CN110378628A - Based at most sending the pre- of part type to send part method in advance - Google Patents
Based at most sending the pre- of part type to send part method in advance Download PDFInfo
- Publication number
- CN110378628A CN110378628A CN201810324297.5A CN201810324297A CN110378628A CN 110378628 A CN110378628 A CN 110378628A CN 201810324297 A CN201810324297 A CN 201810324297A CN 110378628 A CN110378628 A CN 110378628A
- Authority
- CN
- China
- Prior art keywords
- advance
- send
- sends
- sending
- packages amount
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 26
- RVRCFVVLDHTFFA-UHFFFAOYSA-N heptasodium;tungsten;nonatriacontahydrate Chemical compound O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.O.[Na+].[Na+].[Na+].[Na+].[Na+].[Na+].[Na+].[W].[W].[W].[W].[W].[W].[W].[W].[W].[W].[W] RVRCFVVLDHTFFA-UHFFFAOYSA-N 0.000 claims abstract description 4
- 238000004364 calculation method Methods 0.000 claims description 7
- 230000001105 regulatory effect Effects 0.000 claims description 4
- 238000011161 development Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/083—Shipping
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Quality & Reliability (AREA)
- Entrepreneurship & Innovation (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of based at most sending the pre- of part type to send part method in advance, the steps include: S1: input history number of days factor T;S2: it obtains and maximum allowable pre- sends number of packages amount Nmax;S3: counting in nearest T days, the daily T1 moment in the T2 moment logistics and express delivery send Item Information with charge free;S4: it calculates the pre- of all items and sends number of packages amount;S5: if all items send the sum of number of packages to be less than or equal to Nmax in advance, S8 is gone to step;Otherwise, it is transferred in next step;S6: computing redundancy ratio η;S7: each article is calculated according to redundancy ratio η and really sends number of packages amount in advance, calculated result is rounded;S8: it generates and all pre- sends part article and number of articles inventory.The present invention has many advantages, such as that principle is simple, easy to operate and realization, can be improved and sends speed and efficiency with charge free.
Description
Technical field
Present invention relates generally to the fields such as logistics, express delivery, refer in particular to a kind of pre- group for being applicable to the fields such as logistics, express delivery
Part method.
Background technique
With the fast development of logistics and delivery industry, logistics and quick despatch are more and more, for logistics and delivery industry
Speed band of sending with charge free carry out certain test.And for the angle of user, one of logistics and the development trend of express delivery are exactly in object
In the case that stream and quick despatch are more and more, improve send speed with charge free as far as possible.
Speed is sent in raising at present with charge free, and there are two types of schemes, the first is that increase haulage vehicle quantity, raising transport power are protected as far as possible
Card transport in time;Second is exactly to increase lift capacity, improves travelling speed.Both modes are that traditional logistics and express delivery are universal
For improving the method that speed is sent in logistics and express delivery with charge free, but the investment of great number can be brought therewith, including the transport such as vehicle, aircraft
The acquisition expenses or lease expenses of tool, there are also corresponding maintenance costs, management cost etc..Therefore the raising of speed is sent with charge free
The raising of logistics or express delivery cost can be brought, to improve the unit price of logistics and express delivery.It can be seen that current logistics and fast
The development passed enters a bottleneck period, and there is an urgent need for new equipment or method to carry out sending part, can not improve logistics and fast
It is improved under the premise of passing cost and sends speed with charge free.
Summary of the invention
The technical problem to be solved in the present invention is that, for technical problem of the existing technology, the present invention provides one
Kind of principle is simple, it is easy to operate and realize, can be improved send with charge free speed and efficiency based at most sending the pre- of part type to send part side in advance
Method.
In order to solve the above technical problems, the invention adopts the following technical scheme:
It is a kind of based at most sending the pre- of part type to send part method in advance, the steps include:
S1: input history number of days factor T;
S2: it obtains and maximum allowable pre- sends number of packages amount Nmax;
S3: counting in nearest T days, the daily T1 moment in the T2 moment logistics and express delivery send Item Information with charge free;
S4: it calculates the pre- of all items and sends number of packages amount;
S5: if all items send the sum of number of packages to be less than or equal to Nmax in advance, S8 is gone to step;Otherwise, it is transferred in next step;
S6: computing redundancy ratio η, the calculation formula of redundancy ratio η are as follows:
Wherein, NpiIt represents the pre- of i-th of article and sends number of packages amount, n is total number of items.
S7: it calculates each article and really sends number of packages amount in advance, calculated result is rounded.
S8: it generates and all pre- sends part article and number of articles inventory.
Further improvement as the method for the present invention: in the step S4, number of packages amount is sent to be less than not considering for integer 1 in advance.
Further improvement as the method for the present invention: the preset period is two or more in the step S3.
Further improvement as the method for the present invention: it in the step S4, is calculated using the method for nearest consensus forecast pre-
Send number of packages amount, process are as follows:
It calculates each specific the pre- of article and sends quantity N with charge free;The calculation method of N is as follows:
Wherein, σ represents regulatory factor.
Compared with the prior art, the advantages of the present invention are as follows: it is of the invention based at most sending the pre- of part type to send part side in advance
Method can be reflected the statistics of a period of time and be bonded nearest actual conditions based on the nearest time.Do not consider transport power,
Only consider the demand of target group.Of the invention sends method with charge free, have many advantages, such as principle it is simple, it is easy to operate and realize, Neng Gou
It is improved under the premise of not improving logistics and express delivery cost and sends speed with charge free and send efficiency with charge free.
Detailed description of the invention
Fig. 1 is the flow diagram of the method for the present invention.
Specific embodiment
The present invention is described in further details below with reference to Figure of description and specific embodiment.
As shown in Figure 1, it is of the invention based at most sending the pre- of part type to send part method in advance, it is suitble to the dispatching of someone's equipment, nothing
The modes such as the dispatching of people's equipment and the dispatching of cabinet, process are as follows:
S1: input history number of days factor T;
S2: it obtains and maximum allowable pre- sends number of packages amount Nmax;
S3: counting in nearest T days, the daily T1 moment in the T2 moment logistics and express delivery send Item Information with charge free;
S4: calculating the pre- of all items and send number of packages amount, and number of packages amount is sent to be less than not considering for integer 1 in advance;
S5: if all items send the sum of number of packages to be less than or equal to Nmax in advance, turn the 8th step;Otherwise, it is transferred in next step;
S6: computing redundancy ratio η, the calculation formula of redundancy ratio η are as follows:
Wherein, NpiIt represents the pre- of i-th of article and sends number of packages amount, n is total number of items.
S7: it calculates each article and really sends number of packages amount in advance, calculated result is rounded downwards.
S8: it generates and all pre- sends part article and number of articles inventory.
In a specific application example, by some it is pre- send point Z with charge free for, will be divided within one day and multiple pre- send the part time
Section: 6:00-8:00,8:00-11:00,11:00-13:00,13:00-17:00,17:00-19:00,19:00-22:00.With January
No. 8 11:00-13:00 this it is pre- send the part period for, this strategy is described in detail.
The same day is January 8, is reference with 7 days before, therefore T is 7.
S101: input history number of days 7;
S102: maximum allowable in this embodiment pre- to send number of packages amount be 500;
S103: 7 days before being extracted in historical data base, logistics in this period of daily 11:00 to 13:00 and
Item Information is sent in express delivery with charge free, and statistical information is as follows:
S104: in this embodiment, number of packages amount is sent specifically to be explained in advance using the method calculating of nearest consensus forecast, still
Algorithm without being limited thereto.
It calculates each specific the pre- of article and sends quantity N with charge free.The calculation method of N is as follows:
Wherein, σ represents regulatory factor.Regulatory factor is fixed 0.8 in this embodiment.By taking A1 as an example, calculating is sent with charge free in advance
Quantity:
Here, number of articles should be integer, therefore the pre- quantity of sending with charge free of A1 is 79.
Similarly, the pre- quantity of sending with charge free that can obtain all items is as follows:
Serial number | Item Title | Send number of articles with charge free in advance |
1 | A1 | 79 |
2 | A2 | 49 |
3 | A3 | 37 |
4 | B1 | 22 |
5 | B2 | 13 |
6 | B3 | 9 |
7 | C1 | 192 |
8 | C2 | 130 |
9 | C3 | 89 |
S105: it calculates and total pre- sends number of packages Npsum, calculation method is as follows:
It can be calculated, Npsum=620.
Npsum> Nmax, therefore, into next step.
S106: computing redundancy ratio.
S107: it calculates the final of all items and pre- sends number of packages amount.It by taking A1 as an example, is calculated, is as a result rounded downwards:
Similarly, can calculate the final of other articles pre- sends number of packages amount to be as follows:
S108: the pre- quantity of sending with charge free of all items is all larger than 1, and therefore, all articles are sent with charge free in advance, therefore final
Pre- send article with charge free and quantity is as follows:
Serial number | Part Item Title is sent in advance | Send quantity with charge free in advance |
1 | A1 | 63 |
2 | A2 | 39 |
3 | A3 | 29 |
4 | B1 | 17 |
5 | B2 | 10 |
6 | B3 | 7 |
7 | C1 | 154 |
8 | C2 | 104 |
9 | C3 | 71 |
The above is only the preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-described embodiment,
All technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art
For those of ordinary skill, several improvements and modifications without departing from the principles of the present invention should be regarded as protection of the invention
Range.
Claims (4)
1. a kind of based at most sending the pre- of part type to send part method in advance, which is characterized in that step are as follows:
S1: input history number of days factor T;
S2: it obtains and maximum allowable pre- sends number of packages amount Nmax;
S3: counting in nearest T days, the daily T1 moment in the T2 moment logistics and express delivery send Item Information with charge free;
S4: it calculates the pre- of all items and sends number of packages amount;
S5: if all items send the sum of number of packages to be less than or equal to Nmax in advance, S8 is gone to step;Otherwise, it is transferred in next step;
S6: computing redundancy ratio η, the calculation formula of redundancy ratio η are as follows:
Wherein, NpiIt represents the pre- of i-th of article and sends number of packages amount, n is total number of items.
S7: it calculates each article and really sends number of packages amount in advance, calculated result is rounded.
S8: it generates and all pre- sends part article and number of articles inventory.
2. according to claim 1 based at most sending the pre- of part type to send part method in advance, which is characterized in that the step S4
In, send number of packages amount to be less than not considering for integer 1 in advance.
3. according to claim 1 or 2 based at most sending the pre- of part type to send part method in advance, which is characterized in that the step
The preset period is two or more in rapid S3.
4. according to claim 1 or 2 based at most sending the pre- of part type to send part method in advance, which is characterized in that the step
In rapid S4, is calculated using the method for nearest consensus forecast and sends number of packages amount, process in advance are as follows:
It calculates each specific the pre- of article and sends quantity N with charge free;The calculation method of N is as follows:
Wherein, σ represents regulatory factor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810324297.5A CN110378628A (en) | 2018-04-12 | 2018-04-12 | Based at most sending the pre- of part type to send part method in advance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810324297.5A CN110378628A (en) | 2018-04-12 | 2018-04-12 | Based at most sending the pre- of part type to send part method in advance |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110378628A true CN110378628A (en) | 2019-10-25 |
Family
ID=68243102
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810324297.5A Pending CN110378628A (en) | 2018-04-12 | 2018-04-12 | Based at most sending the pre- of part type to send part method in advance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110378628A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102609783A (en) * | 2012-01-11 | 2012-07-25 | 东南大学 | Construction optimizing and operating method of automatic fixed-point picking-up system of logistics express |
CN102708475A (en) * | 2012-05-10 | 2012-10-03 | 东南大学 | System and method for dynamic delivery of logistic express |
CN106845732A (en) * | 2017-02-20 | 2017-06-13 | 浙江大学 | A kind of satellite-type logistics express delivery allocator |
CN107368988A (en) * | 2017-06-30 | 2017-11-21 | 上海斐讯数据通信技术有限公司 | A kind of logistics express delivery device, system and method |
CN107730166A (en) * | 2017-09-19 | 2018-02-23 | 广州唯品会研究院有限公司 | The express mail for sending car with charge free based on nobody sends scheduling method, device and storage medium with charge free |
-
2018
- 2018-04-12 CN CN201810324297.5A patent/CN110378628A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102609783A (en) * | 2012-01-11 | 2012-07-25 | 东南大学 | Construction optimizing and operating method of automatic fixed-point picking-up system of logistics express |
CN102708475A (en) * | 2012-05-10 | 2012-10-03 | 东南大学 | System and method for dynamic delivery of logistic express |
CN106845732A (en) * | 2017-02-20 | 2017-06-13 | 浙江大学 | A kind of satellite-type logistics express delivery allocator |
CN107368988A (en) * | 2017-06-30 | 2017-11-21 | 上海斐讯数据通信技术有限公司 | A kind of logistics express delivery device, system and method |
CN107730166A (en) * | 2017-09-19 | 2018-02-23 | 广州唯品会研究院有限公司 | The express mail for sending car with charge free based on nobody sends scheduling method, device and storage medium with charge free |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108830531B (en) | Intelligent classification logistics storage system | |
CN106803136A (en) | A kind of fresh dispatching real-time optimization method based on genetic algorithm | |
CN203991329U (en) | A kind of logistics Automated Sorting System | |
CN104174599A (en) | Method and device for cargo sorting under conditions of large cargo amount and large cargo owner amount | |
CN110223014A (en) | A kind of multimodal transport logistics system based on underground rail shipping | |
CN109460951B (en) | Intelligent logistics classification management system based on Internet of things | |
WO2023279409A1 (en) | Path optimization method based on logistics tracking | |
CN111563709A (en) | Intelligent logistics cargo link cargo collection method and system | |
CN117541022B (en) | Method for planning picking path of international transportation bulk cargo | |
CN109345170A (en) | A kind of foreign trade B2C electric business stock method and system | |
CN113592409B (en) | Automatic logistics warehouse system and management method | |
CN108460565A (en) | A kind of active logistic management system based on cloud computing | |
CN110378628A (en) | Based at most sending the pre- of part type to send part method in advance | |
CN110458322B (en) | Train operation plan generation method considering enterprise requirements | |
CN117709638A (en) | Method and system for optimizing reliability improvement measures of large sending end system | |
CN106096290A (en) | A kind of method of modified line loss rate | |
CN110378629A (en) | The pre- of number of packages amount is sent to send part method in advance based on maximum | |
CN108305004A (en) | A kind of intelligent dispatching system and dispatching method for flexible manufacturing | |
CN108665362A (en) | A kind of distributed power station accounting system | |
CN110378500A (en) | Nearest statistics based on threshold value selection sends part method in advance | |
Chung et al. | A strategic alliance model with a regional monopoly of service centres in express courier services | |
CN205670304U (en) | A kind of logistics platform merging based on internet and Internet of Things | |
CN110378626A (en) | Pre- part method is sent based on average recently | |
CN110766203A (en) | Railway collection and distribution service network optimization method based on comprehensive cost | |
CN110378627A (en) | Number of packages amount and maximum is sent to send the pre- of part volume to send part method in advance in advance based on minimum |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191025 |
|
RJ01 | Rejection of invention patent application after publication |