CN110374084A - Prefabricated tubular pile stomidium plugging device and method - Google Patents

Prefabricated tubular pile stomidium plugging device and method Download PDF

Info

Publication number
CN110374084A
CN110374084A CN201910574195.3A CN201910574195A CN110374084A CN 110374084 A CN110374084 A CN 110374084A CN 201910574195 A CN201910574195 A CN 201910574195A CN 110374084 A CN110374084 A CN 110374084A
Authority
CN
China
Prior art keywords
end plate
pile
baffle
cushion cap
stomidium
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910574195.3A
Other languages
Chinese (zh)
Inventor
方三陵
陈超
陈华
曲良军
谢慕华
管安康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201910574195.3A priority Critical patent/CN110374084A/en
Publication of CN110374084A publication Critical patent/CN110374084A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/223Details of top sections of foundation piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

This disclosure relates to prefabricated tubular pile stomidium plugging device and method, the prefabricated tubular pile stomidium plugging device, comprising: pile end plate, middle part have the pile end plate cushion cap for being open and surrounding the opening;Baffle is arranged on the pile end plate cushion cap to cover the opening;Reinforcing support part, the baffle is pressed on the pile end plate cushion cap on the baffle;And fastener, the reinforcing support part, the baffle and the pile end plate cushion cap are detachably fastened together.The disclosure can guarantee that stake holes cleans in full process, so as to avoid borehole cleaning process.

Description

Prefabricated tubular pile stomidium plugging device and method
Technical field
This disclosure relates to prefabricated tubular pile stomidium plugging device and method.
Background technique
In the construction of general prefabricated tubular pile, tubular pole can be embedded in soil in most cases, and soil, foreign matter can fall into tubular pole It is accumulated in hole.It walks process after progress to go to toward to spend a lot of manpower and time borehole cleaning, this is to restrict pile foundation construction efficiency A great problem.For this problem, this field related invention is often conceived to tool of invention and improves borehole cleaning efficiency, not from root It is solved the problems, such as on this.
Summary of the invention
The disclosure provides a kind of prefabricated tubular pile stomidium plugging device and method, passes through reusable device and blocks stake end Hole effectively solves the problems, such as the accumulation of soil, foreign matter in prefabricated tubular pile stake holes, and then borehole cleaning is avoided to work, and optimized construction procedure mentions High efficiency.
According to the first aspect of the embodiments of the present disclosure, a kind of prefabricated tubular pile stomidium plugging device is provided, comprising: pile end plate, Middle part has the pile end plate cushion cap for being open and surrounding the opening;Baffle is arranged on the pile end plate cushion cap described to cover Opening;Reinforcing support part, the baffle is pressed on the pile end plate cushion cap on the baffle;And fastener, by institute Reinforcing support part, the baffle and the pile end plate cushion cap is stated to be detachably fastened together.
In above-mentioned prefabricated tubular pile stomidium plugging device, the pile end plate cushion cap and the reinforcing support part are equipped with multiple Screw hole, the fastener are and the matched screw of the screw hole.
In above-mentioned prefabricated tubular pile stomidium plugging device, the pile end plate cushion cap, the baffle and the reinforcing support part It is regular hexagon shape.
Have in the reinforcing support part of above-mentioned prefabricated tubular pile stomidium plugging device, the regular hexagon by vertex and center The dowel connected.
In above-mentioned prefabricated tubular pile stomidium plugging device, sealing element is equipped between the baffle and the pile end plate cushion cap.
According to the second aspect of an embodiment of the present disclosure, a kind of prefabricated tubular pile stomidium method for blocking is provided, comprising:
Pile end plate is fastened on to the end of prefabricated tubular pile, makes the opening face prefabricated tubular pile stomidium in the middle part of the pile end plate, Wherein, there is the pile end plate cushion cap around the opening in the middle part of the pile end plate;Baffle is placed on the pile end plate cushion cap To cover the opening;Reinforcing support part is placed on the baffle the baffle is pressed on the pile end plate cushion cap;Make The reinforcing support part, the baffle and the pile end plate cushion cap are detachably fastened together with fastener.
In above-mentioned prefabricated tubular pile stomidium method for blocking, the pile end plate cushion cap and the reinforcing support part are equipped with multiple Screw hole, the fastener are and the matched screw of the screw hole.
In above-mentioned prefabricated tubular pile stomidium method for blocking, the pile end plate cushion cap, the baffle and the reinforcing support part It is regular hexagon shape.
In above-mentioned prefabricated tubular pile stomidium method for blocking, the baffle is plank or metal plate.
In above-mentioned prefabricated tubular pile stomidium method for blocking, sealing element is equipped between the baffle and the pile end plate cushion cap.
The disclosure devises reusable Demountable by adjusting the structure of pile end plate, by blocking stake Stomidium effectively solves the problems, such as the accumulation of soil, foreign matter in prefabricated tubular pile stake holes, so that borehole cleaning process is avoided, optimized construction procedure, Improve production efficiency.Baffle can be used scene and put template construct aside as useless in the disclosure, be simple to manufacture, and expense is low, embody waste benefit Green construction is furthermore achieved in spirit.Disclosure structure is simple, reliable, easy-to-use, low in cost, optimizes construction party Method improves construction efficiency, have the characteristics that it is easy to use, be easy to grasp, it is high-efficient, more economical.
Detailed description of the invention
The disclosure is described in further detail with reference to the accompanying drawings and detailed description.
Fig. 1 shows the perspective view that operating condition is blocked according to the pile end plate of one embodiment of the disclosure.
Fig. 2 shows the sectional views that pile end plate shown in FIG. 1 blocks operating condition.
Fig. 3 shows the structural schematic diagram of the pile end plate of one embodiment according to the disclosure.
Fig. 4 shows the reinforcing support part structural schematic diagram according to one embodiment of the disclosure.
Specific embodiment
Such as Fig. 1 and 2, prefabricated tubular pile stomidium plugging device includes pile end plate 1, reinforcing support part 4, baffle 5, fastener etc.. Have such as Fig. 3, in the middle part of pile end plate 1 be open and around the opening pile end plate cushion cap 9, pile end plate cushion cap 9 is equipped with multiple spiral shells Wire hole 8.The opening that pile end plate 1 is covered on pile end plate cushion cap 9 is arranged in baffle 5.Such as Fig. 4, reinforcing support part 4 is set to baffle 5 On, baffle 5 is pressed on pile end plate cushion cap 9, reinforcing support part 4 is equipped with multiple screw holes 3.On reinforcing support part 4 8 face of screw hole on screw hole 3 and pile end plate cushion cap 9 can be used as the screw of fastener for reinforcing support part 4, baffle 5 and stake End plate cushion cap 9 is detachably fastened together.
In a kind of possible embodiment, reinforcing support part 4, baffle 5 and pile end plate cushion cap 9 are regular hexagon shape Shape.Wherein the reinforcing support part 4 of regular hexagon has the dowel for connecting vertex and center.
It is necessary to determine whether to need to prevent stake holes from seeping water according to construction.It, then can be in baffle 5 and stake if you need to be sealed setting Sealing element is set between 9 on end plate cushion cap, which can be used flexible glue seal ring.
Prefabricated tubular pile stomidium method for blocking the following steps are included:
Step 1, the end of prefabricated tubular pile pile body 7 is installed in by the anchor hole 2 on pile end plate 1, and makes pile end plate 1 The opening face prefabricated tubular pile stomidium at middle part, wherein there is the spacing collar 6 for the effect of being connected and fixed on pile body 7.
Step 2, the rubber O-ring seal as sealing element is placed on 9 on pile end plate cushion cap.
Step 3, baffle 5 is placed on sealing element, to cover the opening of pile end plate 1, wherein baffle 5 can be existing by constructing The discarded template in field is cut, can also special configuration metal plate.
Step 4, reinforcing support part 4 is placed on baffle 5 baffle 5 to be pressed on pile end plate cushion cap 9.
Step 5, reinforcing support part 4, baffle 5 and pile end plate cushion cap 9 are detachably fastened together using screw.Glue stops Water ring is closely knit under the pressing of reinforcing support part 4, baffle 5 and pile end plate cushion cap 9, realizes sealing effect.
Stake holes is completed to block at this time, can carry out pile sinking operation.According to design requirement, pile body is divided into bury and exposed one completely First two operating condition of part stake, since closure is completed in stake holes, soil, foreign matter etc. be will not fall into hole under this two kinds of operating conditions.? Under the operating condition for having installed seal ring additional, muddy water, sewage can not also penetrate into.Certainly, it can not also be held in baffle 5 and pile end plate without sealing Rubber O-ring seal is set between platform 9.
It is completed wait drive piles, the next step can be entered as needed after the assay was approved, such as cut stake.At this time by reinforcement branch Screw is removed in the screw hole 3 of support member 4, i.e., dismountable entire plugging device, can be put in storage after simple-to-maintain and be remained next engineering and make With.
The prefabricated tubular pile stomidium plugging device and method of the disclosure can guarantee that stake holes cleans in full process, to avoid Borehole cleaning process.

Claims (10)

1. a kind of prefabricated tubular pile stomidium plugging device characterized by comprising
Pile end plate, middle part have the pile end plate cushion cap for being open and surrounding the opening;
Baffle is arranged on the pile end plate cushion cap to cover the opening;
Reinforcing support part, the baffle is pressed on the pile end plate cushion cap on the baffle;With
The reinforcing support part, the baffle and the pile end plate cushion cap are detachably fastened together by fastener.
2. prefabricated tubular pile stomidium plugging device according to claim 1, which is characterized in that the pile end plate cushion cap and described Reinforcing support part is equipped with multiple screw holes, and the fastener is and the matched screw of the screw hole.
3. prefabricated tubular pile stomidium plugging device according to claim 1, which is characterized in that the pile end plate cushion cap, described Baffle and the reinforcing support part are regular hexagon shape.
4. prefabricated tubular pile stomidium plugging device according to claim 3, which is characterized in that the reinforcement branch of the regular hexagon Support member has the dowel for connecting vertex and center.
5. prefabricated tubular pile stomidium plugging device according to any one of claims 1 to 4, which is characterized in that the baffle and Sealing element is equipped between the pile end plate cushion cap.
6. a kind of prefabricated tubular pile stomidium method for blocking characterized by comprising
Pile end plate is fastened on to the end of prefabricated tubular pile, makes the opening face prefabricated tubular pile stomidium in the middle part of the pile end plate, wherein There is the pile end plate cushion cap around the opening in the middle part of the pile end plate;
Baffle is placed on the pile end plate cushion cap to cover the opening;
Reinforcing support part is placed on the baffle the baffle is pressed on the pile end plate cushion cap;
The reinforcing support part, the baffle and the pile end plate cushion cap are detachably fastened together using fastener.
7. prefabricated tubular pile stomidium method for blocking according to claim 6, which is characterized in that the pile end plate cushion cap and described Reinforcing support part is equipped with multiple screw holes, and the fastener is and the matched screw of the screw hole.
8. prefabricated tubular pile stomidium method for blocking according to claim 6, which is characterized in that the pile end plate cushion cap, described Baffle and the reinforcing support part are regular hexagon shape.
9. prefabricated tubular pile stomidium method for blocking according to claim 6, which is characterized in that the baffle is plank or metal Plate.
10. according to the described in any item prefabricated tubular pile stomidium method for blocking of claim 6~9, which is characterized in that the baffle and Sealing element is equipped between the pile end plate cushion cap.
CN201910574195.3A 2019-06-28 2019-06-28 Prefabricated tubular pile stomidium plugging device and method Pending CN110374084A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910574195.3A CN110374084A (en) 2019-06-28 2019-06-28 Prefabricated tubular pile stomidium plugging device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910574195.3A CN110374084A (en) 2019-06-28 2019-06-28 Prefabricated tubular pile stomidium plugging device and method

Publications (1)

Publication Number Publication Date
CN110374084A true CN110374084A (en) 2019-10-25

Family

ID=68251325

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910574195.3A Pending CN110374084A (en) 2019-06-28 2019-06-28 Prefabricated tubular pile stomidium plugging device and method

Country Status (1)

Country Link
CN (1) CN110374084A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115075224A (en) * 2022-07-12 2022-09-20 中建八局第一建设有限公司 Steel-flexible combined multifunctional baffle plate for precast tubular pile and implementation method

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0941370A (en) * 1995-07-28 1997-02-10 Shimizu Corp Increasing method of bearing power of existing pile by new steel-pipe pile
CN203729295U (en) * 2013-12-24 2014-07-23 绿地控股集团有限公司 Pile head protection device
CN204608772U (en) * 2015-04-17 2015-09-02 上海三凯建设管理咨询有限公司 A kind of have the piling strtucture keeping off native function
CN205636735U (en) * 2016-04-26 2016-10-12 江苏仪征苏中建设有限公司 But secondary is used as in advance stake hole guard plate that core layer board was filled out to stress tube stake pile bolck
CN205712089U (en) * 2016-04-22 2016-11-23 江苏兴厦建设工程集团有限公司 A kind of pre-stress hollow square pile
CN205907720U (en) * 2016-06-16 2017-01-25 昆明顺弘水泥制管制品有限公司 Concrete sealing well lid
CN206428694U (en) * 2016-12-30 2017-08-22 上海三凯建设管理咨询有限公司 A kind of Prefabricated hollow pile of dash soil
CN107288125A (en) * 2017-06-30 2017-10-24 上海二十冶建设有限公司 Prefabricated pile stake core anti-blocking method
CN206667231U (en) * 2016-12-30 2017-11-24 上海三凯建设管理咨询有限公司 A kind of precast hollow pile tube
CN206667242U (en) * 2016-12-30 2017-11-24 上海三凯建设管理咨询有限公司 A kind of closed type hollow shell pill
CN108625357A (en) * 2018-06-28 2018-10-09 唐山曹妃甸二十二冶工程技术有限公司 PHC pile piles
CN208685607U (en) * 2018-05-19 2019-04-02 江苏地基工程有限公司 A kind of PHC tubular pole aperture plugging structure
CN109723077A (en) * 2017-10-31 2019-05-07 中国二十冶集团有限公司 Prevent the method that pile for prestressed pipe stake core bore blocks when bearing platform construction

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0941370A (en) * 1995-07-28 1997-02-10 Shimizu Corp Increasing method of bearing power of existing pile by new steel-pipe pile
CN203729295U (en) * 2013-12-24 2014-07-23 绿地控股集团有限公司 Pile head protection device
CN204608772U (en) * 2015-04-17 2015-09-02 上海三凯建设管理咨询有限公司 A kind of have the piling strtucture keeping off native function
CN205712089U (en) * 2016-04-22 2016-11-23 江苏兴厦建设工程集团有限公司 A kind of pre-stress hollow square pile
CN205636735U (en) * 2016-04-26 2016-10-12 江苏仪征苏中建设有限公司 But secondary is used as in advance stake hole guard plate that core layer board was filled out to stress tube stake pile bolck
CN205907720U (en) * 2016-06-16 2017-01-25 昆明顺弘水泥制管制品有限公司 Concrete sealing well lid
CN206428694U (en) * 2016-12-30 2017-08-22 上海三凯建设管理咨询有限公司 A kind of Prefabricated hollow pile of dash soil
CN206667231U (en) * 2016-12-30 2017-11-24 上海三凯建设管理咨询有限公司 A kind of precast hollow pile tube
CN206667242U (en) * 2016-12-30 2017-11-24 上海三凯建设管理咨询有限公司 A kind of closed type hollow shell pill
CN107288125A (en) * 2017-06-30 2017-10-24 上海二十冶建设有限公司 Prefabricated pile stake core anti-blocking method
CN109723077A (en) * 2017-10-31 2019-05-07 中国二十冶集团有限公司 Prevent the method that pile for prestressed pipe stake core bore blocks when bearing platform construction
CN208685607U (en) * 2018-05-19 2019-04-02 江苏地基工程有限公司 A kind of PHC tubular pole aperture plugging structure
CN108625357A (en) * 2018-06-28 2018-10-09 唐山曹妃甸二十二冶工程技术有限公司 PHC pile piles

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115075224A (en) * 2022-07-12 2022-09-20 中建八局第一建设有限公司 Steel-flexible combined multifunctional baffle plate for precast tubular pile and implementation method
CN115075224B (en) * 2022-07-12 2023-07-07 中建八局第一建设有限公司 Steel-flexible combined multifunctional baffle for prefabricated pipe piles and implementation method

Similar Documents

Publication Publication Date Title
KR200436633Y1 (en) Assembly manhole system
KR101109320B1 (en) Field assembly concrete culvert box having underground excavation prevention structure and construction method thereof
KR101963836B1 (en) Concrete structure expansion joint structure
US9714496B2 (en) Apparatus and method for controlling liquid on a site
CN110374084A (en) Prefabricated tubular pile stomidium plugging device and method
KR101469603B1 (en) Pipe for piperoof with multipurpose solidarizing tube and construction method using this pipe
JP5468733B2 (en) Foundation through-pipe structure and drainage pipe removal method
KR102190480B1 (en) Implant pile pressing apparatus in architecture foundation system and a universal implant piling method
KR100679480B1 (en) Drain board
KR20190016819A (en) Crack inducer for concrete pile head cutting, concrete pile therewith, and construction method thereof
CN218236612U (en) Reinforced concrete pipeline repairing device
KR101597933B1 (en) Resistance method of sliding slope using flexible pipe without slip for soil-cement layer
CN212248272U (en) Concrete body supporting system for high-strength precipitation
JP2007162381A (en) Reinforcing structure of foundation in existing underwater structure and its reinforcing method
KR102123666B1 (en) Implant pile installer in architecture foundation system and a universal implant pile method
US20120308309A1 (en) Manufacturing method, driving in and injection of underwater piles
KR102136256B1 (en) Rainwater storage tank construction method using top-down method
KR101047257B1 (en) Construction method of earth wall using composite sheet pile
JPH10299377A (en) Earth retaining construction method for shaft
CN207092137U (en) A kind of prestressed pipe merism
CN205116171U (en) Earth mulch board is prevented to PHC tubular pile pile head
JPH10205270A (en) Shaft block, shaft excavation method and conduct pipe jacking method
KR101641463B1 (en) Drain construction method
JP4452170B2 (en) Construction method of shaft
CN110158605B (en) Foundation pit construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191025

RJ01 Rejection of invention patent application after publication