CN110388220A - A kind of tunnel internal rail flowering structure assembly device - Google Patents
A kind of tunnel internal rail flowering structure assembly device Download PDFInfo
- Publication number
- CN110388220A CN110388220A CN201910826174.6A CN201910826174A CN110388220A CN 110388220 A CN110388220 A CN 110388220A CN 201910826174 A CN201910826174 A CN 201910826174A CN 110388220 A CN110388220 A CN 110388220A
- Authority
- CN
- China
- Prior art keywords
- vehicle frame
- wheel group
- assembly device
- structure assembly
- internal rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000017260 vegetative to reproductive phase transition of meristem Effects 0.000 title claims abstract description 16
- 230000007246 mechanism Effects 0.000 claims abstract description 40
- 230000000694 effects Effects 0.000 claims abstract description 6
- 238000010276 construction Methods 0.000 abstract description 9
- 230000006872 improvement Effects 0.000 abstract description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 208000019901 Anxiety disease Diseases 0.000 description 1
- 230000036506 anxiety Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/40—Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Electric Cable Installation (AREA)
Abstract
The invention belongs to constructing tunnel equipment technical fields, in particular a kind of tunnel internal rail flowering structure assembly device, including vehicle frame, the bottom of the vehicle frame is equipped with wheel group driving mechanism, the wheel group driving mechanism in the running wheel group on shield tunnel segment lining and acts on the running wheel group on mounted prefabricated side box culvert for driving effect, the top slide of the vehicle frame is connected with transverse-moving mechanism, the bottom of the transverse-moving mechanism is fixed with derricking gear, the bottom of the derricking gear is equipped with rotating mechanism, and the bottom of the rotating mechanism is equipped with U-shaped suspender.The present invention is by the reasonability to integrally-built improvement and structure design, so that having compressed the constructing tunnel duration, facilitates construction, improves construction efficiency.
Description
Technical field
The present invention relates to constructing tunnel equipment technical field, specially a kind of tunnel internal rail flowering structure assembly device.
Background technique
The prior art is only furnished with middle box culvert assembling machine on shield machine, tunnels forward with shield and synchronizes box culvert in assembly, and two
Side structure is that integral cast-in-situ is infused or part shows casting and constructing.Three pieces of prefabricated box culvert component composition tunnel rail flowering structures are national first
Example, before this without special assembled mechanical.
A kind of side box culvert prefabricated component that this engineering is designed for the full prefabricated construction of tunnel internal rail flowering structure is assembled to be applied
Tooling is set, and the device is mainly by vehicle frame, walking and guidance system, location and installation system, electric electrical control and safety system
Deng four big system compositions.The device can sling side box culvert part from transport vehicle, and be put into designated mounting position after translating adjustment,
Finally side box culvert part is accurately installed in tunnel, realizes the quick-assembling construction of tunnel side box culvert.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, it the present invention provides a kind of tunnel internal rail flowering structure assembly device, solves existing
The bad problem of track construction structure assembly device using effect.
(2) technical solution
To achieve the above object, the invention provides the following technical scheme: a kind of tunnel internal rail flowering structure assembly device, including
Vehicle frame, the bottom of the vehicle frame are equipped with wheel group driving mechanism, and the wheel group driving mechanism is for driving effect in shield tunnel
Running wheel group on road pipe-plate lining and act on the running wheel group on mounted prefabricated side box culvert, the top of the vehicle frame
Portion slidably connects transverse-moving mechanism, and the bottom of the transverse-moving mechanism is fixed with derricking gear, and the bottom of the derricking gear is equipped with
The bottom of rotating mechanism, the rotating mechanism is equipped with U-shaped suspender.
As a preferred technical solution of the present invention, hysteresis type cable drum is fixed on the side wall of the vehicle frame.
As a preferred technical solution of the present invention, the left bottom of the vehicle frame is fixed in wheel group driving mechanism
The electrical control of top and safety system.
As a preferred technical solution of the present invention, the bottom right side of the vehicle frame is fixed with guiding mechanism.
As a preferred technical solution of the present invention, the vehicle frame both ends are different in size, and height is high on the left of the vehicle frame
In right side.
(3) beneficial effect
Compared with prior art, the present invention provides a kind of tunnel internal rail flowering structure assembly devices, have following beneficial to effect
Fruit:
The tunnel internal rail flowering structure assembly device is made by the reasonability to integrally-built improvement and structure design
The constructing tunnel duration must be had compressed, construction is facilitated, improves construction efficiency.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is structure of the invention side view.
In figure: 1, vehicle frame;201, the running wheel group on shield tunnel segment lining is acted on;202, it acts on and has installed
Prefabricated side box culvert on running wheel group;3, wheel group driving mechanism;4, hysteresis type cable drum;5, transverse-moving mechanism;6, it rises
Loop wheel machine structure;7, rotating mechanism;8, U-shaped suspender;9, electric electrical control and safety system;10, guiding mechanism.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Embodiment
The present invention is the following technical schemes are provided: a kind of tunnel internal rail flowering structure assembly device referring to FIG. 1-2, including vehicle
Frame 1, the bottom of vehicle frame 1 are equipped with wheel group driving mechanism 3, and wheel group driving mechanism 3 is for driving effect in duct pieces of shield tunnel
Running wheel group 201 in lining cutting and act on the running wheel group 202 on mounted prefabricated side box culvert, the top of vehicle frame 1
Transverse-moving mechanism 5 is slidably connected, the bottom of transverse-moving mechanism 5 is fixed with derricking gear 6, and the bottom of derricking gear 6 is equipped with whirler
The bottom of structure 7, rotating mechanism 7 is equipped with U-shaped suspender 8.
In the present embodiment, according to the assembled one piece of side box culvert of field statistics about at 10 minutes or so, side case is greatly accelerated
Contain assembled progress, creates superior precondition for subsequent construction, either on material or difficulty of construction, duration degree all
Occupy quite apparent advantage, compresses time duration, meet duration anxiety situation.
Specifically, being fixed with hysteresis type cable drum 4 on the side wall of vehicle frame 1.
In the present embodiment, hysteresis type cable drum 4 is used for the winding of wire and cable.
Specifically, the left bottom of vehicle frame 1 is fixed with electrical control and safeguard protection above wheel group driving mechanism 3
System 9.
In the present embodiment, electrical control and safety system 9 are both control cabinet.
Specifically, the bottom right side of vehicle frame 1 is fixed with guiding mechanism 10.
In the present embodiment, guiding mechanism 10 is to guarantee that assembling machine position is maintained at tunnel center.
Specifically, 1 both ends of vehicle frame are different in size, 1 left side height of vehicle frame is higher than right side.
In the present embodiment, length is customized according to needs of production.
The working principle of the invention and process for using: the crossbeam constituted between girder with fashioned iron on vehicle frame 1 is used as traversing
Mechanism 5, derricking gear 6, rotating mechanism 7, U-shaped suspender 8 primary structure member, act on the moving trolley on shield tunnel segment lining
Wheel group 201 is consistent with vehicle frame column direction, is walked on the prefabricated side box culvert surface installed;It acts on mounted
Running wheel group 202 and vehicle frame column on prefabricated side box culvert keep tilting, and fit closely shield tunnel segment lining to meet
Demand, this two groups of systems, which have, to be directed laterally to mechanism 10 and acts on middle box culvert, to guarantee that assembling machine position is maintained in tunnel
The heart, walking wheel are driven using the wheel group driving mechanism 3 that motor and transmission device are constituted, and 4 wheel driven form is integrally formed, traversing
Mechanism 5 is mounted on the straining beam of vehicle frame 1, and rotating mechanism 7, U-shaped suspender 8 are carried out whole laterally shifting using motor and conveyer belt
It is dynamic, it is that, from tunnel center to two sides transverse shifting, will finally be delivered installation site from the prefabricated components that derricking gear 6 has fallen
Main device.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention,
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features.
All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention
Within protection scope.
Claims (5)
1. a kind of tunnel internal rail flowering structure assembly device, including vehicle frame (1), it is characterised in that: the bottom of the vehicle frame (1) is equipped with
Wheel group driving mechanism (3), the wheel group driving mechanism (3) is for driving effect in the walking on shield tunnel segment lining
Wheel group (201) and the running wheel group (202) on mounted prefabricated side box culvert is acted on, the top of the vehicle frame (1) is sliding
Dynamic to be connected with transverse-moving mechanism (5), the bottom of the transverse-moving mechanism (5) is fixed with derricking gear (6), the derricking gear (6)
Bottom is equipped with rotating mechanism (7), and the bottom of the rotating mechanism (7) is equipped with U-shaped suspender (8).
2. a kind of tunnel internal rail flowering structure assembly device according to claim 1, it is characterised in that: the vehicle frame (1)
Hysteresis type cable drum (4) are fixed on side wall.
3. a kind of tunnel internal rail flowering structure assembly device according to claim 1, it is characterised in that: the vehicle frame (1)
Left bottom is fixed with electrical control and safety system (9) above wheel group driving mechanism (3).
4. a kind of tunnel internal rail flowering structure assembly device according to claim 1, it is characterised in that: the vehicle frame (1)
Bottom right side is fixed with guiding mechanism (10).
5. a kind of tunnel internal rail flowering structure assembly device according to claim 1, it is characterised in that: the vehicle frame (1) two
Hold different in size, height is higher than right side on the left of the vehicle frame (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910826174.6A CN110388220A (en) | 2019-09-03 | 2019-09-03 | A kind of tunnel internal rail flowering structure assembly device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910826174.6A CN110388220A (en) | 2019-09-03 | 2019-09-03 | A kind of tunnel internal rail flowering structure assembly device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110388220A true CN110388220A (en) | 2019-10-29 |
Family
ID=68289738
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910826174.6A Pending CN110388220A (en) | 2019-09-03 | 2019-09-03 | A kind of tunnel internal rail flowering structure assembly device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110388220A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111622774A (en) * | 2020-06-04 | 2020-09-04 | 中铁十四局集团大盾构工程有限公司 | Fine adjustment assembly trolley and assembly method for prefabricated box culvert of shield tunnel |
CN111927493A (en) * | 2020-10-09 | 2020-11-13 | 中国铁建重工集团股份有限公司 | Special-shaped section of jurisdiction erector of super large section |
CN113137253A (en) * | 2021-04-30 | 2021-07-20 | 盾构及掘进技术国家重点实验室 | Through type tunnel arc-shaped part installing machine |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108678785A (en) * | 2018-05-04 | 2018-10-19 | 中铁第五勘察设计院集团有限公司 | A kind of box culvert loop wheel machine for the prefabricated inverted arch side box culvert lifting of railway tunnel |
CN208137972U (en) * | 2018-05-04 | 2018-11-23 | 中铁第五勘察设计院集团有限公司 | A kind of box culvert loop wheel machine for the prefabricated inverted arch side box culvert lifting of railway tunnel |
CN109650261A (en) * | 2019-01-24 | 2019-04-19 | 中铁十四局集团大盾构工程有限公司 | A kind of constructing device for the box culvert prefabricated component assembly of tunnel side |
CN209322345U (en) * | 2018-11-15 | 2019-08-30 | 中铁第五勘察设计院集团有限公司 | The prefabricated inverted arch side box culvert loop wheel machine in tunnel with angle regulating function |
CN211230513U (en) * | 2019-09-03 | 2020-08-11 | 中铁十四局集团大盾构工程有限公司 | Tunnel inner rail lower structure assembling device |
-
2019
- 2019-09-03 CN CN201910826174.6A patent/CN110388220A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108678785A (en) * | 2018-05-04 | 2018-10-19 | 中铁第五勘察设计院集团有限公司 | A kind of box culvert loop wheel machine for the prefabricated inverted arch side box culvert lifting of railway tunnel |
CN208137972U (en) * | 2018-05-04 | 2018-11-23 | 中铁第五勘察设计院集团有限公司 | A kind of box culvert loop wheel machine for the prefabricated inverted arch side box culvert lifting of railway tunnel |
CN209322345U (en) * | 2018-11-15 | 2019-08-30 | 中铁第五勘察设计院集团有限公司 | The prefabricated inverted arch side box culvert loop wheel machine in tunnel with angle regulating function |
CN109650261A (en) * | 2019-01-24 | 2019-04-19 | 中铁十四局集团大盾构工程有限公司 | A kind of constructing device for the box culvert prefabricated component assembly of tunnel side |
CN211230513U (en) * | 2019-09-03 | 2020-08-11 | 中铁十四局集团大盾构工程有限公司 | Tunnel inner rail lower structure assembling device |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111622774A (en) * | 2020-06-04 | 2020-09-04 | 中铁十四局集团大盾构工程有限公司 | Fine adjustment assembly trolley and assembly method for prefabricated box culvert of shield tunnel |
CN111622774B (en) * | 2020-06-04 | 2021-12-14 | 中铁十四局集团大盾构工程有限公司 | Fine adjustment assembly trolley and assembly method for prefabricated box culvert of shield tunnel |
CN111927493A (en) * | 2020-10-09 | 2020-11-13 | 中国铁建重工集团股份有限公司 | Special-shaped section of jurisdiction erector of super large section |
CN113137253A (en) * | 2021-04-30 | 2021-07-20 | 盾构及掘进技术国家重点实验室 | Through type tunnel arc-shaped part installing machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110388220A (en) | A kind of tunnel internal rail flowering structure assembly device | |
CN106240578B (en) | A kind of suspension train track, hanging bogie and its train system | |
CN105416096B (en) | Door frame type level crossing movable type contact line | |
CN103223878A (en) | Overhead power grid for mobile mining machines | |
CN109958464B (en) | Portal type duct piece assembling equipment and method | |
CN104179090B (en) | A kind of subway is laid a railway track system | |
CN109098138A (en) | Hopper collection sand formula railroad track removes sand vehicle | |
CN112093662B (en) | Shield segment lifting machine | |
DE2541599A1 (en) | Linear induction tracked vehicle - with stators spaced on each side of permanent magnet cores | |
US3548751A (en) | Electric linear locomotive | |
CN103072519B (en) | The dust-proof soft paulin convering system of a kind of city slag waggon environmental protection | |
CN211230513U (en) | Tunnel inner rail lower structure assembling device | |
CN210391118U (en) | Suspension type monorail train system with double-row type electromagnetic weight reduction mechanism | |
CN104179092A (en) | Machine for removing, transporting and laying turnout steel rail component | |
CN208106657U (en) | Wind power generating set and its handling apparatus | |
CN208167427U (en) | Steel rail collection device for construction of railways scene | |
CN113479221B (en) | Single-track crane driving unit group capable of realizing mechanical power rapid distribution | |
CN217076721U (en) | Crane beam rail brake device | |
CN103015276A (en) | Host machine of track-laying machine improved based on replacement structure, and assembly method thereof | |
CN216034399U (en) | Tunnel maintenance car anti-slip control device | |
CN213059937U (en) | Shield segment lifting machine | |
CN109650260B (en) | Double arch bridge type mounting machine for railway tunnel template trolley | |
CN102979015B (en) | Magnetic suspension track-laying vehicle | |
CN208631636U (en) | A kind of pickling line automatic charging device | |
CN203255879U (en) | Longitudinal movement drive mechanism for crown block of railway bridge erecting machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |