CN110395494A - Pin-connected panel storage tank and its assemble method - Google Patents

Pin-connected panel storage tank and its assemble method Download PDF

Info

Publication number
CN110395494A
CN110395494A CN201910825691.1A CN201910825691A CN110395494A CN 110395494 A CN110395494 A CN 110395494A CN 201910825691 A CN201910825691 A CN 201910825691A CN 110395494 A CN110395494 A CN 110395494A
Authority
CN
China
Prior art keywords
tank
jigsaw
arc
cylinder section
leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910825691.1A
Other languages
Chinese (zh)
Other versions
CN110395494B (en
Inventor
毛松江
张研杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WEIFANG BEITE CONSTRUCTION MACHINERY CO Ltd
Original Assignee
WEIFANG BEITE CONSTRUCTION MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WEIFANG BEITE CONSTRUCTION MACHINERY CO Ltd filed Critical WEIFANG BEITE CONSTRUCTION MACHINERY CO Ltd
Priority to CN201910825691.1A priority Critical patent/CN110395494B/en
Publication of CN110395494A publication Critical patent/CN110395494A/en
Application granted granted Critical
Publication of CN110395494B publication Critical patent/CN110395494B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D90/00Component parts, details or accessories for large containers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D90/00Component parts, details or accessories for large containers
    • B65D90/02Wall construction
    • B65D90/023Modular panels
    • B65D90/024Modular panels with features of cylindrical curvature
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D90/00Component parts, details or accessories for large containers
    • B65D90/12Supports
    • B65D90/14Legs, e.g. detachable
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D2590/00Component parts, details or accessories for large containers
    • B65D2590/0091Ladders

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention discloses a kind of pin-connected panel storage tank and its assemble methods, its tank deck, canister and tank bottom are detachably fixed connection, canister includes multiple sections, each section is spliced by muti-piece arc jigsaw, arc jigsaw has arc ontology, and the surrounding of arc ontology is provided with the circumferential connecting flange of a pair of axial connecting flange and a pair of of arc, and adjacent cylinder section passes through the circumferential connecting flange connection, in a cylinder section, adjacent arc jigsaw passes through axial connecting flange connection;Tank bottom is equipped with tank leg, and tank leg includes upper tank leg and lower tank leg, and upper tank leg is fixed on the tank bottom, is provided with hinge arrangement between upper tank leg and the lower tank leg.The pin-connected panel storage tank of such structure can be realized the positive installation of storage tank, and assembling can be completed in a crane, compared with well known inverted order installation method, tank body is without laying flat, installation rate is high, and tank body is not easy to deform during the installation process, improves installation quality.

Description

Pin-connected panel storage tank and its assemble method
Technical field
The present invention relates to storage tank technical fields, and in particular to a kind of pin-connected panel storage tank and its assemble method.
Background technique
In the prior art, there are mainly two types of storage tanks, one is by being welded after steel plate bending, this storage tank Great work intensity production efficiency is low, can not replace after single steel plate damage, gradually be eliminated.Another storage tank is pin-connected panel Storage tank is used widely because easy to replace and maintain.
Pin-connected panel storage tank is usually seperated spare and accessory parts when reaching curstomer's site, and assembly working is mostly in curstomer's site It completes, since equipment is bigger, for the height of one piece of jigsaw at 1.4 meters or so, the big danger coefficient of installation workload is high.
The attachmentes such as guardrail, ladder, tank leg in order to facilitate the installation of, the erection sequence of well known pin-connected panel storage tank are inverted order peaces Tank bottom is first stood upside down in ground, then slings tank bottom with crane, install one layer of tank body, tank body is above mentioned to one layer by dress, until Tank deck is installed, after installing tank deck, then with another crane tank deck is hung, tank body is laid flat, guardrail is installed on the ground, is climbed The attachmentes such as ladder, tank leg are finally again holded up tank body with two cranes, and this mounting means needs fell to be holded up again, are mostly used one Crane is spent more and takes man power and material, inefficiency, and when two cranes play tank body both ends, since tank body is very heavy, tank body Middle lower portion bears very big tensile stress, and tank body middle upper portion bears very big compression, there is deformation, the risk of damage.Due to Ladder is that monoblock type is welded on the outer wall of storage tank, and upper tank leg and lower tank leg be to be bolted to be fixed together , if not using this mounting means, since ladder is very high, high altitude operation, especially overhead welding influence welding quality, mention High welding difficulty;The height of tank leg is very high, and weight is very big, and high-altitude of not falling can spend many labours to bolt hole, also takes Time.
Summary of the invention
In view of this, first technical problem to be solved by this invention is to provide a kind of pin-connected panel storage tank, as same A kind of design, second technical problem to be solved by this invention are to provide the assemble method of the storage tank, the spelling of such structure Dress formula storage tank can be realized the positive installation of storage tank, and assembling can be completed in a crane, with well known inverted order installation method It compares, tank body is without laying flat, and installation rate is high, and tank body is not easy to deform during the installation process, improves installation quality.
In order to solve the first technical problem mentioned above, the technical scheme is that a kind of pin-connected panel storage tank, comprising: tank Body, the tank body include being detachably fixed the tank deck to link together, canister and tank bottom, and the canister includes multiple sections, often One cylinder section is spliced by muti-piece arc jigsaw, the arc jigsaw have arc ontology, the four of the arc ontology It is provided with the circumferential connecting flange of a pair of axial connecting flange and a pair of of arc week, the adjacent cylinder section is connected by the circumferential direction Acting flange connection, in a cylinder section, the adjacent arc jigsaw passes through the axial connecting flange connection;The tank Tip cutting is equipped with split type guardrail, is equipped with ladder in the side wall of the tank body, the ladder upper end passes through hook and the tank Top mounting, the tank bottom are equipped with tank leg, and the tank leg includes upper tank leg and lower tank leg, and the upper tank leg is fixed on the tank Bottom is provided with hinge arrangement between the upper tank leg and the lower tank leg.
Preferably, the hinge arrangement includes upper tank leg otic placode and lower tank leg otic placode, and the upper tank leg is provided with tank leg Connecting flange, the lower tank leg are provided with lower tank leg connecting flange, and the upper tank leg otic placode is fixed on the upper tank leg connection method Orchid, the lower tank leg otic placode are fixed on the lower tank leg connecting flange, and the upper tank leg otic placode passes through with the lower tank leg otic placode Articulated shaft is hinged.
Preferably, the tank interior is provided with tank body stiffening device, the tank body stiffening device is set to radial phase Pair the axial connecting flange between, tank body stiffening device multi-tier arrangement up and down.The tank body stiffening device can be The push-and-pull rod or flexible cable being fixed between the axial connecting flange diametrically.
Preferably, the arc reinforcing rib of compression moulding, the arc are provided on the arc ontology of the arc jigsaw Reinforcing rib extends along the radian direction of the arc ontology.
Preferably, the tank deck includes multiple tank deck jigsaw and the short cylinder section of a tank deck, and the short cylinder section of tank deck is by muti-piece Arc jigsaw is spliced, the arc jigsaw of the short cylinder section of tank deck institute shorter than the arc jigsaw of the canister cylinder section, adjacent It states between tank deck jigsaw through flanged joint into a tank deck jigsaw component, the tank deck jigsaw component and the short cylinder section of the tank deck Welding;The tank bottom includes the short cylinder section of tank bottom, upper tank cone and lower tank cone, and the short cylinder section of tank bottom is spelled by muti-piece arc jigsaw It connects, the arc jigsaw of the short cylinder section of tank bottom is shorter than the arc jigsaw of the canister cylinder section, and the upper tank cone includes more A taper jigsaw, by flanged joint between the adjacent taper jigsaw, the arc jigsaw of the short cylinder section of tank bottom and corresponding The taper jigsaw of the upper tank cone match and be welded into monomer one by one, the upper tank cone and the lower tank cone pass through method Orchid connection.
To solve above-mentioned second technical problem, the technical scheme is that a kind of assembling side of pin-connected panel storage tank Method includes the following steps:
(a) it in factory, manufactures the arc jigsaw and assembles the tank deck and the tank bottom;
(b) the tank deck forward direction is placed in ground, the guardrail is inserted into the intubation on the tank deck;
(c) tank deck is sling with crane, the arc jigsaw in the first segment cylinder section of the canister is placed on On ground, the tank deck sling is placed on the arc jigsaw of the first segment cylinder section, passes through the circumferential method The arc jigsaw is connected to the tank deck by orchid, and the adjacent arc jigsaw is connected to one by the axial flange It rises, in the first segment cylinder section, push-and-pull rod or flexible cable is set between the axial connecting flange diametrically, it is complete At the installation of the first segment cylinder section;And so on, the remaining cylinder section of the canister is installed with same method;
(d) tank deck connected and the canister are above mentioned with the crane, tank bottom is placed on ground, by institute It states the tank deck sling and the canister is placed on the tank bottom, be connected to the tank bottom by the circumferential flange described The last section cylinder section of canister, is assembled into the tank body;
(e) the lower tank leg is connected by hinge and the upper tank leg, is hinged on the lower tank leg obliquely On the upper tank leg, the tank body then is promoted with the crane, the lower tank leg is made naturally to erect simultaneously by gravity It is fixed;
(f) ladder is articulated on the tank deck by the hook of upper end, and ladder is fixed on the tank body.
Preferably, the tank deck has central axis;In factory, the tank deck is assembled into along by the central axis Symmetrical two halfbodies of one plane of line, in the both ends connection push-and-pull rod or flexible cable of halfbody opening;It is existing in construction Described two halfbodies are connected into the tank deck by field;The tank bottom includes the short cylinder section of tank bottom, upper tank cone and lower tank cone, described The short cylinder section of tank bottom is formed by connecting by muti-piece arc jigsaw by axial connecting flange, and the arc jigsaw of the short cylinder section of tank bottom compares institute The arc jigsaw for stating canister cylinder section is short, and the upper tank cone includes multiple taper jigsaw, leads between the adjacent taper jigsaw Flanged joint is crossed, the arc jigsaw of the short cylinder section of tank bottom is matched and welded one by one with the taper jigsaw of the corresponding upper tank cone It is connected into monomer, the upper tank cone and the lower tank cone pass through flanged joint;In the factory, first by the short cylinder section of the tank bottom Arc jigsaw matches one by one with the taper jigsaw of the corresponding upper tank cone and is welded into monomer;At the construction field (site), first by institute The each monomer stated passes through circumferential flange respectively and is connected in the last section cylinder section of the canister, and then, the lower tank is bored Body is connected to the upper tank cone by circumferential flange;In the short cylinder section of the tank bottom, in the axial connection diametrically Push-and-pull rod or flexible cable are set between flange.
Preferably, during installing the canister cylinder section, opposite two piece of the cylinder section arc jigsaw is A pair, first by the arc jigsaw of the first segment cylinder section by the circumferential connecting flange by the tank deck is fixed on, then The adjacent arc jigsaw is connected by axial connecting flange again;And so on, by each section cylinder of the remaining canister Section is linked in sequence in the cylinder section described in a upper section;When installing each monomer of the tank bottom, using above-mentioned same side Method.
Using above-mentioned technical proposal, the beneficial effects of the present invention are:
1) split type guardrail is plugged in the tank deck, and the upper end of ladder is by hanging on the outer wall of storage tank, In After installing tank bottom, lower tank leg is connected by hinge arrangement and upper tank leg, hangs over lower tank leg obliquely on tank leg, so After promote storage tank, lower tank leg erects under the drive of hinge arrangement, does not have to lift lower tank leg, and can be convenient in this way Upper tank leg and lower tank leg are fixed up with bolt.Such structure can be realized the positive installation of storage tank, and a crane is Achievable assembling, compared with well known inverted order installation method, tank body is without laying flat, and installation rate is high, and tank during the installation process Body is not easy to deform, and improves installation quality.
2) tank body stiffening device is set between the axial connecting flange diametrically, on the tank body stiffening device Lower multi-tier arrangement.The tank body stiffening device can be push-and-pull rod and be also possible to flexible cable.The tank body stiffening device is effective Shared storing to the pressure of storage tank radial direction, while the gravity of a part of material can also be undertaken, prevent the gravity of material All apply.Flexible cable is easy to adjust, and push-and-pull rod is convenient for keeping dimensional accuracy in the transportational process of long range.
3) the arc reinforcing rib of compression moulding, the arc reinforcing rib are provided on the arc ontology of the arc jigsaw Extending along the radian direction of the arc ontology, arc reinforcing rib can effectively improve the rigidity of arc jigsaw, prevent jigsaw from deforming, In the case where intensity is certain, the jigsaw for being provided with round reinforcing rib can reduce the wall thickness of 1mm, so that material be greatly saved Material, alleviates self weight.
Detailed description of the invention
Fig. 1 is the front view of pin-connected panel storage tank embodiment of the present invention;
Fig. 2 is the perspective view of the residual oil in tank of pin-connected panel storage tank shown in Fig. 1;
Fig. 3 is the perspective view of a cylinder section in the canister structure of pin-connected panel storage tank shown in Fig. 1;
Fig. 4 is the assembly of the tank bottom short cylinder section and upper tank cone in the bottom configuration of pin-connected panel storage tank shown in Fig. 1 Perspective view;
Fig. 5 is the perspective view of the lower tank cone in the bottom configuration of pin-connected panel storage tank shown in Fig. 1;
Fig. 6 is the structural schematic diagram of the tank leg of pin-connected panel storage tank shown in Fig. 1;
In figure, 10- tank deck, 11- tank deck jigsaw, the short cylinder section arc jigsaw of 12- tank deck, 121- arc reinforcing rib, 13- insert Pipe, 20- guardrail, 30- canister, 31- sections, 31a- arc jigsaw, 31a1- arc reinforcing rib, 32- sections, 33- sections, 34- Section, 35- sections, 40- tank bottom, the short cylinder section arc jigsaw of 41- tank bottom, 411- arc reinforcing rib, the upper tank cone of 42-, tank cone under 43- Body, the upper tank leg of 51-, the upper tank leg connecting flange of 511-, tank leg under 52-, tank leg connecting flange under 521-, 60- ladder, the upper tank of 71- Leg otic placode, tank leg otic placode under 72-, 80- push-and-pull rod.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawings and examples.
As shown in Figure 1, a kind of pin-connected panel storage tank, tank body includes being detachably fixed tank deck 10, the tank to link together Cylinder 30 and tank bottom 40, the canister 30 include multiple sections 31,32,33,34,35, each described cylinder section is spelled by muti-piece arc Plate is spliced.
As shown in figure 3, arc jigsaw 31a has arc ontology by taking cylinder section 31 as an example, the surrounding of the arc ontology is arranged There is the circumferential connecting flange of a pair of axial connecting flange and a pair of of arc, the adjacent cylinder section passes through the circumferential connecting flange Connection, in a cylinder section, the adjacent arc jigsaw 31a passes through the axial connecting flange connection;In the arc The arc reinforcing rib 31a1 of compression moulding is provided on the arc ontology of shape jigsaw 31a, the arc reinforcing rib 31a1 is along described The radian direction of arc ontology extends.Axial flange junction is the weak spot of 31 intensity of cylinder section, is easy to strut, therefore, in institute It states cylinder section 31 and is internally provided with tank body stiffening device, the tank body stiffening device is set to the axial connection method diametrically Between orchid, multi-tier arrangement above and below the tank body stiffening device.The tank body stiffening device can be affixed to institute diametrically The push-and-pull rod 80 between axial connecting flange is stated, flexible cable is also possible to.Push-and-pull rod 80 can be channel steel or angle steel, pull rod Both ends be welded in tank body axial flange connections;When using flexible Cable Structure, can first it connect in the intracorporal axial flange of tank Place's welded nut is connect, rope is then tensed by lifting bolt.The tank body stiffening device has effectively shared storing to storing Tank diameter to pressure, booster action is played to tank body.For push-and-pull rod 80, the weight of a part of material can also be undertaken Power prevents the gravity of material to be all applied to tank body peripheral wall, while push-and-pull rod is convenient for keeping in the transportational process of long range Dimensional accuracy.For flexible cable, key benefit is that scene is easy to adjust.
As shown in Figure 1, the tank deck 10 is provided with intubation 13, split type guardrail 20, In is fitted in the intubation 13 The side wall of the tank body is equipped with ladder 60, and the ladder upper end is mounted by hook and the tank deck 10.
As shown in figures 1 to 6, the tank bottom 40 is equipped with tank leg, and the tank leg includes upper tank leg 51 and lower tank leg 52, institute It states tank leg 51 and is fixed on the tank bottom 40, be provided with hinge arrangement between the upper tank leg 51 and the lower tank leg 52.It is described Hinge arrangement includes upper tank leg otic placode 71 and lower tank leg otic placode 72, and the upper tank leg 51 is provided with tank leg connecting flange 511, institute It states lower tank leg 52 and is provided with lower tank leg connecting flange 521, the upper tank leg otic placode 71 is fixed on the upper tank leg connecting flange 511, the lower tank leg otic placode 72 is fixed on the lower tank leg connecting flange 521, the upper tank leg otic placode 71 and the lower tank leg Otic placode 72 is hinged by articulated shaft.
As shown in Fig. 2, the tank deck 10 includes multiple tank deck jigsaw 11 and the short cylinder section of a tank deck, the short cylinder section of tank deck It is spliced by muti-piece arc jigsaw 12, the arc jigsaw of the arc jigsaw 12 of the short cylinder section of tank deck than the canister cylinder section It is short, by flanged joint at a tank deck jigsaw component between the adjacent tank deck jigsaw 11, the tank deck jigsaw component with The short cylinder section welding of tank deck.
As shown in figure 3, the tank bottom 40 includes the short cylinder section of tank bottom, upper tank cone 42 and lower tank cone 43, the tank bottom is short Cylinder section is spliced by muti-piece arc jigsaw 41, and the arc jigsaw 41 of the short cylinder section of tank bottom is spelled than the arc of the canister cylinder section Plate is short, and the upper tank cone 42 includes multiple taper jigsaw, passes through flanged joint, the tank between the adjacent taper jigsaw The arc jigsaw 41 of the short cylinder section in bottom and the taper jigsaw of the corresponding upper tank cone match one by one and are welded into monomer, it is described on Tank cone 42 and the lower tank cone 43 pass through flanged joint.
Above-mentioned pin-connected panel storage tank can be assembled using the method for positive assembling, and for tank body without laying flat, installation rate is high, And tank body is not easy to deform during the installation process, improves installation quality.The specific method is as follows:
(a) it in factory, manufactures the arc jigsaw and assembles the tank deck 10 and the tank bottom 40;
(b) 10 forward direction of tank deck is placed in ground, the guardrail 20 is inserted into the intubation 13 on the tank deck;
(c) tank deck 10 is sling with crane, the arc jigsaw in the first segment cylinder section of the canister 30 is put It sets on the ground, the tank deck 10 sling is placed on the arc jigsaw of the first segment cylinder section, by described The arc jigsaw is connected to the tank deck by circumferential flange, is connected the adjacent arc jigsaw by the axial flange Together, in the first segment cylinder section, push-and-pull rod 80 or soft is set between the axial connecting flange diametrically Sex cords completes the installation of the first segment cylinder section;And so on, the remaining cylinder section of the canister is installed with same method;
(d) tank deck 10 connected and the canister 30 are above mentioned with the crane, by tank bottom 40 be placed in ground it On, the tank deck sling and the canister are placed on the tank bottom, connected the tank bottom by the circumferential flange It is connected to the last section cylinder section of the canister, is assembled into the tank body;
(e) the lower tank leg 52 is connected by hinge arrangement with the upper tank leg 51, the lower tank leg 52 is made to incline It is tiltedly hinged on the upper tank leg 51, then promotes the tank body with the crane, the lower tank leg 52 is made to rely on gravity certainly Right erecting and fixing;
(f) ladder 60 is articulated on the tank deck 10 by the hook of upper end, and ladder 60 is fixed on the tank body On.
In the present embodiment, the tank deck 10 has central axis;In factory, the tank deck 10 is assembled into edge and passes through institute Symmetrical two halfbodies of a plane for stating central axis, in the both ends connection push-and-pull rod 80 or flexibility of halfbody opening Rope;Described two halfbodies are connected into the tank deck 10 at the construction field (site).
In the present embodiment, in the factory, first the arc jigsaw 41 of the short cylinder section of the tank bottom is bored with the corresponding upper tank The taper jigsaw of body matches one by one and is welded into monomer;At the construction field (site), each monomer is first passed through into circumferential method respectively Orchid is connected in the last section cylinder section of the canister 30, then, the lower tank cone 43 is connected to institute by circumferential flange State tank cone;In the short cylinder section of the tank bottom, push-and-pull rod 80 is set between the axial connecting flange diametrically Or flexible cable.
In the present embodiment, during installing the canister cylinder section, opposite two piece of the cylinder section arc is spelled Plate is a pair, first by the arc jigsaw of the first segment cylinder section by the circumferential connecting flange by being fixed on the tank deck 10, then the adjacent arc jigsaw is connected by axial connecting flange again;And so on, by the remaining canister Each section cylinder section is linked in sequence in the cylinder section described in a upper section;When installing each monomer of the tank bottom, using above-mentioned same The method of sample.
The present invention is not limited to the above embodiment, all are made based on design of the invention, structure, principle and method Various improvement, fall within the protection scope of the application.

Claims (10)

1. a kind of pin-connected panel storage tank, comprising:
Tank body, the tank body include being detachably fixed the tank deck to link together, canister and tank bottom, and the canister includes multiple cylinders Section, each described cylinder section are spliced by muti-piece arc jigsaw, and the arc jigsaw has arc ontology, the arc ontology Surrounding be provided with the circumferential connecting flange of a pair of axial connecting flange and a pair of of arc, the adjacent cylinder section passes through the week It is connected to connecting flange, in a cylinder section, the adjacent arc jigsaw passes through the axial connecting flange connection;Its It is characterized in that,
The tank deck is fitted with split type guardrail, is equipped with ladder in the side wall of the tank body, the ladder upper end passes through extension Hook and the tank deck mount, and the tank bottom is equipped with tank leg, and the tank leg includes upper tank leg and lower tank leg, and the upper tank leg is fixed Hinge arrangement is provided between the tank bottom, the upper tank leg and the lower tank leg.
2. pin-connected panel storage tank according to claim 1, which is characterized in that the hinge arrangement include upper tank leg otic placode and Lower tank leg otic placode, the upper tank leg are provided with tank leg connecting flange, and the lower tank leg is provided with lower tank leg connecting flange, described Upper tank leg otic placode is fixed on the upper tank leg connecting flange, and the lower tank leg otic placode is fixed on the lower tank leg connecting flange, institute It is hinged by articulated shaft with the lower tank leg otic placode to state tank leg otic placode.
3. pin-connected panel storage tank according to claim 1, which is characterized in that the tank interior is provided with tank body and reinforces Device, the tank body stiffening device is set between the axial connecting flange diametrically, on the tank body stiffening device Lower multi-tier arrangement.
4. pin-connected panel storage tank according to claim 3, which is characterized in that the tank body stiffening device is affixed to radial direction Push-and-pull rod between the opposite axial connecting flange.
5. pin-connected panel storage tank according to claim 3, which is characterized in that the tank body stiffening device is affixed to radial direction Flexible cable between the opposite axial connecting flange.
6. pin-connected panel storage tank according to claim 1, which is characterized in that set on the arc ontology of the arc jigsaw It is equipped with the arc reinforcing rib of compression moulding, the arc reinforcing rib extends along the radian direction of the arc ontology.
7. pin-connected panel storage tank according to claim 1, which is characterized in that the tank deck includes multiple tank deck jigsaw and one A short cylinder section of tank deck, the short cylinder section of tank deck are spliced by muti-piece arc jigsaw, the arc jigsaw ratio of the short cylinder section of tank deck The arc jigsaw of the canister cylinder section is short, by flanged joint at a tank deck jigsaw group between the adjacent tank deck jigsaw Part, the tank deck jigsaw component and the short cylinder section of the tank deck are welded;
The tank bottom includes the short cylinder section of tank bottom, upper tank cone and lower tank cone, and the short cylinder section of tank bottom is spelled by muti-piece arc jigsaw It connects, the arc jigsaw of the short cylinder section of tank bottom is shorter than the arc jigsaw of the canister cylinder section, and the upper tank cone includes more A taper jigsaw, by flanged joint between the adjacent taper jigsaw, the arc jigsaw of the short cylinder section of tank bottom and corresponding The taper jigsaw of the upper tank cone match and be welded into monomer one by one, the upper tank cone and the lower tank cone pass through method Orchid connection.
8. a kind of method of pin-connected panel storage tank described in assembling claim 1, includes the following steps:
(a) it in factory, manufactures the arc jigsaw and assembles the tank deck and the tank bottom;
(b) the tank deck forward direction is placed in ground, the guardrail is inserted into the intubation on the tank deck;
(c) tank deck is sling with crane, the arc jigsaw in the first segment cylinder section of the canister is placed on ground On, the tank deck sling is placed on the arc jigsaw of the first segment cylinder section, it will by the circumferential flange The arc jigsaw is connected to the tank deck, and the adjacent arc jigsaw is linked together by the axial flange, In In the first segment cylinder section, push-and-pull rod or flexible cable are set between the axial connecting flange diametrically, complete institute State the installation of first segment cylinder section;And so on, the remaining cylinder section of the canister is installed with same method;
(d) tank deck connected and the canister are above mentioned with the crane, tank bottom is placed on ground, is hung described The tank deck and the canister risen is placed on the tank bottom, and the tank bottom is connected to the canister by the circumferential flange The last section cylinder section, be assembled into the tank body;
(e) the lower tank leg is connected by hinge and the upper tank leg, is hinged on the lower tank leg obliquely described On upper tank leg, the tank body then is promoted with the crane, the lower tank leg is made naturally to erect and fix by gravity;
(f) ladder is articulated on the tank deck by the hook of upper end, and ladder is fixed on the tank body.
9. the assemble method of pin-connected panel storage tank according to claim 8, which is characterized in that the tank deck has central axis Line;In factory, the tank deck is assembled into along symmetrical two halfbodies of a plane by the central axis, described The both ends connection push-and-pull rod or flexible cable of halfbody opening;Described two halfbodies are connected into the tank deck at the construction field (site);
The tank bottom includes the short cylinder section of tank bottom, upper tank cone and lower tank cone, and the short cylinder section of tank bottom is led to by muti-piece arc jigsaw It crosses axial connecting flange to be formed by connecting, the arc jigsaw of the short cylinder section of tank bottom is shorter than the arc jigsaw of the canister cylinder section, institute Stating tank cone includes multiple taper jigsaw, passes through flanged joint, the short cylinder section of tank bottom between the adjacent taper jigsaw Arc jigsaw match and be welded into monomer, the upper tank cone and institute one by one with the taper jigsaw of the corresponding upper tank cone It states lower tank cone and passes through flanged joint;In the factory, first by the arc jigsaw of the short cylinder section of the tank bottom and the corresponding upper tank The taper jigsaw of cone matches one by one and is welded into monomer;At the construction field (site), each monomer is first passed through into circumferential direction respectively Flanged joint is in the last section cylinder section of the canister, then, the lower tank cone is connected to by circumferential flange described in Upper tank cone;In the short cylinder section of the tank bottom, push-and-pull rod or soft is set between the axial connecting flange diametrically Sex cords.
10. the assemble method of pin-connected panel storage tank according to claim 9, which is characterized in that installing the canister cylinder During section, opposite two piece of the cylinder section arc jigsaw is a pair, first spells the arc of the first segment cylinder section Plate by the circumferential connecting flange by the tank deck is fixed on, then again by axial connecting flange by the adjacent arc The connection of shape jigsaw;And so on, each section cylinder section of the remaining canister is linked in sequence in the cylinder section described in a upper section;Pacifying When filling each monomer of the tank bottom, using above-mentioned same method.
CN201910825691.1A 2019-09-03 2019-09-03 Split type storage tank and assembly method thereof Active CN110395494B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910825691.1A CN110395494B (en) 2019-09-03 2019-09-03 Split type storage tank and assembly method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910825691.1A CN110395494B (en) 2019-09-03 2019-09-03 Split type storage tank and assembly method thereof

Publications (2)

Publication Number Publication Date
CN110395494A true CN110395494A (en) 2019-11-01
CN110395494B CN110395494B (en) 2023-11-17

Family

ID=68329767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910825691.1A Active CN110395494B (en) 2019-09-03 2019-09-03 Split type storage tank and assembly method thereof

Country Status (1)

Country Link
CN (1) CN110395494B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT201900023499A1 (en) * 2019-12-10 2021-06-10 Technobins S R L INCOERENT GRANULAR MATERIAL MIXER
CN114412193A (en) * 2022-01-27 2022-04-29 中鼎锐拓(天津)机械制造有限公司 Split site construction method for storage tank

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0564969A1 (en) * 1992-04-04 1993-10-13 Normann Bock Reusable package for flowable and/or pourable bulk goods
CN2424128Y (en) * 2000-05-19 2001-03-21 长丰运达装备有限责任公司 Loose cement storage cylinder
CN201626654U (en) * 2010-02-08 2010-11-10 山东金星环保设备有限公司 Fiberglass reinforced plastic bunker
CN104401604A (en) * 2014-10-24 2015-03-11 潍坊金河机械有限公司 Cement bin and manufacturing process thereof
CN105756399A (en) * 2016-02-22 2016-07-13 中交路桥华东工程有限公司 Combined type large-capacity typhoon-resistant silo and manufacturing method thereof
CN107973012A (en) * 2017-11-14 2018-05-01 中国电建集团西北勘测设计研究院有限公司 A kind of tile powder material tank and shelf type installation method
CN207524349U (en) * 2017-11-06 2018-06-22 三一汽车制造有限公司 A kind of stirring station powder batch can and mixing plant
CN209080677U (en) * 2018-11-05 2019-07-09 山东富鑫汽车科技有限公司 A kind of assembled bin
CN210392277U (en) * 2019-09-03 2020-04-24 潍坊市贝特工程机械有限公司 Assembled storage tank

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0564969A1 (en) * 1992-04-04 1993-10-13 Normann Bock Reusable package for flowable and/or pourable bulk goods
CN2424128Y (en) * 2000-05-19 2001-03-21 长丰运达装备有限责任公司 Loose cement storage cylinder
CN201626654U (en) * 2010-02-08 2010-11-10 山东金星环保设备有限公司 Fiberglass reinforced plastic bunker
CN104401604A (en) * 2014-10-24 2015-03-11 潍坊金河机械有限公司 Cement bin and manufacturing process thereof
CN105756399A (en) * 2016-02-22 2016-07-13 中交路桥华东工程有限公司 Combined type large-capacity typhoon-resistant silo and manufacturing method thereof
CN207524349U (en) * 2017-11-06 2018-06-22 三一汽车制造有限公司 A kind of stirring station powder batch can and mixing plant
CN107973012A (en) * 2017-11-14 2018-05-01 中国电建集团西北勘测设计研究院有限公司 A kind of tile powder material tank and shelf type installation method
CN209080677U (en) * 2018-11-05 2019-07-09 山东富鑫汽车科技有限公司 A kind of assembled bin
CN210392277U (en) * 2019-09-03 2020-04-24 潍坊市贝特工程机械有限公司 Assembled storage tank

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT201900023499A1 (en) * 2019-12-10 2021-06-10 Technobins S R L INCOERENT GRANULAR MATERIAL MIXER
CN114412193A (en) * 2022-01-27 2022-04-29 中鼎锐拓(天津)机械制造有限公司 Split site construction method for storage tank

Also Published As

Publication number Publication date
CN110395494B (en) 2023-11-17

Similar Documents

Publication Publication Date Title
US9719487B2 (en) Wind turbine blade structures, lifting assemblies and methods of blade handling
CN110395494A (en) Pin-connected panel storage tank and its assemble method
AU2011202369A1 (en) Arrangement for lifting a tower wall portion of a wind turbine and method for lifting a tower wall portion of a wind turbine
WO1983000855A1 (en) Spreader bar assembly
US10968895B1 (en) Wind turbine shipping method
WO2016119035A1 (en) Structural material tower and assembly method
CN207314534U (en) Girder steel tongue and groove shear connections device
CN108473289A (en) The luffing-jib crane of lift unit including this lift unit and the method for assembling this crane
CN110371841A (en) A kind of turning tool and its application method
JP2007022789A (en) Suspension tool and vertical pipe construction method
CN112960529A (en) Tail slipping mechanism and tail slipping method of slender thin-wall equipment
CN210944573U (en) Push-pull device for article hoisting
CN210286469U (en) Prefabricated part hoist
JP5367645B2 (en) Working machine
CN210392277U (en) Assembled storage tank
CN217326704U (en) Variable cross-section large-section pier tower reinforcement cage segment ring splitting structure
CN110002354B (en) Hoisting system and hoisting method for heavy pipeline equipment in complex space
CN208564132U (en) Chimney top opening glass reinforced plastic inner cylinder connection structure
CN203403717U (en) Tower body erecting and descending mechanism of tower crane
JP3781155B2 (en) Pipe suspension guide
KR101134860B1 (en) The jib crane mast apparatus
CN207296877U (en) Without anchor rope workover rig
CN102922280B (en) Tower crane boom mounting method and auxiliary mounting pull rod applied by same
CN218560838U (en) Tower drum lifting appliance
CN218786507U (en) Special lifting appliance for large-tonnage steel truss girder cable-spanning lifting of mountain railway suspension bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant