CN110387825A - A kind of construction method of prefabricated stand column quick device to hole and pose adjustment - Google Patents

A kind of construction method of prefabricated stand column quick device to hole and pose adjustment Download PDF

Info

Publication number
CN110387825A
CN110387825A CN201910643977.8A CN201910643977A CN110387825A CN 110387825 A CN110387825 A CN 110387825A CN 201910643977 A CN201910643977 A CN 201910643977A CN 110387825 A CN110387825 A CN 110387825A
Authority
CN
China
Prior art keywords
stand column
prefabricated stand
cushion cap
hole
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910643977.8A
Other languages
Chinese (zh)
Other versions
CN110387825B (en
Inventor
李厚荣
董景超
胡小忠
黄春晖
朱克宏
吴银根
蔡奇鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 24th Bureau Group Co Ltd
Original Assignee
China Railway 24th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 24th Bureau Group Co Ltd filed Critical China Railway 24th Bureau Group Co Ltd
Priority to CN201910643977.8A priority Critical patent/CN110387825B/en
Publication of CN110387825A publication Critical patent/CN110387825A/en
Application granted granted Critical
Publication of CN110387825B publication Critical patent/CN110387825B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of construction methods of prefabricated stand column quick device to hole and pose adjustment, the following steps are included: lifting prefabricated stand column is moved to right above cushion cap, the top surface of cushion cap is vertically equipped with several embedded bars, is vertically correspondingly provided with several embedded sleeve barrels in prefabricated stand column;Embedded bar guidance prefabricated stand column is clamped using guide cone clamp gradually to fall, and makes the accurate device to hole embedded bar of embedded sleeve barrel;Guide cone clamp is removed, when prefabricated stand column falls to the top surface preset height away from the cushion cap, using the horizontal pushing tow prefabricated stand column of direction regulator on four side of top surface for being installed on cushion cap, the plan-position of accurate adjustment prefabricated stand column makes it accurately fall to the center of cushion cap.The invention has the advantages that prefabricated stand column can be made quickly in place in hoisting process, reduce number and time that hoisting process pilot scale is hung;It is convenient to accurately adjust plan-position and the verticality of prefabricated stand column in hoisting process, it is ensured that the error of construction is controllable, and easy to operate, and security risk is low.

Description

A kind of construction method of prefabricated stand column quick device to hole and pose adjustment
Technical field
The present invention relates to bridge prefabrication assembling construction technical fields, and in particular to a kind of quick device to hole of prefabricated stand column and posture The construction method of adjustment.
Background technique
As bridge prefabrication assembling construction process popularizes in bridge construction, need in work progress to carry out a large amount of Prefabricated stand column lifting, column lift substantial amounts, and since single column weight is to tens tons of even tons up to a hundred, in hoisting process Risk is larger.
Traditional column is mainly based on cast-in-place, without extensive, large-tonnage lifting.This several years, also there is minority The science of bridge building of precast assembly, but hoisting process is cumbersome, inefficiency, and the lifting precision controlling of column is not high.
Summary of the invention
According to the deficiencies of the prior art described above, It is an object of the present invention to provide a kind of quick device to hole of prefabricated stand column and The construction method of pose adjustment, the construction method by before prefabricated stand column bottom sleeves device to hole cushion cap embedded bar just cushion cap Face elevation leveling, by self-control guiding taper pincers so that the rapid device to hole pile cap steel of prefabricated stand column bottom sleeves during lifting In muscle, then by the plan-position of direction regulator adjustment prefabricated stand column, by the bracket on jacking prefabricated stand column, adjusting is vertical The verticality of column, whole process time-consuming is short, noise is small, easy to operate and reduce security risk in hoisting process.
The object of the invention realization is completed by following technical scheme:
A kind of construction method of prefabricated stand column quick device to hole and pose adjustment, it is characterised in that the construction method includes following step Rapid: lifting prefabricated stand column is moved to right above cushion cap, and the top surface of the cushion cap is vertically equipped with several embedded bars, described prefabricated vertical Several embedded sleeve barrels are vertically correspondingly provided in column;Using guide cone clamp clamp the embedded bar guide the prefabricated stand column by Step falls, and the embedded sleeve barrel is made to be accurately aimed at the embedded bar and cover the embedded bar wherein;Remove described lead It is clamped to taper, when the prefabricated stand column falls to the top surface preset height away from the cushion cap, using being installed on the cushion cap Prefabricated stand column described in the horizontal pushing tow of direction regulator on four side of top surface, under the plan-position of prefabricated stand column described in accurate adjustment keeps its accurate Drop down onto the center of the cushion cap.
Four side of top surface of the cushion cap is provided with angle steel, and the direction regulator is set on the angle steel.
The construction method is further comprising the steps of: after the prefabricated stand column is fallen on down on the cushion cap completely, using setting Be placed in the top surface surrounding of the cushion cap jacking apparatus jack the prefabricated stand column side pre-installation bracket, it is pre- described in accurate adjustment The verticality of column processed.
Several screw shells are embedded in the prefabricated stand column, the one end of the screw shell stretches out in described prefabricated vertical The side of column, the bracket are installed in the screw shell.
Each side of the prefabricated stand column offers the injected hole to connect with the embedded sleeve barrel, and the bracket is installed on In the injected hole.
The construction method is further comprising the steps of: the elevation of the end face center of the cushion cap is measured, in the cushion cap End face center places the steel plate of corresponding thickness and rubber slab is wanted to adjust the elevation of the top surface of the cushion cap with meeting design altitude It asks.
The plan-position of prefabricated stand column described in accurate adjustment method particularly includes: set on each side of the prefabricated stand column in advance Set vertical center line markings, using calibrating installation observe the vertical center line markings obtain it is inclined with the top surface central axes of the cushion cap Difference, the direction regulator by being located at different direction make according to prefabricated stand column described in the variance level pushing tow described prefabricated Column centering is accurately fallen.
The calibrating installation is theodolite or total station.
The guide cone clamp includes clamp handle, connecting shaft and plier, and the clamp handle is through the connecting shaft and the plier It is connected, the plier is engaged on direction perpendicular to it and is provided with conical guide member.
The invention has the advantages that prefabricated stand column can be made quickly in place in hoisting process, reduce what hoisting process pilot scale was hung Number and time;It is convenient to accurately adjust plan-position and the verticality of prefabricated stand column in hoisting process, it is ensured that apply The error of work is controllable, and easy to operate, and security risk is low.
Detailed description of the invention
Fig. 1 is the elevational schematic view of prefabricated stand column device to hole in the present invention;
Fig. 2 is the floor map of prefabricated stand column integral hoisting in the present invention;
Fig. 3 is the elevational schematic view of prefabricated stand column plan-position adjustment in the present invention;
Fig. 4 is the elevational schematic view of prefabricated stand column verticality adjustment in the present invention;
Fig. 5 is the schematic top plan view of guide cone clamp in the present invention;
Fig. 6 is the schematic side view of guide cone clamp in the present invention.
Specific embodiment
Feature of the invention and other correlated characteristics are described in further detail by embodiment below in conjunction with attached drawing, with Convenient for the understanding of technical staff of the same trade:
Such as Fig. 1-6, label 1-15 is respectively as follows: adjustment cushion block 1, calibrating installation 2, guide cone clamp 3, direction regulator 4, angle in figure Steel 5, embedded bar 6, prefabricated stand column 7, embedded sleeve barrel 8, bracket 9, jacking apparatus 10, cushion cap 11, clamp handle 12, connecting shaft 13, pincers Mouth 14, guide part 15.
Embodiment: as shown, the present embodiment is specifically related to the construction of a kind of prefabricated stand column quick device to hole and pose adjustment Method, the construction method by before the embedded bar 6 on the 8 device to hole cushion cap 11 of embedded sleeve barrel of 7 bottom of prefabricated stand column just holding The leveling of 11 elevation of top surface of platform, makes the embedded sleeve barrel 8 of prefabricated stand column 7 during lifting by homemade guide cone clamp 3 In embedded bar 6 on rapid device to hole cushion cap 11, then by the plan-position of the adjustment prefabricated stand column 7 of direction regulator 4, pass through Jack prefabricated stand column 7 on bracket 9, adjust prefabricated stand column 7 verticality, whole process time-consuming is short, noise is small, it is easy to operate simultaneously And reduce the security risk in hoisting process.
As shown in figures 1 to 6, the quick device to hole of one of the present embodiment prefabricated stand column and the construction method of pose adjustment include Following steps:
(1) pre-production prefabricated stand column 7, the prefabrication phase embedded sleeve barrel 8 vertically arranged in the pre-buried circle in 7 bottom of prefabricated stand column, Injected hole is opened up in each side of prefabricated stand column 7, so that injected hole is connected with embedded sleeve barrel 8, to facilitate into embedded sleeve barrel 8 Slip casting, injected hole can also be replaced with pre-buried screw shell, and corresponding screw shell runs through embedded sleeve barrel 8, while screw shell One end to stretch out in corresponding side;Prefabricated cushion cap 11, and corresponded at 7 drop-off positions of prefabricated stand column in the Mosaic face of cushion cap 11 The setting form of vertically arranged several embedded bars 6, embedded bar 6 is corresponding with embedded sleeve barrel 8, and the diameter of embedded bar 6 Less than the internal diameter of embedded sleeve barrel 8, to ensure that embedded bar 6 can protrude into embedded sleeve barrel 8.For embedded sleeve barrel 8 and embedded bar 6 Laying form, can require be changed according to Practical Project, such as two circle of setting or multi-turn embedded sleeve barrel 8 and embedded bar 6, It can be laid in the form of circle, triangle etc..
(2) pacify by the injected hole of the embedded sleeve barrel 8 positioned at each center side position inside connection prefabricated stand column 7 Bracket 9 is filled, i.e. a bracket 9 is respectively installed in slip casting hole site in the four of prefabricated stand column 7 side;Cushion cap 11 Mosaic face (i.e. Top surface) four sides be arranged angle steel 5, every one side 5 medium position of angle steel be arranged direction regulator 4;Spelling is drawn on cushion cap 11 The central axes of the four edges of junction, and it is mutual on four central axes of the Mosaic face of cushion cap 11 arbitrarily to place two decorating positions Vertical calibrating installation 2, while the line of ink marker on bullet on the vertical middle line of four sides of prefabricated stand column 7;In the present embodiment, calibration Device 2 can be theodolite or total station.
(3) measure the altitude data of the Mosaic face center of cushion cap 11 with level, and with the setting on design drawing Value is compared, and places certain thickness adjustment cushion block 1 by the Mosaic face center in cushion cap 11 to adjust the splicing of cushion cap 11 The elevation in face, to meet design requirement, adjustment cushion block 1 can be steel plate and be also possible to rubber slab.
(4) it lifts by crane prefabricated stand column 7 and is transferred to the top of cushion cap 11, clamp cushion cap with two homemade guide cone clamps 3 Two embedded bars 6 on 11, general this two embedded bars 6 clamped of choosing are located at not ipsilateral, prefabricated stand column 7 gradually under It falls, since guide cone clamp 3 has vertically arranged guide part 15, therefore bootable prefabricated stand column 7 is pressed both along guide cone clamp 3 Determine direction whereabouts, the embedded bar 6 on the successful device to hole cushion cap 11 of embedded sleeve barrel 8 in final prefabricated stand column 7, when embedded sleeve barrel 8 Part is when covering outside precast reinforced 6 upper end, guide cone clamp 3 can be unclamped and guide cone clamp is displaced downwardly to be detached from it is pre-buried Thus sleeve 8 can smoothly be taken from guide cone clamp 3.The diameter of embedded sleeve barrel 8 is greater than guide cone clamp 3 and clamps embedded bar 6 When outer diameter.
Guide cone clamp 3 in the present embodiment includes clamp handle 12, connecting shaft 13 and plier 14, and clamp handle 12 passes through connecting shaft 13 are connected with plier 14, and when forcing in clamp handle 12 moves toward one another it, plier 14 will be realized and is engaged, and plier 14 is stung perpendicular to it Guide part 15 is provided on conjunction face, guide part 15 is tapered, and plier 14 and guide part 15 can be integrated molding, is also possible to point Section welding is formed.
(5) continuation of prefabricated stand column 7 is gradually fallen under the guiding of embedded bar 6, is fallen to prefabricated stand column 7 away from cushion cap face When 3-5 centimetres of height, side bottom edge center (i.e. side line of ink marker center line and the bottom of prefabricated stand column 7 are observed by calibrating installation 2 The intersection point on side) and the corresponding sides on the Mosaic face of cushion cap 11 central axes deviation, then utilized according to the deviation data that measures The horizontal jacking prefabricated stand column 7 of direction regulator 4 being arranged on angle steel 5 at four sides of cushion cap 11, since prefabricated stand column 7 is at this time Suspended state, therefore jacking operation is relatively easy to, so as to adjust the plan-position of prefabricated stand column 7, then again slowly under hang it is prefabricated vertical Column 7 makes it accurately fall on the Mosaic face center setting position of cushion cap 11;Direction regulator 4 can be can precession major diameter spiral shell Bolt is also possible to the equipment such as jack.
(6) after prefabricated stand column 7 is fallen on down on cushion cap 11 completely, the side top margin of prefabricated stand column 7 is observed using calibrating installation 2 The deviation of the central axes of the Mosaic face of center (i.e. the intersection point of side line of ink marker center line and top margin) and cushion cap 11, then basis measures Deviation data using cushion cap 11 Mosaic face surrounding jacking apparatus 10 jack prefabricated stand column 7 side on bracket 9, thus The verticality of accurate adjustment prefabricated stand column 7, jacking apparatus 10 can be the equipment such as jack.
(7) subsequent pouring construction is finally completed the splicing of prefabricated stand column.
The beneficial effect of the present embodiment is: (1) package unit used in is simple, safety, practical, energy during lifting Keep column quickly in place, reduces number and time that hoisting process pilot scale is hung;(2) in prefabricated stand column bottom sleeves device to hole cushion cap Just cushion cap face elevation is leveled before embedded bar, can be clamped by self-control guiding taper so that column bottom set during lifting In the rapid device to hole cushion cap reinforcing bar of cylinder, and the plan-position of column can be adjusted by direction regulator, it can also be prefabricated by jacking Bracket on column, the verticality of adjusting post;(3) whole process time-consuming is short, noise is small, easy to operate and reduce lifting Security risk in the process.

Claims (9)

1. a kind of construction method of prefabricated stand column quick device to hole and pose adjustment, it is characterised in that the construction method includes following Step: lifting prefabricated stand column is moved to right above cushion cap, and the top surface of the cushion cap is vertically equipped with several embedded bars, described prefabricated Several embedded sleeve barrels are vertically correspondingly provided in column;The embedded bar, which is clamped, using guide cone clamp guides the prefabricated stand column It gradually falls, the embedded sleeve barrel is made to be accurately aimed at the embedded bar and cover the embedded bar wherein;It removes described Guide cone clamp, when the prefabricated stand column falls to the top surface preset height away from the cushion cap, using being installed on the cushion cap Four side of top surface the horizontal pushing tow of direction regulator described in prefabricated stand column, the plan-position of prefabricated stand column described in accurate adjustment keeps it accurate Fall to the center of the cushion cap.
2. the construction method of a kind of prefabricated stand column quick device to hole and pose adjustment according to claim 1, it is characterised in that Four side of top surface of the cushion cap is provided with angle steel, and the direction regulator is set on the angle steel.
3. the construction method of a kind of prefabricated stand column quick device to hole and pose adjustment according to claim 1, it is characterised in that The construction method is further comprising the steps of: described using being set to after the prefabricated stand column is fallen on down on the cushion cap completely The jacking apparatus of the top surface surrounding of cushion cap jacks the bracket of the side pre-installation of the prefabricated stand column, prefabricated stand column described in accurate adjustment Verticality.
4. the construction method of a kind of prefabricated stand column quick device to hole and pose adjustment according to claim 3, it is characterised in that Several screw shells are embedded in the prefabricated stand column, the one end of the screw shell stretches out in the side of the prefabricated stand column Face, the bracket are installed in the screw shell.
5. the construction method of a kind of prefabricated stand column quick device to hole and pose adjustment according to claim 3, it is characterised in that Each side of the prefabricated stand column offers the injected hole to connect with the embedded sleeve barrel, and the bracket is installed on the slip casting Kong Zhong.
6. the construction method of a kind of prefabricated stand column quick device to hole and pose adjustment according to claim 1, it is characterised in that The construction method is further comprising the steps of: the elevation of the end face center of the cushion cap is measured, in the end face center of the cushion cap Steel plate and the rubber slab of corresponding thickness are placed to adjust the elevation of the top surface of the cushion cap to meet design altitude requirement.
7. the construction method of a kind of prefabricated stand column quick device to hole and pose adjustment according to claim 1, it is characterised in that The plan-position of prefabricated stand column described in accurate adjustment method particularly includes: be arranged in vertical on each side of the prefabricated stand column in advance Wire tag is observed the deviation of the top surface central axes of the vertical center line markings acquisition and the cushion cap using calibrating installation, passed through The direction regulator positioned at different direction makes the prefabricated stand column pair according to prefabricated stand column described in the variance level pushing tow In accurately fall.
8. the construction method of a kind of prefabricated stand column quick device to hole and pose adjustment according to claim 7, it is characterised in that The calibrating installation is theodolite or total station.
9. the construction method of a kind of prefabricated stand column quick device to hole and pose adjustment according to claim 1, it is characterised in that The guide cone clamp includes clamp handle, connecting shaft and plier, and the clamp handle is connected through the connecting shaft with the plier, described Plier is engaged on direction perpendicular to it and is provided with conical guide member.
CN201910643977.8A 2019-07-17 2019-07-17 Construction method for quickly adjusting holes and postures of prefabricated stand columns Active CN110387825B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910643977.8A CN110387825B (en) 2019-07-17 2019-07-17 Construction method for quickly adjusting holes and postures of prefabricated stand columns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910643977.8A CN110387825B (en) 2019-07-17 2019-07-17 Construction method for quickly adjusting holes and postures of prefabricated stand columns

Publications (2)

Publication Number Publication Date
CN110387825A true CN110387825A (en) 2019-10-29
CN110387825B CN110387825B (en) 2021-10-19

Family

ID=68286715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910643977.8A Active CN110387825B (en) 2019-07-17 2019-07-17 Construction method for quickly adjusting holes and postures of prefabricated stand columns

Country Status (1)

Country Link
CN (1) CN110387825B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110863652A (en) * 2019-11-25 2020-03-06 上海市基础工程集团有限公司 Precise positioning and mounting method for prefabricated and assembled double-section stand column
CN112609575A (en) * 2020-11-19 2021-04-06 中铁二局集团有限公司 Steel pipe column alignment structure and steel pipe column alignment method
CN113026562A (en) * 2021-03-15 2021-06-25 中铁大桥局上海工程有限公司 Rapid positioning device and method for prefabricated capping beam and prefabricated stand column
CN113668406A (en) * 2021-09-26 2021-11-19 河南国基建设集团有限公司 Municipal construction prefabricated pier erecting device and erecting method thereof
CN114046054A (en) * 2021-12-27 2022-02-15 山东同创设计咨询集团有限公司 Guide positioning device for assembly type building component and construction method
WO2022088664A1 (en) * 2020-10-29 2022-05-05 中铁四局集团第一工程有限公司 Installation method for prefabricated capping beam of viaduct

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4328114B2 (en) * 2003-03-17 2009-09-09 三井住友建設株式会社 Bridge construction method
CN105951601A (en) * 2016-06-07 2016-09-21 上海公路投资建设发展有限公司 Horizontal positioning device for prefabricated stand column and method for positioning and installing prefabricated stand column through horizontal positioning device
CN205857035U (en) * 2016-06-07 2017-01-04 上海公路投资建设发展有限公司 A kind of prefabricated stand column and the assembled positioner of cushion cap
CN107299768A (en) * 2017-08-18 2017-10-27 中建科技(北京)有限公司 The abutting joint instrument and its application method of fabricated shear wall
CN107476586A (en) * 2017-08-09 2017-12-15 安徽兰兮工程技术开发有限公司 The erecting device of house PC prefabricated components and the installation method of PC prefabricated components
CN107524092A (en) * 2017-09-12 2017-12-29 上海建工集团股份有限公司 The spatial attitude adjusting apparatus and its control method of prefabricated stand column section assembling
CN107654073A (en) * 2017-10-31 2018-02-02 中建四局第六建筑工程有限公司 One kind guiding assembled architecture wall lifting positioner and hanging method
CN108894116A (en) * 2018-07-24 2018-11-27 中铁十局集团第五工程有限公司 Prefabricated stand column assembling and construction method
CN109208485A (en) * 2018-10-17 2019-01-15 中铁大桥局集团有限公司 The method for rapidly positioning of positioning device and packaged type bridges Precast Pier Columns
CN109537917A (en) * 2018-10-23 2019-03-29 中建局集团第建筑有限公司 A kind of device for pre-positioning and prefabricated vertical PC member reinforcing steel bar sleeve are pre-positioned method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4328114B2 (en) * 2003-03-17 2009-09-09 三井住友建設株式会社 Bridge construction method
CN105951601A (en) * 2016-06-07 2016-09-21 上海公路投资建设发展有限公司 Horizontal positioning device for prefabricated stand column and method for positioning and installing prefabricated stand column through horizontal positioning device
CN205857035U (en) * 2016-06-07 2017-01-04 上海公路投资建设发展有限公司 A kind of prefabricated stand column and the assembled positioner of cushion cap
CN107476586A (en) * 2017-08-09 2017-12-15 安徽兰兮工程技术开发有限公司 The erecting device of house PC prefabricated components and the installation method of PC prefabricated components
CN107299768A (en) * 2017-08-18 2017-10-27 中建科技(北京)有限公司 The abutting joint instrument and its application method of fabricated shear wall
CN107524092A (en) * 2017-09-12 2017-12-29 上海建工集团股份有限公司 The spatial attitude adjusting apparatus and its control method of prefabricated stand column section assembling
CN107654073A (en) * 2017-10-31 2018-02-02 中建四局第六建筑工程有限公司 One kind guiding assembled architecture wall lifting positioner and hanging method
CN108894116A (en) * 2018-07-24 2018-11-27 中铁十局集团第五工程有限公司 Prefabricated stand column assembling and construction method
CN109208485A (en) * 2018-10-17 2019-01-15 中铁大桥局集团有限公司 The method for rapidly positioning of positioning device and packaged type bridges Precast Pier Columns
CN109537917A (en) * 2018-10-23 2019-03-29 中建局集团第建筑有限公司 A kind of device for pre-positioning and prefabricated vertical PC member reinforcing steel bar sleeve are pre-positioned method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
南京建设监理协会: "《建设工程监理履行安全生产职责培训教程》", 31 May 2017, 东南大学出版社 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110863652A (en) * 2019-11-25 2020-03-06 上海市基础工程集团有限公司 Precise positioning and mounting method for prefabricated and assembled double-section stand column
WO2022088664A1 (en) * 2020-10-29 2022-05-05 中铁四局集团第一工程有限公司 Installation method for prefabricated capping beam of viaduct
CN112609575A (en) * 2020-11-19 2021-04-06 中铁二局集团有限公司 Steel pipe column alignment structure and steel pipe column alignment method
CN113026562A (en) * 2021-03-15 2021-06-25 中铁大桥局上海工程有限公司 Rapid positioning device and method for prefabricated capping beam and prefabricated stand column
CN113668406A (en) * 2021-09-26 2021-11-19 河南国基建设集团有限公司 Municipal construction prefabricated pier erecting device and erecting method thereof
CN114046054A (en) * 2021-12-27 2022-02-15 山东同创设计咨询集团有限公司 Guide positioning device for assembly type building component and construction method
CN114046054B (en) * 2021-12-27 2022-06-21 山东同创设计咨询集团有限公司 Guide positioning device for assembly type building component and construction method

Also Published As

Publication number Publication date
CN110387825B (en) 2021-10-19

Similar Documents

Publication Publication Date Title
CN110387825A (en) A kind of construction method of prefabricated stand column quick device to hole and pose adjustment
KR101995649B1 (en) Tower crane for erecting a wind turbine, and method for erecting said tower crane
CN104389268B (en) A kind of steel tower column with location structure and construction method for hanging thereof
CN111851565A (en) Steel structure stand column alignment structure with cup-mouth type foundation and construction method thereof
CN111236217A (en) Pile foundation reinforcement cage elevation and centering positioning device and method
CN110616640A (en) Positioning and lowering device for reinforcement cage and construction method of positioning and lowering device
CN105604336A (en) Steel column installation and positioning device and steel column installation and positioning method
CN113605390A (en) Accurate positioning structure for pile connection and construction method
CN205330189U (en) Steel column locating rack
CN104372798A (en) Construction method of all-casing all-direction drilling rig
CN111945714A (en) Steel sleeve guiding method combined with steel upright column inserting construction method
CN101838986B (en) Disassembling tool type lattice column and construction method thereof
CN203069118U (en) Casting thickness measuring device for concrete cast-in-place slab
CN210918290U (en) Construction device for quickly adjusting hole and posture of prefabricated stand column
CN106088756A (en) A kind of method of the cartridge type steel storage tank hydraulic pressure lift upside-down mounting based on BIM technology
CN107587770A (en) Disjunctor storehouse synchronization slding form operation method
CN206815854U (en) A kind of Height marker for improving the smooth thickness construction first-time qualification rate of cast-in-situ floor
CN106403996A (en) Production method of forced centering observation mark stake for precision engineering measurement
CN204174945U (en) Steel pipe column inserts the vertical correction device of construction
CN108798042B (en) Steel pipe column integrated construction verticality adjusting method
CN109201971A (en) For making the positioning device and its construction method of pile foundation steel bar cage
CN212927858U (en) Concrete pouring device for shield starting base
CN204298736U (en) A kind of steel tower column with location structure
CN111962500A (en) Accurate positioning method for lowering pile foundation reinforcement cage
CN105696798B (en) Glomeration pattern masonry wall piece adjusts rope length lift-on/lift-off system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant