Buried water stop plug board mold in tunnel lining trolley installation Download PDF

Info

Publication number
CN110359935A
CN110359935A CN201910465056.7A CN201910465056A CN110359935A CN 110359935 A CN110359935 A CN 110359935A CN 201910465056 A CN201910465056 A CN 201910465056A CN 110359935 A CN110359935 A CN 110359935A
Authority
CN
China
Prior art keywords
lower template
cope plate
ear
water stop
trolley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910465056.7A
Other languages
Chinese (zh)
Inventor
朱永战
王松
喻致蓉
訾晓阳
孙晓华
毛振营
卫容芳
李恒乾
王跃功
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingdingshan Pmj Coal Mine Machinery Equipment Co Ltd
Original Assignee
Pingdingshan Pmj Coal Mine Machinery Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingdingshan Pmj Coal Mine Machinery Equipment Co Ltd filed Critical Pingdingshan Pmj Coal Mine Machinery Equipment Co Ltd
Priority to CN201910465056.7A priority Critical patent/CN110359935A/en
Publication of CN110359935A publication Critical patent/CN110359935A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/381Setting apparatus or devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Buried water stop plug board mold in tunnel lining trolley installation, setting is on the car, for clamping fixed by middle buried water stop and then being cast in the size positions of two lining Concrete Design requirements, plug board mold includes cope plate, lower template, adjustable screw jack and supporting rod seat, the top of cope plate and lower template is connected by first hinge seat, and the gap width between cope plate lower end surface and lower template upper surface is greater than middle buried water stop thickness, the bottom of lower template is connected on the car by second hinge seat, supporting rod seat one end is vertically fixed on the trolley below lower template, the other end is hinged by the bottom end of the first otic placode and adjustable screw jack, the top of adjustable screw jack is hinged by the second otic placode and cope plate, the one side that cope plate is in contact with two lining concrete is equipped with cork mounting base;The present invention can solve the problems, such as existing waterstop fixed form there are waterstop fixed masses that unstable, working procedure is cumbersome and increases engineering cost.

Description

Buried water stop plug board mold in tunnel lining trolley installation
Technical field
The present invention relates to technical field of tunnel construction, more specifically to buried in a kind of tunnel lining trolley installation Waterstop plug board mold.
Background technique
In buried rubber fastening band using preceding substantially all coiled storage, be difficult in installation process it is straight, in the construction process The installation quality of generally existing middle buried water stop is straight, not in the problem of burying.During traditional construction, middle buried water stop Construction quality rely primarily on the level of operation and sense of responsibility of construction personnel, once construction personnel, which thinks little of technique for fixing, to cause It now arbitrarily perforates situations such as fixed, arbitrarily truncation connects, is then fixed not when middle buried water stop can be caused to be embedded in concrete The phenomenon in jail, then occurs that abjection concrete, not placed in the middle, bonding quality is not up to standard, waterstop is by sharp steel again in casting process Muscle head punctures and other issues, has seriously affected the waterproof effect of waterstop.To solve existing for existing waterstop fixed form Fixed mass is unstable, working procedure is cumbersome, increases the problem of engineering cost, devises a set of fixation and clamps middle buried water stop Plug board mold.
Summary of the invention
In view of this, to solve above-mentioned the deficiencies in the prior art, the purpose of the present invention is to provide tunnel lining trolley plus Buried water stop plug board mold in dress, can solve existing waterstop fixed form there are waterstop fixed masses it is unstable, The problem of working procedure is cumbersome and increases engineering cost.
To achieve the above object, the technical scheme adopted by the invention is that:
Buried water stop plug board mold in tunnel lining trolley installation, setting on the car, are used for middle buried water stop Clamp fixed and then be cast in the size positions of two lining Concrete Design requirements, the plug board mold include cope plate, under The top of template, adjustable screw jack and supporting rod seat, the cope plate and lower template is connected by first hinge seat, and Gap width between the cope plate lower end surface and lower template upper surface is greater than middle buried water stop thickness, the lower template Bottom is connected on the car by second hinge seat, and described supporting rod seat one end is vertically fixed on the trolley below the lower template On, the other end is hinged by the bottom end of the first otic placode and the adjustable screw jack, the adjustable screw jack Top is hinged by the second otic placode and the cope plate, and the one side that the cope plate is in contact with two lining concrete is pacified equipped with cork Fill seat.
Further, the number of the first hinge seat is 2 ~ 4, and the first hinge seat is by L-type pin ear I, L-type pin ear II and pin shaft I form, the L-type pin ear I is arranged on the cope plate, and the L-type pin ear II is arranged in the lower template, The pin shaft I is and then hinged by the cope plate and lower template by connecting the L-type pin ear I and L-type pin ear II, and makes The cope plate is that axis is overturn around the lower template with pin shaft I.
Further, the number of the second hinge seat is 2 ~ 4, and the second hinge seat is by direct selling ear I, direct selling ear II It is formed with pin shaft II, the direct selling ear I is arranged in the lower template, and the direct selling ear II is arranged on the trolley, described Pin shaft II is and then hinged by the lower template and trolley by by the direct selling ear I and selling ear II directly to households and connecting, and makes the lower die Plate is overturn by axis of pin shaft II.
Further, the cork for preventing trolley from pouring generation spillage phenomenon is fixed in the cork mounting base.
Further, diagonal brace is equipped between the supporting rod seat and the trolley.
Further, the middle buried water stop with a thickness of 10 ~ 20mm.
The beneficial effects of the present invention are:
Plug board mold of the invention is fixed with trolley, is made of cope plate and lower template, and being reserved between bolster can wear The gap of middle buried water stop is crossed, steps up to be fixed by cope plate, lower template in use, is poured in concrete Displacement deformation is not susceptible to during note.It is to be connected by first hinge seat between cope plate and lower template, lower template and trolley Between connected by second hinge seat, cope plate can be overturn along lower template, and lower template can be overturn along trolley, convenient for into The switching of row off working state and working condition, when underway buried water stop is fixed, when waterstop is put into cope plate under After between template, only cope plate need to be overturn by adjusting the length of the adjustable screw jack hinged with cope plate Waterstop is clamped, the fixed work progress of waterstop is simplified, the fixed construction efficiency of waterstop and quality is improved, can be effectively reduced and apply Work cost, correspondingly, the plug board mold is also that need to only adjust the length of adjustable screw jack and overturn in demoulding Template is conducive to improve demoulding speed, improves construction efficiency without dismantling cope plate completely.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the main view of plug board mold;
Fig. 2 is the off working state schematic diagram of plug board mold;
Fig. 3 is the working state schematic representation of plug board mold;
Fig. 4 is cope plate and lower template connection relationship diagram;
Appended drawing reference: 1, trolley, 2, middle buried water stop, 3, two lining concrete, 4, cope plate, 5, lower template, 6, adjustable silk Bar jack, 7, supporting rod seat, 8, first hinge seat, 801, L-type pin ear I, 802, L-type pin ear II, 803, pin shaft I, 9, second Hinge seat, 901, direct selling ear I, 902, direct selling ear II, 903, pin shaft II, the 10, first otic placode, the 11, second otic placode, 12, cork peace Fill seat, 13, cork, 14, diagonal brace.
Specific embodiment
Specific embodiment is given below, to technical solution of the present invention make further it is clear, complete, explain in detail.This Embodiment is most preferred embodiment based on the technical solution of the present invention, but protection scope of the present invention is not limited to following implementation Example.
Buried water stop plug board mold in tunnel lining trolley installation is arranged in trolley 1 as depicted in figs. 1 and 2 On, for clamping fixed by middle buried water stop 2 and then being cast in the size positions of two lining concrete, 3 design requirement, can solve That there are waterstop fixed masses is unstable for certainly existing waterstop fixed form, working procedure is cumbersome and increases asking for engineering cost Topic.
As shown in Figure 1, the plug board mold includes cope plate 4, lower template 5, adjustable screw jack 6 and support rod Seat 7, as shown in figure 4, the cope plate 4 is connect with the top of lower template 5 by first hinge seat 8, and 4 lower end of the cope plate Gap width between 5 upper surface of face and lower template is greater than middle 2 thickness of buried water stop, the thickness of the middle buried water stop 2 For 10 ~ 20mm;Plug board mold and trolley 1 of the invention is fixed, and being reserved between bolster may pass through middle buried water stop Gap, step up to be fixed by cope plate 4, lower template 5 in use, be not easy in concrete placement It is subjected to displacement deformation;
As shown in Fig. 2, the number of the first hinge seat 8 is 2 ~ 4, the first hinge seat 8 is by L-type pin ear I 801, L-type pin Ear II 802 and pin shaft I 803 form, and the L-type pin ear I 801 is arranged on the cope plate 4, and the L-type pin ear II 802 is arranged In the lower template 5, the pin shaft I 803 is by by the L-type pin ear I 801 and the connection of L-type pin ear II 802, and then by institute It states cope plate 4 and lower template 5 is hinged, and overturn the cope plate 4 around the lower template 5 with I 803 axis of pin shaft;
As shown in Figure 1, the bottom of the lower template 5 is connected on trolley 1 by second hinge seat 9, the second hinge seat 9 Number is 2 ~ 4, and the second hinge seat 9 is made of direct selling ear I 901, direct selling ear II 902 and pin shaft II 903, the direct selling ear I 901 are arranged in the lower template 5, the directs selling ear II 902 setting on the trolley 1, the pin shaft II 903 pass through by The direct selling ear I 901 and direct selling ear II 902 connect, and then the lower template 5 and trolley 1 is hinged, and make the lower template 5 It is axis overturning with pin shaft II 903;
As shown in Figures 2 and 3, described 7 one end of supporting rod seat is vertically fixed on the trolley of 5 lower section of lower template, the other end Bottom end by the first otic placode 10 and the adjustable screw jack 6 is hinged, between the supporting rod seat 7 and the trolley 1 Equipped with diagonal brace 14;The top of the adjustable screw jack 6 is hinged by the second otic placode 11 and the cope plate 4, it is described on The one side that template 4 is in contact with two lining concrete 3 is equipped with cork mounting base 12, is fixed in the cork mounting base 12 for preventing Only trolley 1 pours the cork 13 for generating spillage phenomenon.
It between cope plate 4 and lower template 5 of the invention is connected by first hinge seat 8, between lower template 5 and trolley 1 It is connected by second hinge seat 9, cope plate 4 can be overturn along lower template 5, and lower template 5 can be overturn along trolley 1, be convenient for Carry out the switching of off working state and working condition;When underway buried water stop 2 is fixed, buried water stop 2 is put into the middle After between cope plate 4 and lower template 5, it need to only pass through the length of the adjusting adjustable screw jack 6 hinged with cope plate 4 It clamps bolster by waterstop, simplifies the fixed work progress of waterstop, improve the fixed construction efficiency of waterstop and quality, energy Construction cost is effectively reduced, correspondingly, the plug board mold is also the length that need to only adjust adjustable screw jack 6 in demoulding Cope plate 4 is spent and overturn, without dismantling cope plate 4 completely, is conducive to improve demoulding speed, improves construction efficiency.
The process that plug board mold of the invention is used to clamp middle buried water stop is as follows:
(1) L-type pin ear I 801, L-type pin ear II 802 are connected with pin shaft I 803, thus cope plate 4 and lower template 5 is hinged, it uses Pin shaft II 903 will sell ear I 901 directly to households, sell the connection of ear II 902 directly to households, thus lower template 5 and trolley 1 is hinged, make bolster and platform Vehicle is installed in place, and guarantees the vertical vertical trolley 1 of lower template 5, as shown in Fig. 2, cope plate 4 and lower template 5 are at rollover states at this time (off working state);
(2) buried water stop 2 in installation, the vertical operative end surface of the width centreline of buried water stop 2 and lower template 5 in guarantee It is overlapped;
(3) as shown in figure 3, overturning lower template 5, makes cope plate 4, lower template 5 be in vertical state (working condition);
(4) adjustable screw jack 6 is installed on supporting rod seat 7, makes adjustable 6 one end of screw jack and supporting rod seat 7 It is connected by the first otic placode 10, the other end is connect by the second otic placode 11 with cope plate 4;
(5) collapsing length for constantly adjusting adjustable screw jack 6 makes to be between cope plate 4, lower template 5 and steps up state;
(6) cork mounting base 12 is welded on cope plate 4, and cork 13 is fixed in cork mounting base 12, completes entire tunnel end The sealing in face, then casting concrete;
(7) after concrete strength reaches grade, the contracted length of adjustable screw jack 6 is adjusted, pushes cope plate 4, lower die The overturning of plate 5 is detached from concrete lining working face, and one installation procedure of buried water stop in completion, so circulation are until complete entire The lining construction in tunnel.
Main feature of the invention, basic principle and advantages of the present invention has been shown and described above.Industry technology Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, the present invention can also have various change according to the actual situation And improvement, these changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended Claims and its equivalent thereof.

Claims (6)

1. buried water stop plug board mold in tunnel lining trolley installation, is arranged on trolley (1), stop for buried by Water band (2) is clamped fixed and then is cast in the size positions of two lining concrete (3) design requirements, which is characterized in that described stifled Head plate mold includes cope plate (4), lower template (5), adjustable screw jack (6) and supporting rod seat (7), the cope plate (4) it is connect with the top of lower template (5) by first hinge seat (8), and on the cope plate (4) lower end surface and lower template (5) Gap width between end face is greater than middle buried water stop (2) thickness, and the bottom of the lower template (5) passes through second hinge seat (9) it is connected on trolley (1), described supporting rod seat (7) one end is vertically fixed on the trolley below the lower template (5), separately One end is hinged by the first otic placode (10) and the bottom end of the adjustable screw jack (6), the adjustable screw jack (6) hingedly by the second otic placode (11) and the cope plate (4), the cope plate (4) connects with two linings concrete (3) on top The one side of touching is equipped with cork mounting base (12).
2. buried water stop plug board mold in tunnel lining trolley installation according to claim 1, which is characterized in that The number of the first hinge seat (8) is 2 ~ 4, and the first hinge seat (8) is by L-type pin ear I (801), L-type pin ear II (802) it is arranged on the cope plate (4) with pin shaft I (803) composition, the L-type pin ear I (801), the L-type pin ear II (802) it is arranged on the lower template (5), the pin shaft I (803) is by by the L-type pin ear I (801) and L-type pin ear II (802) it connects, and then hingedly by the cope plate (4) and lower template (5), and makes the cope plate (4) be with pin shaft I (803) Axis is overturn around the lower template (5).
3. buried water stop plug board mold in tunnel lining trolley installation according to claim 1, which is characterized in that The number of the second hinge seat (9) is 2 ~ 4, and the second hinge seat (9) is by direct selling ear I (901), direct selling ear II (902) It is formed with pin shaft II (903), the direct selling ear I (901) is arranged on the lower template (5), direct selling ear II (902) setting On the trolley (1), the pin shaft II (903) is by connecting the direct selling ear I (901) and direct selling ear II (902), in turn Hingedly by the lower template (5) and trolley (1), and make the lower template (5) with pin shaft II (903) for axis overturning.
4. buried water stop plug board mold in tunnel lining trolley installation according to claim 1, which is characterized in that The cork (13) for preventing trolley (1) from pouring generation spillage phenomenon is fixed in the cork mounting base (12).
5. buried water stop plug board mold in tunnel lining trolley installation according to claim 1, which is characterized in that Diagonal brace (14) are equipped between the supporting rod seat (7) and the trolley (1).
6. buried water stop plug board mold in tunnel lining trolley installation according to claim 1, which is characterized in that The middle buried water stop (2) with a thickness of 10 ~ 20mm.
CN201910465056.7A 2019-05-30 2019-05-30 Buried water stop plug board mold in tunnel lining trolley installation Pending CN110359935A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910465056.7A CN110359935A (en) 2019-05-30 2019-05-30 Buried water stop plug board mold in tunnel lining trolley installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910465056.7A CN110359935A (en) 2019-05-30 2019-05-30 Buried water stop plug board mold in tunnel lining trolley installation

Publications (1)

Publication Number Publication Date
CN110359935A true CN110359935A (en) 2019-10-22

Family

ID=68214928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910465056.7A Pending CN110359935A (en) 2019-05-30 2019-05-30 Buried water stop plug board mold in tunnel lining trolley installation

Country Status (1)

Country Link
CN (1) CN110359935A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114278337A (en) * 2021-06-24 2022-04-05 保定市宇航机械科技有限公司 Novel secondary lining platform truck end mould
CN114320366A (en) * 2021-12-31 2022-04-12 李经国 Semi-automatic lining trolley for tunnel and method for pouring lining in tunnel bin by bin
CN117988897A (en) * 2024-03-29 2024-05-07 中铁九局集团第七工程有限公司 Plug board capable of automatically filling middle-buried water stop

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0318285U (en) * 1989-06-29 1991-02-22
JPH0464696A (en) * 1990-07-04 1992-02-28 Toda Constr Co Ltd Tunnel lining method and form device therefor
JPH09158496A (en) * 1995-12-13 1997-06-17 Okabe Co Ltd Concrete formwork construction method to reinforce existing pillar type structure and its formwork device
EP2626509A1 (en) * 2012-02-08 2013-08-14 Kern Tunneltechnik SA Formwork assembly
CN103775105A (en) * 2014-02-20 2014-05-07 中铁十局集团第三建设有限公司 Double hinge joint turnover type tunnel lining trolley steel end mold
CN203685208U (en) * 2013-12-31 2014-07-02 中铁十二局集团第二工程有限公司 End-shaping steel template for double-lining trolley for tunnel
JP2016030967A (en) * 2014-07-29 2016-03-07 鹿島建設株式会社 Framework device of lining concrete and construction method of lining concrete
CN205977242U (en) * 2016-06-24 2017-02-22 中铁十八局集团第五工程有限公司 Be used for two lining platform truck end steel limit waterstop anchor clamps in tunnel
CN206016827U (en) * 2016-08-12 2017-03-15 福州市顺鑫路桥机械设备制造有限公司 A kind of chassis bulkhead
CN210509225U (en) * 2019-05-30 2020-05-12 平顶山平煤机煤矿机械装备有限公司 Plug plate mould for embedded water stop belt additionally mounted on tunnel lining trolley

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0318285U (en) * 1989-06-29 1991-02-22
JPH0464696A (en) * 1990-07-04 1992-02-28 Toda Constr Co Ltd Tunnel lining method and form device therefor
JPH09158496A (en) * 1995-12-13 1997-06-17 Okabe Co Ltd Concrete formwork construction method to reinforce existing pillar type structure and its formwork device
EP2626509A1 (en) * 2012-02-08 2013-08-14 Kern Tunneltechnik SA Formwork assembly
CN203685208U (en) * 2013-12-31 2014-07-02 中铁十二局集团第二工程有限公司 End-shaping steel template for double-lining trolley for tunnel
CN103775105A (en) * 2014-02-20 2014-05-07 中铁十局集团第三建设有限公司 Double hinge joint turnover type tunnel lining trolley steel end mold
JP2016030967A (en) * 2014-07-29 2016-03-07 鹿島建設株式会社 Framework device of lining concrete and construction method of lining concrete
CN205977242U (en) * 2016-06-24 2017-02-22 中铁十八局集团第五工程有限公司 Be used for two lining platform truck end steel limit waterstop anchor clamps in tunnel
CN206016827U (en) * 2016-08-12 2017-03-15 福州市顺鑫路桥机械设备制造有限公司 A kind of chassis bulkhead
CN210509225U (en) * 2019-05-30 2020-05-12 平顶山平煤机煤矿机械装备有限公司 Plug plate mould for embedded water stop belt additionally mounted on tunnel lining trolley

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114278337A (en) * 2021-06-24 2022-04-05 保定市宇航机械科技有限公司 Novel secondary lining platform truck end mould
CN114320366A (en) * 2021-12-31 2022-04-12 李经国 Semi-automatic lining trolley for tunnel and method for pouring lining in tunnel bin by bin
CN117988897A (en) * 2024-03-29 2024-05-07 中铁九局集团第七工程有限公司 Plug board capable of automatically filling middle-buried water stop

Similar Documents

Publication Publication Date Title
CN110359935A (en) Buried water stop plug board mold in tunnel lining trolley installation
CN102152392A (en) Hydraulic device for moulding board of precast beam
CN103774561B (en) The job execution of speedway prefabricated small box girder frock method streamlined
CN109930455A (en) A kind of town road kerbstone mounting structure and constructing device and construction method
CN210827329U (en) Slope protection concrete pouring mold for high and steep slope surface
CN210509225U (en) Plug plate mould for embedded water stop belt additionally mounted on tunnel lining trolley
CN102836992A (en) Deformation correction device for tundish
CN206581595U (en) A kind of big plate erecting device of new concrete
CN206844127U (en) A kind of steep side slope forced action type drawing-die
CN107419895A (en) A kind of construction joint control device and its construction method
CN206053971U (en) Buried water stop erecting device in a kind of tunnel
CN205976472U (en) Pour mould of building post -cast strip
CN104847090B (en) A kind of small cross-sectional size ventilation shaft construction method
CN208163916U (en) A kind of producing device of hybrid beam
CN209633287U (en) A kind of prefabricated piping lane rapid molding device
CN207079912U (en) A kind of construction joint control device
CN207348880U (en) A kind of tunnel center gutter formed molding board
CN208163928U (en) A kind of producing device of stiffened column
CN206655473U (en) Waterstop, which pours, uses template
CN208949729U (en) Concrete beam mould board device
CN202247681U (en) Layered construction device for railway bridge piers
CN207044390U (en) New prefabricated U-shaped beam
CN207958938U (en) A kind of curb wall concrete-pouring template fixing device
CN207377118U (en) Agent structure increases a layer aluminum alloy mould plate jacking apparatus
CN206957206U (en) A kind of concrete floor drop plate hangs mould servicing unit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination