on the water surface, pedestal is unstable, is easy to happen offset or utilizes two frame Extension support of hydraulic control in bridge floor on bridge floor
Bottom split, relative to the former, this method pedestal and movement are all more stable, but because are spelled in the split of bridge floor bottom
The stability that coincidence is set wants low relative to two sides, once, the latch fitting of linking is broken, and service personnel withdraws not in time, can be because
Safety accident occurs to shake the of short duration inclination with extension rod.
Summary of the invention
In view of the deficiencies of the prior art, the present invention is to realize by the following technical solutions: one kind is for bridge bottom wall
The equipment of construction, structure include mounting seat, reinforcing bar, large arm, forearm, hydraulic stem, railing, central strut, Extension support, described
Large arm one end and mounting seat installation connection, the large arm other end and small arm axle connect, end water of the forearm far from large arm
It is flat to be vertically installed with Extension support, hydraulic stem, the railing are equipped at the switching of the Extension support and forearm and forearm and large arm
Set on Extension support two sides, the Extension support and railing are vertically fixed, and the Extension support is equipped with center branch far from the end of forearm
Bar.
The central strut is made of negative pressure cylinder, telescopic rod, fixation hole, pedestal, the negative pressure cylinder be located at telescopic rod just on
Side, the telescopic rod are fixedly connected with negative pressure cylinder, and bottom end and pedestal of the telescopic rod far from negative pressure cylinder are fixed, the pedestal bottom
Portion is hemispherical dome structure, and the position of the pedestal middle is provided with a fixation hole.
As advanced optimizing for the technical program, the negative pressure cylinder is made of outer cylinder and piston rod, the outer cylinder bottom
It is threadedly coupled with telescopic rod, the outer barrel is equipped with a piston rod, and the piston rod and outer cylinder, which use, to be slidably matched, described
Outer cylinder is equipped with the sliding mouth of more than two bar shapeds, and the sliding mouth of these bar shapeds is evenly distributed, the distance between sliding mouth of twice bar shaped phase
Deng.
As advanced optimizing for the technical program, the piston rod is by chock plug, strut, holding rod, inserting hole, chassis group
At the chock plug is located at outer barrel, and the outer cylinder interior diameter and chock plug overall diameter are equivalent, and the chock plug middle is vertically equipped with
A piece strut, the strut bottom end are vertical at chassis middle, and the strut is fixedly connected with chassis, chock plug, the chassis
Edge is equipped with more than two inserting holes, and the interspersed hole number and the sliding mouth quantity of bar shaped are equivalent, the position relative misalignment of the two.
As advanced optimizing for the technical program, the one side of the pedestal is horizontally fixed with an inverted L-type shape
Chimeric bar, the chimeric bar and Extension support activity cooperation.
As advanced optimizing for the technical program, ring is cleared up embedded with a circle in outer cylinder top end face middle, described clear
Reason ring has two layers of patch to constitute, and the surface irregularity of patch, the patch is made of rubber material.
As advanced optimizing for the technical program, the outer cylinder outer surface of cupular part and telescopic rod bottom are equipped with triangle card
Seat, the two triangle decks are on same center line, horizontal median axis axial symmetry of the triangle deck about central strut.
Beneficial effect
A kind of equipment for the construction of bridge bottom wall of the present invention has the advantage that compared with prior art
1. the present invention is cooperated jointly by negative pressure cylinder and telescopic rod, enhance negative pressure cylinder and bridge floor bottom using negative-pressure adsorption principle
While the connection of wall, as the support construction of two frame Extension support connecting points, the endurance of two frame Extension supports is improved.
2. the surface irregularity of the patch of present invention cleaning ring, removes the moss on the bridge floor bottom wall being in contact with outer cylinder
Opposite sliding blow-by occurs when outer cylinder and bridge floor being avoided to connect for equal bryophytes.
3. the design of pedestal of the present invention and triangle deck is cooperated jointly using the fixation hole and Extension support of pedestal, convenient to turn
It is dynamic to hide, during rotation, pedestal be it is hemispherical, rotate smooth, Caton do not occur, after rotation, triangle deck and prolong
It stretches frame mutually to agree with, is not susceptible to deviate.
4. being fitted into bar after central strut rotational support standing of the present invention comes and being embedded in another frame Extension support, occur in latch fitting
The Extension support of single hop takes the lead in after fracture, mutually rubs with chimeric bar side face, realizes occlusion, is not easily disconnected from, causes safety accident.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention,
Objects and advantages will become more apparent upon:
Fig. 1 is a kind of side structure schematic diagram of the equipment for the construction of bridge bottom wall of the present invention.
Fig. 2 is diagrammatic cross-section when central strut of the present invention uses.
Fig. 3 is the schematic perspective view of central strut of the present invention.
Fig. 4 is the structural schematic diagram after central strut of the present invention is inverted.
Fig. 5 is the schematic perspective view of inventive piston bar.
Fig. 6 is the end view after central strut use of the present invention.
Fig. 7 is end view when central strut of the present invention is not used.
In figure: mounting seat 1, reinforcing bar 2, large arm 3, forearm 4, hydraulic stem 5, railing 6, central strut 7, Extension support 8, negative pressure
Cylinder 71, telescopic rod 72, fixation hole 73, pedestal 74, outer cylinder b, piston rod c, the sliding mouth b1 of bar shaped, chock plug c1, strut c2, holding rod c3,
Inserting hole c4, chassis c5, chimeric bar m, cleaning ring n, triangle deck a.
Specific embodiment
To be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, below with reference to
Specific embodiment and Detailed description of the invention, the preferred embodiment that the present invention is further explained.
Embodiment
Fig. 1-Fig. 7 is please referred to, the present invention provides a kind of equipment for the construction of bridge bottom wall, and structure includes mounting seat
1, reinforcing bar 2, large arm 3, forearm 4, hydraulic stem 5, railing 6, central strut 7, Extension support 8, described 3 one end of large arm and mounting seat 1
Installation connection, 3 other end of large arm and 4 axis of forearm connect, and the forearm 4 is vertically installed with far from the terminal horizontal of large arm 3 to be prolonged
Frame 8 is stretched, hydraulic stem 5 is equipped at the switching of the Extension support 8 and forearm 4 and forearm 4 and large arm 3, the railing 6, which is set to, to be extended
8 two sides of frame, the Extension support 8 and railing 6 are vertically fixed, and the Extension support 8 is equipped with central strut 7 far from the end of forearm 4.
The central strut 7 is made of negative pressure cylinder 71, telescopic rod 72, fixation hole 73, pedestal 74, and the negative pressure cylinder 71 is located at
Right above telescopic rod 72, the telescopic rod 72 is fixedly connected with negative pressure cylinder 71, the bottom end of the telescopic rod 72 far from negative pressure cylinder 71
Fixed with pedestal 74,74 bottom of pedestal is hemispherical dome structure, and the position of 74 middle of pedestal is provided with a fixation hole
73, the central strut 7 is mainly movably fixed on Extension support 8 by fixation hole 73, since its bottom is hemispherical dome structure, In
In rotation process, rotation is smooth, and Caton does not occur.
The negative pressure cylinder 71 is made of outer cylinder b and piston rod c, and the bottom the outer cylinder b and telescopic rod 72 are threadedly coupled, described
Piston rod a c, the piston rod c and outer cylinder b are equipped with inside outer cylinder b using being slidably matched, set on the outer cylinder b there are two with
On the sliding mouth b1 of bar shaped, the sliding mouth b1 of these bar shapeds is evenly distributed, and the distance between sliding mouth b1 of twice bar shaped is equal.
The piston rod c is made of chock plug c1, strut c2, holding rod c3, inserting hole c4, chassis c5, and the chock plug c1 is located at
Inside outer cylinder b, the outer cylinder b interior diameter and chock plug c1 overall diameter are equivalent, and the middle the chock plug c1 is vertically equipped with a strut
The bottom end c2, the strut c2 is vertical at the chassis middle c5, and the strut c2 is fixedly connected with chassis c5, chock plug c1, described
The chassis edge c5 is equipped with more than two inserting hole c4, and the inserting hole c4 quantity and the sliding mouth b1 quantity of bar shaped are equivalent, the two
Position relative misalignment guarantees that piston rod c and outer cylinder b intersects opposite sliding, is not easily disconnected from.
The one side of the pedestal 74 is horizontally fixed with an inverted L-type shape and is fitted into bar m, the chimeric bar m and extension
8 activity cooperation of frame, when two frame Extension supports, 8 junction is broken, the gravity that single hop is born can rate than heavier Extension support 8
First sink, mutually rub with the side chimeric bar m, realizes occlusion, be not easily disconnected from, cause safety accident.
Ring n is cleared up embedded with a circle in the outer cylinder b top end face middle, and the cleaning ring n has two layers of patch to constitute, patch
Surface irregularity, the patch are made of rubber material, open fit with 9 bottom wall of bridge floor naturally under the effect of the pressure,
It is in contact with bryophytes such as mosses on bottom wall, removes bryophyte, prevent excessively smooth bryophyte
Opposite sliding occurs for outer cylinder b top end face.
The outer cylinder b outer surface of cupular part and 72 bottom of telescopic rod are equipped with triangle deck a, the two triangle decks a is same
On one center line, horizontal median axis axial symmetry of the triangle deck a about central strut 7.
