CN110360707A - A kind of judgment method of intelligent fresh air system filter replacement - Google Patents

A kind of judgment method of intelligent fresh air system filter replacement Download PDF

Info

Publication number
CN110360707A
CN110360707A CN201910650062.XA CN201910650062A CN110360707A CN 110360707 A CN110360707 A CN 110360707A CN 201910650062 A CN201910650062 A CN 201910650062A CN 110360707 A CN110360707 A CN 110360707A
Authority
CN
China
Prior art keywords
fresh air
air system
speed
filter
fan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910650062.XA
Other languages
Chinese (zh)
Other versions
CN110360707B (en
Inventor
陈平
陈衍德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Xingtel Environmental Technology Co Ltd
Original Assignee
Xiamen Xingtel Environmental Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Xingtel Environmental Technology Co Ltd filed Critical Xiamen Xingtel Environmental Technology Co Ltd
Priority to CN201910650062.XA priority Critical patent/CN110360707B/en
Publication of CN110360707A publication Critical patent/CN110360707A/en
Application granted granted Critical
Publication of CN110360707B publication Critical patent/CN110360707B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/32Responding to malfunctions or emergencies
    • F24F11/39Monitoring filter performance
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/61Control or safety arrangements characterised by user interfaces or communication using timers

Abstract

The invention discloses a kind of judgment methods of intelligent fresh air system filter replacement, comprising: the output power of blower is constant in intelligent fresh air system;By being packed into the simulation dust accumulation filter of end-of-life in the intelligent fresh air system being installed in place in actual use place, the rotation speed of fan obtained under different wind-speed gears is used as referring to revolving speed;Detection is packed into real-time rotation speed of fan of the intelligent fresh air system of new filter under real use state;Comparison according to the variation of real-time rotation speed of fan and its with reference revolving speed corresponding to current wind-speed gear, judges whether to need to replace filter.The judgment method of above-mentioned intelligent fresh air system filter replacement solves the problems such as comparison threshold value acquisition time existing in the prior art is long, filter service life judgement resultant error is big, at high cost and realization is complex.

Description

A kind of judgment method of intelligent fresh air system filter replacement
Technical field
The present invention relates to fresh air system technical fields, and in particular to a kind of judgement side of intelligent fresh air system filter replacement Method.
Background technique
After fresh air system is started to work, the filters such as HEPA begin to slowly dust accumulation, with the increase of dust accumulation amount, filter Resistance becomes larger, dust accumulation to a certain extent after, the corresponding augmented resistance of unit dust accumulation amount increment institute will be doubled and redoubled, if not The replacement filters such as HEPA in time, excessively high resistance will will affect the air quantity of blower, and with the increase of dust accumulation amount, in filter It is easy to produce mildew or breeds bacterium, in addition, the grit under original has been blocked can fall off after volume increase from filter screen Get off, and be fed through interior with air duct, causes the secondary pollution of room air;Therefore, when filter dust accumulation to a certain extent Later, the operation for reminding user to replace filter in time is necessary.
Currently, the judgment method for reminding user to replace filter in intelligent fresh air system mainly has chronometry and pressure differential method, Wherein, chronometry is affected by outside ambient air performance figure, there is a problem of determining that resultant error is larger;Pressure difference Method is changed by testing filters resistance determines that dust accumulation amount is that comparison is scientific, still, the realization of this method is more complicated, at This is higher, and deposition of the dust on static pressure transducer can also have an impact the detection of static pressure transducer;In view of the above-mentioned problems, A kind of fresh air system filter device was disclosed in the Patent No. CN104848505A patent of China's application on April 6th, 2015 Jam judging method and fresh air host and fresh air system, this method in experimental situation by simulating filter device from completely newly to mistake The course of work of effect simultaneously obtains power corresponding to different wind speed, and the time of previous experiments need to be up to the several months, is consumed Equipment cost and time cost it is larger, and since experimental situation and practical service environment often have differences, this method Also having ignored fresh air system can be with there are factors such as the length of the fresh air pipeline of installation, variable diameter, sewing, elbows in actual installation Experimental situation has differences, and the resistance of fresh air system entirety is not only related with filter, even more the dynamic external with these because Element it is closely related, it is seen then that fresh air system factory before in the experimental situation of factory by simply obtain threshold value as than Pair basic data, determine result can also have error.
Summary of the invention
It is an object of the invention to overcome the problems, such as drawbacks described above present in background technique or, a kind of intelligent fresh air system is provided It unites the judgment method of filter replacement, to solve, comparisons threshold value acquisition time existing in the prior art is long, filter uses the longevity Life determines the problems such as resultant error is big, at high cost and realization is complex.
To reach above-mentioned purpose, the present invention adopts the following technical scheme:
A kind of judgment method of intelligent fresh air system filter replacement, comprising: blower is defeated in the intelligent fresh air system Power invariability out;By the simulation for being packed into end-of-life in the intelligent fresh air system being installed in place in actual use place Dust accumulation filter, the rotation speed of fan obtained under different wind-speed gears are used as referring to revolving speed;The intelligence that detection is packed into new filter is new Real-time rotation speed of fan of the wind system under real use state;According to real-time rotation speed of fan variation and its with current wind-speed gear The comparison of corresponding reference revolving speed, judges whether to need to replace filter.
Further, determine that needing to carry out filter replacement meets the following conditions: the intelligent fresh air system certain the The real-time rotation speed of fan that one moment measured is greater than referring to revolving speed corresponding to current wind-speed gear, and artificially sets from the first moment Real-time rotation speed of fan measured by any time is all larger than corresponding to current wind-speed gear referring to revolving speed in fixed first period.
Further, it when the first period of artificial settings reaches from first moment, issues filter replacement and reminds.
Further, further includes: by adjusting the intelligence equipped with new filter being installed in place in actual use place Can fresh air system wind-speed gear, acquire the correspondence rotation speed of fan under different wind-speed gears, and by acquired different wind speed shelves Corresponding rotation speed of fan is as rated rotational frequency under position.
Further, further includes: according to real-time rotation speed of fan variation and its with reference corresponding to current wind-speed gear The comparison of revolving speed, judges whether filter enters replacement probationary period;Determine filter enter replacement probationary period at least meets below Condition: the intelligent fresh air system is greater than mark corresponding to current wind-speed gear in the real-time rotation speed of fan that certain second moment measures Quasi- revolving speed, and the absolute value of difference between the two is more than or equal to the first value being manually set, and the first value is less than current wind speed shelves The absolute value of the difference of rated rotational frequency corresponding to reference revolving speed corresponding to position and current wind-speed gear;The people from the second moment Standard corresponding to current wind-speed gear is all larger than for real-time rotation speed of fan measured by any time in the second phase of setting Revolving speed and it is less than corresponding to current wind-speed gear referring to revolving speed.
Further, it when the second phase of artificial settings reaches from second moment, issues filter maintenance and reminds simultaneously Into replacement probationary period.
Further, the output power of blower is adjusted by motor driving plate in the intelligent fresh air system, wherein The revolving speed of blower is calculated by P=π/30*T*n, and P is the output power of blower, and T is the torque of blower, and n is the revolving speed of blower.
A kind of judgment method of intelligent fresh air system filter replacement, comprising: blower turns in the intelligent fresh air system Speed is constant;By the simulation dust accumulation for being packed into end-of-life in the intelligent fresh air system being installed in place in actual use place Filter, the power obtained under different wind-speed gears are used as referring to power;The intelligent fresh air system that detection is packed into new filter exists Real-time power of fan under real use state;According to real-time power of fan variation and its with corresponding to current wind-speed gear Referring to the comparison of power, judge whether to need to replace filter.
Further, determine that needing to carry out filter replacement meets the following conditions: the intelligent fresh air system certain the The real-time power of fan that three moment measured is less than referring to power corresponding to current wind-speed gear, and artificially sets from the third moment Real-time power of fan measured by any time is respectively less than corresponding to current wind-speed gear referring to revolving speed during fixed third.
Further, it when being reached during the third of artificial settings from the third moment, issues filter replacement and reminds.
Further, further includes: by adjusting the intelligence equipped with new filter being installed in place in actual use place Can fresh air system wind-speed gear, acquire the correspondence power of fan under different wind-speed gears, and by acquired different wind speed shelves Corresponding power of fan is as calibration power under position.
Further, further includes: according to real-time rotation speed of fan variation and its with reference corresponding to current wind-speed gear The comparison of power, judges whether filter enters replacement probationary period;Determine filter enter replacement probationary period at least meets below Condition: the intelligent fresh air system is less than mark corresponding to current wind-speed gear in the real-time power of fan that certain the 4th moment measures Power is infused, and the absolute value of difference between the two is more than or equal to the second value being manually set, and second value is less than current wind speed shelves The absolute value of the difference of calibration power corresponding to reference power corresponding to position and current wind-speed gear;The people from the 4th moment Real-time power of fan measured by the fourth phase interior any time for setting is respectively less than standard corresponding to current wind-speed gear Power and it is greater than corresponding to current wind-speed gear referring to power.
Further, it when being reached between the fourth phase of artificial settings from the 4th moment, issues filter maintenance and reminds simultaneously Into replacement probationary period.
Further, the power of blower is calculated by the electric current and voltage for acquiring blower in the intelligent fresh air system ?.
A kind of judgment method of intelligent fresh air system filter replacement, comprising the following steps: the intelligence in experimental situation It is packed into new filter in fresh air system, and obtains fan parameter corresponding to different wind-speed gears as first referring to parameter;? The simulation dust accumulation filter of end-of-life is packed into intelligent fresh air system in experimental situation, and it is right to obtain different wind-speed gear institutes The fan parameter answered is as second referring to parameter;In actual use place, it is loaded into the intelligent fresh air system of new filter It is installed in place;The wind-speed gear of intelligent fresh air system, acquires the correspondence wind under different wind-speed gears in adjustment actual use place Machine parameter, which is used as, uses parameter;According to use parameter calculate obtain actual use place in intelligent blower system in different wind speed shelves The lower corresponding end-of-life parameter in position;The fan parameter of intelligent fresh air system in real-time monitoring actual use place, and with The end-of-life parameter of current wind-speed gear is compared, and whether reaches end-of-life parameter according to real-time fan parameter, judges Whether need to replace filter;Wherein, the fan parameter is intelligent fresh air system with the wind of constant rotary speed working Rotation speed of fan when machine power or intelligent fresh air system are worked with constant output power;Described first referring to parameter, the second ginseng It is corresponding rotation speed of fan or power of fan parameter according to parameter, using parameter and end-of-life parameter;The end-of-life Parameter is by first referring to parameter, and/the second reference parameter=is calculated using parameter/end-of-life parameter and is obtained.
Further, determine that needing to carry out filter replacement meets the following conditions: the intelligent fresh air system certain the The real-time fan parameter that five moment measured reaches end-of-life parameter corresponding to current wind-speed gear, and the people from the 5th moment Real-time fan parameter measured by the fifth phase interior any time for setting is met or exceeded corresponding to current wind-speed gear End-of-life parameter, then when being reached between the fifth phase of artificial settings from the 5th moment, issue filter replacement remind.
By the above-mentioned description of this invention it is found that compared with the existing technology, have following of the present invention the utility model has the advantages that
1, the judgment method of intelligent fresh air system filter replacement provided by the invention, by using the simulation of end-of-life Dust accumulation filter obtains the comparison threshold data under different wind-speed gears, both effectively saves the acquisition time of data, and compare Time consumption reliable to result, before reduction product export on experimental period, can effectively promote the performance of enterprises;The present invention In order to reduce intelligent fresh air system installation Shi Suocun the factors such as length, variable diameter, sewing, the elbow of fresh air pipeline of installation shadow Ring, by be packed into the fresh air system that is installed in place of actual use place new, old filter carry out data acquisition or by The fresh air system of experimental situation be fitted into new, old filter carry out data acquisition and in the fresh air system in actual use place The proportional reference of data and use are actually used, external world's dynamic factor is to the resistance of fresh air system when effectively eliminating installation It influences, guarantees that the data of blower revolving speed under the premise of firm power can be a fixed value or wind under shelves wind-speed gear The data of machine power under the premise of constant rotational speed can be a fixed value, to ensure that the validity and standard for determining result True property.
2, the judgment method of the first intelligent fresh air system filter replacement provided by the invention, intelligent fresh air system apoplexy Machine output power is constant;Intelligent fresh air system is installed in place in actual use place, is then charged into the simulation of end-of-life Dust accumulation filter, to obtain the rotation speed of fan under different wind-speed gears as referring to revolving speed;When normal use, pass through real time monitoring Real-time rotation speed of fan under the current wind-speed gear of intelligent fresh air system, then be compared with referring to revolving speed, you can learn that fresh air system What state the dust accumulation resistance of system is under, that is, if such as finds under current wind-speed gear during normal operation Real-time rotation speed of fan is more than normal value and has been more than the reference revolving speed simulated under current wind-speed gear corresponding to dust accumulation filter, It can determine that filter is replaced;It can using the installation dynamic factor that the judgment method not only excludes intelligent fresh air system Influence of the energy bring to resistance, data acquiring mode simplicity, the acquisition speed referring to revolving speed are very fast;Simultaneously, it is thus also avoided that adopt With the use of the Acquisition Circuit of electric current and voltage, overall cost is lower;Guarantee that user can carry out the service life of filter Effectively judges and replaced.
3, in the judgment method of the first intelligent fresh air system filter replacement, if intelligent fresh air system is at the first moment It measures, real-time rotation speed of fan is greater than referring to revolving speed corresponding to current wind-speed gear, and is continuing appointing in first period later Real-time rotation speed of fan measured by the meaning moment is all larger than corresponding to current wind-speed gear referring to revolving speed, then can determine that currently used Intelligent fresh air system in the dust accumulation amount of filter had reached the dust accumulation degree opposite with the filter of end-of-life, by This can remind user to replace filter according to the judgement result, avoid the secondary pollution and energy consumption of air Take.
4, in the judgment method of the first intelligent fresh air system filter replacement, before intelligent fresh air system use, By adjusting wind-speed gear, it can be achieved that acquiring correspondence rotation speed of fan under different wind-speed gears as rated rotational frequency;As a result, The normal tachometer value of should reach under intelligent fresh air system normal operating condition later is compared, to determine just Whether the parameter for being often used the intelligent fresh air system in the case where new filter is normal, is used with excluding new filter at the beginning When the case where being exactly abnormal state.
It 5, further include judging whether filter enters in the judgment method of the first intelligent fresh air system filter replacement Replace probationary period, with remind in advance user prepare replacement filter, specific judgment method are as follows: when intelligent fresh air system certain second Moment detects that real-time rotation speed of fan is greater than rated rotational frequency corresponding to current wind-speed gear, and difference between the two is absolute Value is more than or equal to the first value being manually set, and first is greater than corresponding to current wind-speed gear referring to revolving speed and current wind speed shelves The absolute value of the difference of rated rotational frequency corresponding to position, meanwhile, when any in the second phase of artificial settings from the second moment Measured real-time rotation speed of fan is carved to be all larger than rated rotational frequency corresponding to current wind-speed gear and be less than current wind-speed gear institute It is corresponding referring to revolving speed, for example for, when intelligent fresh air system is in the real-time rotation speed of fan that certain second moment detects 3300 turns, rated rotational frequency is 3000 turns, and the difference which is less than rated rotational frequency and the two has been more than the of setting One 250 turns of value, meanwhile, which is less than referring to revolving speed, if then real-time rotation speed of fan is still kept within the second phase Under a higher level, then it can determine whether that filter enters replacement probationary period at this time, makes anticipation result in advance for user.
6, in intelligent fresh air system, when the dust accumulation on filter increases, the overall resistance of intelligent fresh air system increases, resistance The torque that power increase will lead to blower becomes smaller, by the constant characteristic of the output power of blower it is found that the torque of blower becomes smaller band Carry out revolving speed to get higher, it as a result, can be according to the dust accumulation situation for judging the judgement of rotation speed of fan filter.
7, the judgment method and the first intelligent behaviour of second of intelligent fresh air system filter replacement provided by the invention Consistent in the judgment method thinking of system filters replacement, the installation dynamic factor that can equally exclude intelligent fresh air system can Influence of the energy bring to resistance, data acquiring mode simplicity, the acquisition speed referring to power are very fast;Guarantee that user can be to mistake The service life of filter is effectively judged and is replaced.
8, in the judgment method of second of intelligent fresh air system filter replacement, when the dust accumulation on filter increases, The overall resistance of intelligent fresh air system increases, and the air quantity of output is reduced, and the output power of blower is reduced, as a result, can be according to wind The dust accumulation situation of machine output power determined to judge filter.
9, the judgment method of the third intelligent fresh air system filter replacement provided by the invention, by experimental situation Newly, then fan parameter corresponding to the corresponding different wind-speed gears of old filter in actual use place, passes through the service life Terminal parameter is shifted onto out referring to parameter=using parameter/end-of-life parameter relationship by first referring to parameter/the second practical End-of-life parameter corresponding to current wind-speed gear when use, then in real time join the parameter of running blower and end-of-life Number is compared, and judges come the dust accumulation situation to filter;When the use parameter real-time monitored reaches end-of-life ginseng It can determine that filter is replaced when number;The installation dynamic factor which not only excludes intelligent fresh air system can energy band The influence to resistance come, meanwhile, second obtained under being to have obtained using end-of-life filter state in the experimental stage Referring to parameter, thus avoid reducing answering for installation the case where erecting bed also needs one old filter of band to be simulated Miscellaneous degree is conducive to improve installation effectiveness.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below to needed in embodiment description Attached drawing is briefly described, it should be apparent that, drawings in the following description are some embodiments of the invention, for this field For those of ordinary skill, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the relational graph in the embodiment of the present invention one between blower and motor driving plate.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description.Obviously, described embodiment is the preferred embodiment of the present invention, and is not to be seen as the row to other embodiments It removes.Based on the embodiment of the present invention, those skilled in the art are obtained all under the premise of not making creative work Other embodiments shall fall within the protection scope of the present invention.
In claims of the present invention, specification and above-mentioned attached drawing, unless otherwise specifically limited, such as using term " the One ", " second " or " third " etc. are provided to distinguish different objects, be not use to describe a particular order.
In claims of the present invention, specification and above-mentioned attached drawing, unless otherwise specifically limited, for the noun of locality, such as Using term " center ", " transverse direction ", " longitudinal direction ", "horizontal", " vertical ", "top", "bottom", "inner", "outside", "upper", "lower", The indicating positions such as "front", "rear", "left", "right", " clockwise ", " counterclockwise " or positional relationship are orientation based on the figure And positional relationship, and be merely for convenience of the narration present invention and simplify description, rather than the device or member of indication or suggestion meaning Part must have a particular orientation or be constructed and operated in a specific orientation, so can not be interpreted as limiting of the invention specific Protection scope.
In claims of the present invention, specification and above-mentioned attached drawing, unless otherwise specifically limited, such as using term " Gu Connect " or " being fixedly connected ", it should broadly understood, i.e., between the two without any connection side of displacement relation and relative rotation relationship Formula, that is to say, that including be unremovably fixedly connected with, be removably secured connection, be linked together and by other devices or Element is fixedly connected.
In claims of the present invention, specification and above-mentioned attached drawing, such as using term " includes ", " having " and they Deformation, it is intended that " including but not limited to ".
The judgment method of intelligent fresh air system filter replacement provided by the embodiment of the present invention includes the following three types implementation Mode:
The judgment method of the intelligent fresh air system filter replacement of embodiment one includes: the defeated of blower in intelligent fresh air system Power invariability out;By the simulation for being packed into end-of-life in the intelligent fresh air system being installed in place in actual use place Dust accumulation filter, the rotation speed of fan obtained under different wind-speed gears are used as referring to revolving speed r1;Detection is packed into the intelligence of new filter Real-time rotation speed of fan r of the fresh air system under real use state0;According to real-time rotation speed of fan variation and its with current wind speed Referring to revolving speed r corresponding to gear1Comparison, judge whether to need to replace filter.
Wherein, determine that needing to carry out filter replacement meets the following conditions: intelligent fresh air system is in certain the first moment t1 The real-time rotation speed of fan r measured0Greater than reference revolving speed r corresponding to current wind-speed gear1, and from the first moment t1It rises and artificially sets Fixed first phase T1Real-time rotation speed of fan r measured by interior any time0Reference corresponding to current wind-speed gear is all larger than to turn Fast r1.As the first moment t1Act the first period T being manually set1When arrival, issues filter replacement and remind.
In the above method further include: by adjusting the intelligence equipped with new filter being installed in place in actual use place Can fresh air system wind-speed gear, acquire the correspondence rotation speed of fan under different wind-speed gears, and by acquired different wind speed shelves Corresponding rotation speed of fan is as rated rotational frequency r under position2
It preferably, further include the judgement that replacement probationary period is carried out before being replaced to filter in the above method, specifically It include: according to real-time rotation speed of fan r0Variation and its with corresponding to current wind-speed gear referring to revolving speed r1Comparison, judged Whether filter enters replacement probationary period;Determine filter enter replacement probationary period at least meet the following conditions:
Intelligent fresh air system is in certain the second moment t2The real-time rotation speed of fan r measured0Greater than corresponding to current wind-speed gear Rated rotational frequency r1, and the absolute value of difference between the two is more than or equal to the first value △ r being manually set, and the first value △ r is less than Referring to revolving speed r corresponding to current wind-speed gear1With rated rotational frequency r corresponding to current wind-speed gear2Difference absolute value; From the second moment t2Act the second phase T being manually set2Real-time rotation speed of fan r measured by interior any time0It is all larger than current wind Rated rotational frequency r corresponding to fast gear2And it is less than corresponding to current wind-speed gear referring to revolving speed r1;As the second moment t2Play people For the second phase T of setting2When arrival, issues filter maintenance and remind and enter replacement probationary period.
The output power of blower is adjusted by motor driving plate in above-mentioned intelligent fresh air system, wherein blower turns Speed is calculated by P=π/30*T*n, and P is the output power of blower, and T is the torque of blower, and n is the revolving speed of blower.
The judgment method simplified summary of above-mentioned intelligent fresh air system filter replacement is as follows:
Step 1: installing intelligent fresh air system in actual use place;
Step 2: completely new filter is packed into intelligent fresh air system, the engineering mode for adjusting intelligence system keeps intelligence new Wind system can operate normally, and then, detect to obtain standard corresponding to different wind-speed gears by adjusting different wind-speed gear Revolving speed r2, and generate table 1;
Step 3: being packed into the simulation dust accumulation filter of end-of-life, acquire corresponding each referring to revolving speed under different wind-speed gears r1, and generate table 2;
Step 4: intelligent fresh air system enters normal mode of operation, and the real-time rotation speed of fan r of real-time monitoring blower0
Step 5: according to real-time rotation speed of fan r0It is compared with table 1 and table 2;
Step 6: as real-time rotation speed of fan r0It is higher than whithin a period of time to should refer to revolving speed r1When, remind client to replace Filter.
In the present embodiment, the output power of the blower in intelligent fresh air system is adjusted by DC/EC motor driving plate, blower Using centrifugation DC/EC motor fan;As shown in Figure 1, the revolving speed output terminal FG of centrifugation DC/EC motor fan is anti-by rotary speed information It is fed to DC/EC motor driving plate, DC/EC motor driving plate is connect by its VSP terminal with centrifugation DC/EC motor fan, and is controlled The output power of system centrifugation DC/EC motor fan.
The judgment method of the intelligent fresh air system filter replacement of embodiment two includes: turn of blower in intelligent fresh air system Speed is constant;By the simulation dust accumulation for being packed into end-of-life in the intelligent fresh air system being installed in place in actual use place Filter, the power obtained under different wind-speed gears are used as referring to power P1;Detection is packed into the intelligent fresh air system of new filter Real-time power of fan P under real use state0;According to real-time power of fan P0Variation and its with current wind-speed gear institute Corresponding reference power P1Comparison, judge whether to need to replace filter.
Wherein, determine that needing to carry out filter replacement meets the following conditions: intelligent fresh air system is in certain third moment t3 The real-time power of fan P measured0Less than reference power P corresponding to current wind-speed gear1, and from third moment t3It rises and artificially sets T during fixed third3Real-time power of fan P measured by interior any time0Reference corresponding to respectively less than current wind-speed gear turns Fast P1;As third moment t3Rise be manually set third during T3When arrival, issues filter replacement and remind.
The above method further include: by adjusting the intelligence equipped with new filter being installed in place in actual use place The wind-speed gear of fresh air system, acquires the correspondence power of fan under different wind-speed gears, and by acquired different wind-speed gears Under corresponding power of fan as calibration power P2
It preferably, further include the judgement that replacement probationary period is carried out before being replaced to filter in the above method, specifically Include: according to real-time rotation speed of fan variation and its with reference power P corresponding to current wind-speed gear1Comparison, judged Whether filter enters replacement probationary period;Determine filter enter replacement probationary period at least meet the following conditions: intelligent fresh air system In certain the 4th moment t4The real-time power of fan P measured0Less than calibration power P corresponding to current wind-speed gear2, and between the two Difference absolute value be more than or equal to be manually set second value △ P, and second value △ P be less than current wind-speed gear corresponding to Referring to power P1With calibration power P corresponding to current wind-speed gear2Difference absolute value;From the 4th moment t4It rises and artificially sets T between the fixed fourth phase4Real-time power of fan P measured by interior any time0Standard function corresponding to respectively less than current wind-speed gear Rate P2And it is greater than reference power P corresponding to current wind-speed gear1;As the 4th moment t4Rise be manually set the fourth phase between T4It arrives Up to when, issue filter maintenance remind simultaneously enter replacement probationary period.
In the above method, current collection circuit should be provided in intelligent fresh air system, to acquire electric current, and by electric current and The product of voltage calculates to obtain the power of blower in intelligent fresh air system.
The judgment method simplified summary of above-mentioned intelligent fresh air system filter replacement is as follows:
Step 1: installing intelligent fresh air system in actual use place;
Step 2: completely new filter is packed into intelligent fresh air system, the engineering mode for adjusting intelligence system keeps intelligence new Wind system can operate normally, and then, detect to obtain standard corresponding to different wind-speed gears by adjusting different wind-speed gear Power P2, and generate table 1;
Step 3: being packed into the simulation dust accumulation filter of end-of-life, acquire corresponding each referring to power under different wind-speed gears P1, and generate table 2;
Step 4: intelligent fresh air system enters normal mode of operation, and the real-time power of fan P of real-time monitoring blower0
Step 5: according to real-time power of fan P0It is compared with table 1 and table 2;
Step 6: as real-time power of fan P0It is higher than whithin a period of time to should refer to power P1When, remind client to replace Filter.
The judgment method of the intelligent fresh air system filter replacement of embodiment three the following steps are included:
Step 1: new filter is packed into the intelligent fresh air system in experimental situation, and it is right to obtain different wind-speed gear institutes The fan parameter answered is as first referring to parameter;
Step 2: being packed into the simulation dust accumulation filter of end-of-life in the intelligent fresh air system in experimental situation, and obtain Fan parameter corresponding to different wind-speed gears is as second referring to parameter;
Step 3: in actual use place, the intelligent fresh air system for being loaded into new filter is installed in place;
Step 4: the wind-speed gear of intelligent fresh air system in adjustment actual use place acquires pair under different wind-speed gears It answers fan parameter to be used as and uses parameter;
Step 5: according to use parameter calculate obtain actual use place in intelligent blower system under different wind-speed gears Corresponding end-of-life parameter;
Step 6: real-time monitoring actually use place in intelligent fresh air system fan parameter, and with current wind-speed gear End-of-life parameter be compared, whether reach end-of-life parameter according to real-time fan parameter, judge whether need to mistake Filter is replaced.
Wherein, fan parameter be intelligent fresh air system with the power of fan or intelligent fresh air system of constant rotary speed working with Rotation speed of fan when constant output power works;First is joined referring to parameter, second referring to parameter, using parameter and end-of-life Number is corresponding rotation speed of fan or power of fan parameter;End-of-life parameter is by first referring to parameter/second reference ginseng Number=calculated and obtained using parameter/end-of-life parameter.
Specifically, determine that needing to carry out filter replacement meets the following conditions: intelligent fresh air system is at certain the 5th moment t5The real-time fan parameter measured reaches end-of-life parameter corresponding to current wind-speed gear, and from the 5th moment t5It rises artificial T between the fifth phase of setting5Real-time fan parameter measured by interior any time is met or exceeded corresponding to current wind-speed gear End-of-life parameter, then in the 5th moment t5Rise be manually set the fifth phase between arrive T5Up to when, issue filter replacement remind.
Above-mentioned each embodiment, obtains by using the simulation dust accumulation filter of end-of-life under different wind-speed gears Comparison threshold data, both effectively save the acquisition time of data, and comparison result is reliable, reduce product export before testing Time consumption on period can effectively promote the performance of enterprises;The present invention installs Shi Suocun to reduce intelligent fresh air system The factors such as length, variable diameter, sewing, the elbow of fresh air pipeline of installation influence, by being installed in place in actual use place Fresh air system in be packed into new, old filter and carry out data acquisition or new, old mistake is packed by the fresh air system in experimental situation Filter progress data acquisition and reference proportional to the actual use data in the fresh air system in actual use place and use, Influence of external world's dynamic factor to the resistance of fresh air system when effectively eliminating installation guarantees under shelves wind-speed gear, blower The data of revolving speed can be the number of a fixed value or blower power under the premise of constant rotational speed under the premise of firm power According to that can be a fixed value, to ensure that the validity and accuracy for determining result.
The description of description above and embodiment is used to explain the present invention protection scope, but does not constitute and protect to the present invention Protect the restriction of range.Through the invention or the enlightenment of above-described embodiment, those of ordinary skill in the art combine common knowledge, ability The ordinary technical knowledge and/or the prior art in domain, it is available right by logical analysis, reasoning or limited experiment Modification, equivalent replacement or the other improvements of the embodiment of the present invention or in which a part of technical characteristic, should be included in of the invention Within protection scope.

Claims (16)

1. a kind of judgment method of intelligent fresh air system filter replacement, characterized in that include:
The output power of blower is constant in the intelligent fresh air system;By in the intelligence being installed in place in actual use place It is packed into the simulation dust accumulation filter of end-of-life in energy fresh air system, obtains the rotation speed of fan under different wind-speed gears as reference Revolving speed;Detection is packed into real-time rotation speed of fan of the intelligent fresh air system of new filter under real use state;According to real-time wind The variation of machine revolving speed and its with the comparison corresponding to current wind-speed gear referring to revolving speed, judge whether to need to carry out filter Replacement.
2. a kind of judgment method of intelligent fresh air system filter replacement as described in claim 1, characterized in that determine to need Carry out replacement to filter and meet the following conditions: the real-time rotation speed of fan that the intelligent fresh air system measures at certain first moment is big Referring to revolving speed corresponding to current wind-speed gear, and any time is surveyed in the first period of artificial settings from the first moment The real-time rotation speed of fan obtained is all larger than corresponding to current wind-speed gear referring to revolving speed.
3. a kind of judgment method of intelligent fresh air system filter replacement as claimed in claim 2, characterized in that described first When the first period of artificial settings reaches from moment, issues filter replacement and remind.
4. a kind of judgment method of intelligent fresh air system filter replacement as described in claim 1, characterized in that further include: By adjusting the wind-speed gear for the intelligent fresh air system equipped with new filter being installed in place in actual use place, acquisition Correspondence rotation speed of fan under different wind-speed gears, and using corresponding rotation speed of fan under acquired different wind-speed gears as standard Revolving speed.
5. a kind of judgment method of intelligent fresh air system filter replacement as claimed in claim 4, characterized in that further include: Whether comparison according to the variation of real-time rotation speed of fan and its with reference revolving speed corresponding to current wind-speed gear, judge filter Into replacement probationary period;Determine filter enter replacement probationary period at least meet the following conditions:
The intelligent fresh air system is greater than mark corresponding to current wind-speed gear in the real-time rotation speed of fan that certain second moment measures Quasi- revolving speed, and the absolute value of difference between the two is more than or equal to the first value being manually set, and the first value is less than current wind speed shelves The absolute value of the difference of rated rotational frequency corresponding to reference revolving speed corresponding to position and current wind-speed gear;
Real-time rotation speed of fan measured by any time is all larger than current wind in the second phase of artificial settings from the second moment Rated rotational frequency corresponding to fast gear and it is less than corresponding to current wind-speed gear referring to revolving speed.
6. a kind of judgment method of intelligent fresh air system filter replacement as claimed in claim 5, characterized in that described second When the second phase of artificial settings reaches from moment, issues filter maintenance and remind and enter replacement probationary period.
7. a kind of judgment method of intelligent fresh air system filter replacement as described in claim 1, characterized in that the intelligence The output power of blower is adjusted by motor driving plate in fresh air system, wherein the revolving speed of blower passes through P=π/30*T*n It calculates, P is the output power of blower, and T is the torque of blower, and n is the revolving speed of blower.
8. a kind of judgment method of intelligent fresh air system filter replacement, characterized in that include:
The invariablenes turning speed of blower in the intelligent fresh air system;By new in the intelligence being installed in place in actual use place The simulation dust accumulation filter of end-of-life is packed into wind system, the power obtained under different wind-speed gears is used as referring to power;Inspection Survey real-time power of fan of the intelligent fresh air system for being packed into new filter under real use state;According to real-time power of fan Variation and its with corresponding to current wind-speed gear referring to power comparison, judge whether to need to replace filter.
9. a kind of judgment method of intelligent fresh air system filter replacement as claimed in claim 8, characterized in that determine to need Carry out replacement to filter and meet the following conditions: the real-time power of fan that the intelligent fresh air system measures at certain third moment is small Referring to power corresponding to current wind-speed gear, and any time is surveyed during the third of artificial settings from the third moment The real-time power of fan obtained is respectively less than corresponding to current wind-speed gear referring to revolving speed.
10. a kind of judgment method of intelligent fresh air system filter replacement as claimed in claim 9, characterized in that described the When being reached during the third of artificial settings from three moment, issues filter replacement and remind.
11. a kind of judgment method of intelligent fresh air system filter replacement as claimed in claim 8, characterized in that further include: By adjusting the wind-speed gear for the intelligent fresh air system equipped with new filter being installed in place in actual use place, acquisition Correspondence power of fan under different wind-speed gears, and using corresponding power of fan under acquired different wind-speed gears as standard Power.
12. a kind of judgment method of intelligent fresh air system filter replacement as claimed in claim 11, characterized in that also wrap Include: the comparison according to the variation of real-time rotation speed of fan and its with reference power corresponding to current wind-speed gear judges filter Whether replacement probationary period is entered;Determine filter enter replacement probationary period at least meet the following conditions:
The intelligent fresh air system is less than mark corresponding to current wind-speed gear in the real-time power of fan that certain the 4th moment measures Quasi- power, and the absolute value of difference between the two is more than or equal to the second value being manually set, and second value is less than current wind speed shelves The absolute value of the difference of calibration power corresponding to reference power corresponding to position and current wind-speed gear;
Real-time power of fan measured by the fourth phase interior any time of artificial settings is respectively less than current wind from the 4th moment Calibration power corresponding to fast gear and it is greater than corresponding to current wind-speed gear referring to power.
13. a kind of judgment method of intelligent fresh air system filter replacement as claimed in claim 12, characterized in that described the When being reached between the fourth phase of artificial settings from four moment, issues filter maintenance and remind and enter replacement probationary period.
14. a kind of judgment method of intelligent fresh air system filter replacement as claimed in claim 8, characterized in that the intelligence The power of blower is calculated by the electric current and voltage for acquiring blower in energy fresh air system.
15. a kind of judgment method of intelligent fresh air system filter replacement, characterized in that the following steps are included:
It is packed into new filter in intelligent fresh air system in experimental situation, and obtains the ginseng of blower corresponding to different wind-speed gears Number is as first referring to parameter;
It is packed into the simulation dust accumulation filter of end-of-life in intelligent fresh air system in experimental situation, and obtains different wind speed shelves Fan parameter corresponding to position is as second referring to parameter;
In actual use place, the intelligent fresh air system for being loaded into new filter is installed in place;
The wind-speed gear of intelligent fresh air system, acquires the correspondence fan parameter under different wind-speed gears in adjustment actual use place As using parameter;
The longevity that intelligent blower system is corresponding under different wind-speed gears in actual use place is obtained according to using parameter to calculate Order terminal parameter;
Real-time monitoring actually uses the fan parameter of the intelligent fresh air system in place, and the end-of-life with current wind-speed gear Parameter is compared, and whether reaches end-of-life parameter according to real-time fan parameter, judges whether to need to carry out more filter It changes;
Wherein, the fan parameter be intelligent fresh air system with the power of fan or intelligent fresh air system of constant rotary speed working with Rotation speed of fan when constant output power works;
Described first referring to parameter, second is corresponding rotation speed of fan referring to parameter, using parameter and end-of-life parameter Or power of fan parameter;
The end-of-life parameter is by first referring to parameter, and/the second reference parameter=uses parameter/end-of-life parameter to calculate And it obtains.
16. a kind of judgment method of intelligent fresh air system filter replacement as claimed in claim 15, characterized in that determine to need Replacement is carried out to filter and meets the following conditions: the real-time fan parameter that the intelligent fresh air system measures at certain the 5th moment End-of-life parameter corresponding to current wind-speed gear is reached, and when the fifth phase of artificial settings is interior any from the 5th moment It carves measured real-time fan parameter and meets or exceeds end-of-life parameter corresponding to current wind-speed gear, then at the 5th It has carved between the fifth phase being manually set when reaching, has issued filter replacement and remind.
CN201910650062.XA 2019-07-18 2019-07-18 Method for judging replacement of filter of intelligent fresh air system Active CN110360707B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910650062.XA CN110360707B (en) 2019-07-18 2019-07-18 Method for judging replacement of filter of intelligent fresh air system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910650062.XA CN110360707B (en) 2019-07-18 2019-07-18 Method for judging replacement of filter of intelligent fresh air system

Publications (2)

Publication Number Publication Date
CN110360707A true CN110360707A (en) 2019-10-22
CN110360707B CN110360707B (en) 2021-12-31

Family

ID=68221030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910650062.XA Active CN110360707B (en) 2019-07-18 2019-07-18 Method for judging replacement of filter of intelligent fresh air system

Country Status (1)

Country Link
CN (1) CN110360707B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110925952A (en) * 2019-12-13 2020-03-27 雷勃电气(常州)有限公司 Method for realizing filter screen blockage detection function through motor
CN111256289A (en) * 2020-02-17 2020-06-09 海信(山东)空调有限公司 Filter screen filth blockage detection method
CN113446247A (en) * 2021-06-22 2021-09-28 杭州和而泰智能控制技术有限公司 Method for detecting filter screen pollution turbidity by direct-current variable-frequency fan and fresh air filtering device
CN113513805A (en) * 2021-07-22 2021-10-19 中山市万得福电子热控科技有限公司 Air treatment apparatus, control method thereof, and computer-readable storage medium
CN113639405A (en) * 2021-07-23 2021-11-12 青岛海尔空调电子有限公司 Method and device for controlling air conditioner and intelligent air conditioner
CN115121072A (en) * 2022-08-31 2022-09-30 启东万惠机械制造有限公司 Method and system for determining replacement of filter grille of mine dust collector
CN115247861A (en) * 2022-06-28 2022-10-28 浙江中广电器集团股份有限公司 Air conditioner and dust removal control method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005249277A (en) * 2004-03-03 2005-09-15 Yamatake Corp Air conditioner control system and air conditioner control method
CN101074968A (en) * 2006-05-15 2007-11-21 精工爱普生株式会社 Wind velocity measuring device and electronic apparatus
CN104913457A (en) * 2015-06-16 2015-09-16 杨志荣 Air capacity control method of air purifying device and air purifying device
CN106091291A (en) * 2016-07-21 2016-11-09 广东美的制冷设备有限公司 A kind of air-conditioning air volume self compensation control method, control system and air-conditioning
CN107003019A (en) * 2014-12-01 2017-08-01 3M创新有限公司 System and method for predicting HVAC filter replacements
DE102017119836A1 (en) * 2017-05-29 2018-11-29 Liebherr-Hausgeräte Lienz Gmbh Fridge and / or freezer

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005249277A (en) * 2004-03-03 2005-09-15 Yamatake Corp Air conditioner control system and air conditioner control method
CN101074968A (en) * 2006-05-15 2007-11-21 精工爱普生株式会社 Wind velocity measuring device and electronic apparatus
CN107003019A (en) * 2014-12-01 2017-08-01 3M创新有限公司 System and method for predicting HVAC filter replacements
CN104913457A (en) * 2015-06-16 2015-09-16 杨志荣 Air capacity control method of air purifying device and air purifying device
CN106091291A (en) * 2016-07-21 2016-11-09 广东美的制冷设备有限公司 A kind of air-conditioning air volume self compensation control method, control system and air-conditioning
DE102017119836A1 (en) * 2017-05-29 2018-11-29 Liebherr-Hausgeräte Lienz Gmbh Fridge and / or freezer

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110925952A (en) * 2019-12-13 2020-03-27 雷勃电气(常州)有限公司 Method for realizing filter screen blockage detection function through motor
CN111256289A (en) * 2020-02-17 2020-06-09 海信(山东)空调有限公司 Filter screen filth blockage detection method
CN113446247A (en) * 2021-06-22 2021-09-28 杭州和而泰智能控制技术有限公司 Method for detecting filter screen pollution turbidity by direct-current variable-frequency fan and fresh air filtering device
CN113446247B (en) * 2021-06-22 2022-06-17 杭州和而泰智能控制技术有限公司 Method for detecting filter screen pollution turbidity by direct-current variable-frequency fan and fresh air filtering device
CN113513805A (en) * 2021-07-22 2021-10-19 中山市万得福电子热控科技有限公司 Air treatment apparatus, control method thereof, and computer-readable storage medium
CN113639405A (en) * 2021-07-23 2021-11-12 青岛海尔空调电子有限公司 Method and device for controlling air conditioner and intelligent air conditioner
CN115247861A (en) * 2022-06-28 2022-10-28 浙江中广电器集团股份有限公司 Air conditioner and dust removal control method thereof
CN115247861B (en) * 2022-06-28 2023-09-08 浙江中广电器集团股份有限公司 Air conditioner and dust removal control method thereof
CN115121072A (en) * 2022-08-31 2022-09-30 启东万惠机械制造有限公司 Method and system for determining replacement of filter grille of mine dust collector
CN115121072B (en) * 2022-08-31 2023-09-29 安徽省青阳县五溪矿业有限责任公司 Method and system for determining replacement of filter grids of mining dust remover

Also Published As

Publication number Publication date
CN110360707B (en) 2021-12-31

Similar Documents

Publication Publication Date Title
CN110360707A (en) A kind of judgment method of intelligent fresh air system filter replacement
CN103940608B (en) A kind of improve the method that gearbox of wind turbine fault level judges precision
CN105115105B (en) Power failure detection method, detection of power loss system and air conditioner
CN105066366B (en) It is a kind of to be used to judge air-conditioner outdoor unit into the method for wind condition
CN106525472B (en) A kind of method for detecting cleaning degree and detection device of kitchen ventilator
CN105137233A (en) Mine main fan safety hazard monitoring and early warning system and method
CN110594105B (en) Low-power wind turbine aerodynamic characteristic measuring device suitable for wind tunnel test
CN103486695B (en) A kind of air conditioner fault diagnostic method based on theoretical model
CN109405180A (en) A kind of condensation prevention control method and device
CN106642558A (en) Detection method for dust removal of variable frequency air conditioner heat exchanger
CN212083990U (en) Motor controller offline detection system
CN108131799A (en) For the automatically cleaning control method of air conditioner
CN109916041A (en) Air conditioner automatically cleaning control method and air conditioner
CN110925952A (en) Method for realizing filter screen blockage detection function through motor
WO2012129749A1 (en) Air volume calculation system for variable speed or constant speed fan
CN107490762B (en) Load torque detection circuit based on armature supply and tach signal
CN110513843A (en) A kind of dustless cleanliness closed-loop control system based on FFU
CN103026075A (en) Method for controlling a regulated-rotation-speed low-pressure centrifugal fan
CN106642572B (en) Air-conditioner control method, controller and air conditioner
CN108397864A (en) Automatically cleaning control method for air conditioner
CN110594809A (en) Device and method for monitoring backflow and leakage of lampblack purification device
CN202502102U (en) Circuit for detecting rotation speed of machine tool spindle
CN206909275U (en) A kind of integral type automatic air discharging machine
CN208654180U (en) A kind of device of automatic test smoke control system air quantity
CN212690844U (en) Flexible double-rotation airtight butterfly valve device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant