CN110399513A - Build data real-time query device - Google Patents
Build data real-time query device Download PDFInfo
- Publication number
- CN110399513A CN110399513A CN201910198055.0A CN201910198055A CN110399513A CN 110399513 A CN110399513 A CN 110399513A CN 201910198055 A CN201910198055 A CN 201910198055A CN 110399513 A CN110399513 A CN 110399513A
- Authority
- CN
- China
- Prior art keywords
- equipment
- building
- matrix
- image
- mean square
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/50—Information retrieval; Database structures therefor; File system structures therefor of still image data
- G06F16/53—Querying
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Databases & Information Systems (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Image Processing (AREA)
- Alarm Systems (AREA)
Abstract
The present invention relates to a kind of building data real-time query devices, it include: pattern analysis equipment, image matching operations are executed to Signal averaging image respectively based on the corresponding each benchmark building mark article pattern of various building marker typonyms, with one or more building markers present in the determination Signal averaging image;Progress extract equipment executes following movement for each building marker present in the Signal averaging image: inquiring corresponding building progress percentage from EDO DRAM storage chip.Building data real-time query device data of the invention are intuitive, are widely used.As determining one or more building markers existing for the scene of construction site based on the corresponding each benchmark building mark article pattern of various building marker typonyms, and current schedules percentage is determined based on the corresponding one or more building progress percentages of one or more building markers, to obtain more effectively building reference data.
Description
Technical field
The present invention relates to field of house buildings more particularly to a kind of building data real-time query devices.
Background technique
Building construction refers in planning and designing place, provided for user or investor live, produce, working or other
Movable entity.House architectural structure, which refers to, divides class according to the construction material of the main supporting member such as the beam, column, wall in house
Not.The purpose of building construction design is to ensure that built structure is safe and applicable, can meet in the defined time limit various
The requirement of expectation function, and economical rationality.
Building structure has six kinds of classifications: (1) steel construction: the primary structure of load-bearing is built with Steel material, including suspension cable
Structure.Such as steel workshop, coliseum.(2) steel, reinforced concrete structure: the primary structure of load-bearing is mixed with steel, reinforcing bar
Solidifying civil engineering is made.If an a part of beam column in building house uses steel framework, a part of beam column is built using reinforced concrete frame.
(3) reinforced concrete structure: the primary structure of load-bearing is built with armored concrete, including book shell structure, the cast-in-place knot of large form
What the armored concrete of the advanced construction method construction such as structure and use sliding formwork lift slab was built.(4) mixed structure: the main knot of load-bearing
Structure is built with armored concrete and brick wood.If the beam in a building house is made of armored concrete, using brick wall as load bearing wall, or
Beam is timber manufacture, and column is that armored concrete is built.With prefabricated reinforced concrete girder thin plate hug mixing it is second-class, others are
Mixing is first-class.(5) post and panel structure: the primary structure brick of load-bearing, timber are built, a such as building house be wood roof truss, brick wall,
Pin is built.House two sides (referring to a row or a building similarly hereinafter) gable and forward position cross wall are first-class with a thickness of brick wood more than a brick;Room
Room two sides gable is a brick or more, and forward position cross wall is with a thickness of bat, wooden partition, false wall or other single walls, and wing-room gable is with a thickness of one
Brick, wing-room forward position wall and principal rooms forward position wall are that brick wood is second-class less than a brick;House two sides gable uses half-brick wall with yoke load-bearing
Or other false wall fillings, or being formed with brick wall, wood roof truss, tile roofing, bamboo stringer is that brick wood is third.(6) other structures: all
Be not belonging to above structure house architectural structure be included into it is such.
Summary of the invention
The present invention at least has inventive point important at following three:
(1) construction site is determined based on the corresponding each benchmark building mark article pattern of various building marker typonyms
One or more building markers existing for scene, and it is based on the corresponding one or more of one or more building markers
Building progress percentage determines current schedules percentage, to obtain more effectively building reference data;
(2) using the electrical energy consumption analysis mechanism of customization, the electricity that the electric power input terminal based on measurement equipment to be checked inputs per hour
Pressure and the electric current inputted per hour execute the high-precision analysis of electricity consumption grade execution for treating detection device;
(3) to image carry out dynamic range enhancing action on the basis of, to the cyan matrix of image, magenta matrix,
Yellow matrix and black matrix" execute the wavelet filtering processing based on respective matrix content, improve the adaptive water of wavelet filtering
It is flat.