Using two frame Extension support 8 of hydraulic control in the split of bridge floor bottom on bridge floor, two frame Extension supports 8 are realized by latch fitting
Split is fixed, and service personnel stands on Extension support 8, hand steered a railing 6, the other hand center of rotation strut 7, rotation process
In, triangle deck a is slowly detached from Extension support 8, pedestal 74 be it is hemispherical, do not rub with Extension support 8, rotate smooth, rotation
After 90 degree, the chimeric bar m on pedestal 74 can be completely embedded into another frame Extension support 8, realize engaging, if latch fitting is disconnected
It splits, wherein 8 gravity of a frame Extension support is subjected in comparison, sinks first, be now placed in the chimeric bar of the central strut 7 on this
M can intersect friction with the generation of Extension support 8 side and be engaged, and the short time will not sink, to the time that service personnel withdraws, then
Afterwards, telescopic rod 72 is adjusted, negative pressure cylinder 71 is allowed to rise completely, cleaning ring n is in contact with 9 bottom wall of bridge floor first, not by telescopic rod 72
Disconnected to rise the pressure adjusted, the patch of two panels surface irregularity opens automatically, if there is the plant of the moss such as moss on contact surface
Object, will phase mutual friction therewith to realize the removal of bryophyte avoid the unstable and leakproofness of its cohesive position
Not strong problem, finally, drop-down, which is located at piston rod c, piston rod c and outer cylinder b inside outer cylinder b, intersects slide design, first is that shape
At negative pressure, negative pressure cylinder 71 is tightly adsorbed on 9 bottom wall of bridge floor, as the support construction of 8 end of Extension support, to improve Extension support 8
Total endurance, second is that prevent the disengaging of piston rod c, when pulling down piston rod c bar, it is sliding that chock plug c1 minimum altitude is higher than bar shaped
The highest point mouth b1 avoids air from entering in outer cylinder b from the sliding mouth b1 of bar shaped, can not form negative pressure, enhancing connection.
Problems solved by the invention is because being in the split of bridge floor bottom, and the stability of split position is wanted relative to two sides
It is low, once, the latch fitting of linking is broken, service personnel withdraw not in time, can because shake and extension rod of short duration inclination and
The safety accident present invention being combined with each other by above-mentioned component occurs, the present invention is matched jointly by negative pressure cylinder 71 and telescopic rod 72 etc.
It closes, while enhancing the connection of negative pressure cylinder 71 and 9 bottom wall of bridge floor using negative-pressure adsorption principle, as two frame Extension supports, 8 connecting points
Support construction, improve two frame Extension supports 8 endurance, this central strut 7 can also activity hide, cleaning ring n increase center
The leakproofness and stability that strut 7 is connected with bridge floor bottom wall.
The basic principles, main features and advantages of the present invention have been shown and described above, the technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this
The principle of invention can not only be realized in other specific forms under the premise of not departing from spirit of that invention or essential characteristic
The present invention will also have various changes and improvements, these changes and improvements both fall within scope of the claimed invention, therefore this hair
Bright claimed range is defined by appended claims and its equivalent, rather than above description limits.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.
Claims (3)
1. a kind of equipment for the construction of bridge bottom wall, it is characterised in that: its structure includes mounting seat (1), reinforcing bar (2), big
Arm (3), forearm (4), hydraulic stem (5), railing (6), central strut (7), Extension support (8), described large arm (3) one end and installation bottom
Seat (1) installation connection, large arm (3) other end and forearm (4) axis connect, terminal horizontal of the forearm (4) far from large arm (3)
It is vertically installed with Extension support (8), liquid is equipped at the switching of the Extension support (8) and forearm (4) and forearm (4) and large arm (3)
Compression bar (5), the railing (6) are set to Extension support (8) two sides, and the Extension support (8) is equipped with center far from the end of forearm (4)
Strut (7).
2. a kind of equipment for the construction of bridge bottom wall according to claim 1, it is characterised in that: the central strut
(7) it is made of negative pressure cylinder (71), telescopic rod (72), fixation hole (73), pedestal (74), the negative pressure cylinder (71) is located at telescopic rod
(72) right above, bottom end and pedestal (74) of the telescopic rod (72) far from negative pressure cylinder (71) are fixed, pedestal (74) center
Between position be provided with a fixation hole (73), the negative pressure cylinder (71) is made of outer cylinder (b) and piston rod (c), the outer cylinder (b)
Bottom and telescopic rod (72) are threadedly coupled, and a piston rod (c), the piston rod (c) and outer cylinder are equipped with inside the outer cylinder (b)
(b) using being slidably matched, it is sliding mouth (b1) that the outer cylinder (b) is equipped with more than two bar shapeds.
3. a kind of equipment for the construction of bridge bottom wall according to claim 2, it is characterised in that: the piston rod (c)
It is made of chock plug (c1), strut (c2), holding rod (c3), inserting hole (c4), chassis (c5), the chock plug (c1) is located at outer cylinder (b)
Inside, chock plug (c1) middle are vertically equipped with a strut (c2), and strut (c2) bottom end is vertical at chassis (c5)
Middle, the strut (c2) are fixedly connected with chassis (c5), chock plug (c1), and the chassis edge (c5) is equipped with more than two
Inserting hole (c4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910560753.0A CN110409298A (en) | 2019-06-26 | 2019-06-26 | A kind of equipment for the construction of bridge bottom wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910560753.0A CN110409298A (en) | 2019-06-26 | 2019-06-26 | A kind of equipment for the construction of bridge bottom wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110409298A true CN110409298A (en) | 2019-11-05 |
Family
ID=68359865
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910560753.0A Withdrawn CN110409298A (en) | 2019-06-26 | 2019-06-26 | A kind of equipment for the construction of bridge bottom wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110409298A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5481832A (en) * | 1993-09-23 | 1996-01-09 | Tirikos; Steven M. | Bridge sand blasting support apparatus |
CN105507145A (en) * | 2016-01-08 | 2016-04-20 | 长安大学 | Bridge detection device |
CN107642037A (en) * | 2017-10-23 | 2018-01-30 | 广西大学 | A kind of intelligence system for bridge machinery |
CN206956546U (en) * | 2017-06-20 | 2018-02-02 | 江苏燕宁工程咨询有限公司 | Lifting protector for bridge maintenance |
CN207047698U (en) * | 2017-08-02 | 2018-02-27 | 苏州国通建设工程有限公司 | A kind of equipment for the construction of bridge bottom wall |
CN109778696A (en) * | 2019-03-26 | 2019-05-21 | 黑龙江交通职业技术学院 | A kind of bridge machinery maintenance device |
-
2019
- 2019-06-26 CN CN201910560753.0A patent/CN110409298A/en not_active Withdrawn
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5481832A (en) * | 1993-09-23 | 1996-01-09 | Tirikos; Steven M. | Bridge sand blasting support apparatus |
CN105507145A (en) * | 2016-01-08 | 2016-04-20 | 长安大学 | Bridge detection device |
CN206956546U (en) * | 2017-06-20 | 2018-02-02 | 江苏燕宁工程咨询有限公司 | Lifting protector for bridge maintenance |
CN207047698U (en) * | 2017-08-02 | 2018-02-27 | 苏州国通建设工程有限公司 | A kind of equipment for the construction of bridge bottom wall |
CN107642037A (en) * | 2017-10-23 | 2018-01-30 | 广西大学 | A kind of intelligence system for bridge machinery |
CN109778696A (en) * | 2019-03-26 | 2019-05-21 | 黑龙江交通职业技术学院 | A kind of bridge machinery maintenance device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110565984A (en) | Bearing structure is used in building engineering construction | |
CN205397994U (en) | Mine electromechanical equipment operating platform | |
CN110409298A (en) | A kind of equipment for the construction of bridge bottom wall | |
CN110469030A (en) | A kind of new A grade mantle open-type mounting rack and installation method | |
CN206767413U (en) | A kind of lifting sucker of building glass | |
CN106698242B (en) | Support frame for pipeline installation | |
CN210002835U (en) | kind of rack for construction hanging basket | |
CN204483322U (en) | A kind of vehicular umbrella accommodation barrel | |
CN211691525U (en) | Construction device for overhanging type inclined curtain wall | |
CN204152219U (en) | Side fascia stone tongs | |
CN209066745U (en) | A kind of very useful spliced drainage channel structure of intelligent house | |
CN208603613U (en) | Super high-rise building electromechanical equipment masts type hanging apparatus | |
CN208815982U (en) | It is a kind of suitable for being easy to collapse the electric pole on ground | |
CN208820352U (en) | A kind of five layers of simply connected Cable hanger of bridge railings | |
CN208798834U (en) | A kind of Portable type shoe rack | |
CN207469019U (en) | Building iron structure is met an urgent need supporting rack | |
CN106238250B (en) | A kind of anchor chain hanger bracket | |
CN206616747U (en) | A kind of building decoration curtain wall | |
CN208595311U (en) | A kind of Anti-leakage type chemical pipeline fixed installation structure | |
CN205875410U (en) | A hang module system all for tube structure room panel construction | |
CN205773047U (en) | A kind of automobile-used scissor-like jack | |
CN209599190U (en) | Reinforcing bar material stock frame | |
CN211776174U (en) | Stage bearing upright post | |
CN205361761U (en) | Anchor chain mounted frame | |
CN109259558A (en) | A kind of adjustable moving-type clothing hanger of household |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20191105 |