CN110359649A - 一种大跨度无支撑钢结构旋转楼梯预应力施工工艺 - Google Patents
一种大跨度无支撑钢结构旋转楼梯预应力施工工艺 Download PDFInfo
- Publication number
- CN110359649A CN110359649A CN201810251913.9A CN201810251913A CN110359649A CN 110359649 A CN110359649 A CN 110359649A CN 201810251913 A CN201810251913 A CN 201810251913A CN 110359649 A CN110359649 A CN 110359649A
- Authority
- CN
- China
- Prior art keywords
- steel
- girder steel
- weld
- plate
- large span
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
- E04F11/022—Stairways; Layouts thereof characterised by the supporting structure
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/12—Mounting of reinforcing inserts; Prestressing
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810251913.9A CN110359649B (zh) | 2018-03-26 | 2018-03-26 | 一种大跨度无支撑钢结构旋转楼梯预应力施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810251913.9A CN110359649B (zh) | 2018-03-26 | 2018-03-26 | 一种大跨度无支撑钢结构旋转楼梯预应力施工工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110359649A true CN110359649A (zh) | 2019-10-22 |
CN110359649B CN110359649B (zh) | 2021-08-06 |
Family
ID=68212077
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810251913.9A Active CN110359649B (zh) | 2018-03-26 | 2018-03-26 | 一种大跨度无支撑钢结构旋转楼梯预应力施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110359649B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112031298A (zh) * | 2020-09-01 | 2020-12-04 | 湖北工业大学 | 一种钢筋混凝土楼梯抗震加固结构 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB786955A (en) * | 1954-03-04 | 1957-11-27 | Costain Concrete Company Ltd | Improvements in or relating to pre-stressed concrete members |
US4413460A (en) * | 1979-03-01 | 1983-11-08 | Horst Gerlach | Method of assembling a spiral stair case |
CN202416744U (zh) * | 2011-12-31 | 2012-09-05 | 苏州工业园区设计研究院股份有限公司 | 大跨预应力交叉弦支钢楼梯 |
CN103659182A (zh) * | 2013-12-03 | 2014-03-26 | 中建钢构江苏有限公司 | 弯扭箱型梁360°旋转楼梯的制作方法 |
CN104264920A (zh) * | 2014-09-09 | 2015-01-07 | 中国建筑第八工程局有限公司 | 超高大曲率圆形螺旋清水楼梯的施工方法 |
CN205712823U (zh) * | 2016-06-07 | 2016-11-23 | 三能集成房屋股份有限公司 | 预应力装配式楼梯 |
CN107237461A (zh) * | 2017-07-17 | 2017-10-10 | 深圳市建艺装饰集团股份有限公司 | 一种全悬空旋转钢结构楼梯结构及施工方法 |
-
2018
- 2018-03-26 CN CN201810251913.9A patent/CN110359649B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB786955A (en) * | 1954-03-04 | 1957-11-27 | Costain Concrete Company Ltd | Improvements in or relating to pre-stressed concrete members |
US4413460A (en) * | 1979-03-01 | 1983-11-08 | Horst Gerlach | Method of assembling a spiral stair case |
CN202416744U (zh) * | 2011-12-31 | 2012-09-05 | 苏州工业园区设计研究院股份有限公司 | 大跨预应力交叉弦支钢楼梯 |
CN103659182A (zh) * | 2013-12-03 | 2014-03-26 | 中建钢构江苏有限公司 | 弯扭箱型梁360°旋转楼梯的制作方法 |
CN104264920A (zh) * | 2014-09-09 | 2015-01-07 | 中国建筑第八工程局有限公司 | 超高大曲率圆形螺旋清水楼梯的施工方法 |
CN205712823U (zh) * | 2016-06-07 | 2016-11-23 | 三能集成房屋股份有限公司 | 预应力装配式楼梯 |
CN107237461A (zh) * | 2017-07-17 | 2017-10-10 | 深圳市建艺装饰集团股份有限公司 | 一种全悬空旋转钢结构楼梯结构及施工方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112031298A (zh) * | 2020-09-01 | 2020-12-04 | 湖北工业大学 | 一种钢筋混凝土楼梯抗震加固结构 |
CN112031298B (zh) * | 2020-09-01 | 2022-02-08 | 湖北工业大学 | 一种钢筋混凝土楼梯抗震加固结构 |
Also Published As
Publication number | Publication date |
---|---|
CN110359649B (zh) | 2021-08-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11149390B2 (en) | Prefabricated, prestressed bridge module | |
CN101538831B (zh) | 简支梁转换为连续梁的后浇隐盖梁施工工法 | |
KR20010078870A (ko) | 프리스트레스트 복합 트러스 보의 개발 및 제작공법 | |
CN100447338C (zh) | 软土地基多孔双悬臂拱形桥结构及其施工方法 | |
CN101440598B (zh) | 钢箱-砼组合箱板拱结构及其施工方法 | |
CN106812229A (zh) | 组合约束双钢板混凝土剪力墙及其施工方法 | |
CN201794214U (zh) | 一种带有空腔的预制梁 | |
CN104929381A (zh) | 钢支托无粘结钢绞线下撑式预应力加固楼板的方法 | |
CN110359649A (zh) | 一种大跨度无支撑钢结构旋转楼梯预应力施工工艺 | |
KR101337185B1 (ko) | 보강 콘크리트에 의해 보강된 하이브리드 교량의 시공방법 및 그 구조체 | |
CN201254731Y (zh) | 一种钢十字梁式可拆卸塔基 | |
CN202466844U (zh) | 钢管混凝土柱与型钢混凝土梁顶层节点连接结构 | |
CN106758839A (zh) | 一种墩顶现浇节段施工的支架体系及其安装方法 | |
CN210597882U (zh) | 一种格构式钢骨混凝土组合柱梁柱节点 | |
CN205369295U (zh) | 基础预制预应力梁板式风力发电塔基础 | |
CN201071515Y (zh) | 组合式斜拉柱伞反力装置 | |
CN215211508U (zh) | 一种混凝土柱和钢柱的连接节点 | |
JPH02136445A (ja) | スーパーフレームを含む構造物の構築方法 | |
KR102107666B1 (ko) | 장스팬 합성보 및 이를 이용한 장스팬 구조 시공 방법 | |
JP2004019306A (ja) | 塔状建造物及びその構築方法 | |
CN110565600A (zh) | 一种长隧洞衬砌施工方法 | |
CN101230673A (zh) | 一种砼楼盖用结构承力式叠合构件 | |
CN101230664A (zh) | 一种承力式底板构件 | |
CN214272589U (zh) | 一种内置填充预制球及钢筋桁架的楼承板 | |
CN211037415U (zh) | 一种剪力墙的转换支承结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220720 Address after: 311800 no.713-3, Jiefang Road, Diankou Town, Zhuji City, Shaoxing City, Zhejiang Province Patentee after: Zhuji Bihan Precision Machinery Technology Co.,Ltd. Address before: 311800 no.713 Jiefang Road, Diankou Town, Zhuji City, Shaoxing City, Zhejiang Province Patentee before: ZHUJI BIHAN PRECISION MOULDING CO.,LTD. |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A prestressed construction technology of large-span unsupported steel structure rotating stairs Effective date of registration: 20220719 Granted publication date: 20210806 Pledgee: Zhejiang Zhuji Rural Commercial Bank Co.,Ltd. Meichi sub branch Pledgor: Zhuji Bihan Precision Machinery Technology Co.,Ltd. Registration number: Y2022980010767 |