CN110374316A - A kind of firefighting movable operation platform and its construction method - Google Patents

A kind of firefighting movable operation platform and its construction method Download PDF

Info

Publication number
CN110374316A
CN110374316A CN201910664057.4A CN201910664057A CN110374316A CN 110374316 A CN110374316 A CN 110374316A CN 201910664057 A CN201910664057 A CN 201910664057A CN 110374316 A CN110374316 A CN 110374316A
Authority
CN
China
Prior art keywords
frame body
construction
supporting leg
fire
fixedly installed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910664057.4A
Other languages
Chinese (zh)
Inventor
商桢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jing'an Engineering Co Ltd
Original Assignee
Jing'an Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jing'an Engineering Co Ltd filed Critical Jing'an Engineering Co Ltd
Priority to CN201910664057.4A priority Critical patent/CN110374316A/en
Publication of CN110374316A publication Critical patent/CN110374316A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/283Mobile scaffolds; Scaffolds with mobile platforms mobile horizontally

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Fencing (AREA)

Abstract

The present invention relates to a kind of firefighting movable operation platform and its construction methods, belong to fire engineering technical field, including frame body, construction plate is fixedly installed on the frame body, walker is fixedly installed at the top of the frame body, the traveling wheel being in rolling contact with the second wind girder on tank body is installed on the walker, the directive wheel being in rolling contact with the basic ring beam of tank body is provided on the frame body, the bottom of the frame body is provided with for the spiral supporting leg with ground face contact, and the limit assembly for limiting frame body position is provided on the walker.When needing to construct to other positions of tank body, the personnel on ground loosen spiral supporting leg, and promotion frame body synchronous with the personnel on the second wind girder is to suitable position, then by limit assembly fixing bracket body position, and fasten spiral supporting leg, can construct;It is easy to use, improve construction efficiency.

Description

A kind of firefighting movable operation platform and its construction method
Technical field
The present invention relates to fire engineering technical field, in particular to a kind of firefighting movable operation platform and its construction method.
Background technique
Oil storage tank in petrochemical industry crude stockpile library is generally bulky, and volume is up to 10x104m3, and petroleum is inflammable and explosive The fire-fighting work of article, this large oil tank is particularly important.
Currently, generalling use double-row steel pipe scaffold, and along tank when carrying out fire-fighting construction operation on the outside of the tank body of oil tank Body is surrounded one week and is used, and the steel pipe enormous amount used will also be installed sporadicly, be detected, quality inspection etc., time-consuming and laborious, is set up Long with the dismounting time, construction efficiency is low.
Summary of the invention
One of the objects of the present invention is to provide a kind of firefighting movable operation platforms, have easy to use, raising construction effect The advantages of rate.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of fire-fighting construction moving platform, including frame body, construction plate is fixedly installed on the frame body, and the top of the frame body is solid Surely it is provided with walker, the traveling wheel being in rolling contact with the second wind girder on tank body, the frame are installed on the walker Be provided with the directive wheel being in rolling contact with the basic ring beam of tank body on body, the bottom of the frame body be provided with for ground face contact Spiral supporting leg, the limit assembly for limiting frame body position is provided on the walker.
Implement above-mentioned technical proposal, when needing to construct to other positions of tank body, the personnel on ground loosen spiral branch Leg, and promotion frame body synchronous with the personnel on the second wind girder is to suitable position, then by limit assembly fixing bracket body position, and Spiral supporting leg is fastened, can be constructed;It is easy to use, improve construction efficiency.
The present invention is further arranged to: the limit assembly includes track card and abutting stud, the side wall of the track card Threaded hole is offered, the joining threaded hole male screw is connected in threaded hole.
Implement above-mentioned technical proposal track card is connected on the second wind girder after frame body position regulates, and walks Track card is respectively provided at left and right sides of wheel, then rotation abuts stud, so that abutting stud and the abutting of the second wind girder, prevents from going It walks wheel freely to roll, plays the purpose of limiting frame body position.
The present invention is further arranged to: the abutting stud is fixedly installed hand-held part far from one end of track card.
Implement above-mentioned technical proposal, the setting of hand-held part facilitates worker to rotate manually and pushes against stud, simple to operate.
The present invention is further arranged to: the track card is fixedly connected by connecting rope with walker.
Implement above-mentioned technical proposal, track card is connected on walker by connecting rope, track card is fallen when preventing mobile It falls and hurts sb.'s feelings.
The present invention is further arranged to: the two sides of the traveling wheel are fixedly installed convex for preventing traveling wheel from derailing Edge.
Implement above-mentioned technical proposal, the purpose for preventing traveling wheel from derailing is played in the setting of flange.
The present invention is further arranged to: is fixedly installed on the walker for being fixedly connected with the protective fence on tank body Safety rope.
Implement above-mentioned technical proposal, when construction, safety rope is fixedly connected with the protective fence on tank body, playing prevents frame body Inclined effect, so that frame body is more stable.
The present invention is further arranged to: the spiral supporting leg includes stud, accepts ring and handle, the undertaking ring thread bush On stud, the bottom of the frame body is fixedly installed casing vertically, and described sleeve pipe is sheathed on stud, and the bottom wall of casing It is contradicted with ring is accepted, the handle is fixedly connected with the side wall for accepting ring.
Implement above-mentioned technical proposal, after frame body is moved to suitable position, stud is supported on the ground, holds handle rotation Ring is accepted, so that the bottom wall of support ring and casing pushes against, plays the role of supporting frame, reduces the pressure that traveling wheel is subject to Power, while can prevent frame body from shaking.
The present invention is further arranged to: hangers, the side wall fixed setting for accepting ring are fixedly installed in described sleeve pipe There is drawstring, the hook that can be mounted with hangers is fixedly installed on the drawstring.
Implement above-mentioned technical proposal and be first rotated down undertaking ring in movable support body, holds up spiral supporting leg then up, Hook on drawstring is connect with hangers, so that spiral supporting leg is detached from ground, at this point, push frame body mobile again, and spiral supporting leg It is moved together with frame body, individually holds the movement of spiral supporting leg without separately setting worker, save manpower, it is easy to operate.
Another object of the present invention is to provide a kind of firefighting movable operation platform construction method, have easy to use, mentions The advantages of high construction efficiency.
A kind of fire-fighting construction moving platform construction method, comprising the following steps:
S1, the mobile platform is transported to construction site, and is lifted to the second wind girder of tank body;
After S2, lifting are in place, by limit assembly limiting frame body position, prevent frame body from arbitrarily sliding, and directive wheel is supported on base On plinth ring beam, spiral supporting leg is adjusted, keeps spiral supporting leg and ground face contact secured;
S3, construction personnel, which are climbed up, carries out construction operation on the construction plate of frame body;
S4, when needing movable support body, on second wind girder be equipped with guardian, guardian open limit assembly, ground Operator loosens spiral supporting leg, synchronous to push frame body to suitable position, then by limit assembly fixing bracket body position, and fastens Spiral supporting leg can construct after passed examination.
Implement above-mentioned skill scheme, in movable support body, passes through the operator of guardian and ground on second wind girder Member is synchronous to push frame body mobile, so that frame body movement is more steady, when mobile, traveling wheel is in rolling contact with the second wind girder, is moved It is dynamic more smooth, it is easy to use, improve construction efficiency.
The present invention is further arranged to: in S1, hoisting process need to use slip rope.
Implement above-mentioned technical proposal, slip rope in hoisting process use, can prevent frame body from rotating, be convenient for erection of frames, improves Efficiency.
In conclusion the present invention having the beneficial effect that in contrast to the prior art
One, when needing to construct to other positions of tank body, the personnel on ground loosen spiral supporting leg, and on the second wind girder Personnel it is synchronous push frame body to suitable position, then pass through limit assembly fixing bracket body position, and fasten spiral supporting leg, Ji Keshi Work, it is easy to use, improve construction efficiency;
Two, after frame body position regulates, track card is connected on the second wind girder, and is respectively provided at left and right sides of traveling wheel Track card, then rotation abuts stud, so that abutting stud and the abutting of the second wind girder, prevents traveling wheel from freely rolling, plays The purpose of limiting frame body position;
Three, when movable support body, it is first rotated down undertaking ring, spiral supporting leg is held up then up, by the hook and hangers on drawstring Connection, so that spiral supporting leg is detached from ground, at this point, it is mobile to push frame body again, and spiral supporting leg moves together with frame body, without another If it is mobile that worker individually holds spiral supporting leg, manpower is saved, it is easy to operate.
Detailed description of the invention
Structural schematic diagram when Fig. 1 is present invention construction;
Fig. 2 is whole structural schematic diagram of the invention;
Fig. 3 is the portion the A enlarged drawing in Fig. 2;
Fig. 4 is the portion the B enlarged drawing in Fig. 2.
Appended drawing reference: 1, tank body;11, the first wind girder;111, protective fence;12, the second wind girder;121, channel steel;13, base Plinth ring beam;2, frame body;21, construction plate;22, walker;221, connecting rope;222, safety rope;223, safety screen;23, it walks Wheel;231, flange;24, directive wheel;25, casing;251, hangers;3, spiral supporting leg;31, stud;32, ring is accepted;321, drawstring; 3211, it links up with;33, handle;4, limit assembly;41, track card;411, threaded hole;42, stud is abutted;421, hand-held part.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment one:
As shown in Figure 1, a kind of fire-fighting construction moving platform, including frame body 2, construction plate 21, frame body 2 are fixedly installed on frame body 2 Top be fixedly installed walker 22, whole walker 22 is in П shape.It should be noted that the mobile platform is in cylinder It is used on tank body 1, the first wind girder 11 and the second wind girder 12, and is from top to bottom successively arranged in the top exterior walls of tank body 1 Protective fence 111 is fixedly installed on one wind girder 11, the top annular of the second wind girder 12 is provided with channel steel 121, the bottom of tank body 1 Portion is provided with basic ring beam 13.
As shown in Figure 2,3, safety screen 223 is fixedly installed on walker 22, safety screen 223 is L-shaped, L-shaped guarantor Channel steel 121(is protruded into referring to Fig. 1 in one end of dangerous baffle 223) card slot in, when moving, if derailing because unexpected, safety dog Plate 223 will catch on channel steel 121, play the purpose for preventing frame body 2 from falling, and improve safety.
In conjunction with Fig. 1, the safety rope for being fixedly connected with the protective fence 111 on tank body 1 is fixedly installed on walker 22 222;When construction, safety rope 222 is fixedly connected with the protective fence 111 on tank body 1, plays the role of preventing frame body 2 inclined, make It is more stable to obtain frame body 2.
As shown in Figure 2,3, be equipped on walker 22 with the second wind girder 12(on tank body 1 referring to Fig. 1) channel steel 121 The traveling wheel 23 being in rolling contact, the two sides on traveling wheel 23 are fixedly installed the flange 231 for preventing traveling wheel 23 from derailing, convex Edge 231 and channel steel 121 contradict, and prevent traveling wheel 23 from derailing;It is provided on frame body 2 and is in rolling contact with the basic ring beam 13 of tank body 1 Directive wheel 24, directive wheel 24 is contacted with basic ring beam 13, highly-safe so that frame body 2 constitutes balanced system of force in the horizontal direction.
As shown in Figure 2,3, the limit assembly 4 for limiting 2 position of frame body is provided on walker 22, limit assembly 4 wraps It including track card 41 and abuts stud 42, the generally П shape structure of track card 41, the side wall of track card 41 offers threaded hole 411, Stud 42 is abutted to be threadedly connected in threaded hole 411;It abuts stud 42 and is fixedly installed hand-held part far from one end of track card 41 421, hand-held part 421 be it is round table-like, facilitate worker rotate manually abutting stud 31, it is simple to operate.
After 2 position of frame body regulates, track card 41 is connected on wind girder, and the left and right sides of traveling wheel 23 is all provided with Track card 41 is set, then rotation abuts stud 42, so that abutting stud 42 and wind girder abutting, prevents traveling wheel 23 from freely rolling It is dynamic, play the purpose for limiting 2 position of frame body.
Wherein, as shown in Figure 2,3, track card 41 is fixedly connected by connecting rope 221 with walker 22;Pass through connecting rope 221 are connected to track card 41 on walker 22, and track card 41, which falls, when preventing mobile hurts sb.'s feelings.
As shown in Figure 2,4, the bottom of frame body 2 is provided with for the spiral supporting leg 3 with ground face contact, and spiral supporting leg 3 includes Stud 31 accepts ring 32 and handle 33, accepts 32 thread bush of ring and is set on stud 31, the bottom of frame body 2 is fixedly installed vertically Casing 25, casing 25 are sheathed on stud 31, and the bottom wall of casing 25 and undertaking ring 32 contradict, handle 33 and the side for accepting ring 32 Wall is fixedly connected.
After frame body 2 is moved to suitable position, stud 31 is supported on the ground, is held the rotation of handle 33 and is accepted ring 32, makes The bottom wall for obtaining support ring and casing 25 pushes against, and plays the role of supporting frame 2, reduces the pressure that traveling wheel 23 is subject to, together When can prevent frame body 2 shake.
Wherein, as shown in Figure 2,4, hangers 251 is fixedly installed on casing 25, the side wall for accepting ring 32 is fixedly installed drawing Rope 321 is fixedly installed the hook 3211 that can be mounted with hangers 251 on drawstring 321.
It in movable support body 2, is first rotated down and accepts ring 32, hold up spiral supporting leg 3 then up, it will be on drawstring 321 Hook 3211 is connect with hangers 251, so that spiral supporting leg 3 is detached from ground, at this point, push frame body 2 mobile again, and spiral supporting leg 3 It is moved together with frame body 2, individually holds the movement of spiral supporting leg 3 without separately setting worker, save manpower, it is easy to operate.
Specific work process: the mobile platform is lifted on tank body 1 to be onstructed, and traveling wheel 23 is made to be undertaken on tank body On 1 wind girder, and directive wheel 24 is contacted with the basic ring beam 13 of 1 bottom of tank body, plays 2 horizontal direction active force of balance frame Purpose, make spiral supporting leg 3 and ground face contact, and fasten spiral supporting leg 3, finally track card 41 is connected on wind girder, and The left and right sides of traveling wheel 23 is respectively provided with track card 41, and then rotation abuts stud 4231, so that abutting stud 4231 and wind resistance Circle pushes against, and prevents traveling wheel 23 from freely rolling, and construction personnel station carries out construction operation on construction plate 21.
When needing to construct to other positions of tank body 1, the personnel on ground loosen spiral supporting leg 3, and on wind girder Personnel it is synchronous push frame body 2 to arrive suitable position, then by 4 fixing bracket body of limit assembly, 2 position, and fasten spiral supporting leg 3, i.e., It can construct;It is easy to use, improve construction efficiency.
When construction, on a tank body 1, two or four mobile operation platforms can be carried out simultaneously and are constructed, but are wanted Dispersion installation, avoids wind girder stress from excessively concentrating.
In terms of duration angle, a tank double-pole scaffold probably need it is steel pipe 2,000 6 meters long, it is 1,000 4 meters long, 1.5 Rice is 2000 long, fastener 15000,2000 pieces of springboard, sets up with 10 people of scaffolder, 15 people of power work, to set up 10 days, wherein material The preparation and transport of material take 7 days time, and adding up to the duration is 17 days.And a tank prepares 2 with 4 movement operation platform materials It, makes 4 people of welder, and 3 people of power work need to only make 5 days, and adding up to the duration is 7 days.From above data, we are not difficult to find out movement Operation platform is economical and can shorten the construction period.
It economically sees, a tank double-pole scaffold frame material lease expenses is about 50,000 yuan/month, sets up and demolition expense With being 100,000 yuan, 10,000 yuan of freight, and frame material will reserve deposit, while long in time limit cannot timely have enough to meet the need.And one The expense of mobile operation platform is probably at 30,000 yuan or so, and four are 120,000, therefore mobile operation platform is more economical.
Embodiment two:
A kind of fire-fighting construction moving platform construction method, comprising the following steps:
S1, the mobile platform is transported to construction site, and is lifted to the second wind girder of tank body 1, lifted Journey need to use slip rope, with prevent frame body 2 rotate;
After S2, lifting are in place, 2 position of frame body is limited by limit assembly 4, prevents frame body 2 from arbitrarily sliding, and directive wheel 24 supports On basic ring beam 13, spiral supporting leg 3 is adjusted, keeps spiral supporting leg 3 and ground face contact secured;
S3, construction personnel, which are climbed up, carries out construction operation on the construction plate 21 of frame body 2;
S4, when needing movable support body 2, on second wind girder be equipped with guardian, guardian open limit assembly 4, ground Operator loosen spiral supporting leg 3, it is synchronous that frame body 2 is pushed to arrive suitable position, then by 4 fixing bracket body of limit assembly, 2 position, And spiral supporting leg 3 is fastened, it can construct after passed examination.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (10)

1. a kind of fire-fighting construction moving platform, including frame body (2), it is characterised in that: be fixedly installed construction on the frame body (2) Plate (21) is fixedly installed walker (22) at the top of the frame body (2), is equipped on the walker (22) and tank body (1) On the traveling wheel (23) that is in rolling contact of the second wind girder (12), be provided with and the basic ring beam of tank body (1) on the frame body (2) (13) directive wheel (24) being in rolling contact, the bottom of the frame body (2) are provided with for the spiral supporting leg (3) with ground face contact, The limit assembly (4) for limiting frame body (2) position is provided on the walker (22).
2. a kind of fire-fighting construction moving platform according to claim 1, it is characterised in that: the limit assembly (4) includes Track card (41) and abutting stud (42), the side wall of the track card (41) offer threaded hole (411), the abutting stud (42) it is threadedly connected in threaded hole (411).
3. a kind of fire-fighting construction moving platform according to claim 2, it is characterised in that: the abutting stud (42) is separate One end of track card (41) is fixedly installed hand-held part (421).
4. a kind of fire-fighting construction moving platform according to claim 3, it is characterised in that: the track card (41) passes through company Splicing (221) is fixedly connected with walker (22).
5. a kind of fire-fighting construction moving platform according to claim 1, it is characterised in that: the two sides of the traveling wheel (23) It is fixedly installed the flange (231) for preventing traveling wheel (23) from derailing.
6. a kind of fire-fighting construction moving platform according to claim 1, it is characterised in that: fixed on the walker (22) It is provided with the safety rope (222) for being fixedly connected with the protective fence (111) on tank body (1).
7. a kind of fire-fighting construction moving platform according to claim 1, it is characterised in that: the spiral supporting leg (3) includes Stud (31) accepts ring (32) and handle (33), and undertaking ring (32) thread bush is set on stud (31), the frame body (2) Bottom be fixedly installed vertically casing (25), described sleeve pipe (25) is sheathed on stud (31), and the bottom wall of casing (25) with It accepts ring (32) to contradict, the handle (33) is fixedly connected with the side wall for accepting ring (32).
8. a kind of fire-fighting construction moving platform according to claim 7, it is characterised in that: fixation is set in described sleeve pipe (25) It is equipped with hangers (251), the side wall for accepting ring (32) is fixedly installed drawstring (321), is fixedly installed on the drawstring (321) There is the hook (3211) that can be mounted with hangers (251).
9. a kind of fire-fighting construction moving platform construction method, it is characterised in that: the following steps are included:
S1, the mobile platform is transported to construction site, and is lifted to the second wind girder of tank body (1);
After S2, lifting are in place, frame body (2) position is limited by limit assembly (4), prevents frame body (2) from arbitrarily sliding, and directive wheel (24) it is supported on basic ring beam (13), adjusts spiral supporting leg (3), keep spiral supporting leg (3) and ground face contact secured;
S3, construction personnel are climbed up and are carried out construction operation on the construction plate (21) of frame body (2);
S4, when needing movable support body (2), on second wind girder be equipped with guardian, guardian open limit assembly (4), The operator on ground loosens spiral supporting leg (3), synchronous that frame body (2) is pushed to arrive suitable position, then fixed by limit assembly (4) Frame body (2) position, and spiral supporting leg (3) are fastened, it can construct after passed examination.
10. a kind of fire-fighting construction moving platform construction method according to claim 9, it is characterised in that: in S1, lifting Process need to use slip rope.
CN201910664057.4A 2019-07-23 2019-07-23 A kind of firefighting movable operation platform and its construction method Pending CN110374316A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910664057.4A CN110374316A (en) 2019-07-23 2019-07-23 A kind of firefighting movable operation platform and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910664057.4A CN110374316A (en) 2019-07-23 2019-07-23 A kind of firefighting movable operation platform and its construction method

Publications (1)

Publication Number Publication Date
CN110374316A true CN110374316A (en) 2019-10-25

Family

ID=68254931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910664057.4A Pending CN110374316A (en) 2019-07-23 2019-07-23 A kind of firefighting movable operation platform and its construction method

Country Status (1)

Country Link
CN (1) CN110374316A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101597955A (en) * 2009-04-30 2009-12-09 台山市东扩钢构有限公司 Safety scaffold
CN103352559A (en) * 2013-07-18 2013-10-16 江维安 Hanging type movable working platform for storage tank maintenance
CN106639281A (en) * 2016-10-13 2017-05-10 周峰 Detachable lifting scaffold
CN206767478U (en) * 2017-04-14 2017-12-19 宝鸡石油机械有限责任公司 The adjustable BOP in position hangs moving device position-limit mechanism
CN206815790U (en) * 2017-06-21 2017-12-29 上海森大机械制造有限公司 A kind of traveling centering

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101597955A (en) * 2009-04-30 2009-12-09 台山市东扩钢构有限公司 Safety scaffold
CN103352559A (en) * 2013-07-18 2013-10-16 江维安 Hanging type movable working platform for storage tank maintenance
CN106639281A (en) * 2016-10-13 2017-05-10 周峰 Detachable lifting scaffold
CN206767478U (en) * 2017-04-14 2017-12-19 宝鸡石油机械有限责任公司 The adjustable BOP in position hangs moving device position-limit mechanism
CN206815790U (en) * 2017-06-21 2017-12-29 上海森大机械制造有限公司 A kind of traveling centering

Similar Documents

Publication Publication Date Title
CN105452583B (en) Manufacturing field
CN103492649B (en) Boat scaffold system
CN105350763A (en) Guide rail-type construction hanging basket for chimney beacon paint and construction method
CN206829586U (en) Overhanging type steel pipe scaffold vertical rod base stand location buckle
CN104895335B (en) Method for mounting hanging pillar
CN104018659B (en) The auxiliary manned utensil of the inner regular inspection of a kind of spherical tank
JP5913765B2 (en) Mounting pole for power pole and method for mounting power pole of suspended load using this mounting pole for power pole
CN110374316A (en) A kind of firefighting movable operation platform and its construction method
KR102411789B1 (en) Anti-fall system of a sophisticated work
JP2008031667A (en) Funnel-shaped protective shelf device
JP2001009764A (en) Steel tower moving robot
CN212201400U (en) Assembled steel structure external hanging type protective frame
CN109402313B (en) Blast furnace downcomer bricklaying lining material transportation system and construction method
US11390497B2 (en) Construction system
US4367809A (en) Apparatus for conveying rubble
CN210152220U (en) Movable operating platform that encorbelments
CN209293395U (en) Construction adhesion type safety work protective platform
CN112324161A (en) Mounting structure of annular rail dismounting device and annular rail dismounting method
CN113622365A (en) Quick-assembling operation platform capable of movably walking on radial gate support arm and support hinge
CN205808410U (en) A kind of portable laser level
JP2008212964A (en) Apparatus for welding foundation pile
CN110315175A (en) The welding equipment of rectangle gooseneck and the welding method of rectangle gooseneck
CN211114774U (en) Mounting tool for erecting external scaffold
CN208979732U (en) Portable belt conveyer pedestrian bridge
CN209620540U (en) A kind of decoration steel structure scaffold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191025