CN109723077A - Prevent the method that pile for prestressed pipe stake core bore blocks when bearing platform construction - Google Patents

Prevent the method that pile for prestressed pipe stake core bore blocks when bearing platform construction Download PDF

Info

Publication number
CN109723077A
CN109723077A CN201711048238.1A CN201711048238A CN109723077A CN 109723077 A CN109723077 A CN 109723077A CN 201711048238 A CN201711048238 A CN 201711048238A CN 109723077 A CN109723077 A CN 109723077A
Authority
CN
China
Prior art keywords
pile
steel plate
sealing
core bore
sealing steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711048238.1A
Other languages
Chinese (zh)
Inventor
吴敏
刘千印
杨君琦
王岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201711048238.1A priority Critical patent/CN109723077A/en
Publication of CN109723077A publication Critical patent/CN109723077A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The method that pile for prestressed pipe stake core bore blocks when bearing platform construction is prevented the present invention relates to a kind of, comprising steps of one: determining the top section piling of every pile before prestressing pipe pile construction, and it is concentrated stacking by region;Two: production sealing steel plate;Three: carrying out stake core bore sealing with sealing steel plate in the top section piling one end determined, sealing steel plate and pile end plate are welded to connect using interruption, and sealing steel plate is placed by the lower part of pile end plate;Four: after bearing platform construction, welding position between sealing steel plate and pile end board being cut with hand-held cutting machine, sealing steel plate recycling is used as stake stem end plate.The present invention blocks stake core bore in pile foundation construction Shi Xianyong steel plate, prevents extruding of the mud in the natural reset of tempus intercalare and earth excavation from blocking stake core bore, to reduce the time spent when foundation platform construction because clearing up stake core bore, human and material resources.

Description

Prevent the method that pile for prestressed pipe stake core bore blocks when bearing platform construction
Technical field
The present invention relates to one kind to prevent obstruction method, specifically prevents pile for prestressed pipe stake core bore when bearing platform construction from blocking up The method of plug.
Background technique
Tubular pole is usually to press friction pile design in the soft layer of coastal area, and when construction is mainly made with pile head elevation control For final pressure or ceasing driving standard.It is extruded that soil layer resets naturally, the extruding of foundation pit or cushion cap earth excavation can allow after pile foundation construction Stake in-core is crowded with soil, and foundation platform stake stem need to spend very big material resources, manpower to carry out the mud cleaning in stake core bore when constructing, And it is not easy to clean out.
Summary of the invention
The present invention is directed to overcome the deficiencies of existing technologies, providing one kind prevents pile for prestressed pipe stake core bore when bearing platform construction from blocking up The method of plug solves the problems, such as that pipe pile core bore is blocked by soil and influences the construction of stake stem in pile for prestressed pipe soft layer.
In order to solve the above-mentioned technical problem, the present invention is implemented as follows:
A method of prevent pile for prestressed pipe stake core bore when bearing platform construction from blocking, it is characterised in that include the following steps:
Step 1: the top section piling of every pile is determined before prestressing pipe pile construction, and it is concentrated by region and is stacked;
Step 2: production sealing steel plate, the sealing plate size is according to stake core bore dimensioned;
Step 3: stake core bore sealing is carried out with sealing steel plate in the top section piling one end determined, sealing steel plate is adopted with pile end plate It is welded to connect with interruption, every section of fusion length is not less than 50mm, and the height of weld seam is broken when cannot exceed pile end plate to prevent pile follower Bad hush panel, sealing steel plate are placed by the lower part of pile end plate;
Step 4: after bearing platform construction, cutting welding position between sealing steel plate and pile end board with hand-held cutting machine, sealing Steel plate recycling is used as stake stem end plate.
Described prevents the method that pile for prestressed pipe sealing blocks when bearing platform construction, it is characterised in that: sealing steel plate setting It goes wrong after the completion when sealing steel plate end bidding will to prevent hanging.
Described prevents the method that pile for prestressed pipe sealing blocks when bearing platform construction, it is characterised in that: pile top is using sealing Pile top such as uses opening pile toe, and stake lower part also needs to be blocked.
The beneficial effects of the present invention are: being applicable in wide: coastal area tier building, low-rise building, industrial premises are mostly used tubular pole As pile foundation, Design of Foundation stake top absolute altitude generally all on natural ground hereinafter, and coastal area soft layer it is more normal See;It is good in economic efficiency: relative to the time, human and material resources required for cleaning stake core bore, carry out sealing in advance the required time, Human and material resources are few very much, and hush panel remove after can the end plate of purposes stake stem use;Strong operability: required for this method The goods and materials such as all machinery, equipment, material, personnel, be construction site it is existing or be easy to rent with and purchase.
Stake core bore is blocked in pile foundation construction Shi Xianyong steel plate, prevents mud in the natural reset and the earthwork of tempus intercalare Extruding when excavation blocks stake core bore, to reduce the time spent when foundation platform construction because clearing up stake core bore, manpower, object Power.
Detailed description of the invention
The present invention will be further described in detail below with reference to the accompanying drawings and embodiments:
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the structural schematic diagram of Fig. 1 overlook direction.
Specific embodiment
It is as shown in Figure 1, 2: a method of prevent pile for prestressed pipe stake core bore when bearing platform construction from blocking,
Step 1: being familiar with drawing before pile for prestressed pipe 4 is constructed, and carries out rationally matching stake, determines the top section piling of every pile, and handle It is concentrated by region stacks.
Step 2: the sealing steel plate 1 of production 3mm thickness, the sealing plate size is according to stake core bore dimensioned;
Soil is filled by the lower part stake core bore of stake into stake core bore in order to prevent, and pile top such as uses opening pile using sealing pile top Point, stake lower part also need to be blocked.
Step 3: stake core bore sealing is carried out with the sealing steel plate of 3mm thickness in the top section piling one end determined, seals steel plate Be welded to connect with pile end plate 2 using interruption, every section of 3 length of weld seam is not less than 50mm, the height of weld seam cannot beyond pile end plate with It prevents from destroying hush panel when pile follower, sealing steel plate is placed by the lower part of pile end plate;Sealing steel plate is sealing steel plate after being provided with End bidding will when hanging to prevent going wrong.
Step 4: after bearing platform construction, cutting welding position between sealing steel plate and pile end board with hand-held cutting machine, Sealing steel plate recycling is used as stake stem end plate.

Claims (3)

1. a kind of prevent the method that pile for prestressed pipe stake core bore blocks when bearing platform construction, it is characterised in that include the following steps:
Step 1: the top section piling of every pile is determined before prestressing pipe pile construction, and it is concentrated by region and is stacked;
Step 2: production sealing steel plate, the sealing plate size is according to stake core bore dimensioned;
Step 3: stake core bore sealing is carried out with sealing steel plate in the top section piling one end determined, sealing steel plate is adopted with pile end plate It is welded to connect with interruption, every section of fusion length is not less than 50mm, and the height of weld seam is broken when cannot exceed pile end plate to prevent pile follower Bad hush panel, sealing steel plate are placed by the lower part of pile end plate;
Step 4: after bearing platform construction, cutting welding position between sealing steel plate and pile end board with hand-held cutting machine, sealing Steel plate recycling is used as stake stem end plate.
2. according to claim 1 prevent the method that pile for prestressed pipe sealing blocks when bearing platform construction, it is characterised in that: envelope Mouthful steel plate goes wrong after being provided with when sealing steel plate end bidding will to hang.
3. according to claim 1 prevent the method that pile for prestressed pipe sealing blocks when bearing platform construction, it is characterised in that: stake Point such as uses opening pile toe, stake lower part also needs to be blocked using sealing pile top.
CN201711048238.1A 2017-10-31 2017-10-31 Prevent the method that pile for prestressed pipe stake core bore blocks when bearing platform construction Pending CN109723077A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711048238.1A CN109723077A (en) 2017-10-31 2017-10-31 Prevent the method that pile for prestressed pipe stake core bore blocks when bearing platform construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711048238.1A CN109723077A (en) 2017-10-31 2017-10-31 Prevent the method that pile for prestressed pipe stake core bore blocks when bearing platform construction

Publications (1)

Publication Number Publication Date
CN109723077A true CN109723077A (en) 2019-05-07

Family

ID=66293130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711048238.1A Pending CN109723077A (en) 2017-10-31 2017-10-31 Prevent the method that pile for prestressed pipe stake core bore blocks when bearing platform construction

Country Status (1)

Country Link
CN (1) CN109723077A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374084A (en) * 2019-06-28 2019-10-25 中国一冶集团有限公司 Prefabricated tubular pile stomidium plugging device and method
CN111021351A (en) * 2019-12-25 2020-04-17 中建六局土木工程有限公司 Pile top plugging construction method for pre-tensioning prestressed concrete pipe pile
CN111364463A (en) * 2020-03-03 2020-07-03 中国华冶科工集团有限公司 Mud falling prevention pile cap for precast tubular pile core and construction method of mud falling prevention pile cap

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374084A (en) * 2019-06-28 2019-10-25 中国一冶集团有限公司 Prefabricated tubular pile stomidium plugging device and method
CN111021351A (en) * 2019-12-25 2020-04-17 中建六局土木工程有限公司 Pile top plugging construction method for pre-tensioning prestressed concrete pipe pile
CN111364463A (en) * 2020-03-03 2020-07-03 中国华冶科工集团有限公司 Mud falling prevention pile cap for precast tubular pile core and construction method of mud falling prevention pile cap

Similar Documents

Publication Publication Date Title
JP5932124B1 (en) Steel pipe pile construction method
CN109723077A (en) Prevent the method that pile for prestressed pipe stake core bore blocks when bearing platform construction
CN205636735U (en) But secondary is used as in advance stake hole guard plate that core layer board was filled out to stress tube stake pile bolck
US20140314496A1 (en) Polymer grouting method for constructing multi-wing pile
CN109056713B (en) Construction method for steel structure anchor-increasing pouring anti-pulling pile
CN113338362A (en) Construction method of cage core bag bottom-expanding grouting anchor rod static pressure steel pipe pile
CN104481408A (en) Pick cylindrical drill suitable for construction of super-large diameter swivel-driven piles and application method thereof
CN111636417A (en) Grouting type steel pipe pile and construction method thereof
CN112176992A (en) Construction method of manual hole digging pile and manual hole digging pile
JP2010222870A (en) Soil-cement column earth-retaining wall
CN110055953B (en) Multistage series-connection assembled type recyclable miniature steel pipe pile and construction method thereof
CN104164873A (en) Prestressed pipe pile and construction method thereof
CN204919533U (en) Drilling bored concrete pile hosqe bit
CN109881685A (en) A kind of assembled piling bar and its assembly method with the edge of a wing
CN211006702U (en) Inclined strut underground structure is thrown in soft soil foundation double-deck
CN109183831A (en) Become the multistage load stake of stake diameter string hole and its construction method
CN203007940U (en) Tubular pile protection structure in side slope hammering construction
CN111021351A (en) Pile top plugging construction method for pre-tensioning prestressed concrete pipe pile
CN214940085U (en) Reinforced structure at pile splicing part of prestressed concrete pipe pile
CN206385532U (en) It is a kind of to be used for the piling template of CFG
CN215053032U (en) Protection architecture that deep basal pit closes on existing shallow basis
CN100557144C (en) A kind of method of removing the bored pile construction obstacle
CN211036960U (en) Electroosmosis gravel grouting pile
CN211368686U (en) High-strength pipe pile
CN210031773U (en) Civil construction engineering is with prefabricated pile foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190507

RJ01 Rejection of invention patent application after publication