CN110397216A - Hot rolled seamless steel tube beam and connecting node and its processing technology - Google Patents

Hot rolled seamless steel tube beam and connecting node and its processing technology Download PDF

Info

Publication number
CN110397216A
CN110397216A CN201910754306.9A CN201910754306A CN110397216A CN 110397216 A CN110397216 A CN 110397216A CN 201910754306 A CN201910754306 A CN 201910754306A CN 110397216 A CN110397216 A CN 110397216A
Authority
CN
China
Prior art keywords
steel
shaped
hot rolled
prefabricated
tubular beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910754306.9A
Other languages
Chinese (zh)
Other versions
CN110397216B (en
Inventor
任自放
刘界鹏
查晓雄
陈兴慧
程晓波
单文臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910754306.9A priority Critical patent/CN110397216B/en
Publication of CN110397216A publication Critical patent/CN110397216A/en
Application granted granted Critical
Publication of CN110397216B publication Critical patent/CN110397216B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C23/00Extruding metal; Impact extrusion
    • B21C23/21Presses specially adapted for extruding metal
    • B21C23/217Tube extrusion presses
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C29/00Cooling or heating work or parts of the extrusion press; Gas treatment of work
    • B21C29/003Cooling or heating of work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • E04B1/6108Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
    • E04B1/612Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces
    • E04B1/6125Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces with protrusions on the one frontal surface co-operating with recesses in the other frontal surface
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/023Separate connecting devices for prefabricated floor-slabs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C2003/0404Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects
    • E04C2003/0443Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects characterised by substantial shape of the cross-section
    • E04C2003/0452H- or I-shaped
    • E04C2003/0456H- or I-shaped hollow flanged, i.e. "dogbone" metal beams

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The present invention relates to a kind of hot rolled seamless steel tube beam and connecting nodes and its processing technology comprising prefabricated lining and steel tubular beam;Steel tubular beam is the seamless H-shaped steel tubular beam of hot rolling, girder steel is that internal cavities are H-shaped, the upper and lower surfaces of H-shaped steel tubular beam are recessed inserting groove, the matched plug division of shape are arranged positioned at the upper surface of the prefabricated lining of lower part, plug division is inserted into the inserting groove of H-shaped steel tubular beam lower surface.Steel tubular beam of the present invention and prefabricated lining are mating, facilitate the installation of lining, and the two forms occlusion, stronger, and the top surface for avoiding lining forms horizontal straight joint, increases the insulation and anti-acoustic capability of structure.

Description

Hot rolled seamless steel tube beam and connecting node and its processing technology
Technical field
The present invention relates to the technical fields of assembled architecture, more particularly, to a kind of hot rolled seamless steel tube beam and connecting node And its processing technology.
Background technique
Carrying out assembled architecture at present is trend of the times, develops assembled-type house, can improve structure precision, leak, open Equal common quality defects are split, the performances such as sound insulation, heat preservation, fire prevention are improved, convenient for system maintenance, are updated.Assembled-type house has huge Energy-saving and emission-reduction effect, improves housing quality and efficiency, substantially increases construction efficiency, shorten construction period, and abundant body The characteristics of having showed green building " four sections, one environmental protection ".
At present in the steel construction assembled architecture in China, girder steel mostly uses H profile steel beam, since H profile steel beam upper and lower surface is equal For plane, so the junction with wall and floor will form horizontal straight joint, horizontal straight joint not only influences bonding strength, Er Qiehui The problems such as causing noise reduction, poor thermal insulation property.
Summary of the invention
The first purpose of the invention is to provide a kind of bonding strength height, the hot rolled seamless steel tube beam of noise reduction good heat insulating Connecting node.Foregoing invention purpose of the invention has the technical scheme that including prefabricated lining and steel Guan Liang;Steel tubular beam is the seamless H-shaped steel tubular beam of hot rolling, and girder steel is that internal cavities are H-shaped, the upper and lower surfaces of H-shaped steel tubular beam It is recessed inserting groove, the matched plug division of shape is set positioned at the upper surface of the prefabricated lining of lower part, H-shaped is inserted into plug division In the inserting groove of steel tubular beam lower surface.
By using above-mentioned technical proposal, steel tubular beam and prefabricated lining are mating, facilitate the installation of lining, and And the two forms occlusion, it is stronger, and the top surface for avoiding lining forms horizontal straight joint, increases the insulation of structure And anti-acoustic capability.
The present invention is further arranged to: further including hollowcore precast floor and the prefabricated lining positioned at steel tubular beam top, institute The upper surface that hollowcore precast floor is overlapped on H-shaped steel tubular beam is stated, the lower surface of top lining is higher than the top of hollowcore precast floor The 5th wet seam is arranged in face between hollowcore precast floor and top lining and H-shaped steel tubular beam.
By using above-mentioned technical proposal, the 5th wet seam all links together floor with wallboard, improves building The globality and shock resistance of structure.
The present invention is further arranged to: the second plug division of the lower surface setting protrusion of top lining, the second plug division It is inserted into the 5th wet seam.
By using above-mentioned technical proposal, plug division pours together with concrete, is integrally formed, and improves node connection Globality, while the bottom surface of prefabricated lining being avoided to form horizontal straight joint;And the second plug division of protrusion setting, make the 5th wet Upper surface after seam pours can preferably reach closely knit.
The present invention is further arranged to: hollowcore precast floor is integrated precast cored slab.
By using above-mentioned technical proposal, hollowcore precast floor is integral prefabricated installation, reduces the splicing of hollowcore precast floor Working procedure, vertical splicing seams are avoided the occurrence of, thus the phenomenon that reducing structural strength.
The present invention is further arranged to: setting double-layer double-direction deformed bar or prestressed high-strength are carved in hollowcore precast floor Trace steel wire.
By using above-mentioned technical proposal, the maximum span of hollowcore precast floor is increased, realizing every house is one The structure of monolith hollowcore precast floor designs, and installs more efficient.
The present invention is further arranged to: hollowcore precast floor includes being located at the integrally formed smallpox pattern layer in bottom surface.
By using above-mentioned technical proposal, floor and decorative layer are integrally formed, and are reduced finishing process, are saved the construction time.
The present invention is further arranged to: the connecting end surface of hollowcore precast floor is embedded with the dowel for stretching out connecting end surface; The dowel of adjacent two pieces of hollowcore precast floors is connected with each other, and is located inside the 5th wet seam.
By using above-mentioned technical proposal, the connection between floor is increased, floor is made to form overall structure, it is more firm Gu.
The present invention is further arranged to: dowel is third U-shaped muscle, and the both ends of third U-shaped muscle are embedded in hollowcore precast building In plate, elbow part is protruded into the 5th wet seam, and the third U-shaped muscle of two pieces of hollowcore precast floors intersects, and is inserted in elbow Lateral connection muscle.
By using above-mentioned technical proposal, the reinforcement cage structure being mutually twisted is formed, becomes one of beam, stress after pouring Can more preferably, globality is more preferable.
A second object of the present invention is to provide a kind of hot rolled seamless steel tube beams.The purpose of foregoing invention of the invention is to pass through What following technical scheme was achieved: steel tubular beam is the seamless H-shaped steel tubular beam of hot rolling, and girder steel is that internal cavities are H-shaped, H-shaped steel pipe The upper and lower surfaces of beam are recessed inserting groove.
By using above-mentioned technical proposal, hot rolled seamless steel tube beam can form grafting groove shape in processing, facilitate It is arranged with the bumps of the cooperation of other components, and its upper and lower surface, enhances its bending resistance.
Third object of the present invention is to provide a kind of processing technologys of hot rolled seamless steel tube beam.Foregoing invention of the invention Purpose has the technical scheme that a kind of processing technology of hot rolled seamless steel tube beam, seamless in traditional hot rolling It is transformed in the production technology of steel pipe, under 900C ° or more high temperature, seamless pipe is by being made of multiple groups single lead screw ex truding briquetting machine Extrusion process line, every group of single lead screw ex truding briquetting machine include the two face rollers and two forming rollers of rack and rotational installation on the rack;No Shape with face roller and forming roller on single lead screw ex truding briquetting machine moves closer to profile iron tubing string according to the direction that seamless pipe passes through Outer dimension;When seamless pipe passes through, face roller and forming roller surround roll shaft rotation, and the cambered surface of seamless pipe is squeezed by face roller Plane, forming roller outer peripheral surface have the zigzag shape face of evagination, so that seamless pipe is squeezed into the H-shaped there are two outer surface indent Girder steel.
By using above-mentioned technical proposal, with same type of material performance comparison, H-shaped girder steel mechanization production efficiency that hot rolling is seamless It is high, high-quality;It can be preferably applied in assembled architecture.
In conclusion advantageous effects of the invention are as follows:
1. steel tubular beam and prefabricated lining are mating, the installation of lining is facilitated, and the two forms occlusion, it is more firm Gu and the top surface for avoiding lining forms horizontal straight joint, increases the insulation and anti-acoustic capability of structure;H-shaped steel tubular beam The concave-convex setting of upper and lower surface, enhances its own bending resistance;
2. the 5th wet seam all links together floor with wallboard, the globality and shock resistance of building structure are improved;
3. the setting of the second plug division of the connection reinforcing bar and prefabricated lining of hollowcore precast floor, so that connecting node is more firm Gu;
4. hot rolling is seamless, and H-shaped girder steel mechanization production is high-efficient, high-quality with same type of material performance comparison;It can preferably apply In assembled architecture.
Detailed description of the invention
Fig. 1 is assembled architecture overall structure diagram;
Fig. 2 is the structural schematic diagram of fabricated construction L shape steel pipe column;
The structural schematic diagram of Fig. 3 fabricated construction T steel tubing string;
Fig. 4 is the structural schematic diagram of fabricated construction cross tube column;
Fig. 5 is the structural schematic diagram that T shape column is connect with inside and outside wall board by wet seam;
Fig. 6 be prefabricated outer wall panel layered structure and pre-buried connection reinforcing bar schematic diagram;
Fig. 7 is the attachment structure schematic diagram of crossbeam Yu prefabricated outer wall panel and floor;
Fig. 8 is the attachment structure schematic diagram of L shape steel tubular beam and prefabricated outer wall panel;
Fig. 9 is the attachment structure schematic diagram of cross section column Yu prefabricated lining;
Figure 10 is the attachment structure schematic diagram of beam and prefabricated lining and floor;
Figure 11 is the perspective view of the explosion of connection structure between prefabricated lining;
Figure 12 is the structural schematic diagram of hollowcore precast floor;
Figure 13-Figure 15 is the node connection schematic diagram of Special-Shaped Column and girder steel;
Figure 16 is the assembled architecture construction flow chart based on BIM platform;
The schematic diagram of the extrusion molding production chain of Figure 17 chapped pipe;
Figure 18 be cross tube column early period single lead screw ex truding briquetting machine structural schematic diagram;
Figure 19 is the structural schematic diagram of the mid-term single lead screw ex truding briquetting machine of cross tube column;
Figure 20 is the structural schematic diagram of the final single lead screw ex truding briquetting machine of cross tube column;
Figure 21 is the structural schematic diagram of L shape steel pipe column single lead screw ex truding briquetting machine;
Figure 22 is the structural schematic diagram of T steel tubing string single lead screw ex truding briquetting machine;
Figure 23 is the structural schematic diagram of H-shaped steel tubular beam single lead screw ex truding briquetting machine.
In figure, 1, steel column;11, L shape steel pipe column;12, T steel tubing string;121, a word portion;122, vertical component effect;13, cross Steel pipe column;14, peg;2, girder steel;21, inserting groove;22, long peg;31, prefabricated outer wall panel;311, load-bearing wall panel;312, prefabricated Insulating layer;313, baffle;314, through-hole;315, internal decking sheet;316, transverse joint;317, stiffened wire lath piece;32, prefabricated Lining;321, trapezoidal convex block;322, plug division;323, the second plug division;324, dovetail groove;4, precast floor slab;41, prestressing force High tensile indented steel wire;5, wet seam;51, the first wet seam;52, the second wet seam;53, the wet seam of third;54, it the 4th wet connects Seam;55, the 5th wet seam;6, reinforcing bar is connected;61, the first U-shaped muscle;62, the second U-shaped muscle;63, third U-shaped muscle;64, vertically connect Connect muscle;65, lateral connection muscle;66, dowel;7, gusset plate;71, bolt;8, single lead screw ex truding briquetting machine;81, face roller;82, angle roller; 83, roll shaft;84, forming roller;9, seamless pipe.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment one:
As shown in Figure 1, being a kind of assembled architecture disclosed by the invention, including the main body frame knot formed by steel column 1, girder steel 2 Structure, the wall formed by integral prefabricated wall panel, and the superstructure formed by integral prefabricated floor 4, integral prefabricated wall panel include prefabricated Side fascia 31 and prefabricated lining 32, steel column 1, girder steel 2 are that the seamless chapped pipe of hot rolling (does processing technology in example IV and has Body introduction), it is connected between each other using gusset plate 7 and bolt 71;Steel column 1 is set between contiguous prefabricated wallboard, steel column 1 and pre- Wet seam 5 is set between wallboard end face processed;Each outer peripheral surface of steel column 1 is all buried in wet seam 5 or portion perimeter face and pre- The surface of wallboard processed flushes (i.e. steel column 1 is non-bulging exposes to metope);Precast floor slab 4 is integrated precast cored slab.
As shown in figs 2-4, steel column 1 includes L shape steel pipe column 11, T steel tubing string 12 and cross tube column 13.Except in figure Shown common L shape, T shape outside cross, can also be the seamless chapped pipe of the hot rolling of rectangular, rectangle or other cross sectional shapes.
As shown in Fig. 3 and Fig. 5, the section of the hollow cavity of T steel tubing string 12 is T shape, and T steel tubing string 12 includes a word It is wet to be arranged first for portion 121 and vertical component effect 122 between the both ends of the surface in a word portion 121 and the end face of corresponding prefabricated outer wall panel 31 Seam 51;Second wet seam 52 is set between the end face of vertical component effect 122 and the end face of prefabricated lining 32;One word portion 121 is close The side of vertical component effect 122 is concordant with the inner surface of prefabricated outer wall panel 31.
Prefabricated outer wall panel 31 includes the frame that the load-bearing wall panel 311 and insertion steel column 1 and girder steel 2 positioned at 1 outside of steel column are formed The prefabricated thermal insulation layer 312 of frame structure.Load-bearing wall panel 311 can use the concrete of high grade, such as C40 concrete;Prefabricated guarantor Warm layer 312 can be using other solidification materials such as lightweight concrete or haydite concretes.
Further, load-bearing wall panel 311 can be made of colored high-strength concrete, thus the decoration of included outer surface Effect can also be arranged the molding decorative layer of formed by integrally casting in load-bearing wall panel surfaces externally and internally, prefabricated outer wall panel 31 is made to be prefabricated into " three Mingzhi " structure.As shown in the figure, in the case where internal decking sheet 315 being arranged, the inner surface and frame structure of internal decking sheet 315 are neat It is flat.Preferably, the thickness of load-bearing wall panel 311, prefabricated thermal insulation layer 312 and internal decking sheet 315 is respectively 90mm, 130mm, 20mm.
When being not provided with internal decking sheet 315, the inner surface of prefabricated thermal insulation layer 312 is flushed with frame structure.Prefabricated thermal insulation layer 312 or internal decking sheet 315 flushed with frame structure, i.e., the inner surface of prefabricated outer wall panel 31 is not contacted with steel column 1 with wet seam 5 All sides are concordant, to solve in the prior art, steel column 1 exposes outside metope, influence the problem that space in house uses.
In order to reinforce the connection of steel column 1 Yu wet seam 5, multiple bolts for protruding into wet seam 5 are arranged in 12 outer surface of T steel tubing string Nail 14.
Outer surface and inner surface when construction, after being installed steel column 1 and prefabricated outer wall panel 31, in prefabricated outer wall panel 31 Vertical side form is installed, the concrete in the first wet seam 51 is then poured;Synchronously, on the surface of prefabricated lining, installation is vertical Then side form pours the concrete in the second wet seam 52.
The outer surface of T steel tubing string 12 is exposed in order to prevent, so the thickness in a word portion 121 of T steel tubing string 12 is less than The thickness of prefabricated outer wall panel 31, so that the lateral surface in a word portion 121 is buried in the concrete of the first wet seam 51.
When further, due to the vertical side form installation of 31 outer surface of prefabricated outer wall panel, need to set up foot in building external The operating platforms such as hand cradle, so installation cost is high, and dangerous.Therefore, as shown in figs. 5 and 6, the load-bearing of prefabricated outer wall panel 31 311 part of wallboard stretches out vertical end face and forms baffle 313, and the baffle 313 of two blocks of contiguous prefabricated Side fascias 31 splices, thus Instead of the outboard template of the first wet seam 51.In order to guarantee T steel tubing string 12 a word portion 121 lateral surface and baffle 313 Between concrete thickness, the thickness of baffle 313 is less than the thickness of load-bearing wall panel 311, can be 20-30mm.Further, it keeps off Stiffened wire lath piece 317 is provided in pulpboard 313, stiffened wire lath piece 317 extends in load-bearing wall panel 311, or in load bearing wall Elongated setting in plate 311 and baffle 313, to increase the intensity of baffle 313.
In order to reinforce between adjacent two pieces of prefabricated outer wall panels 31 and the connection of prefabricated outer wall panel 31 and the first wet seam 51, hold Weight wallboard 311 is embedded with the connection reinforcing bar 6 for stretching out end face in vertical end face;The connection reinforcing bar of adjacent two pieces of prefabricated outer wall panels 31 6 are connected with each other.Preferably, as shown, connection reinforcing bar 6 is U-shaped reinforcing bar, the both ends of U-shaped reinforcing bar are embedded in prefabricated outer wall panel 31 Interior, heel protrudes into the first wet seam 51.U-shaped reinforcing bar can be divided into the first U-shaped muscle 61 and the second U-shaped muscle 62.Such as Fig. 5 institute Show, between 121 lateral surface of a word portion for stretching to T steel tubing string 12 and baffle 313 of the first U-shaped muscle 61, is located at two pieces in advance The first U-shaped muscle 61 on Side fascia 31 processed interlaced arrangement in the vertical direction, and form intersection both makes to have in vertical projection Overlapping, is inserted into vertical dowel 64, so that two pieces of prefabricated outer wall panels 31 more effectively be connected in elbow.Second U-shaped The part that muscle 62 stretches out 31 end face of prefabricated outer wall panel is located at 121 end face of a word portion and the prefabricated outer wall panel 31 of T steel tubing string 12 Between end face.
In order to reinforce the globality of exterior wall, as shown in figs. 5 and 6,311 part of load-bearing wall panel of every piece of prefabricated outer wall panel 31 Setting is equipped in through-hole 314 and connects into all prefabricated outer wall panels 31 in vertical direction there are two vertical perforative through-hole 314 Whole prestressing tendon, has poured concrete or grouting material between prestressing tendon and the inner wall of through-hole 314.Positioned at top and most The position that the prefabricated outer wall panel 31 of bottom installs anchorage carries out local add by adding reinforcing bar or improving the measures such as concrete grade By force, naturally it is also possible to open up the hole of installation anchorage in strip footing upper side, by exterior wall with it is basic connect it is integral.
As shown in fig. 7,31 height of prefabricated outer wall panel is consistent with story height, the prefabricated building of floor is arranged in transverse joint 316 The center of plate 4 is also possible to be arranged at deck-molding center.
As shown in Fig. 2 and Fig. 8, the section of the hollow cavity of L shape steel pipe column 11 is L shape, is set to the corner of exterior wall, The wet seam 53 of third is set between two vertical end faces of L shape steel pipe column 11 and the end face of prefabricated outer wall panel 31;L shape steel pipe column 11 Medial surface it is concordant with the inner surface of prefabricated outer wall panel 31.Further, the setting of 11 outer surface of L shape steel pipe column is multiple protrudes into wet connect The peg 14 of seam 5.
As shown in Fig. 3 and Fig. 9, the section of the hollow cavity of cross tube column 13 is cross;Cross tube column 13 Be set between four pieces of prefabricated linings 32, the end face of four vertical end faces of cross tube column 13 and prefabricated lining 32 it Between be respectively provided with the 4th wet seam 54;The thickness of prefabricated lining 32 can be identical as the thickness of cross tube column 13, to protect Demonstrate,prove the lateral surface of cross tube column 13 and the flush of prefabricated lining 32.The thickness of certain prefabricated lining 32 can also be with Greater than the thickness of cross tube column 13, after being installed, cross tube column 13 and the interior recess of metope are carried out with ornamental strip Closing.
Further, water supply, draining, blowdown and ventilation shaft etc. are installed in the hollow cavity of cross tube column 13, Or it is hollow by the shared pipe well of internal installation.
In conjunction with Figure 10, girder steel 2 is the H-shaped steel tubular beam that internal cavities are H-shaped, in the upper and lower surfaces of H-shaped steel tubular beam Spill can be rectangle or trapezoidal at inserting groove 21, the section of inserting groove 21.Shape is arranged in the upper surface of prefabricated lining 32 The plug division 322 of the plug division 322 matched, prefabricated 32 upper surface of lining is inserted into the inserting groove 21 of H-shaped steel tubular beam lower surface.Figure In prefabricated lining 32 thickness be less than girder steel 2 thickness.
Prefabricated lining 32 can be hollow high-strength lightweight concrete plate.In conjunction with shown in Fig. 9 and Figure 11, prefabricated lining Side end face is provided with male and female falcon slot, and adjacent two pieces of prefabricated linings are coupled using male and female falcon slot.Male and female falcon slot can be general Logical trapezoidal convex block 321 and dovetail groove 324.As shown in figure 9, the trapezoidal convex block 321 of prefabricated lining 32 and dovetail groove 324 can It is preferably engaged with the 4th wet seam 54, to cross tube column 13 be connect with prefabricated lining 32 integral.
As shown in figure 12, precast floor slab 4 is integrated precast cored slab.The setting of 4 upper surface of precast floor slab is integrally formed Decorative layer, such as ceramic tile etc.;Bottom surface is directly counter to beat integrally formed smallpox pattern layer.Setting double-layer double-direction is pre- in precast floor slab 4 Stress reinforcing bar or prestressed high-strength indented wire 41, to increase the span scope of application of precast floor slab 4.Preferably, prestressing force It can be constructed using short line casting.Under the premise of using the above scheme, one monolith floor of a room may be implemented, and be not required to Secondary decoration reduces working procedure and overcomes the problems, such as traditional prefabricated board plate stitch.Further, the connecting pin of precast floor slab 4 Face is embedded with the dowel 66 for stretching out connecting end surface.
Figure 10 is reviewed, precast floor slab 4 is overlapped on the upper surface of H-shaped steel tubular beam, and the lower surface of the prefabricated lining 32 in top is high In the top surface of precast floor slab 4, the 5th wet seam 55 is set between the prefabricated lining 32 of precast floor slab 4 and top and H-shaped steel tubular beam. The dowels 66 of adjacent two blocks of precast floor slabs 4 is connected with each other, and dowel 66 can be third U-shaped muscle 63, and the two of third U-shaped muscle 63 End is embedded in precast floor slab 4, and elbow part protrudes into the 5th wet seam 55, and the third U-shaped muscle 63 of two blocks of precast floor slabs 4 is mutual Intersect, is inserted with lateral connection muscle 65 in elbow.Dowel 66 is also possible to the reinforcing bar with elbow, cooperates in the 5th wet seam 55 Steel reinforcement cage is arranged in portion, node can also be reinforced at this.
In conjunction with Figure 10 and Figure 11, the second plug division 323 of the lower surface setting protrusion of prefabricated lining 32, the second plug division In 323 the 5th wet seams 55 of insertion, so that the bottom surface of prefabricated lining 32 be avoided to form horizontal straight joint.When construction, floor installation After the completion, the prefabricated lining 32 in top is installed in place, temporary support is made in bottom, turning side form is then installed, finally from side form Upper reserved hole carries out pouring for concrete, preferably self-compacting concrete.
In addition, the top surface of the 5th wet seam 55 can also be equal with the top surface of precast floor slab 4, the bottom surface of prefabricated lining 32 For plane, being directly installed on the top surface of the 5th wet seam 55, (program is corresponding with construction method in embodiment three, in figure not It draws).
The connection of Fig. 7, prefabricated outer wall panel 31 and girder steel 2 and precast floor slab 4 is reviewed, it is same that 5th wet seam 55, In is set Pre-buried dowel 66 is arranged in the load-bearing wall panel 311 of prefabricated outer wall panel 31 at the 5th wet seam 55, prefabricated outer wall panel 31 Dowel 66 is connect with the connection reinforcing bar 6 on precast floor slab 4.Further, the dowel 66 of prefabricated outer wall panel 31 and prefabricated building Connection reinforcing bar 6 connection on plate 4 may each be the U-shaped muscle of horizontal direction, and long peg 22, long bolt is arranged in the top surface of H-shaped steel tubular beam After nail 22 vertically passes through U-shaped muscle, prefabricated outer wall panel 31 is connect with precast floor slab 4.
As shown in FIG. 13 to 15, all girder steels 2 are connect with steel column 1 using gusset plate 7 and bolt 71, to realize steel knot The Fast Installation of structure.Girder steel 2 is set to the side of steel column 1, is connected after the directly docking of upper and lower two steel columns 1 using gusset plate 7 It connects.
Further, assembled architecture further includes the prefabricated monoblock type stair of batch production, balcony, elevator, prefabricated entirety Formula kitchen, Wei Danyuan, overall assembled door, window.
Embodiment two:
A kind of construction method of formula building, in conjunction with Figure 16, comprising the following steps:
Step 1: using BIM platform all component components are carried out with the three dimensional design of building structure, input relevant parameter is built Modeling is quasi-, collides to construction site tissue and process simulation, construction and installation training, construction simulation, the construction simulation of complex node, And guide the processing of component component;
The first floor of assembled-type house is formed step 2: successively assembling using special hot rolling special-shaped seamless steel pipe column and steel tubular beam Steel structure frame system;Steel pipe column, steel tubular beam are connected using gusset plate 7 and bolt 71;
Step 3: installing water supply, the row of first layer respectively using the cavity of special hot rolling special-shaped seamless steel pipe column and steel tubular beam Water, blowdown, divulging information shares pipe well, and installs integrated precast stair, elevator, and integrated precast kitchen, integrated precast is defended Equal prefabricated components, accessory between life;
Step 4: installation first layer way and double-layer prestressed concrete Integral hollow precast floor slab 4, forms superstructure;
Step 5: installation first layer carries " sandwich " prefabricated outer wall panel 31 and integrated precast of internal and external ornament, insulating layer Balcony;
Step 6: the prefabricated lining 32 of hollow high-strength lightweight concrete of installation four sideband bumps joinery and its construction of first layer;Installation Steel pipe column, prefabricated outer wall panel 31 and the prefabricated lining 32 of the second layer are made in prefabricated outer wall panel 31 and 32 bottom of prefabricated lining Temporary support is to reserve the casting space of the 5th wet seam 55;
Step 7: pouring all 5 concrete of wet seam for being coupled node of first layer forms overall structure;The steel pipe of the second layer is installed Beam;
Step 8: integrated precast door, window and the other component and fittings of installation first layer;
Step 9: successively repeating above-mentioned third step to the 8th step operational procedure until structure installation all terminates;
Step 10: improving the installation of water power HVAC and inside and outside individual decoration, final acceptance of construction, being delivered for use.
In the construction and delivery process of second step to the tenth step, the prefabrication of component component is instructed using BIM platform, And in-site installation, and realize that the transmission of logistics procurement information is supervised with shared and construction speed, quality and safety conduct monitoring at all levels It surveys.
Embodiment three:
With embodiment two the difference is that: when the top surface of the 5th wet seam 55 is equal with the top surface of precast floor slab 4, it is prefabricated in The bottom surface of wallboard 32 is plane, and when being directly installed on the top surface of the 5th wet seam 55, the 6th step to the 8th step becomes:
Step 6: the prefabricated lining 32 of hollow high-strength lightweight concrete of installation three sideband bumps joinery and its construction of first layer;
Step 7: pouring all 5 concrete of wet seam for being coupled node of first layer forms overall structure;
Step 8: integrated precast door, window and the other component and fittings of installation first layer;
Step 9: successively repeating above-mentioned second step to the 8th step operational procedure until structure installation all terminates.
Based on the mixed structure of steel structure frame and shear wall, component is made as the assembled arthitecutral structure in advance with batch production It is main, force structure based on steel construction, in-site installation is based on bolt riveting;Beam, rod structure material use hot rolling steel tubes frame (cutting) structure;Prefabricated outer wall panel 31 uses " exterior wall is plug-in, interior wall is embedded " method, and exterior wall is " three for carrying internal and external ornament, keeping the temperature Mingzhi " structure, interior wall are hollow high-strength lightweight concrete, and Suo Youliang, column connection are that high-strength bolt 71 connects, and superstructure is whole Formula way and double-layer prefabricated concrete hollow slab structure assembles to realize entirety, and process flow is simple, sound construction, The good building structure of shock resistance;
Example IV:
Girder steel, steel column in traditional steel building are mainly formed by steel plate cold bending or through cutting, welding processing, essentially square Shape and rectangular section, or be directly that secondary operation is carried out using real abdomen fashioned iron.Cold-rolled forming section limited by processing technology, not only wall Thick relatively thin and high-frequency welding weldquality is poor, Rouno Cormer Pregrinding Wheel, is difficult to as important beam column construction;And welding fabrication not only welds The amount of connecing is big, time-consuming and poor appearance, deformation are big, welding residual stress is difficult to eliminate.
In addition, traditional steel structural rod piece due to being limited by various conditions, is mostly square and rectangular section, section ruler Very little to be greater than inner, external wall thickness, steel structural rod piece protrusion wall part is difficult to be handled, and secondary decoration is difficult, and is easy to produce Raw crack, forms hidden danger of quality at leakage phenomenon.
Steel column 1 described in embodiment 1 to 3, girder steel 2 are the seamless chapped pipe of hot rolling, abnormity that the hot rolling is seamless Steel pipe is a kind of chapped pipe of new production technology machine-shaping.
As shown in figure 17, the seamless chapped pipe processing technology of hot rolling is enterprising in traditional hot rolling seamless tube equipment and technique Row transformation, the heat of the beam suitable for assembled arthitecutral structure, rod structure standard is squeezed out using dedicated multiple single lead screw ex truding briquetting machines 8 Roll seamless chapped pipe series.Standard section specification includes but is not limited to rectangle, L-type, T-type, cross and cavity H-type etc..
Under 900C ° or more high temperature, allow seamless pipe 9 by the extrusion process line that is made of multiple groups single lead screw ex truding briquetting machine 8, it is more Group single lead screw ex truding briquetting machine 8 is mounted among the online equipment on hot rolled seamless steel tube production line, and it is seamless specifically to may be mounted at hot rolling On pipe production line behind reducing mill stand or behind tube reducing rack, with other equipment synchronize work online;Multiple groups extrusion forming Machine 8 forms seamless pipe 9 by multiple roll-in gradual change.
Preferably, the heating of pipe blank of roll-in processing and hot rolled seamless steel tube to seamless pipe 9, sizing, tube reducing, it is secondary plus The techniques such as heat, correction, cutting are synchronous while carrying out, to keep the same quality with hot rolled seamless steel tube.
It referring to Figure 18-20, is introduced by taking the processing of cross tube column 13 as an example, every group of single lead screw ex truding briquetting machine 8 includes machine The four face rollers 81 and four angle rollers 82 of frame and rotational installation on the rack, four face rollers 81 and angle roller 82 are according to cross tube The shape of column 13 is spaced apart from each other arrangement;The shape of face roller 81 and angle roller 82 on different single lead screw ex truding briquetting machines 8 is logical according to seamless pipe 9 The direction crossed moves closer to the outer dimension of cross tube column 13, and all face rollers 81 on same group of single lead screw ex truding briquetting machine 8 with Angle roller 82 encloses the outer contour to form cross tube column 13;When seamless pipe 9 passes through, face roller 81 and angle roller 82 surround roller Axis 83 rotates, and the cambered surface of seamless pipe 9 is squeezed into plane by face roller 81, and the cambered surface of round tube is squeezed into the right angle of indent by angle roller 82 Face.
More specifically, the cambered surface of seamless pipe 9 is squeezed into plane by the angle roller 82 on former groups of single lead screw ex truding briquetting machines 8, rear several Plane is squeezed into the right-angle surface of indent by the angle roller 82 on group single lead screw ex truding briquetting machine 8;That is the angle roller 82 on former groups of single lead screw ex truding briquetting machines 8 Seamless pipe 9 is squeezed into polygon with 81 collective effect of face roller, the angle roller 82 on rear several groups of single lead screw ex truding briquetting machines 8 is by seamless pipe The right-angle surface that 9 respective planes squeeze as indent.
As shown in figure 21, the single lead screw ex truding briquetting machine 8 of L shape steel pipe column 11 includes an angle roller 82 and four face rollers 81.
As shown in figure 22, the single lead screw ex truding briquetting machine 8 of T steel tubing string 12 includes two angle rollers 82 and four face rollers 81.
As shown in figure 23, the single lead screw ex truding briquetting machine 8 of H-shaped steel pipe (i.e. H-shaped steel tubular beam) includes two face rollers 81 and two moldings The outer peripheral surface of roller 84, forming roller 84 is evolved as the zigzag shape face of evagination by plane, so that seamless pipe 9 has been squeezed into two The H-shaped girder steel 2 of a outer surface indent.
With same type of material performance comparison, hot rolling is seamless, and chapped pipe can roll out various rule by dedicated extruded molding machine 8 The section of lattice kind, unlike material, mechanization production are high-efficient, high-quality;It can be widely used in assembling type steel structure to build The main bearing members such as beam, the column built.
In addition, the processing technology of the seamless chapped pipe of hot rolling can be applicable to automobile, shipbuilding and equipment platform etc. The processing of field steel tube component;It can also be to the material of unlike material, specification by heating, extrusion forming, to form abnormity Pipe fitting.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (10)

1. a kind of connecting node of hot rolled seamless steel tube beam, it is characterised in that: including prefabricated lining (32) and steel tubular beam;Steel pipe Beam is the seamless H-shaped steel tubular beam of hot rolling, and girder steel (2) is that internal cavities are H-shaped, the upper and lower surfaces concave shaped of H-shaped steel tubular beam At inserting groove (21), the matched plug division of shape (322) are arranged in the upper surface positioned at the prefabricated lining (32) of lower part, plug division (322) it is inserted into the inserting groove (21) of H-shaped steel tubular beam lower surface.
2. the connecting node of hot rolled seamless steel tube beam according to claim 1, it is characterised in that: further include hollowcore precast building Plate (4) and prefabricated lining (32) positioned at steel tubular beam top, the hollowcore precast floor (4) are overlapped on the upper of H-shaped steel tubular beam Surface, the lower surface of top lining are higher than the top surface of hollowcore precast floor (4), hollowcore precast floor (4) and top lining And the 5th wet seam (55) is set between H-shaped steel tubular beam.
3. the connecting node of hot rolled seamless steel tube beam according to claim 2, it is characterised in that: the following table of top lining The second plug division (323) of face setting protrusion, the second plug division (323) are inserted into the 5th wet seam (55).
4. the connecting node of hot rolled seamless steel tube beam according to claim 3, it is characterised in that: hollowcore precast floor (4) For integrated precast cored slab.
5. the connecting node of hot rolled seamless steel tube beam according to claim 4, it is characterised in that: hollowcore precast floor (4) Interior setting double-layer double-direction deformed bar or prestressed high-strength indented wire (41).
6. the connecting node of hot rolled seamless steel tube beam according to claim 5, it is characterised in that: hollowcore precast floor (4) Including being located at the integrally formed smallpox pattern layer in bottom surface.
7. the connecting node of hot rolled seamless steel tube beam according to claim 5, it is characterised in that: hollowcore precast floor (4) Connecting end surface be embedded with stretch out connecting end surface dowel (66);The dowel (66) of adjacent two pieces of hollowcore precast floors (4) It is connected with each other, and it is internal to be located at the 5th wet seam (55).
8. the connecting node of hot rolled seamless steel tube beam according to claim 6, it is characterised in that: dowel (66) is third U-shaped muscle (63), the both ends of third U-shaped muscle (63) are embedded in hollowcore precast floor (4), and elbow part protrudes into the 5th wet seam (55) in, the third U-shaped muscle (63) of two pieces of hollowcore precast floors (4) intersects, and lateral connection muscle (65) are inserted in elbow.
9. a kind of hot rolled seamless steel tube beam, it is characterised in that: steel tubular beam is the seamless H-shaped steel tubular beam of hot rolling, and girder steel (2) is internal empty Chamber is H-shaped, and the upper and lower surfaces of H-shaped steel tubular beam are recessed inserting groove (21).
10. a kind of processing technology of hot rolled seamless steel tube beam, it is characterised in that: in the production technology of traditional hot rolled seamless steel tube It is transformed, under 900C ° or more high temperature, seamless pipe (9) passes through the extrusion process that is made of multiple groups single lead screw ex truding briquetting machine (8) Line, every group of single lead screw ex truding briquetting machine (8) include the two face rollers (81) and two forming rollers (84) of rack and rotational installation on the rack; The direction that the shape of face roller (81) on different single lead screw ex truding briquetting machines (8) and forming roller (84) passes through according to seamless pipe (9) is gradually Close to the outer dimension of profile iron tubing string;When seamless pipe (9) passes through, face roller (81) and forming roller (84) surround roll shaft (83) The cambered surface of seamless pipe (9) is squeezed into plane by rotation, face roller (81), and forming roller (84) outer peripheral surface has the zigzag shape of evagination Face, so that seamless pipe (9) is squeezed into the H-shaped girder steel there are two outer surface indent.
CN201910754306.9A 2019-08-15 2019-08-15 Hot-rolled seamless steel tube beam and connecting joint and processing technology thereof Active CN110397216B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910754306.9A CN110397216B (en) 2019-08-15 2019-08-15 Hot-rolled seamless steel tube beam and connecting joint and processing technology thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910754306.9A CN110397216B (en) 2019-08-15 2019-08-15 Hot-rolled seamless steel tube beam and connecting joint and processing technology thereof

Publications (2)

Publication Number Publication Date
CN110397216A true CN110397216A (en) 2019-11-01
CN110397216B CN110397216B (en) 2024-08-13

Family

ID=68328608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910754306.9A Active CN110397216B (en) 2019-08-15 2019-08-15 Hot-rolled seamless steel tube beam and connecting joint and processing technology thereof

Country Status (1)

Country Link
CN (1) CN110397216B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07144223A (en) * 1993-11-19 1995-06-06 Nakajima Kokan Kk Manufacture of square steel tube with large diameter with emphasis on improving quality and uniformizing radiused shape of corner
CN104831812A (en) * 2014-11-27 2015-08-12 高阳 Whole assembly-type precast concrete frame structure, structural part production technology and mounting method
CN105696817A (en) * 2016-02-18 2016-06-22 东南大学 Multilayer cold-formed steel integrally prefabricated house and splicing method thereof
CN107401217A (en) * 2017-09-22 2017-11-28 中国石油大学(华东) A kind of beamless hollow floor chamber concrete-filled steel tube shear wall combined structure system and method
CN107626766A (en) * 2016-07-18 2018-01-26 鞍钢股份有限公司 Rolling manufacturing method of special-shaped seamless steel tube
CN108824818A (en) * 2018-07-09 2018-11-16 西南科技大学 The method of construction of assembly concrete-filled steel tube frame shear wall structure system
CN109057091A (en) * 2018-08-22 2018-12-21 江苏华大装配式房屋有限公司 A kind of assembled hollow exterior wall body and its assembly method suitable for steel construction
CN211007309U (en) * 2019-08-15 2020-07-14 任自放 Hot-rolled seamless steel pipe beam and connecting joint

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07144223A (en) * 1993-11-19 1995-06-06 Nakajima Kokan Kk Manufacture of square steel tube with large diameter with emphasis on improving quality and uniformizing radiused shape of corner
CN104831812A (en) * 2014-11-27 2015-08-12 高阳 Whole assembly-type precast concrete frame structure, structural part production technology and mounting method
CN105696817A (en) * 2016-02-18 2016-06-22 东南大学 Multilayer cold-formed steel integrally prefabricated house and splicing method thereof
CN107626766A (en) * 2016-07-18 2018-01-26 鞍钢股份有限公司 Rolling manufacturing method of special-shaped seamless steel tube
CN107401217A (en) * 2017-09-22 2017-11-28 中国石油大学(华东) A kind of beamless hollow floor chamber concrete-filled steel tube shear wall combined structure system and method
CN108824818A (en) * 2018-07-09 2018-11-16 西南科技大学 The method of construction of assembly concrete-filled steel tube frame shear wall structure system
CN109057091A (en) * 2018-08-22 2018-12-21 江苏华大装配式房屋有限公司 A kind of assembled hollow exterior wall body and its assembly method suitable for steel construction
CN211007309U (en) * 2019-08-15 2020-07-14 任自放 Hot-rolled seamless steel pipe beam and connecting joint

Also Published As

Publication number Publication date
CN110397216B (en) 2024-08-13

Similar Documents

Publication Publication Date Title
CN110397187A (en) Assembled architecture and construction method
JP2009528464A (en) Prefabricated reinforced concrete single-person house and method for constructing the house
CN206570920U (en) One kind utilizes ALC plates design production assembled architecture
CN105064529A (en) Prefabricated and assembled large-board shear wall structure with concealed bracings
CN107989238A (en) A kind of cast-in-place sandwiched heat-preservation shear wall structure, assembled architecture and engineering method
CN110397186A (en) Prefabricated outer wall panel and connecting node
CN115162505A (en) Key groove connected full-assembly integral building system and construction method
CN110397218A (en) The building enclosure of assembled architecture and the steel pipe column used and steel pipe column processing technology
CN116378222A (en) Construction method of prefabricated modularized building earthquake-resistant structure and earthquake-resistant structure thereof
CN111648555A (en) Laminated precast concrete elevator shaft way
CN211007146U (en) Prefabricated external wall panel and connecting joint
CN211007147U (en) Fabricated building
CN204475580U (en) Wall panel assembly and full prefabricated building
CN113529929A (en) Ultralow-energy-consumption assembled house structure and assembling method thereof
CN211007309U (en) Hot-rolled seamless steel pipe beam and connecting joint
CN211007316U (en) Enclosure structure of fabricated building and steel pipe column used by same
EP1918477A2 (en) Multilayer building block, assembly of such blocks and method of erection of building structures by using such blocks
CN110397216A (en) Hot rolled seamless steel tube beam and connecting node and its processing technology
CN114658141B (en) T-shaped constructional column and independent foundation connection structure of assembled composite wallboard and manufacturing method
CN103758256B (en) A kind of decorative heat preservation composite wall and preparation method thereof
CN207812689U (en) A kind of dry method connecting plate type structural system
CN111576880B (en) Assembling construction method for connecting beam of windowing hole superposed shear wall
CN114278004A (en) Low-layer assembled profiled steel sheet light-concrete composite wallboard, connecting structure and construction method
CN215367795U (en) Large box-shaped concrete member
CN219343839U (en) Heat preservation and decoration integrated plate structure and building installation structure comprising same

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant