CN208603613U - Mast type hoisting device for electromechanical equipment of super high-rise building - Google Patents

Mast type hoisting device for electromechanical equipment of super high-rise building Download PDF

Info

Publication number
CN208603613U
CN208603613U CN201820737789.2U CN201820737789U CN208603613U CN 208603613 U CN208603613 U CN 208603613U CN 201820737789 U CN201820737789 U CN 201820737789U CN 208603613 U CN208603613 U CN 208603613U
Authority
CN
China
Prior art keywords
pulley
fixedly installed
inner sidewall
super high
annular groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820737789.2U
Other languages
Chinese (zh)
Inventor
王萌
冯权利
张超
姬飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201820737789.2U priority Critical patent/CN208603613U/en
Application granted granted Critical
Publication of CN208603613U publication Critical patent/CN208603613U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a mast type hoisting device for electromechanical equipment of super high-rise buildings, which comprises a winch, a first pulley, a ground and a mounting plate, wherein the winch and the first pulley are both arranged on the ground, the top of the mounting plate is fixedly provided with a base and a fixed block, the top of the base is fixedly provided with a vertical pipe and a threaded rod, the left side wall of the vertical pipe is provided with an opening, the inner side wall of the vertical pipe is provided with a vertical rod in a sliding way, the utility model discloses a telescopic mast is formed by the vertical pipe and the vertical rod, the vertical pipe and the vertical rod are fixed by an internal threaded pipe, the length of the vertical rod relative to the vertical pipe is convenient to adjust, the length of the building outer facade at the top end of the vertical rod is adjusted, the top end of the vertical rod and a rotating rod are connected by a cable rope, a rotating block is arranged above the rotating rod, the outer side, the position of the cable rope can be conveniently changed along with the vertical rod.

Description

Super high-rise building electromechanical equipment masts type hanging apparatus
Technical field
The utility model relates to technical field of building construction, specially super high-rise building electromechanical equipment masts type lifting dress It sets.
Background technique
In recent years, super high-rise building is increasing, and layer height is higher and higher, and difficulty of construction also increases therewith, especially superelevation The transport of layer large scale equipment is mounted to the big problem considered for emphasis, and currently used hanging apparatus has masts type lifting dress It sets, but since the length of mast can not be adjusted, when lifting different size of equipment, the bottom of adjusting mast can only be passed through Seat, pedestal are usually bolted, and the length of the top stretching facade of mast is adjusted with this, dismantles time-consuming expense Power, for this purpose, it is proposed that super high-rise building electromechanical equipment masts type hanging apparatus.
Utility model content
The purpose of this utility model is to provide super high-rise building electromechanical equipment masts type hanging apparatus, to solve above-mentioned back The problem of being proposed in scape technology.
To achieve the above object, the utility model provides the following technical solutions: super high-rise building electromechanical equipment masts type is hung Assembling device, including hoist engine, first pulley, ground and mounting plate, the hoist engine and first pulley are respectively mounted on the ground, institute The top fixing assembling for stating mounting plate has pedestal and fixed block, and the top fixing assembling of the pedestal has standpipe and threaded rod, institute The left side wall for stating standpipe is equipped with port, and the inner sidewall of the standpipe is slidably fitted with upright bar, and the side wall left end of the upright bar is solid Surely it is equipped with slide bar, riffled tube is bolted on the threaded rod, the lateral wall of the riffled tube is equipped with the first annular groove, described The left end of slide bar passes through a port and is fixedly installed with connecting rod, and the left end of the connecting rod is fixedly installed with lantern ring, institute The inner sidewall for stating lantern ring is slidably mounted on the inner sidewall of the first annular groove, and the top of the fixed block is connected with by bearing to be turned Bar, the top of the upright bar are fixedly installed with one end of cable wind rope, and the other end of the cable wind rope is fixedly mounted on the side of bull stick On wall, the right end fixing assembling of the mounting plate has second pulley, and the top of the upright bar is equipped with pulley blocks, and the hoist engine prolongs The race rope of stretching successively bypasses first pulley, second pulley and connects equipment with pulley blocks.
Preferably, the top fixing assembling of the bull stick has switch block, and the lateral wall of the switch block is equipped with the second annular groove, described The top left side of mounting plate is fixedly installed with vertical plate, and the right side fixing assembling of the vertical plate has spring, and the right end of the spring is solid Dingan County is equipped with shift(ing) ring, and the inner sidewall right end of the shift(ing) ring is fitted tightly over the inner sidewall of the second annular groove.
Preferably, the inner sidewall of second annular groove is equipped with tooth socket, and the inner sidewall of the shift(ing) ring is fixedly installed with sawtooth, In the sawtooth clamping tooth socket.
Preferably, it is fixedly installed with reinforcement block at the top of the pedestal, is fixedly mounted on standpipe on the left of the reinforcement block Lateral wall right end.
Preferably, the lateral wall of the riffled tube is fixedly installed with fixed link.
Compared with prior art, the utility model has the beneficial effects that the utility model passes through in standpipe and upright bar composition Stretchable mast, standpipe and upright bar are fixed by riffled tube, are facilitated the length of adjustment upright bar relative riser, are made the top of upright bar The length of facade is held, it is time saving and energy saving to adjust, and passes through top and the bull stick of cable wind rope connecting upright pole, sets above bull stick There is switch block, the lateral wall of switch block is equipped with the second annular groove, is stuck in the second annular groove by shift(ing) ring and cable wind rope is fixed, convenient Cable wind rope follows upright bar to shift one's position, easy to adjust, and the inner sidewall of shift(ing) ring is equipped with sawtooth, and sawtooth passes through and the second annular groove internal tooth Slot cooperation, increases the stability of cable wind rope, and the right side of standpipe is equipped with reinforcement block, plays the role of Supporting vertical tube, increase standpipe Bearing strength.
Detailed description of the invention
Fig. 1 is the overall schematic of the utility model.
Fig. 2 is the schematic diagram at a of the utility model.
Fig. 3 is the switch block schematic diagram of the utility model.
In figure: 1, hoist engine, 2, first pulley, 3, ground, 4, mounting plate, 5, pedestal, 6, standpipe, 7, port, 8, screw thread Bar, 9, upright bar, 10, slide bar, 11, connecting rod, 12, lantern ring, 13, riffled tube, the 14, first annular groove, 15, cable wind rope, 16, fixation Block, 17, bull stick, 18, second pulley, 19, pulley blocks, 20, tooth socket, 21, switch block, the 22, second annular groove, 23, vertical plate, 24, spring, 25, shift(ing) ring, 26, sawtooth, 27, reinforcement block, 28, fixed link.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1, Fig. 2 and Fig. 3, super high-rise building electromechanical equipment masts type hanging apparatus, including hoist engine 1, first Pulley 2, ground 3 and mounting plate 4, hoist engine 1 and first pulley 2 are installed on ground 3, the top fixing assembling of mounting plate 4 There are pedestal 5 and fixed block 16, mounting plate 4 is mountable in the floor that hanging device needs to be transported to, the top fixing assembling of pedestal 5 There are standpipe 6 and threaded rod 8, the left side wall of standpipe 6 is equipped with port 7, and the inner sidewall of standpipe 6 is slidably fitted with upright bar 9, upright bar 9 Top stretch out outside vertical surface of building, the side wall left end fixing assembling of upright bar 9 has slide bar 10, is bolted with internal screw thread on threaded rod 8 Pipe 13, the lateral wall of riffled tube 13 are equipped with the first annular groove 14, and the left end of slide bar 10 passes through a port 7 and is fixedly installed with connection Bar 11, the left end of connecting rod 11 are fixedly installed with lantern ring 12, and the inner sidewall of lantern ring 12 is slidably mounted on the inside of the first annular groove 14 On wall, lantern ring 12 cannot move up and down in the first annular groove 14, can only rotate, and the top of fixed block 16 is connected with by bearing to be turned Bar 17, the top of upright bar 9 are fixedly installed with one end of cable wind rope 15, and the other end of cable wind rope 15 is fixedly mounted on the side of bull stick 17 On wall, the right end fixing assembling of mounting plate 4 has second pulley 18, and the top of upright bar 9 is equipped with pulley blocks 19, and hoist engine 1 extends Race rope successively bypass first pulley 2, second pulley 18 and pulley blocks 19 connect equipment.
Specifically, the top fixing assembling of bull stick 17 has switch block 21, the lateral wall of switch block 21 is equipped with the second annular groove 22, peace The top left side of loading board 4 is fixedly installed with vertical plate 23, and the right side fixing assembling of vertical plate 23 has spring 24, spring 24 shown in FIG. 1 In extended state, the right end of spring 24 is fixedly installed with shift(ing) ring 25, and the inner sidewall of shift(ing) ring 25 is rougher, shift(ing) ring 25 Inner sidewall right end is fitted tightly over the inner sidewall of the second annular groove 22.
Specifically, the inner sidewall of the second annular groove 22 is equipped with tooth socket 20, the inner sidewall of shift(ing) ring 25 is fixedly installed with sawtooth 26, sawtooth 26 is clamped in tooth socket 20, is stuck in tooth socket 20 by sawtooth 26, and switch block 21 is fixed.
Specifically, the top of pedestal 5 is fixedly installed with reinforcement block 27, the left side of reinforcement block 27 is fixedly mounted on standpipe 6 Lateral wall right end, reinforcement block 27 can play the role of Supporting vertical tube 6, increase the bearing strength of standpipe 6.
Specifically, the lateral wall of riffled tube 13 is fixedly installed with fixed link 28, the setting of fixed link 28 facilitates rotation Riffled tube 13.
Working principle: it in use, mounting plate 4 is mounted in the floor that hanging device needs to be transported to, is set by running rope connection It is standby, the transport of equipment is carried out by hoist engine 1, and when lifting different size equipment, shift(ing) ring 25 is taken out out of second annular groove 22, Then riffled tube 13 is rotated, riffled tube 13 is made to drive upright bar 9 to move by connecting rod 11, and then adjusts the top of upright bar 9 The length for stretching out outside vertical surface of building after the completion of adjusting, rotates switch block 21, keeps cable wind rope 15 tight, existed by 25 sets of shift(ing) ring In second annular groove 22, it is stuck in sawtooth 26 in tooth socket 20, switch block 21 is fixed.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. super high-rise building electromechanical equipment masts type hanging apparatus, it is characterised in that: including hoist engine (1), first pulley (2), Ground (3) and mounting plate (4), the hoist engine (1) and first pulley (2) are installed on ground (3), the mounting plate (4) Top fixing assembling have pedestal (5) and fixed block (16), the top fixing assembling of the pedestal (5) has standpipe (6) and screw thread The left side wall of bar (8), the standpipe (6) is equipped with port (7), and the inner sidewall of the standpipe (6) is slidably fitted with upright bar (9), The side wall left end fixing assembling of the upright bar (9) has slide bar (10), is bolted with riffled tube (13), institute on the threaded rod (8) The lateral wall for stating riffled tube (13) is equipped with the first annular groove (14), and the left end of the slide bar (10) passes through a port (7) Be fixedly installed with connecting rod (11), the left end of the connecting rod (11) is fixedly installed with lantern ring (12), the lantern ring (12) it is interior Side walls are mounted on the inner sidewall of the first annular groove (14), and the top of the fixed block (16) is connected with bull stick by bearing (17), the top of the upright bar (9) is fixedly installed with one end of cable wind rope (15), the fixed peace of the other end of the cable wind rope (15) On the side wall of bull stick (17), the right end fixing assembling of the mounting plate (4) has second pulley (18), the upright bar (9) Top is equipped with pulley blocks (19), and the race rope that the hoist engine (1) is extended successively bypasses first pulley (2), second pulley (18) Equipment is connected with pulley blocks (19).
2. super high-rise building electromechanical equipment masts type hanging apparatus according to claim 1, it is characterised in that: the bull stick (17) top fixing assembling has switch block (21), and the lateral wall of the switch block (21) is equipped with the second annular groove (22), the mounting plate (4) top left side is fixedly installed with vertical plate (23), and the right side fixing assembling of the vertical plate (23) has spring (24), the spring (24) right end is fixedly installed with shift(ing) ring (25), and the inner sidewall right end of the shift(ing) ring (25) is fitted tightly over the second annular groove (22) inner sidewall.
3. super high-rise building electromechanical equipment masts type hanging apparatus according to claim 2, it is characterised in that: described second The inner sidewall of annular groove (22) is equipped with tooth socket (20), and the inner sidewall of the shift(ing) ring (25) is fixedly installed with sawtooth (26), the saw Tooth (26) is clamped in tooth socket (20).
4. super high-rise building electromechanical equipment masts type hanging apparatus according to claim 1, it is characterised in that: the pedestal (5) it is fixedly installed at the top of reinforcement block (27), the lateral wall that standpipe (6) is fixedly mounted on the left of the reinforcement block (27) is right End.
5. super high-rise building electromechanical equipment masts type hanging apparatus according to claim 1, it is characterised in that: the interior spiral shell The lateral wall of line pipe (13) is fixedly installed with fixed link (28).
CN201820737789.2U 2018-05-17 2018-05-17 Mast type hoisting device for electromechanical equipment of super high-rise building Active CN208603613U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820737789.2U CN208603613U (en) 2018-05-17 2018-05-17 Mast type hoisting device for electromechanical equipment of super high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820737789.2U CN208603613U (en) 2018-05-17 2018-05-17 Mast type hoisting device for electromechanical equipment of super high-rise building

Publications (1)

Publication Number Publication Date
CN208603613U true CN208603613U (en) 2019-03-15

Family

ID=65661678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820737789.2U Active CN208603613U (en) 2018-05-17 2018-05-17 Mast type hoisting device for electromechanical equipment of super high-rise building

Country Status (1)

Country Link
CN (1) CN208603613U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112661026A (en) * 2020-12-23 2021-04-16 蒋彩霞 High hoisting apparatus for construction of security

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112661026A (en) * 2020-12-23 2021-04-16 蒋彩霞 High hoisting apparatus for construction of security

Similar Documents

Publication Publication Date Title
CN200940077Y (en) Miniature crane
CN201136745Y (en) Portable small-sized hoisting machine
CN206647287U (en) A kind of protection type industrial ceiling fan
CN108560510B (en) Movable overhaul platform for surface runner of hydropower station
CN208603613U (en) Mast type hoisting device for electromechanical equipment of super high-rise building
CN206360316U (en) A kind of high lift Architectural Equipment of stability
CN105947900A (en) Energy-saving hoisting construction device
CN2835192Y (en) Crane
CN206842914U (en) Vertical elevator pivot stud structure
CN208532061U (en) A kind of derrick crane convenient for construction
CN209448357U (en) A kind of reinforced cable bridge trailing arm
CN211998489U (en) Large-scale water and electricity pipeline installation overhead hoist
CN208648588U (en) One kind is shaken the head gin pole
CN208500178U (en) A kind of building hanging basket for house construction engineering
CN105293299A (en) Windproof tower crane for building
CN206767418U (en) A kind of fixture type derrick mast device
CN108862082A (en) A kind of concrete handling equipment
CN216564418U (en) Cable bridge with rotation function
CN113526368B (en) Material lifting crane with auxiliary fixing function for building high-altitude construction
CN212982303U (en) High altitude crane that construction was used
CN221343594U (en) Aluminum alloy door and window hoisting clamp
CN219885526U (en) Hoisting equipment
CN201056466Y (en) Minitype swing machine
CN219491761U (en) High-rise green building construction unloading equipment
CN221521895U (en) Cable suspension device with adjusting structure for electric power construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant