CN110374338B - 一种高层公共建筑施工用卸料平台 - Google Patents

一种高层公共建筑施工用卸料平台 Download PDF

Info

Publication number
CN110374338B
CN110374338B CN201910751743.5A CN201910751743A CN110374338B CN 110374338 B CN110374338 B CN 110374338B CN 201910751743 A CN201910751743 A CN 201910751743A CN 110374338 B CN110374338 B CN 110374338B
Authority
CN
China
Prior art keywords
channel
steel
box
fixed
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201910751743.5A
Other languages
English (en)
Other versions
CN110374338A (zh
Inventor
陈勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yancheng Suxia Construction Group Co ltd
Original Assignee
Yancheng Suxia Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yancheng Suxia Construction Group Co ltd filed Critical Yancheng Suxia Construction Group Co ltd
Priority to CN201910751743.5A priority Critical patent/CN110374338B/zh
Publication of CN110374338A publication Critical patent/CN110374338A/zh
Application granted granted Critical
Publication of CN110374338B publication Critical patent/CN110374338B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/166Landings, receiving platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种高层公共建筑施工用卸料平台,包括槽钢,所述槽钢正面的左端设有定量装置,槽钢正面的右端设有监控装置;通过监控装置对槽钢的水平状态进行实时监控,使监控装置能够在槽钢产生倾斜弯曲时对施工人员进行警示,确保施工人员能够及时发现槽钢受力过大并产生向下倾斜弯曲的情况,以便施工人员能够根据警示信息控制转运台顶面材料的堆载重量,避免超载情况的发生,通过定量装置,使施工人员能够实时获取槽钢的倾斜弯曲度,确保槽钢的倾斜弯曲度在安全范围内,避免槽钢的倾斜弯曲度过大容易造成危险的问题,增加了该高层公共建筑施工用卸料平台的安全性,降低了事故的发生率,提高了该高层公共建筑施工用卸料平台的实用性。

Description

一种高层公共建筑施工用卸料平台
技术领域
本发明涉及卸料平台领域,更具体地说,涉及一种高层公共建筑施工用卸料平台。
背景技术
在高层建筑的建造过程中,需要使用塔式起重机将模板、架管等材料运输至施工楼层,然而塔式起重机并不能直接伸入到建筑内,为了便于运输模板、架管等材料,一般情况下,均是在建筑上设置外伸的卸料平台,通过卸料平台对材料进行中转,省时省力,且效率较高,使得卸料平台成为建筑施工现场常见的临时施工设施,是楼层与地面、楼层与楼层之间材料、设备的垂直运输转运平台,主要有移动式卸料平台、落地式卸料平台、悬挑式卸料平台三种类型,其中悬挑式卸料平台由槽钢、转运台、护栏、花篮螺栓、钢丝绳、U型锚栓等构成,槽钢的一端通过U型锚栓与楼板上预埋孔的配合固定在楼板上,槽钢的另一端延伸至建筑外部,转运台活动卡在槽钢内,护栏焊接在槽钢的顶面上,且槽钢通过花篮螺栓和钢丝绳与上层楼板连接。
但是,现有悬挑式卸料平台不方便进行安装,在安装过程中经常会因为预埋孔定位出现偏差,一旦定位错误,很难再进行调整,导致后续安装受阻,需要另外采取措施进行固定,安装速度慢,而且施工人员无法准确掌握平台的堆载重量,容易超载,超载会使槽钢受力过大而向下倾斜、弯曲,若不及时发现这些情况并进行控制,槽钢的倾斜弯曲度会逐渐积累,危险系数越来越高,容易造成安全事故,因此亟需设计一种高层公共建筑施工用卸料平台。
发明内容
1.要解决的技术问题
针对现有技术中存在的现有悬挑式卸料平台不方便进行安装,在安装过程中经常会因为预埋孔定位出现偏差,一旦定位错误,很难再进行调整,导致后续安装受阻,需要另外采取措施进行固定,安装速度慢,而且施工人员无法准确掌握平台的堆载重量,容易超载,超载会使槽钢受力过大而向下倾斜、弯曲,若不及时发现这些情况并进行控制,槽钢的倾斜弯曲度会逐渐积累,危险系数越来越高,容易造成安全事故的问题,本发明的目的在于提供一种高层公共建筑施工用卸料平台,它可以很好的解决背景技术中提出的问题。
2.技术方案
为解决上述问题,本发明采用如下的技术方案。
一种高层公共建筑施工用卸料平台,包括槽钢,所述槽钢正面的左端设有定量装置,槽钢正面的右端设有监控装置,槽钢顶面的左端设有压紧装置和止逆装置,槽钢的底面连接有卡板,槽钢顶面的右端设有防护栏,槽钢顶面的右端连接有钢丝绳,钢丝绳的线路上连接有花篮螺栓,钢丝绳的另一端连接有固定件,槽钢的内部滑动卡接有转运台;
所述定量装置包括固定箱,固定箱的背面与槽钢的正面固定连接,固定箱的内部设有固定杆,固定杆的端部与固定箱的内壁固定连接,固定杆的外部活动套接有卷绕辊和绷紧弹簧,绷紧弹簧的一端与卷绕辊连接,绷紧弹簧的另一端与固定箱的内壁固定连接,卷绕辊的外部缠绕有皮尺,固定箱的内部设有旋转杆,旋转杆的端部与固定箱的内壁活动套接,旋转杆的外部固定套接有收集辊和从动齿轮,皮尺的一端缠绕在收集辊的外部,固定箱的内部设有旋转轴,旋转轴的端部与固定箱的内壁活动套接,旋转轴的外部固定套接有驱动齿轮和收线辊,收线辊的外部缠绕有牵拉线,固定箱的右侧面连接有加强管,加强管的背面与槽钢的正面焊接,固定箱的正面开设有嵌装孔,嵌装孔的内部嵌装有透视玻璃。
优选的,所述监控装置包括警示灯和绝缘箱,警示灯与槽钢的右端连接,绝缘箱的背面与槽钢的正面连接,绝缘箱内腔的右侧面连接有接触弹片,接触弹片通过导线与警示灯连接,绝缘箱的内壁连接有固定板,固定板上固定穿插有导电柱,导电柱与接触弹片之间夹持有纽扣电池,绝缘箱的正面连接有与导通装置相适配的盖板,绝缘箱的内部设有位于固定板左侧的导通装置,导通装置通过导电片与导电柱连接,绝缘箱的内壁连接有隔板,隔板上活动穿插有电阻杆,电阻杆的右端呈锥形,电阻杆的左端设有应变装置,电阻杆的外部活动套接有缓冲弹簧,缓冲弹簧的一端与隔板连接,缓冲弹簧的另一端与应变装置连接,绝缘箱内腔的底面开设有位于隔板左侧的嵌装槽,嵌装槽的内部嵌装有导电板,导电板通过导线与警示灯连接,绝缘箱的内部设有位于应变装置左侧的铅球,铅球与绝缘箱的内壁接触连接,牵拉线的一端穿过加强管并与铅球连接。
优选的,所述导通装置包括导电弹片,导电弹片与绝缘箱的内壁固定连接,导电弹片与导电片的一端连接,导电弹片的数量为两个,两个导电弹片的端部均连接有夹持块,夹持块与绝缘箱的内壁滑动连接,两个夹持块相互接触的两个侧面均开设有半锥形槽和半圆形槽,两个半锥形槽组成一个与电阻杆右端相适配的锥形孔,两个半圆形槽组成一个内径小于电阻杆最大直径的圆孔。
优选的,所述应变装置包括绝缘滑块,绝缘滑块与绝缘箱的内壁滑动连接,绝缘滑块的右侧面与电阻杆的左端连接,绝缘滑块的底面开设有安装槽,安装槽内腔的顶面通过压紧弹簧传动连接有导电触头,导电触头与安装槽的内壁滑动连接,导电触头的底端与导电板的顶面接触连接,导电触头通过导线与电阻杆连接。
优选的,所述压紧装置包括内六角管,内六角管的数量为两个,内六角管的底端与槽钢的顶面固定焊接,内六角管的内部活动插接有六角柱,六角柱的顶端延伸至内六角管的外部并连接有定位螺杆,定位螺杆的外部螺纹套接有定位套管,定位套管的外部固定套接有驱动把手,定位套管的外部固定套接有位于驱动把手上方的加强盘,加强盘上通过销钉活动连接有加强杆,定位套管的顶端活动套接有顶板。
优选的,所述止逆装置包括方形筒,方形筒固定焊接在槽钢的顶面上,方形筒的内部活动插接有插接块,插接块通过传动轴传动连接有U型钢,U型钢的右端连接有限位装置,限位装置的另一端连接有止逆螺杆,止逆螺杆的外部螺纹套接有止逆套管,止逆套管的另一端固定套接有限位角钢。
优选的,所述限位装置包括限位管,限位管的左端与U型钢的右端连接,限位管内腔的左侧面设有凸台,凸台的右侧面设有固定齿,限位管的内部活动插接有插接管,插接管的左端活动套接在凸台的外部,插接管的上下两面均开设有滑槽,插接管的内部设有活塞块,活塞块与插接管的内壁滑动连接,活塞块的上下两面均连接有滑片,滑片的另一端活动插接在滑槽的内部,活塞块的左侧面设有限位齿,限位齿与固定齿啮合,插接管的右端连接有转接箱,转接箱的右侧面与止逆螺杆的一端固定连接,转接箱的内部设有导向轮,活塞块通过啮合弹簧与转接箱传动连接,活塞块的右侧面连接有牵拉绳,牵拉绳的另一端延伸至转接箱的内部并绕过导向轮之后延伸至转接箱的外部且连接有牵拉环。
3.有益效果
相比于现有技术,本发明的优点在于:
通过压紧装置、止逆装置、卡板的配合直接对槽钢进行固定,固定方式简单、牢固、容易操作,方便施工人员安装和拆卸该高层公共建筑施工用卸料平台,安装速度快,安装过程中不需要使用预埋孔,使下楼板上不需要提前预留预埋孔,下楼板在施工之后能够保持完整的状态,避免了下楼板容易在预埋孔位置发生渗漏的问题,通过监控装置对槽钢的水平状态进行实时监控,使监控装置能够在槽钢产生倾斜弯曲时对施工人员进行警示,确保施工人员能够及时发现槽钢受力过大并产生向下倾斜弯曲的情况,以便施工人员能够根据警示信息控制转运台顶面材料的堆载重量,避免超载情况的发生,通过定量装置,使施工人员能够实时获取槽钢的倾斜弯曲度,确保槽钢的倾斜弯曲度在安全范围内,避免槽钢的倾斜弯曲度过大容易造成危险的问题,增加了该高层公共建筑施工用卸料平台的安全性,降低了事故的发生率,提高了该高层公共建筑施工用卸料平台的实用性。
附图说明
图1为本发明的结构示意图;
图2为本发明图1中定量装置的结构示意图;
图3为本发明图2的内部结构示意图;
图4为本发明图1中监控装置的结构示意图;
图5为本发明图4的内部结构示意图;
图6为本发明图5中导通装置的内部结构示意图;
图7为本发明图5中应变装置的内部结构示意图;
图8为本发明图1中压紧装置的结构示意图;
图9为本发明图1中止逆装置的结构示意图;
图10为本发明图9中限位装置的内部结构示意图。
图中标号说明:
1、槽钢;2、定量装置;201、固定箱;202、固定杆;203、卷绕辊;204、绷紧弹簧;205、皮尺;206、旋转杆;207、收集辊;208、从动齿轮;209、旋转轴;210、透视玻璃;211、驱动齿轮;212、收线辊;213、牵拉线;214、加强管;3、监控装置;300、警示灯;301、绝缘箱;302、接触弹片;303、固定板;304、导电柱;305、纽扣电池;306、盖板;307、导通装置;3071、导电弹片;3072、夹持块;3073、半锥形槽;3074、半圆形槽;308、导电片;309、隔板;310、电阻杆;311、应变装置;3111、绝缘滑块;3112、安装槽;3113、压紧弹簧;3114、导电触头;312、缓冲弹簧;313、嵌装槽;314、导电板;315、铅球;4、压紧装置;41、内六角管;42、六角柱;43、定位螺杆;44、定位套管;45、驱动把手;46、加强盘;47、顶板;48、加强杆;5、止逆装置;51、方形筒;52、插接块;53、传动轴;54、U型钢;55、限位装置;5501、限位管;5502、凸台;5503、固定齿;5504、插接管;5505、滑槽;5506、活塞块;5507、滑片;5508、限位齿;5509、转接箱;5510、导向轮;5511、啮合弹簧;5512、牵拉绳;5513、牵拉环;56、止逆螺杆;57、止逆套管;58、限位角钢;6、卡板;7、防护栏;8、钢丝绳;9、花篮螺栓;10、固定件;11、下楼板;12、中楼板;13、上楼板;14、剪力墙;15、转运台。
具体实施方式
下面将结合本发明实施例中的附图;对本发明实施例中的技术方案进行清楚、完整地描述;显然;所描述的实施例仅仅是本发明一部分实施例;而不是全部的实施例。基于本发明中的实施例;本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例;都属于本发明保护的范围。
请参阅图1-10,一种高层公共建筑施工用卸料平台,包括槽钢1,槽钢1的底面与下楼板11的顶面接触连接,下楼板11的右端设有剪力墙14,槽钢1正面的左端设有定量装置2,槽钢1正面的右端设有监控装置3,槽钢1顶面的左端设有压紧装置4和止逆装置5,槽钢1的底面连接有卡板6,卡板6与相应剪力墙14的右侧面接触连接,槽钢1顶面的右端设有防护栏7,槽钢1顶面的右端连接有钢丝绳8,钢丝绳8的线路上连接有花篮螺栓9,钢丝绳8的另一端连接有固定件10,固定件10与上楼板13右端的剪力墙14固定连接,槽钢1的内部滑动卡接有转运台15。
定量装置2包括固定箱201,固定箱201的背面与槽钢1的正面固定连接,固定箱201的内部设有固定杆202,固定杆202的端部与固定箱201的内壁固定连接,固定杆202的外部活动套接有卷绕辊203和绷紧弹簧204,绷紧弹簧204的一端与卷绕辊203连接,绷紧弹簧204的另一端与固定箱201的内壁固定连接,卷绕辊203的外部缠绕有皮尺205,固定箱201的内部设有旋转杆206,旋转杆206的端部与固定箱201的内壁活动套接,旋转杆206的外部固定套接有收集辊207和从动齿轮208,皮尺205的一端缠绕在收集辊207的外部,固定箱201的内部设有旋转轴209,旋转轴209的端部与固定箱201的内壁活动套接,旋转轴209的外部固定套接有驱动齿轮211和收线辊212,收线辊212的外部缠绕有牵拉线213,固定箱201的右侧面连接有加强管214,加强管214的背面与槽钢1的正面焊接,固定箱201的正面开设有嵌装孔,嵌装孔的内部嵌装有透视玻璃210,透视玻璃210的正面设有指示箭头。
监控装置3包括警示灯300和绝缘箱301,警示灯300与槽钢1的右端连接,绝缘箱301的背面与槽钢1的正面连接,绝缘箱301内腔的右侧面连接有接触弹片302,接触弹片302通过导线与警示灯300连接,绝缘箱301的内壁连接有固定板303,固定板303上固定穿插有导电柱304,导电柱304与接触弹片302之间夹持有纽扣电池305,绝缘箱301的正面连接有与导通装置307相适配的盖板306,绝缘箱301的内部设有位于固定板303左侧的导通装置307,导通装置307通过导电片308与导电柱304连接,绝缘箱301的内壁连接有隔板309,隔板309上活动穿插有电阻杆310,电阻杆310的右端呈锥形,电阻杆310的左端设有应变装置311,电阻杆310的外部活动套接有缓冲弹簧312,缓冲弹簧312的一端与隔板309连接,缓冲弹簧312的另一端与应变装置311连接,绝缘箱301内腔的底面开设有位于隔板309左侧的嵌装槽313,嵌装槽313的内部嵌装有导电板314,导电板314通过导线与警示灯300连接,绝缘箱301的内部设有位于应变装置311左侧的铅球315,铅球315与绝缘箱301的内壁接触连接,牵拉线213的一端穿过加强管214并与铅球315连接。
导通装置307包括导电弹片3071,导电弹片3071与绝缘箱301的内壁固定连接,导电弹片3071与导电片308的一端连接,导电弹片3071的数量为两个,两个导电弹片3071的端部均连接有夹持块3072,夹持块3072与绝缘箱301的内壁滑动连接,两个夹持块3072相互接触的两个侧面均开设有半锥形槽3073和半圆形槽3074,两个半锥形槽3073组成一个与电阻杆310右端相适配的锥形孔,两个半圆形槽3074组成一个内径小于电阻杆310最大直径的圆孔。
应变装置311包括绝缘滑块3111,绝缘滑块3111与绝缘箱301的内壁滑动连接,绝缘滑块3111的右侧面与电阻杆310的左端连接,绝缘滑块3111的底面开设有安装槽3112,安装槽3112内腔的顶面通过压紧弹簧3113传动连接有导电触头3114,导电触头3114与安装槽3112的内壁滑动连接,导电触头3114的底端与导电板314的顶面接触连接,导电触头3114通过导线与电阻杆310连接,确保电阻杆310与导电板314保持良好的电连接状态。
压紧装置4包括内六角管41,内六角管41的数量为两个,内六角管41的底端与槽钢1的顶面固定焊接,内六角管41的内部活动插接有六角柱42,六角柱42的顶端延伸至内六角管41的外部并连接有定位螺杆43,定位螺杆43的外部螺纹套接有定位套管44,定位套管44的外部固定套接有驱动把手45,定位套管44的外部固定套接有位于驱动把手45上方的加强盘46,加强盘46上通过销钉活动连接有加强杆48,定位套管44的顶端活动套接有顶板47,顶板47的顶面与中楼板12的底面接触连接,中楼板12的右端设有剪力墙14。
止逆装置5包括方形筒51,方形筒51固定焊接在槽钢1的顶面上,方形筒51的内部活动插接有插接块52,插接块52通过传动轴53传动连接有U型钢54,U型钢54的右端连接有限位装置55,限位装置55的另一端连接有止逆螺杆56,止逆螺杆56的外部螺纹套接有止逆套管57,止逆套管57的另一端固定套接有限位角钢58,限位角钢58的顶面与中楼板12的底面接触连接,限位角钢58的右侧面与相应剪力墙14的左侧面接触连接。
限位装置55包括限位管5501,限位管5501的左端与U型钢54的右端连接,限位管5501内腔的左侧面设有凸台5502,凸台5502的右侧面设有固定齿5503,限位管5501的内部活动插接有插接管5504,插接管5504的左端活动套接在凸台5502的外部,插接管5504的上下两面均开设有滑槽5505,插接管5504的内部设有活塞块5506,活塞块5506与插接管5504的内壁滑动连接,活塞块5506的上下两面均连接有滑片5507,滑片5507的另一端活动插接在滑槽5505的内部,活塞块5506的左侧面设有限位齿5508,限位齿5508与固定齿5503啮合,插接管5504的右端连接有转接箱5509,转接箱5509的外部对称设有操作把手,转接箱5509的右侧面与止逆螺杆56的一端固定连接,转接箱5509的内部设有导向轮5510,活塞块5506通过啮合弹簧5511与转接箱5509传动连接,活塞块5506的右侧面连接有牵拉绳5512,牵拉绳5512的另一端延伸至转接箱5509的内部并绕过导向轮5510之后延伸至转接箱5509的外部且连接有牵拉环5513。
工作原理:
安装时,首先将槽钢1放置在下楼板11的顶面,然后通过六角柱42与内六角管41的插接作用将压紧装置4与槽钢1固定在一起,接着通过压紧装置4牵拉槽钢1向左移动,使卡板6的左侧面与下楼板11右端剪力墙14的右侧面接触,之后通过驱动把手45转动加强盘46,加强盘46在其与定位螺杆43螺纹配合的作用下带着顶板47向上移动,直至顶板47的顶面紧紧顶在中楼板12的底面上,为槽钢1的左端提供一个压力,使槽钢1的左端不会翘起,然后使用销钉将加强盘46与加强杆48固定在一起,接着将插接块52插入方形筒51,之后转动限位装置55,限位装置55以传动轴53为中心轴转动,对限位装置55的倾斜度进行调节,直至限位角钢58的顶面能与中楼板12的底面接触连接,限位角钢58的右侧面能与相应剪力墙14的左侧面接触连接,然后通过牵拉环5513牵拉牵拉绳5512,牵拉绳5512牵拉活塞块5506向右移动,使限位齿5508与固定齿5503分开,接着将牵拉环5513套在转接箱5509上的操作把手外部,将限位齿5508与固定齿5503的分开状态固定住,解除对插接管5504的限制,之后手握止逆套管57,使止逆套管57不能转动,然后通过操作把手转动转接箱5509,转接箱5509带着止逆螺杆56转动,止逆套管57在其与止逆螺杆56螺纹配合的作用下斜向上延伸移动,直至限位角钢58的顶面与中楼板12的底面挤压在一起,限位角钢58的右侧面与相应剪力墙14的左侧面挤压在一起,为槽钢1提供一个向左的推力,使槽钢1不会向右滑动,接着取下牵拉环5513并松开,之后活塞块5506在啮合弹簧5511的弹力作用下带着限位齿5508向左移动,使限位齿5508与固定齿5503啮合,将限位装置55固定住,然后对钢丝绳8、花篮螺栓9、固定件10进行安装,完成该高层公共建筑施工用卸料平台的安装,使用时,材料通过塔式起重机吊装到转运台15的顶面上,然后材料在自身重力的作用下为槽钢1的右端施加一个向下的压力,接着槽钢1在压力的作用下产生应力变形,使槽钢1的右端向下倾斜弯曲,其倾斜弯曲度与材料的重量呈正比,之后监控装置3的倾斜弯曲度跟随槽钢1右端的倾斜弯曲度同步变化,随着监控装置3倾斜弯曲度的增加,铅球315在自身重力的作用下为应变装置311提供的推力逐渐增加,然后应变装置311在这个推力的作用下带着电阻杆310向右移动,直至电阻杆310的右端与半锥形槽3073的内壁接触,将警示灯300的电源接通,警示灯300发出警示光,此时材料的重量达到该卸料平台荷载的临界值,在材料的重量超过该卸料平台荷载的临界值时,铅球315对应变装置311的推力进一步增加,然后应变装置311推动电阻杆310进一步向右移动,接着电阻杆310位于导通装置307与应变装置311之间的长度变短,使电阻杆310接入电路的长度变短,电流变大,之后警示灯300的明亮度增加,提示施工人员转运台15顶面堆放的材料重量超载,然后施工人员采取相应的措施来减少转运台15顶面堆载的材料重量,使槽钢1右端受到的压力减小,接着槽钢1弹性恢复,倾斜弯曲度减小,之后监控装置3的倾斜弯曲度减小,铅球315对应变装置311的推力减小,应变装置311在缓冲弹簧312弹力的作用下带着电阻杆310向左移动,使电阻杆310接入电路的长度逐渐增加,警示灯300的明亮度降低,直至电阻杆310的右端与半锥形槽3073的内壁分开,警示灯300熄灭,此时转运台15顶面堆载的材料重量在该卸料平台的荷载范围内,实现对转运台15顶面堆载重量的控制,该过程中,铅球315在重力作用下向右滑动会牵拉牵拉线213,牵拉线213从收线辊212的外部释放,使收线辊212转动,收线辊212通过旋转轴209、驱动齿轮211与从动齿轮208的啮合作用带着旋转杆206转动,旋转杆206带着收集辊207转动,使皮尺205向收集辊207的外部缠绕,当铅球315在缓冲弹簧312弹力的作用下向左移动时,卷绕辊203在绷紧弹簧204弹力的作用下转动,使皮尺205向卷绕辊203的外部缠绕,从而将槽钢1的倾斜弯曲度变化转换成皮尺205上数值的变化,使施工人员能够清晰明了的对槽钢1的倾斜弯曲度进行监视,确保槽钢1的倾斜弯曲度在安全范围内,避免槽钢1的倾斜弯曲度过大容易造成危险的问题,增加了该高层公共建筑施工用卸料平台的安全性,降低了事故的发生率,提高了该高层公共建筑施工用卸料平台的实用性。
以上所述;仅为本发明较佳的具体实施方式;但本发明的保护范围并不局限于此;任何熟悉本技术领域的技术人员在本发明揭露的技术范围内;根据本发明的技术方案及其改进构思加以等同替换或改变;都应涵盖在本发明的保护范围内。

Claims (7)

1.一种高层公共建筑施工用卸料平台,其特征在于:包括槽钢(1),所述槽钢(1)正面的左端设有定量装置(2),槽钢(1)正面的右端设有监控装置(3),槽钢(1)顶面的左端设有压紧装置(4)和止逆装置(5),槽钢(1)的底面连接有卡板(6),槽钢(1)顶面的右端设有防护栏(7),槽钢(1)顶面的右端连接有钢丝绳(8),钢丝绳(8)的线路上连接有花篮螺栓(9),钢丝绳(8)的另一端连接有固定件(10),槽钢(1)的内部滑动卡接有转运台(15);
所述定量装置(2)包括固定箱(201),固定箱(201)的背面与槽钢(1)的正面固定连接,固定箱(201)的内部设有固定杆(202),固定杆(202)的端部与固定箱(201)的内壁固定连接,固定杆(202)的外部活动套接有卷绕辊(203)和绷紧弹簧(204),绷紧弹簧(204)的一端与卷绕辊(203)连接,绷紧弹簧(204)的另一端与固定箱(201)的内壁固定连接,卷绕辊(203)的外部缠绕有皮尺(205),固定箱(201)的内部设有旋转杆(206),旋转杆(206)的端部与固定箱(201)的内壁活动套接,旋转杆(206)的外部固定套接有收集辊(207)和从动齿轮(208),皮尺(205)的一端缠绕在收集辊(207)的外部,固定箱(201)的内部设有旋转轴(209),旋转轴(209)的端部与固定箱(201)的内壁活动套接,旋转轴(209)的外部固定套接有驱动齿轮(211)和收线辊(212),收线辊(212)的外部缠绕有牵拉线(213),固定箱(201)的右侧面连接有加强管(214),加强管(214)的背面与槽钢(1)的正面焊接,固定箱(201)的正面开设有嵌装孔,嵌装孔的内部嵌装有透视玻璃(210)。
2.根据权利要求1所述的一种高层公共建筑施工用卸料平台,其特征在于:所述监控装置(3)包括警示灯(300)和绝缘箱(301),警示灯(300)与槽钢(1)的右端连接,绝缘箱(301)的背面与槽钢(1)的正面连接,绝缘箱(301)内腔的右侧面连接有接触弹片(302),接触弹片(302)通过导线与警示灯(300)连接,绝缘箱(301)的内壁连接有固定板(303),固定板(303)上固定穿插有导电柱(304),导电柱(304)与接触弹片(302)之间夹持有纽扣电池(305),绝缘箱(301)的正面连接有与导通装置(307)相适配的盖板(306),绝缘箱(301)的内部设有位于固定板(303)左侧的导通装置(307),导通装置(307)通过导电片(308)与导电柱(304)连接,绝缘箱(301)的内壁连接有隔板(309),隔板(309)上活动穿插有电阻杆(310),电阻杆(310)的右端呈锥形,电阻杆(310)的左端设有应变装置(311),电阻杆(310)的外部活动套接有缓冲弹簧(312),缓冲弹簧(312)的一端与隔板(309)连接,缓冲弹簧(312)的另一端与应变装置(311)连接,绝缘箱(301)内腔的底面开设有位于隔板(309)左侧的嵌装槽(313),嵌装槽(313)的内部嵌装有导电板(314),导电板(314)通过导线与警示灯(300)连接,绝缘箱(301)的内部设有位于应变装置(311)左侧的铅球(315),铅球(315)与绝缘箱(301)的内壁接触连接,牵拉线(213)的一端穿过加强管(214)并与铅球(315)连接。
3.根据权利要求2所述的一种高层公共建筑施工用卸料平台,其特征在于:所述导通装置(307)包括导电弹片(3071),导电弹片(3071)与绝缘箱(301)的内壁固定连接,导电弹片(3071)与导电片(308)的一端连接,导电弹片(3071)的数量为两个,两个导电弹片(3071)的端部均连接有夹持块(3072),夹持块(3072)与绝缘箱(301)的内壁滑动连接,两个夹持块(3072)相互接触的两个侧面均开设有半锥形槽(3073)和半圆形槽(3074),两个半锥形槽(3073)组成一个与电阻杆(310)右端相适配的锥形孔,两个半圆形槽(3074)组成一个内径小于电阻杆(310)最大直径的圆孔。
4.根据权利要求2所述的一种高层公共建筑施工用卸料平台,其特征在于:所述应变装置(311)包括绝缘滑块(3111),绝缘滑块(3111)与绝缘箱(301)的内壁滑动连接,绝缘滑块(3111)的右侧面与电阻杆(310)的左端连接,绝缘滑块(3111)的底面开设有安装槽(3112),安装槽(3112)内腔的顶面通过压紧弹簧(3113)传动连接有导电触头(3114),导电触头(3114)与安装槽(3112)的内壁滑动连接,导电触头(3114)的底端与导电板(314)的顶面接触连接,导电触头(3114)通过导线与电阻杆(310)连接。
5.根据权利要求1所述的一种高层公共建筑施工用卸料平台,其特征在于:所述压紧装置(4)包括内六角管(41),内六角管(41)的数量为两个,内六角管(41)的底端与槽钢(1)的顶面固定焊接,内六角管(41)的内部活动插接有六角柱(42),六角柱(42)的顶端延伸至内六角管(41)的外部并连接有定位螺杆(43),定位螺杆(43)的外部螺纹套接有定位套管(44),定位套管(44)的外部固定套接有驱动把手(45),定位套管(44)的外部固定套接有位于驱动把手(45)上方的加强盘(46),加强盘(46)上通过销钉活动连接有加强杆(48),定位套管(44)的顶端活动套接有顶板(47)。
6.根据权利要求1所述的一种高层公共建筑施工用卸料平台,其特征在于:所述止逆装置(5)包括方形筒(51),方形筒(51)固定焊接在槽钢(1)的顶面上,方形筒(51)的内部活动插接有插接块(52),插接块(52)通过传动轴(53)传动连接有U型钢(54),U型钢(54)的右端连接有限位装置(55),限位装置(55)的另一端连接有止逆螺杆(56),止逆螺杆(56)的外部螺纹套接有止逆套管(57),止逆套管(57)的另一端固定套接有限位角钢(58)。
7.根据权利要求6所述的一种高层公共建筑施工用卸料平台,其特征在于:所述限位装置(55)包括限位管(5501),限位管(5501)的左端与U型钢(54)的右端连接,限位管(5501)内腔的左侧面设有凸台(5502),凸台(5502)的右侧面设有固定齿(5503),限位管(5501)的内部活动插接有插接管(5504),插接管(5504)的左端活动套接在凸台(5502)的外部,插接管(5504)的上下两面均开设有滑槽(5505),插接管(5504)的内部设有活塞块(5506),活塞块(5506)与插接管(5504)的内壁滑动连接,活塞块(5506)的上下两面均连接有滑片(5507),滑片(5507)的另一端活动插接在滑槽(5505)的内部,活塞块(5506)的左侧面设有限位齿(5508),限位齿(5508)与固定齿(5503)啮合,插接管(5504)的右端连接有转接箱(5509),转接箱(5509)的右侧面与止逆螺杆(56)的一端固定连接,转接箱(5509)的内部设有导向轮(5510),活塞块(5506)通过啮合弹簧(5511)与转接箱(5509)传动连接,活塞块(5506)的右侧面连接有牵拉绳(5512),牵拉绳(5512)的另一端延伸至转接箱(5509)的内部并绕过导向轮(5510)之后延伸至转接箱(5509)的外部且连接有牵拉环(5513)。
CN201910751743.5A 2019-08-15 2019-08-15 一种高层公共建筑施工用卸料平台 Expired - Fee Related CN110374338B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910751743.5A CN110374338B (zh) 2019-08-15 2019-08-15 一种高层公共建筑施工用卸料平台

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910751743.5A CN110374338B (zh) 2019-08-15 2019-08-15 一种高层公共建筑施工用卸料平台

Publications (2)

Publication Number Publication Date
CN110374338A CN110374338A (zh) 2019-10-25
CN110374338B true CN110374338B (zh) 2021-05-04

Family

ID=68259471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910751743.5A Expired - Fee Related CN110374338B (zh) 2019-08-15 2019-08-15 一种高层公共建筑施工用卸料平台

Country Status (1)

Country Link
CN (1) CN110374338B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502297A (zh) * 2020-04-03 2020-08-07 中国一冶集团有限公司 一种自动运行的双支撑体系卸料平台装置
CN111962879B (zh) * 2020-06-30 2021-10-01 中铁建工集团广东有限公司 一种高层公共建筑施工用环保卸料平台
CN111946063B (zh) * 2020-09-08 2022-03-22 中国十七冶集团有限公司 实验数据直接指导施工的斜悬挑安全智能施工系统及方法
CN112875148B (zh) * 2021-04-23 2022-09-23 北京天润建设有限公司 一种铝模板传送装置
CN114753656B (zh) * 2022-06-06 2024-02-09 广厦建设集团有限责任公司 一种建筑施工用卸料平台

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19500126C1 (de) * 1995-01-04 1996-06-05 Hebel Ag Vorrichtung zum Verlegen von großformatigen Decken- und Dachplatten
CN103174303B (zh) * 2011-12-23 2016-03-30 五冶集团上海有限公司 活动式悬挑卸料平台及其制作和安装方法
CN104314319A (zh) * 2014-11-16 2015-01-28 重庆市青蓝机械制造有限公司 用于悬挑卸料平台的预警装置
CN104328923A (zh) * 2014-11-16 2015-02-04 重庆市青蓝机械制造有限公司 用于卸料平台上的预警装置
CN204804361U (zh) * 2015-07-03 2015-11-25 上海绿地建设(集团)有限公司 一种建筑施工用卸料平台
CN207048348U (zh) * 2017-07-03 2018-02-27 中国核工业第二二建设有限公司 一种工具式受压支撑卸料平台
CN108166765A (zh) * 2017-12-29 2018-06-15 重庆建工第三建设有限责任公司 一种建筑施工用卸料平台

Also Published As

Publication number Publication date
CN110374338A (zh) 2019-10-25

Similar Documents

Publication Publication Date Title
CN110374338B (zh) 一种高层公共建筑施工用卸料平台
CN114232582A (zh) 一种基坑智能监测系统
CN210833476U (zh) 一种地质滑坡监测装置
CN210032849U (zh) 一种输配电复合材料横担工装金具
CN111942989A (zh) 一种建筑施工用施工电梯安防装置
CN209747390U (zh) 一种使用方便的旁路开关操作装置
CN101745191A (zh) 水泥杆作业用移动式防坠落装置
EP2806950A1 (en) Installing a safety line on a pitched roof
CN211210631U (zh) 一种输电线路清障用的高枝清障装置
CN209277837U (zh) 一种基于低阻的柔性线缆测斜仪探测器打捞装置
CN217954432U (zh) 一种建设工程工程质量检测用破土器
CN114104853B (zh) 一种高压开关柜电力电缆抽放装置及其施工方法
CN210685692U (zh) 一种安全预警挡粮门
CN211226105U (zh) 一种建筑用塔吊
CN114991454A (zh) 一种工具式斜墙脚手架及使用方法
CN112211474A (zh) 一种山野电杆支线夹损坏自动替换机构
CN209125795U (zh) 一种基于集中器本地计算的低压台区管理作业平台结构
CN209592794U (zh) 一种输电电缆临时支撑辅助装置
CN207348433U (zh) 防坠装置及脚手架
CN111847190B (zh) 一种矿井提升机尾绳监控装置
CN211313452U (zh) 一种建筑工程施工用防护装置
CN208952811U (zh) 一种道路桥梁施工用测量装置
CN209621340U (zh) 一种煤矿支护钢带修复装置
CN111017633A (zh) 一种二次导线放线装置
CN109372460A (zh) 基于低阻的柔性线缆测斜仪探测器打捞装置及其打捞方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210419

Address after: 224000 288 Salt Road, Yancheng City, Jiangsu, 3 3

Applicant after: Yancheng Suxia Construction Group Co.,Ltd.

Address before: No. 50, Erchen group, Gaoqiao village, Shizi Town, Quanjiao County, Chuzhou City, Anhui Province

Applicant before: Chen Yong

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210504