CN110378628A - Based at most sending the pre- of part type to send part method in advance - Google Patents

Based at most sending the pre- of part type to send part method in advance Download PDF

Info

Publication number
CN110378628A
CN110378628A CN201810324297.5A CN201810324297A CN110378628A CN 110378628 A CN110378628 A CN 110378628A CN 201810324297 A CN201810324297 A CN 201810324297A CN 110378628 A CN110378628 A CN 110378628A
Authority
CN
China
Prior art keywords
advance
send
sends
sending
packages amount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810324297.5A
Other languages
Chinese (zh)
Inventor
李睿
安向京
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Shenzhen Intelligent Technology Co Ltd
Original Assignee
Changsha Shenzhen Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Shenzhen Intelligent Technology Co Ltd filed Critical Changsha Shenzhen Intelligent Technology Co Ltd
Priority to CN201810324297.5A priority Critical patent/CN110378628A/en
Publication of CN110378628A publication Critical patent/CN110378628A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Quality & Reliability (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of based at most sending the pre- of part type to send part method in advance, the steps include: S1: input history number of days factor T;S2: it obtains and maximum allowable pre- sends number of packages amount Nmax;S3: counting in nearest T days, the daily T1 moment in the T2 moment logistics and express delivery send Item Information with charge free;S4: it calculates the pre- of all items and sends number of packages amount;S5: if all items send the sum of number of packages to be less than or equal to Nmax in advance, S8 is gone to step;Otherwise, it is transferred in next step;S6: computing redundancy ratio η;S7: each article is calculated according to redundancy ratio η and really sends number of packages amount in advance, calculated result is rounded;S8: it generates and all pre- sends part article and number of articles inventory.The present invention has many advantages, such as that principle is simple, easy to operate and realization, can be improved and sends speed and efficiency with charge free.

Description

Based at most sending the pre- of part type to send part method in advance
Technical field
Present invention relates generally to the fields such as logistics, express delivery, refer in particular to a kind of pre- group for being applicable to the fields such as logistics, express delivery Part method.
Background technique
With the fast development of logistics and delivery industry, logistics and quick despatch are more and more, for logistics and delivery industry Speed band of sending with charge free carry out certain test.And for the angle of user, one of logistics and the development trend of express delivery are exactly in object In the case that stream and quick despatch are more and more, improve send speed with charge free as far as possible.
Speed is sent in raising at present with charge free, and there are two types of schemes, the first is that increase haulage vehicle quantity, raising transport power are protected as far as possible Card transport in time;Second is exactly to increase lift capacity, improves travelling speed.Both modes are that traditional logistics and express delivery are universal For improving the method that speed is sent in logistics and express delivery with charge free, but the investment of great number can be brought therewith, including the transport such as vehicle, aircraft The acquisition expenses or lease expenses of tool, there are also corresponding maintenance costs, management cost etc..Therefore the raising of speed is sent with charge free The raising of logistics or express delivery cost can be brought, to improve the unit price of logistics and express delivery.It can be seen that current logistics and fast The development passed enters a bottleneck period, and there is an urgent need for new equipment or method to carry out sending part, can not improve logistics and fast It is improved under the premise of passing cost and sends speed with charge free.
Summary of the invention
The technical problem to be solved in the present invention is that, for technical problem of the existing technology, the present invention provides one Kind of principle is simple, it is easy to operate and realize, can be improved send with charge free speed and efficiency based at most sending the pre- of part type to send part side in advance Method.
In order to solve the above technical problems, the invention adopts the following technical scheme:
It is a kind of based at most sending the pre- of part type to send part method in advance, the steps include:
S1: input history number of days factor T;
S2: it obtains and maximum allowable pre- sends number of packages amount Nmax;
S3: counting in nearest T days, the daily T1 moment in the T2 moment logistics and express delivery send Item Information with charge free;
S4: it calculates the pre- of all items and sends number of packages amount;
S5: if all items send the sum of number of packages to be less than or equal to Nmax in advance, S8 is gone to step;Otherwise, it is transferred in next step;
S6: computing redundancy ratio η, the calculation formula of redundancy ratio η are as follows:
Wherein, NpiIt represents the pre- of i-th of article and sends number of packages amount, n is total number of items.
S7: it calculates each article and really sends number of packages amount in advance, calculated result is rounded.
S8: it generates and all pre- sends part article and number of articles inventory.
Further improvement as the method for the present invention: in the step S4, number of packages amount is sent to be less than not considering for integer 1 in advance.
Further improvement as the method for the present invention: the preset period is two or more in the step S3.
Further improvement as the method for the present invention: it in the step S4, is calculated using the method for nearest consensus forecast pre- Send number of packages amount, process are as follows:
It calculates each specific the pre- of article and sends quantity N with charge free;The calculation method of N is as follows:
Wherein, σ represents regulatory factor.
Compared with the prior art, the advantages of the present invention are as follows: it is of the invention based at most sending the pre- of part type to send part side in advance Method can be reflected the statistics of a period of time and be bonded nearest actual conditions based on the nearest time.Do not consider transport power, Only consider the demand of target group.Of the invention sends method with charge free, have many advantages, such as principle it is simple, it is easy to operate and realize, Neng Gou It is improved under the premise of not improving logistics and express delivery cost and sends speed with charge free and send efficiency with charge free.
Detailed description of the invention
Fig. 1 is the flow diagram of the method for the present invention.
Specific embodiment
The present invention is described in further details below with reference to Figure of description and specific embodiment.
As shown in Figure 1, it is of the invention based at most sending the pre- of part type to send part method in advance, it is suitble to the dispatching of someone's equipment, nothing The modes such as the dispatching of people's equipment and the dispatching of cabinet, process are as follows:
S1: input history number of days factor T;
S2: it obtains and maximum allowable pre- sends number of packages amount Nmax;
S3: counting in nearest T days, the daily T1 moment in the T2 moment logistics and express delivery send Item Information with charge free;
S4: calculating the pre- of all items and send number of packages amount, and number of packages amount is sent to be less than not considering for integer 1 in advance;
S5: if all items send the sum of number of packages to be less than or equal to Nmax in advance, turn the 8th step;Otherwise, it is transferred in next step;
S6: computing redundancy ratio η, the calculation formula of redundancy ratio η are as follows:
Wherein, NpiIt represents the pre- of i-th of article and sends number of packages amount, n is total number of items.
S7: it calculates each article and really sends number of packages amount in advance, calculated result is rounded downwards.
S8: it generates and all pre- sends part article and number of articles inventory.
In a specific application example, by some it is pre- send point Z with charge free for, will be divided within one day and multiple pre- send the part time Section: 6:00-8:00,8:00-11:00,11:00-13:00,13:00-17:00,17:00-19:00,19:00-22:00.With January No. 8 11:00-13:00 this it is pre- send the part period for, this strategy is described in detail.
The same day is January 8, is reference with 7 days before, therefore T is 7.
S101: input history number of days 7;
S102: maximum allowable in this embodiment pre- to send number of packages amount be 500;
S103: 7 days before being extracted in historical data base, logistics in this period of daily 11:00 to 13:00 and Item Information is sent in express delivery with charge free, and statistical information is as follows:
S104: in this embodiment, number of packages amount is sent specifically to be explained in advance using the method calculating of nearest consensus forecast, still Algorithm without being limited thereto.
It calculates each specific the pre- of article and sends quantity N with charge free.The calculation method of N is as follows:
Wherein, σ represents regulatory factor.Regulatory factor is fixed 0.8 in this embodiment.By taking A1 as an example, calculating is sent with charge free in advance Quantity:
Here, number of articles should be integer, therefore the pre- quantity of sending with charge free of A1 is 79.
Similarly, the pre- quantity of sending with charge free that can obtain all items is as follows:
Serial number Item Title Send number of articles with charge free in advance
1 A1 79
2 A2 49
3 A3 37
4 B1 22
5 B2 13
6 B3 9
7 C1 192
8 C2 130
9 C3 89
S105: it calculates and total pre- sends number of packages Npsum, calculation method is as follows:
It can be calculated, Npsum=620.
Npsum> Nmax, therefore, into next step.
S106: computing redundancy ratio.
S107: it calculates the final of all items and pre- sends number of packages amount.It by taking A1 as an example, is calculated, is as a result rounded downwards:
Similarly, can calculate the final of other articles pre- sends number of packages amount to be as follows:
S108: the pre- quantity of sending with charge free of all items is all larger than 1, and therefore, all articles are sent with charge free in advance, therefore final Pre- send article with charge free and quantity is as follows:
Serial number Part Item Title is sent in advance Send quantity with charge free in advance
1 A1 63
2 A2 39
3 A3 29
4 B1 17
5 B2 10
6 B3 7
7 C1 154
8 C2 104
9 C3 71
The above is only the preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-described embodiment, All technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art For those of ordinary skill, several improvements and modifications without departing from the principles of the present invention should be regarded as protection of the invention Range.

Claims (4)

1. a kind of based at most sending the pre- of part type to send part method in advance, which is characterized in that step are as follows:
S1: input history number of days factor T;
S2: it obtains and maximum allowable pre- sends number of packages amount Nmax;
S3: counting in nearest T days, the daily T1 moment in the T2 moment logistics and express delivery send Item Information with charge free;
S4: it calculates the pre- of all items and sends number of packages amount;
S5: if all items send the sum of number of packages to be less than or equal to Nmax in advance, S8 is gone to step;Otherwise, it is transferred in next step;
S6: computing redundancy ratio η, the calculation formula of redundancy ratio η are as follows:
Wherein, NpiIt represents the pre- of i-th of article and sends number of packages amount, n is total number of items.
S7: it calculates each article and really sends number of packages amount in advance, calculated result is rounded.
S8: it generates and all pre- sends part article and number of articles inventory.
2. according to claim 1 based at most sending the pre- of part type to send part method in advance, which is characterized in that the step S4 In, send number of packages amount to be less than not considering for integer 1 in advance.
3. according to claim 1 or 2 based at most sending the pre- of part type to send part method in advance, which is characterized in that the step The preset period is two or more in rapid S3.
4. according to claim 1 or 2 based at most sending the pre- of part type to send part method in advance, which is characterized in that the step In rapid S4, is calculated using the method for nearest consensus forecast and sends number of packages amount, process in advance are as follows:
It calculates each specific the pre- of article and sends quantity N with charge free;The calculation method of N is as follows:
Wherein, σ represents regulatory factor.
CN201810324297.5A 2018-04-12 2018-04-12 Based at most sending the pre- of part type to send part method in advance Pending CN110378628A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810324297.5A CN110378628A (en) 2018-04-12 2018-04-12 Based at most sending the pre- of part type to send part method in advance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810324297.5A CN110378628A (en) 2018-04-12 2018-04-12 Based at most sending the pre- of part type to send part method in advance

Publications (1)

Publication Number Publication Date
CN110378628A true CN110378628A (en) 2019-10-25

Family

ID=68243102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810324297.5A Pending CN110378628A (en) 2018-04-12 2018-04-12 Based at most sending the pre- of part type to send part method in advance

Country Status (1)

Country Link
CN (1) CN110378628A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102609783A (en) * 2012-01-11 2012-07-25 东南大学 Construction optimizing and operating method of automatic fixed-point picking-up system of logistics express
CN102708475A (en) * 2012-05-10 2012-10-03 东南大学 System and method for dynamic delivery of logistic express
CN106845732A (en) * 2017-02-20 2017-06-13 浙江大学 A kind of satellite-type logistics express delivery allocator
CN107368988A (en) * 2017-06-30 2017-11-21 上海斐讯数据通信技术有限公司 A kind of logistics express delivery device, system and method
CN107730166A (en) * 2017-09-19 2018-02-23 广州唯品会研究院有限公司 The express mail for sending car with charge free based on nobody sends scheduling method, device and storage medium with charge free

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102609783A (en) * 2012-01-11 2012-07-25 东南大学 Construction optimizing and operating method of automatic fixed-point picking-up system of logistics express
CN102708475A (en) * 2012-05-10 2012-10-03 东南大学 System and method for dynamic delivery of logistic express
CN106845732A (en) * 2017-02-20 2017-06-13 浙江大学 A kind of satellite-type logistics express delivery allocator
CN107368988A (en) * 2017-06-30 2017-11-21 上海斐讯数据通信技术有限公司 A kind of logistics express delivery device, system and method
CN107730166A (en) * 2017-09-19 2018-02-23 广州唯品会研究院有限公司 The express mail for sending car with charge free based on nobody sends scheduling method, device and storage medium with charge free

Similar Documents

Publication Publication Date Title
CN108830531B (en) Intelligent classification logistics storage system
CN106803136A (en) A kind of fresh dispatching real-time optimization method based on genetic algorithm
CN203991329U (en) A kind of logistics Automated Sorting System
CN104174599A (en) Method and device for cargo sorting under conditions of large cargo amount and large cargo owner amount
CN110223014A (en) A kind of multimodal transport logistics system based on underground rail shipping
CN109460951B (en) Intelligent logistics classification management system based on Internet of things
WO2023279409A1 (en) Path optimization method based on logistics tracking
CN111563709A (en) Intelligent logistics cargo link cargo collection method and system
CN117541022B (en) Method for planning picking path of international transportation bulk cargo
CN109345170A (en) A kind of foreign trade B2C electric business stock method and system
CN113592409B (en) Automatic logistics warehouse system and management method
CN108460565A (en) A kind of active logistic management system based on cloud computing
CN110378628A (en) Based at most sending the pre- of part type to send part method in advance
CN110458322B (en) Train operation plan generation method considering enterprise requirements
CN117709638A (en) Method and system for optimizing reliability improvement measures of large sending end system
CN106096290A (en) A kind of method of modified line loss rate
CN110378629A (en) The pre- of number of packages amount is sent to send part method in advance based on maximum
CN108305004A (en) A kind of intelligent dispatching system and dispatching method for flexible manufacturing
CN108665362A (en) A kind of distributed power station accounting system
CN110378500A (en) Nearest statistics based on threshold value selection sends part method in advance
Chung et al. A strategic alliance model with a regional monopoly of service centres in express courier services
CN205670304U (en) A kind of logistics platform merging based on internet and Internet of Things
CN110378626A (en) Pre- part method is sent based on average recently
CN110766203A (en) Railway collection and distribution service network optimization method based on comprehensive cost
CN110378627A (en) Number of packages amount and maximum is sent to send the pre- of part volume to send part method in advance in advance based on minimum

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191025

RJ01 Rejection of invention patent application after publication