According to an aspect of the present invention, a kind of building data real-time query device is provided, described device includes: EDO
DRAM storage chip, for each building marker typonym and each building marker type name to be stored in advance
Claim corresponding benchmark building mark article pattern and building progress percentage;Immediately equipment is captured, timer is built-in with, every pre-
If time interval carries out candid photograph operation to the construction site in front, image is captured to obtain corresponding building site.
More specifically, in the building data real-time query device, described device further include: real-time timing device, with
Electrical energy consumption analysis equipment connection, for providing chronograph reference signal for electrical energy consumption analysis equipment.
More specifically, in the building data real-time query device, described device further include: electrical energy consumption analysis equipment, with
Immediately the electric power input terminal connection of equipment is captured, the instant candid photograph equipment captures image for exporting the building site, described
The voltage and the electric current execution pair inputted per hour that electrical energy consumption analysis equipment is used to input per hour based on the electric power input terminal
The analysis of the instant electricity consumption grade for capturing equipment.
More specifically, in the building data real-time query device, described device further include: link controlling device, if
It sets between the instant candid photograph equipment and the range lifting means, it is default for being more than or equal in the electricity consumption grade received
When grade threshold, the instant data link captured between equipment and the range lifting means is established, otherwise, described in interruption
Immediately the data link between equipment and the range lifting means is captured.
More specifically, in the building data real-time query device, described device further include: range lifting means is used
Image is captured in receiving the building site, image is captured to the building site and executes dynamic range enhancing action, carries out dynamic to obtain
Image after range enhancing action simultaneously promotes image output as parameter;Matrix extract equipment connects with the range lifting means
It connects, promotes image for receiving the parameter, image is promoted to the parameter and executes color space conversion, to obtain the parameter
Promote cyan matrix, magenta matrix, yellow matrix and the black matrix" of image;Strategy identification equipment, is extracted with the matrix
Equipment connection determines the number that wavelet filtering is executed to the cyan matrix, base for the mean square deviation based on the cyan matrix
The number for executing wavelet filtering to the magenta matrix is determined in the mean square deviation of the magenta matrix, is based on the yellow square
The mean square deviation of battle array determines the number that wavelet filtering is executed to the yellow matrix, based on determining pair of mean square deviation of the black matrix"
The black matrix" executes the number of wavelet filtering;Synchronous processing equipment is connect, for described with the strategy identification equipment
Cyan matrix, the magenta matrix, the yellow matrix small echo for executing respectively corresponding number synchronous with the black matrix"
Filtering, to obtain matrix after corresponding four processing;Signal averaging equipment is connect with the synchronous processing equipment, is used for institute
Matrix executes Signal averaging after stating four processing, to obtain Signal averaging image;Pattern analysis equipment is set with the Signal averaging
Standby connection, for identifying article pattern respectively to the letter based on the corresponding each benchmark building of various building marker typonyms
Number superimposed image executes image matching operations, is identified with one or more buildings present in the determination Signal averaging image
Object.
Building data real-time query device data of the invention are intuitive, are widely used.Due to being based on various building markers
The corresponding each benchmark building mark article pattern of typonym determines one or more building marks existing for the scene of construction site
Object, and current schedules hundred are determined based on the corresponding one or more building progress percentages of one or more building markers
Divide ratio, to obtain more effectively building reference data.
Detailed description of the invention
Embodiment of the present invention is described below with reference to attached drawing, in which:
Fig. 1 is the application scenarios schematic diagram according to the building data real-time query device shown in embodiment of the present invention.
Specific embodiment
The embodiment of building data real-time query device of the invention is described in detail below with reference to accompanying drawings.
Construction schedule is the key content of Design of Construction Organization, is control engineering construction progress and engineering construction time limit
Deng the foundation of every construction activities, whether schedule is reasonable, directly affects speed of application, cost and quality.Therefore construction group
All work for knitting design will be arranged centered on construction speed.
Most well accepted construction speed record form is daily construction report, it by guard station sports representative, or if
It if coming into force, is filled in day by day by the Quality Control Representative of contractor, even if certain day at the construction field (site) does not go into operation, also should this
It does.This report would generally be made into more parts of copies or be printed directly on carbon paper to generate necessary more parts of duplicating
Part.
As progress record, production is reported necessary daily.It is combined with the log of project supervision personnel, is protected
Two kinds of individual document record is demonstrate,proved.In this manner, it is more to be only limited to the Proprietary Information recorded in log,
Construction speed in the report of daily construction speed is truer, because the information that it reflects is more complete extensively.
Currently, the building progress in house is generally spliced administrative staff's naked eyes and is judged, this artificial judgment mode presence
It is certain a possibility that failing to judge and judge by accident, it can not be identified based on the corresponding each benchmark building of various building marker typonyms
Article pattern determines one or more building markers existing for the scene of construction site, can not be based on one or more building marks
Know the current building progress that object judges house, therefore, it is necessary to one kind can replace artificial progress judgment mechanism.
In order to overcome above-mentioned deficiency, the present invention has built a kind of building data real-time query device, can effectively solve the problem that phase
The technical issues of answering.
Fig. 1 is the application scenarios schematic diagram according to the building data real-time query device shown in embodiment of the present invention.Its
In, 1 is the house for being queried data, and 2 be ground.
The building data real-time query device shown according to an embodiment of the present invention includes:
EDO DRAM storage chip, for each building marker typonym and each building to be stored in advance
The corresponding benchmark building mark article pattern of marker typonym and building progress percentage;
Immediately equipment is captured, timer is built-in with, carries out candid photograph behaviour every construction site of the prefixed time interval to front
Make, captures image to obtain corresponding building site.
Then, continue that the specific structure of building data real-time query device of the invention is further detailed.
Can also include: in the building data real-time query device
Real-time timing device is connect with electrical energy consumption analysis equipment, for providing chronograph reference signal for electrical energy consumption analysis equipment.
Can also include: in the building data real-time query device
Electrical energy consumption analysis equipment is connect with the instant electric power input terminal for capturing equipment, and the instant candid photograph equipment is for defeated
Image is captured in the building site out, voltage that the electrical energy consumption analysis equipment is used to input per hour based on the electric power input terminal and
The electric current inputted per hour executes the analysis to the instant electricity consumption grade for capturing equipment.
Can also include: in the building data real-time query device
Link controlling device is arranged between the instant candid photograph equipment and the range lifting means, for receiving
When the electricity consumption grade arrived is more than or equal to predetermined level threshold value, establish between the instant candid photograph equipment and the range lifting means
Data link otherwise interrupt the instant data link captured between equipment and the range lifting means.
Can also include: in the building data real-time query device
Range lifting means captures image for receiving the building site, captures image to the building site and execute dynamic range
Enhancing action, to obtain the image after carrying out dynamic range enhancing action and promote image output as parameter;
Matrix extract equipment is connect with the range lifting means, image is promoted for receiving the parameter, to the ginseng
Number promotes image and executes color space conversion, to obtain cyan matrix, magenta matrix, the yellow square that the parameter promotes image
Battle array and black matrix";
Strategy identification equipment, connect with the matrix extract equipment, determines for the mean square deviation based on the cyan matrix
The number that wavelet filtering is executed to the cyan matrix is determined based on the mean square deviation of the magenta matrix to the pinkish red colour moment
Battle array executes the number of wavelet filtering, is determined based on the mean square deviation of the yellow matrix to yellow matrix execution wavelet filtering
Number determines the number to black matrix" execution wavelet filtering based on the mean square deviation of the black matrix";
Synchronous processing equipment is connect with the strategy identification equipment, for the cyan matrix, the pinkish red colour moment
Battle array, the yellow matrix wavelet filtering for executing respectively corresponding number synchronous with the black matrix", to obtain corresponding four
Matrix after processing;
Signal averaging equipment is connect with the synchronous processing equipment, for matrix after described four processing to be executed signal
Superposition, to obtain Signal averaging image;
Pattern analysis equipment is connect with the Signal averaging equipment, for being based on various building marker typonyms pair
The each benchmark building mark article pattern answered executes image matching operations to the Signal averaging image respectively, with the determination letter
One or more building markers present in number superimposed image;
Progress extract equipment is connect with the pattern analysis equipment, for for present in the Signal averaging image
Each building marker executes following movement: corresponding building progress percentage is inquired from the EDO DRAM storage chip
Than;
Wherein, the progress extract equipment is also used to based on one or more buildings present in the Signal averaging image
The corresponding one or more building progress percentages of marker determine current schedules percentage;
Wherein, in the progress extract equipment, based on one or more buildings present in the Signal averaging image
The corresponding one or more building progress percentages of marker determine that current schedules percentage includes: will be one or more
Maximum value in a building progress percentage is as current schedules percentage;
Wherein, it in the strategy identification equipment, is determined based on the mean square deviation of the cyan matrix to the cyan matrix
The number of execution wavelet filtering includes: that the mean square deviation of the cyan matrix is bigger, executes wavelet filtering to the cyan matrix
Number is more;
Wherein, it in the strategy identification equipment, is determined based on the mean square deviation of the magenta matrix to the magenta
The number of matrix execution wavelet filtering includes: that the mean square deviation of the magenta matrix is bigger, is executed to the magenta matrix small
The number of wave filtering is more;
Wherein, it in the strategy identification equipment, is determined based on the mean square deviation of the yellow matrix to the yellow matrix
The number of execution wavelet filtering includes: that the mean square deviation of the yellow matrix is bigger, executes wavelet filtering to the yellow matrix
Number is more;
Wherein, it in the strategy identification equipment, is determined based on the mean square deviation of the black matrix" to the black matrix"
The number of execution wavelet filtering includes: that the mean square deviation of the black matrix" is bigger, executes wavelet filtering to the black matrix"
Number is more;
Wherein, in the electrical energy consumption analysis equipment, the voltage that is inputted per hour based on the electric power input terminal and per small
When the electric current that inputs to execute to the analysis of the instant electricity consumption grade for capturing equipment include: the voltage that will be inputted per hour and often
The electric current of hour input is multiplied to obtain power consumption per hour, is determined and corresponding is grabbed immediately based on the power consumption per hour
Clap the electricity consumption grade of equipment;
Wherein, in the electrical energy consumption analysis equipment, the power consumption per hour is bigger, the corresponding instant candid photograph determined
The electricity consumption higher grade of equipment.
Can also include: in the building data real-time query device
Onsite alarming equipment is connect with interface detection device, for based on the data volume alarm signal received or data
It measures pre-warning signal and executes corresponding alarm operation.
Can also include: in the building data real-time query device
Interface detection device is connect with the input interface of pattern analysis equipment, for connecing in the input of pattern analysis equipment
When mouth current one time receiving data amount is less than the half of the input interface bandwidth, data volume pre-warning signal is issued,
It is also used to be less than the three of the input interface bandwidth in the input interface current one time receiving data amount of pattern analysis equipment
When/mono-, data volume alarm signal is issued.
Can also include: in the building data real-time query device
The side of the interface detection device is arranged in association process equipment, connect, is used for the interface detection device
It when receiving the data volume pre-warning signal, triggers the trouble shoot to Signal averaging equipment and operates, to obtain corresponding event
Hinder code and is exported as first code.
In the building data real-time query device:
The association process equipment is also used to when receiving the data volume alarm signal, is triggered to progress extract equipment
Trouble shoot operation, using obtain corresponding fault code and as second code export, while trigger to Signal averaging equipment
Trouble shoot operation, using obtain corresponding fault code and as first code export;
Wherein, the interface detection device is also used to receive number in the input interface current one time of pattern analysis equipment
When being more than or equal to the half of the input interface bandwidth according to amount, data volume reliable signal is issued;
Wherein, the association process equipment stops when receiving the data volume reliable signal to Signal averaging equipment
Or the trouble shoot operation of progress extract equipment.
In addition, EDO (Extended Data Out) DRAM, the speed of EDO DRAM wants fast 5% compared with FPM, this be because
To be provided with a logic circuit in EDO, EDO can be read next data before the reading of a upper internal storage data terminates whereby
Enter memory.The EDODRAM for being designed as Installed System Memory is very expensive originally, for no other reason than that a kind of substitution FPM of PC market in urgent need
The product of DRAM, so being widely used on the 5th generation PC.EDO video memory can work in 75MHz or higher, but its standard
Working frequency is 66MHz, but its speed is still unable to satisfy the needs of display chip.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show
The description of example " or " some examples " etc. means specific features, structure, material or spy described in conjunction with this embodiment or example
Point is included at least one embodiment or example of the invention.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance
Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or
Implicitly include at least one this feature.
Although the present invention is disclosed as above with embodiment, it is not intended to limit the invention, any technical field
Those of ordinary skill should can make change appropriate and same replacement without departing from the spirit and scope of the present invention.
Therefore protection scope of the present invention should be subject to the range that the claim of this application defined.
Claims (9)
1. a kind of building data real-time query device, described device include:
EDO DRAM storage chip, for each building marker typonym and each building mark to be stored in advance
The corresponding benchmark building mark article pattern of object typonym and building progress percentage;
Immediately equipment is captured, timer is built-in with, carries out candid photograph operation every construction site of the prefixed time interval to front, with
It obtains corresponding building site and captures image.
2. building data real-time query device as described in claim 1, which is characterized in that described device further include:
Real-time timing device is connect with electrical energy consumption analysis equipment, for providing chronograph reference signal for electrical energy consumption analysis equipment.
3. building data real-time query device as claimed in claim 2, which is characterized in that described device further include:
Electrical energy consumption analysis equipment is connect with the instant electric power input terminal for capturing equipment, and the instant candid photograph equipment is for exporting institute
It states building site and captures image, voltage that the electrical energy consumption analysis equipment is used to inputted per hour based on the electric power input terminal and per small
When the electric current that inputs execute the analysis to the instant electricity consumption grade for capturing equipment.
4. building data real-time query device as claimed in claim 3, which is characterized in that described device further include:
Link controlling device is arranged between the instant candid photograph equipment and the range lifting means, for receiving
When electricity consumption grade is more than or equal to predetermined level threshold value, the instant number captured between equipment and the range lifting means is established
According to link, otherwise, the instant data link captured between equipment and the range lifting means is interrupted.
5. building data real-time query device as claimed in claim 4, which is characterized in that described device further include:
Range lifting means captures image for receiving the building site, captures image to the building site and executes dynamic range promotion
Movement, to obtain the image after carrying out dynamic range enhancing action and promote image output as parameter;
Matrix extract equipment is connect with the range lifting means, is promoted image for receiving the parameter, is mentioned to the parameter
Rise image and execute color space conversion, with obtain the parameter promoted the cyan matrix of image, magenta matrix, yellow matrix and
Black matrix";
Strategy identification equipment, connect with the matrix extract equipment, determines for the mean square deviation based on the cyan matrix to institute
The number that cyan matrix executes wavelet filtering is stated, the magenta matrix is held based on the mean square deviation determination of the magenta matrix
The number of row wavelet filtering determines time to yellow matrix execution wavelet filtering based on the mean square deviation of the yellow matrix
Number determines the number to black matrix" execution wavelet filtering based on the mean square deviation of the black matrix";
Synchronous processing equipment is connect, for the cyan matrix, the magenta matrix, institute with the strategy identification equipment
The yellow matrix wavelet filtering for executing respectively corresponding number synchronous with the black matrix" is stated, after obtaining corresponding four processing
Matrix;
Signal averaging equipment is connect with the synchronous processing equipment, for matrix after described four processing to be executed Signal averaging,
To obtain Signal averaging image;
Pattern analysis equipment is connect with the Signal averaging equipment, for corresponding based on various building marker typonyms
Each benchmark building mark article pattern executes image matching operations to the Signal averaging image respectively, folded with the determination signal
Add one or more building markers present in image;
Progress extract equipment is connect with the pattern analysis equipment, for for each present in the Signal averaging image
Kind building marker executes following movement: corresponding building progress percentage is inquired from the EDO DRAM storage chip;
Wherein, the progress extract equipment is also used to based on one or more buildings mark present in the Signal averaging image
The corresponding one or more building progress percentages of object determine current schedules percentage;
Wherein, in the progress extract equipment, based on one or more buildings mark present in the Signal averaging image
The corresponding one or more building progress percentages of object determine that current schedules percentage includes: to build one or more of
The maximum value in progress percentage is built as current schedules percentage;
Wherein, it in the strategy identification equipment, is determined based on the mean square deviation of the cyan matrix to cyan matrix execution
The number of wavelet filtering includes: that the mean square deviation of the cyan matrix is bigger, and the number of wavelet filtering is executed to the cyan matrix
It is more;
Wherein, it in the strategy identification equipment, is determined based on the mean square deviation of the magenta matrix to the magenta matrix
The number of execution wavelet filtering includes: that the mean square deviation of the magenta matrix is bigger, executes small echo filter to the magenta matrix
The number of wave is more;
Wherein, it in the strategy identification equipment, is determined based on the mean square deviation of the yellow matrix to yellow matrix execution
The number of wavelet filtering includes: that the mean square deviation of the yellow matrix is bigger, and the number of wavelet filtering is executed to the yellow matrix
It is more;
Wherein, it in the strategy identification equipment, is determined based on the mean square deviation of the black matrix" to black matrix" execution
The number of wavelet filtering includes: that the mean square deviation of the black matrix" is bigger, and the number of wavelet filtering is executed to the black matrix"
It is more;
Wherein, in the electrical energy consumption analysis equipment, the voltage that is inputted per hour based on the electric power input terminal and defeated per hour
It includes: the voltage that will be inputted per hour and per hour that the electric current that enters, which is executed to the analysis of the instant electricity consumption grade for capturing equipment,
The electric current of input is multiplied to obtain power consumption per hour, determines that corresponding instant candid photograph is set based on the power consumption per hour
Standby electricity consumption grade;
Wherein, in the electrical energy consumption analysis equipment, the power consumption per hour is bigger, the corresponding instant candid photograph equipment determined
Electricity consumption higher grade.
6. building data real-time query device as claimed in claim 5, which is characterized in that described device further include:
Onsite alarming equipment is connect with interface detection device, for pre- based on the data volume alarm signal received or data volume
Alert signal executes corresponding alarm operation.
7. building data real-time query device as claimed in claim 6, which is characterized in that described device further include:
Interface detection device is connect with the input interface of pattern analysis equipment, for working as in the input interface of pattern analysis equipment
When the preceding unit time receives half of the data volume less than the input interface bandwidth, data volume pre-warning signal is issued, is also used
In the input interface current one time receiving data amount in pattern analysis equipment be less than the input interface bandwidth three/
For the moment, data volume alarm signal is issued.
8. building data real-time query device as claimed in claim 7, which is characterized in that described device further include:
The side of the interface detection device is arranged in association process equipment, connect with the interface detection device, for connecing
When receiving the data volume pre-warning signal, triggers the trouble shoot to Signal averaging equipment and operate, to obtain corresponding failure generation
Code is simultaneously exported as first code.
9. building data real-time query device as claimed in claim 8, it is characterised in that:
The association process equipment is also used to when receiving the data volume alarm signal, triggers the event to progress extract equipment
Hinder search operation, to obtain corresponding fault code and export as second code, while triggering the event to Signal averaging equipment
Hinder search operation, to obtain corresponding fault code and export as first code;
Wherein, the interface detection device is also used to the input interface current one time receiving data amount in pattern analysis equipment
More than or equal to the input interface bandwidth half when, issue data volume reliable signal;
Wherein, the association process equipment is when receiving the data volume reliable signal, stop to Signal averaging equipment or into
Spend the trouble shoot operation of extract equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910198055.0A CN110399513B (en) | 2019-03-15 | 2019-03-15 | Real-time query device for building data |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910198055.0A CN110399513B (en) | 2019-03-15 | 2019-03-15 | Real-time query device for building data |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110399513A true CN110399513A (en) | 2019-11-01 |
CN110399513B CN110399513B (en) | 2020-04-14 |
Family
ID=68322428
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910198055.0A Active CN110399513B (en) | 2019-03-15 | 2019-03-15 | Real-time query device for building data |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110399513B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111474895A (en) * | 2020-03-12 | 2020-07-31 | 常俊杰 | Welding machine automatic control system using block chain |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100114635A1 (en) * | 2008-10-31 | 2010-05-06 | Hitachi-Ge Nuclear Energy, Ltd. | Construction progress visualization system and method of visualizing construction progress |
CN103428448A (en) * | 2012-05-23 | 2013-12-04 | 杭州美盛红外光电技术有限公司 | Infrared shooting device and infrared shooting method |
CN106934595A (en) * | 2017-02-23 | 2017-07-07 | 杭州仟金顶卓筑信息科技有限公司 | Project Management System engineering progress data input method |
CN107464055A (en) * | 2017-08-01 | 2017-12-12 | 贺州学院 | Schedule estimation method and device |
-
2019
- 2019-03-15 CN CN201910198055.0A patent/CN110399513B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100114635A1 (en) * | 2008-10-31 | 2010-05-06 | Hitachi-Ge Nuclear Energy, Ltd. | Construction progress visualization system and method of visualizing construction progress |
CN103428448A (en) * | 2012-05-23 | 2013-12-04 | 杭州美盛红外光电技术有限公司 | Infrared shooting device and infrared shooting method |
CN106934595A (en) * | 2017-02-23 | 2017-07-07 | 杭州仟金顶卓筑信息科技有限公司 | Project Management System engineering progress data input method |
CN107464055A (en) * | 2017-08-01 | 2017-12-12 | 贺州学院 | Schedule estimation method and device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111474895A (en) * | 2020-03-12 | 2020-07-31 | 常俊杰 | Welding machine automatic control system using block chain |
Also Published As
Publication number | Publication date |
---|---|
CN110399513B (en) | 2020-04-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Senaldi et al. | Damage assessment of unreinforced stone masonry buildings after the 2010–2011 Canterbury earthquakes | |
CN110399513A (en) | Build data real-time query device | |
CN101776716B (en) | Line material mechanical &electrical integration testing machine and dedicated tensile test stand thereof | |
CN106429658A (en) | Elevator security control system based on load state | |
CN111241316B (en) | Real-time query device for building data | |
CN117236892A (en) | Digital twin-based bridge steel web water transportation hoisting system and control method | |
CN208752678U (en) | A kind of construction monitoring system based on BIM management platform | |
CN109491500A (en) | A kind of Bridge construction monitoring system | |
CN206272758U (en) | A kind of building fire-fighting construction monitoring system based on Internet of Things | |
CN208488677U (en) | A kind of batch meter monitoring system | |
CN207660096U (en) | A kind of prefabricated assembled concrete frame | |
CN102967877A (en) | Building earthquake resistant real-time detecting system and method | |
CN208297302U (en) | A kind of rock cranny monitoring system | |
CN208609013U (en) | A kind of hydraulic pile hammer communication interaction system | |
CN105429295A (en) | Pre-control system suitable for substation dangerous device | |
CN201749061U (en) | Line material electromechanical integration tester and special tensile test rack thereof | |
Zhang | Construction Schedule Control Method of Prefabricated Building Based on BIM | |
CN218286078U (en) | Intelligent load sensing and positioning system for concrete prefabricated part | |
CN205178651U (en) | Control system in advance suitable for dangerous device of transformer substation | |
CN117055393A (en) | Pouring control and data collection transmission system for capital construction engineering | |
CN209040384U (en) | A kind of standard connector of composite roof truss | |
CN108584596A (en) | It is a kind of based on the elevator debugging panel and its adjustment method of calling plate together outside | |
CN212568794U (en) | Real-time monitoring system for structural stability of dangerous waste rigid landfill | |
CN215905729U (en) | Multi-terminal engineering progress monitoring system | |
CN115930887A (en) | Intelligent monitoring safety early warning system is covered in reinforced concrete structure construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200316 Address after: 510665 room 1102 and 1103, No.123, TIYU West Road, Tianhe District, Guangzhou City, Guangdong Province (office only) Applicant after: GUANGZHOU XINYU ENGINEERING CONSULTING Co.,Ltd. Address before: 225300 South of Diaopu Jiefang Road, Gaogang District, Taizhou City, Jiangsu Province Applicant before: TAIZHOU THREE KAY ENGINEERING TECHNOLOGY Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |