CN110387894A - Schist slope stability processing method - Google Patents

Schist slope stability processing method Download PDF

Info

Publication number
CN110387894A
CN110387894A CN201910711564.9A CN201910711564A CN110387894A CN 110387894 A CN110387894 A CN 110387894A CN 201910711564 A CN201910711564 A CN 201910711564A CN 110387894 A CN110387894 A CN 110387894A
Authority
CN
China
Prior art keywords
schist
slope
reinforcing bar
side slope
stability
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910711564.9A
Other languages
Chinese (zh)
Inventor
王国豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU ZHONGMAO LANDSCAPE CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
GUANGZHOU ZHONGMAO LANDSCAPE CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU ZHONGMAO LANDSCAPE CONSTRUCTION ENGINEERING Co Ltd filed Critical GUANGZHOU ZHONGMAO LANDSCAPE CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201910711564.9A priority Critical patent/CN110387894A/en
Publication of CN110387894A publication Critical patent/CN110387894A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/122Flexible prefabricated covering elements, e.g. mats, strips
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/202Securing of slopes or inclines with flexible securing means
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Abstract

The invention discloses the schist slope stability processing methods, manufacturing process is simple and convenient, to first excavation, rear embedded bar, again by way of concreting on schist side slope periphery, the ground of schist side slope after weathering is carried out reinforcing stable processing, secondly, being used cooperatively by side slope protective screen, the schist side slope after stablizing to reinforcing carry out protective treatment again, technology in the application enhances the overall stability of side slope using the structural strength that schist side slope can be improved.

Description

Schist slope stability processing method
Technical field
The present invention relates to stability of slope protection field more particularly to schist slope stability processing methods.
Background technique
Schist is that have the metamorphic rock of typical sheet structure a kind of, is the product of regional metamorphism.It is characterized in that piece manages structure It makes, by sheet, plate, feather salt is arranged parallel to each other, and granularity is thicker, can visually distinguish.Essential mineral is mica, stone English, hornblend, chlorite etc..Intensity is lower, easily weathering, and frost resistance is poor,
Currently, only there are safeguard procedures for the schist side slope after weathering, there is not it to reinforce stable measure, in view of above Defect, it is really necessary to design schist slope stability processing method.
Summary of the invention
Technical problem to be solved by the present invention lies in: schist slope stability processing method is provided, to solve background skill The problem of art proposes.
In order to solve the above technical problems, the technical scheme is that schist slope stability processing method presses following step It is rapid to carry out:
(1) it excavates: being excavated using machinery with the method manually combined, opened using backhoe and bull-dozer, loading machine It digs;
(2) surface layer is cleared up: removing, stacking and the processing of surface soil need to be executed according to the instruction of supervisor, according to the depth of instruction Degree, which excavates and is transported to specified Dumping Sites, to be stacked;
(3) cut slope: after the completion of mechanical excavation, progress manually cuts slope, manually clears up reserved 10cm protective layer soil;
(4) pre-buried: by reinforcing bar in a manner of longitudinal in the pre-buried region excavated to schist side slope periphery;
(5) pour: using concrete will be pre-buried after reinforcing bar carry out pouring processing, and reinforcing bar is kept during pouring Longitudinally perpendicular stability;
(6) reinforce: the reinforcing bar middle after pouring between any two is reinforced using square steel, is existed so as to improve reinforcing bar Excavate the stability after pouring in region;
(7) lapping: by welding by side slope protective screen, the outside left of welding and reinforcing bar and square steel;
(8) rock ballast backfills: the periphery of schist slope excavating being carried out backfill processing using rock ballast material, ensures schist with this The planarization of slope excavating surrounding ground.
Further, the diameter of reinforcing bar is 20mm in described (4) the pre-buried step.
Further, it is C30 that (5), which pour the strength grade of concrete in step,.
Compared with prior art, the schist slope stability processing method, manufacturing process is simple and convenient, in schist side slope week To first excavation, rear embedded bar, again by way of concreting, add to the ground of the schist side slope after weathering on side Gu stablizing processing, secondly, being used cooperatively by side slope protective screen again, carries out at protection the schist side slope reinforced after stablizing It manages, the technology in the application enhances the overall stability of side slope using the structural strength that schist side slope can be improved.
Detailed description of the invention
Fig. 1 is production flow diagram of the present invention
Specific embodiment
Hereinafter, a variety of specific details are elaborated, in order to provide to the saturating of the concept for constituting described embodiment basis Thorough understanding.However, it will be apparent to those skilled in the art that described embodiment can be in these no specific details In some or all situations get off practice.In other cases, well-known processing step is not specifically described.
Embodiment
The schist slope stability processing method that the present embodiment is enumerated, is made as follows, first using mechanical and people The method that work combines is excavated, and is excavated using backhoe and bull-dozer, loading machine, then by the removing, stacking and processing of surface soil It need to be executed according to the instruction of supervisor, be excavated according to the depth of instruction and be transported to specified Dumping Sites and stacked, when mechanical excavation is completed Afterwards, it carries out manually cutting slope, reserved 10cm protective layer soil is manually cleared up, then reinforcing bar is pre-buried to schist in a manner of longitudinal In the region that side slope periphery is excavated, reuse concrete will be pre-buried after reinforcing bar carry out pouring processing, and during pouring The longitudinally perpendicular stability of reinforcing bar is kept, then the reinforcing bar middle after pouring between any two is reinforced using square steel, with this It improves reinforcing bar and is excavating the stability after pouring in region, then by welding by side slope protective screen, welding and reinforcing bar And the outside left of square steel, then the periphery of schist slope excavating is subjected to backfill processing using rock ballast material, piece is ensured with this The planarization of rock slope excavating surrounding ground.
The schist slope stability processing method, manufacturing process is simple and convenient, by first opening on schist side slope periphery Digging, rear embedded bar, concreting again mode, the ground of the schist side slope after weathering is carried out reinforcing stable processing, It is secondary, then being used cooperatively by side slope protective screen, protective treatment is carried out to the schist side slope reinforced after stablizing, the skill in the application Art enhances the overall stability of side slope using the structural strength that schist side slope can be improved.

Claims (3)

1. schist slope stability processing method, it is characterised in that: sequentially include the following steps:
(1) it excavates: being excavated using machinery with the method manually combined, excavated using backhoe and bull-dozer, loading machine;
(2) surface layer is cleared up: removing, stacking and the processing of surface soil need to be executed according to the instruction of supervisor, be opened according to the depth of instruction It digs and is transported to specified Dumping Sites and stack;
(3) cut slope: after the completion of mechanical excavation, progress manually cuts slope, manually clears up reserved 10cm protective layer soil;
(4) pre-buried: by reinforcing bar in a manner of longitudinal in the pre-buried region excavated to schist side slope periphery;
(5) pour: using concrete will be pre-buried after reinforcing bar carry out pouring processing, and keep reinforcing bar longitudinal during pouring Vertical stability;
(6) reinforce: the reinforcing bar middle after pouring between any two is reinforced using square steel, is being excavated so as to improve reinforcing bar Stability after being poured in region;
(7) lapping: by welding by side slope protective screen, the outside left of welding and reinforcing bar and square steel;
(8) rock ballast backfills: the periphery of schist slope excavating being carried out backfill processing using rock ballast material, ensures schist side slope with this Excavate the planarization of surrounding ground.
2. schist slope stability processing method according to claim 1, it is characterised in that in described (4) the pre-buried step The diameter of reinforcing bar is 20mm.
3. schist slope stability processing method according to claim 2, it is characterised in that (5) pour in step The strength grade of concrete is C30.
CN201910711564.9A 2019-08-02 2019-08-02 Schist slope stability processing method Pending CN110387894A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910711564.9A CN110387894A (en) 2019-08-02 2019-08-02 Schist slope stability processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910711564.9A CN110387894A (en) 2019-08-02 2019-08-02 Schist slope stability processing method

Publications (1)

Publication Number Publication Date
CN110387894A true CN110387894A (en) 2019-10-29

Family

ID=68288145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910711564.9A Pending CN110387894A (en) 2019-08-02 2019-08-02 Schist slope stability processing method

Country Status (1)

Country Link
CN (1) CN110387894A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101032203A (en) * 2007-03-22 2007-09-12 山东铝业股份有限公司 Construction method for laying growth matrix on side slope of red mud storage yard
CN102668836A (en) * 2012-05-07 2012-09-19 青岛高次团粒生态技术有限公司 Spray-sowing greening method for red mud stacking areas
CN103758084A (en) * 2014-01-27 2014-04-30 浙江水利水电学院 Ecological river interlocking type building blocks and construction method for building protection ridge through building blocks
CN106368224A (en) * 2016-10-14 2017-02-01 江苏建筑职业技术学院 Graded slope reinforcing reverse construction method for high slope under complicated geology
CN107761584A (en) * 2017-10-11 2018-03-06 中交路桥建设有限公司 A kind of freeway tunnel mouth Dangerous Rock Body Treatment Methods
CN108330914A (en) * 2018-04-27 2018-07-27 河南创辉水利水电工程有限公司 A kind of levee slope double-layer protecting device of mountain stream
CN108487191A (en) * 2018-04-27 2018-09-04 河南创辉水利水电工程有限公司 A method of double protection is carried out to river side slope
CN109537603A (en) * 2018-12-07 2019-03-29 天津大学 A kind of novel backfill reinforcement means

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101032203A (en) * 2007-03-22 2007-09-12 山东铝业股份有限公司 Construction method for laying growth matrix on side slope of red mud storage yard
CN102668836A (en) * 2012-05-07 2012-09-19 青岛高次团粒生态技术有限公司 Spray-sowing greening method for red mud stacking areas
CN103758084A (en) * 2014-01-27 2014-04-30 浙江水利水电学院 Ecological river interlocking type building blocks and construction method for building protection ridge through building blocks
CN106368224A (en) * 2016-10-14 2017-02-01 江苏建筑职业技术学院 Graded slope reinforcing reverse construction method for high slope under complicated geology
CN107761584A (en) * 2017-10-11 2018-03-06 中交路桥建设有限公司 A kind of freeway tunnel mouth Dangerous Rock Body Treatment Methods
CN108330914A (en) * 2018-04-27 2018-07-27 河南创辉水利水电工程有限公司 A kind of levee slope double-layer protecting device of mountain stream
CN108487191A (en) * 2018-04-27 2018-09-04 河南创辉水利水电工程有限公司 A method of double protection is carried out to river side slope
CN109537603A (en) * 2018-12-07 2019-03-29 天津大学 A kind of novel backfill reinforcement means

Similar Documents

Publication Publication Date Title
CN104847362B (en) Ground consisting of hard rock construction method across underground digging in subway station greatly
CN103938617B (en) A kind of ultra-deep underground continuous wall and construction method thereof
CN108952766A (en) The construction method of Tunnel Passing karst location punishment
CN106121659A (en) The narrow-bore tunnel excavation method of major urban arterial highway upper-soft lower-hard ground is worn under one
CN201943086U (en) Underground building wall body
CN104594912A (en) Method for grinding and penetrating through pile groups through shield tunneling machine
CN106498959A (en) Gutter for deep overburden
CN107654239A (en) A kind of tunnel bottom is excavated and inverted arch construction method
CN104453915B (en) Big cross section vertical shaft pre-pouring grout reinforces Rapid Excavation method
JP2020506309A (en) Clean and efficient coal mining
CN110387894A (en) Schist slope stability processing method
CN104153347A (en) Repair structure of underground diaphragm wall panel notch and construction method of repair structure
CN106761800A (en) Support System in Soft Rock Tunnels excavation construction process
CN106498951B (en) A kind of shaft excavation construction method
CN210439278U (en) Rubber water stop structure at top of impervious wall
CN205975593U (en) Silt region is dug bored concrete pile soon and is put with protecting wound packages
CN111852554B (en) Rapid trenching method for large water inrush quantity pit open-pit mine small-block full-section deep one-time blasting
CN105887798B (en) Rock backfills Novel foundation treatment method
CN112854198A (en) Construction method for treating old foundation of underground diaphragm wall
CN110374609A (en) A kind of ultra-shallow earth-covered shield lakebed builds island driving method
RU2330957C1 (en) Method of tiered gravel deposit mining by continental bucket dredges
Hulme et al. Bored tunneling for Singapore metro
CN110359445A (en) A kind of cut-pff wall top rubber water sealing structure and its construction method
CN104652404A (en) Method for carrying out resource utilization on caustic slag after physical dehydrating
O’Brien et al. Construction of the Plastic Concrete Cut-off Wall at Hinze Dam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191029

RJ01 Rejection of invention patent application after publication