CN110356275A - A kind of underground parking charging pile guard system - Google Patents

A kind of underground parking charging pile guard system Download PDF

Info

Publication number
CN110356275A
CN110356275A CN201910677411.7A CN201910677411A CN110356275A CN 110356275 A CN110356275 A CN 110356275A CN 201910677411 A CN201910677411 A CN 201910677411A CN 110356275 A CN110356275 A CN 110356275A
Authority
CN
China
Prior art keywords
charging
setting
charging pile
equipment cavity
underground parking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910677411.7A
Other languages
Chinese (zh)
Other versions
CN110356275B (en
Inventor
丁锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Dingding Intelligent Technology Co Ltd
Original Assignee
Zhengzhou Dingding Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Dingding Intelligent Technology Co Ltd filed Critical Zhengzhou Dingding Intelligent Technology Co Ltd
Priority to CN201910677411.7A priority Critical patent/CN110356275B/en
Publication of CN110356275A publication Critical patent/CN110356275A/en
Application granted granted Critical
Publication of CN110356275B publication Critical patent/CN110356275B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/30Constructional details of charging stations
    • B60L53/305Communication interfaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/30Constructional details of charging stations
    • B60L53/31Charging columns specially adapted for electric vehicles
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
    • E04H6/42Devices or arrangements peculiar to garages, not covered elsewhere, e.g. securing devices, safety devices, monitoring and operating schemes; centering devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16JPISTONS; CYLINDERS; SEALINGS
    • F16J15/00Sealings
    • F16J15/02Sealings between relatively-stationary surfaces
    • F16J15/06Sealings between relatively-stationary surfaces with solid packing compressed between sealing surfaces
    • F16J15/10Sealings between relatively-stationary surfaces with solid packing compressed between sealing surfaces with non-metallic packing
    • F16J15/104Sealings between relatively-stationary surfaces with solid packing compressed between sealing surfaces with non-metallic packing characterised by structure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16JPISTONS; CYLINDERS; SEALINGS
    • F16J15/00Sealings
    • F16J15/46Sealings with packing ring expanded or pressed into place by fluid pressure, e.g. inflatable packings
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Power Engineering (AREA)
  • Transportation (AREA)
  • Physics & Mathematics (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The present invention provides a kind of underground parking charging pile guard system, equipment cavity including subsurface is arranged in, setting opening at the top of the equipment cavity, elevating mechanism is arranged in the equipment cavity bottom, column is arranged in the upper end of the elevating mechanism, workbench is arranged in the lower end of the column, master control mechanism is set on the workbench, seal base is arranged in the middle part of the column, charging mechanism is set above the seal base, the top setting sealing top plate of the column, humidity control mechanism is set in the equipment cavity, go up and down correcting mechanism and monitoring water level mechanism, present invention is specifically directed to the underground parking charging piles of household to be protected, charging pile can be damaged to avoid in underground parking ponding, improve the protective performance of charging pile, and improve the safety of user, the risk got an electric shock when reducing ponding.

Description

A kind of underground parking charging pile guard system
Technical field
The present invention relates to parking lot charging pile technical fields, and in particular to a kind of underground parking charging pile guard system.
Background technique
New-energy automobile refer to using unconventional vehicle fuel as a source of power (or using conventional vehicle fuel, Using new vehicle-mounted power plant), the dynamic Control of comprehensive vehicle and the advanced technology of driving aspect, the technical principle elder generation of formation Into, the automobile with new technology, new construction.New-energy automobile is referred to as electric car, needs irregularly to charging electricity It charges in pond.Electric car becomes the industry that country supports development energetically because of its clean and environmental protection, matched with electric car Charging pile is also correspondingly fast-developing therewith, and electric car realizes charging by charging pile cable in charging, charging cable around or Disk is hung on charging pile together.
Existing charging pile on the market is substantially business and uses, and such as in power-up station or commercial parking lot, but is directed to The charging pile of household underground parking is substantially the socket-type of most original, and function is very single, and protective capacities is very poor.As being easy It is stealthily used by others, is easy the destruction by others, or even summer many urban waterloggings are serious now, underground parking is direct What is flooded is also not within minority, and current charging pile can not prevent water logging completely, and equipment when it is even more impossible to water logging is protected.
Accordingly, it is now desired to which a kind of level of protection is higher, the more underground parking household charging piles of function, to make up this The blank of aspect.
Summary of the invention
In view of this, the present invention provides a kind of underground parking charging pile guard system, for protecting the underground of household to stop Parking lot charging pile can protect charging pile after the ponding of underground parking especially in area of heavy rainfull, avoid ponding It causes equipment short circuit and mud to flow or blow over and cover completely equipment etc., charging pile is preferably protected.
In order to solve the above technical problems, the present invention provides a kind of underground parking charging pile guard system, including setting exists The equipment cavity of subsurface, the equipment cavity top setting opening, elevating mechanism, the elevating mechanism is arranged in the equipment cavity bottom Upper end column is set, workbench is arranged in the lower end of the column, is arranged master control mechanism on the workbench, in the column Seal base is arranged in portion, and charging mechanism is arranged above the seal base, and the top setting sealing top plate of the column is described to set Standby intracavitary setting humidity control mechanism, lifting correcting mechanism and monitoring water level mechanism, the master control mechanism and humidity control mechanism, Correcting mechanism, monitoring water level mechanism, elevating mechanism, charging mechanism connection are gone up and down, the master control mechanism is by communication module and moves The connection of moved end signal.
Further, the master control mechanism includes microcontroller and charge switch, and the charge switch and charging mechanism connect It connects.
Further, the communication module is arranged on column using wireless communication, the communication module, the communication mould The top of sealing top plate is arranged in the signal antenna of block, and the protection machine for protecting signal antenna is arranged on the sealing top plate Structure.
Further, the protection mechanism includes the circle fixed groove being arranged on sealing top plate around signal antenna, U-shaped sealing rubber layer is set on the inside of the fixed groove, setting corrugated protrusion, the fixation on the inside of the sealing rubber layer The tubular transparent cover of covering signal antenna is caught in groove, the sidewall thickness of the transparent cover is greater than sealing rubber layer two sides The spacing of wall.
Further, the opening, sealing top plate, seal base are circle, and sealing mechanism, institute is arranged in the opening inner side State the edge side setting annular groove of sealing top plate and seal base.
Further, the sealing mechanism includes the annular air-pocket of the head and the tail connection of opening inner side edge setting, the gas The vertical section of capsule is circle, and the air bag is connected to by steam line with the air pump being arranged in equipment cavity, the steam line The first solenoid valve of upper setting, first solenoid valve, air pump and microcontroller connect.
Further, the lifting correcting mechanism includes that open side is located at one infrared receiver of setting in equipment cavity The RF transmitter of the lower section setting and infrared receiver cooperation of device, the sealing top plate and seal base, it is described infrared Line receiver and RF transmitter are connect with microcontroller.
Further, the charging mechanism includes the charging of the charging cable connecting with charge switch, charging thread end setting Rifle and the rolling-up mechanism for accommodating charging cable, the rolling-up mechanism include being located between sealing top plate and seal base in the middle part of column Multiple arcs frid is arranged in the transverse arm of setting, the transverse arm top, and hook, the charging gun is arranged in the end of the transverse arm Upper setting link.
Further, the humidity control mechanism includes the humidity sensor being arranged in equipment cavity and for dehumidifying Desiccant body, the desiccant body include setting L-type support on the table, on the upper end of the L-type support is vertically arranged Mini-fan is arranged in cylinder, the inside of the upper cylinder, and the lower thread of the upper cylinder connects lower cylinder, the lower cylinder inner upper end setting First strainer, the lower cylinder interior lower end activity are arranged the second strainer, discoloration are arranged between first strainer and the second strainer Silica gel, the lower cylinder use transparent material product, and the humidity sensor and mini-fan are connect with microcontroller.
Further, in the second strainer setting mounting ring, the outer diameter of the mounting ring is equal with the internal diameter of lower cylinder, institute It states mounting ring to connect with the bottom thread of lower cylinder, second strainer is arranged in the mounting ring upper end, and the mounting ring lower end is set Set operating stick.
Further, plugging mechanism is arranged in the corresponding desiccant body, and the plugging mechanism includes being arranged on workbench Rotating mechanism is arranged the L-type support on the rotating mechanism, U-shaped plugging plate, the plugging plate is arranged on the workbench Upper plate lower end and upper cylinder upper end it is contour, the upper end of the lower plate of the plugging plate and the lower end of lower cylinder are contour, the closure Plate is located on the rotational trajectory of upper cylinder and lower cylinder.
Further, the rotating mechanism includes the driving hole being arranged on workbench, and the lower section of the driving hole is described Rotating electric machine is set on the downside of workbench, and the rotating electric machine is bolted with workbench, and the output shaft of the rotating electric machine stretches out Rotating disk is arranged in the driving hole, the upper end of the output shaft, and the L-type support is arranged in the rotation disk center.
Further, the monitoring water level mechanism includes water level monitoring mechanism and drainage mechanism, the water level monitoring mechanism Catch basin including the setting of equipment cavity bottom, the catch basin is interior to be arranged liquid level sensor, the liquid level sensor and microcontroller Device connection.
Further, the drainage mechanism includes the drain hole of the equipment cavity bottom setting, the lower section of the drain hole Reservoir is set, and setting drainpipe and pipe of taking a breath, are arranged second solenoid valve, the ventilation on the drainpipe in the drain hole Third solenoid valve is set on pipe, and the second solenoid valve and third solenoid valve are connect with microcontroller.
Further, water pump is arranged in the bottom of the reservoir, and the water pump be connected to tapping pipe, the tapping pipe with outside Boundary is connected to, and the 4th solenoid valve is arranged on the tapping pipe, the 4th solenoid valve and water pump are connect with microcontroller.
Charging pile guard system in underground parking provided by the invention, the equipment cavity including subsurface is arranged in, equipment cavity Elevating mechanism is arranged in top setting opening, equipment cavity bottom, and column is arranged in the upper end of elevating mechanism, and work is arranged in the lower end of column Platform, master control mechanism is arranged on workbench, and the middle part of column is arranged seal base, charging mechanism, column is arranged above seal base Top setting sealing top plate, setting humidity control mechanism, lifting correcting mechanism and monitoring water level mechanism, master control machine in equipment cavity Structure is connect with humidity control mechanism, lifting correcting mechanism, monitoring water level mechanism, elevating mechanism, charging mechanism, and master control mechanism passes through Communication module is connect with mobile end signal.In entire charging pile equipment cavity located underground, equipment cavity can use concrete system At opening facilitates entire charging pile extending equipment chamber.Entire charging pile has been divided into three layers, and top layer is sealing top plate and sealing bottom Between plate, charging mechanism is set here, elevating mechanism operates the part ejecting device chamber when needing to charge.Middle layer Between seal base and workbench, which is provided with master control mechanism, for carrying out control to each mechanism and to charging Mechanism is powered.Lowest level is the elevating mechanism below workbench, is gone up and down to charging pile.Going up and down correcting mechanism is to close It binds plate and whether seal base is monitored in opening and register, to be able to carry out sealing after the alignment, keep away Exempt from dust to enter and avoid water from entering in ponding.Humidity control mechanism can be intracavitary with monitoring device humidity, it is excessive in humidity When dehumidify, the water level that monitoring water level mechanism can be intracavitary with monitoring device, the draining when there is ponding.
When ponding occurs in ground vehicle garage, by sealing the cooperation of top plate and opening, when can be to avoid underground garage water logging Ponding enters inside charging pile, in this way to protecting in equipment cavity.If slowly there is ponding in garage during the charging process, and If car owner aside directly controls elevating mechanism decline, sealing top plate and opening are sealed, and it is right simultaneously to avoid carrying out ponding again Internal drainage.And if nobody looks after, it after ponding enters equipment cavity bottom, is monitored by water level monitoring mechanism, sentences at this time The speed of disconnected water inlet determines whether elevating mechanism declines, if water intake velocity is too fast, directly that seal base and opening is close Envelope, and the power supply of master control mechanism cutting charging mechanism, avoid ponding from entering excessive, damage equipment.If water intake velocity slowly if it is straight Elevating mechanism decline is connect, sealing top plate and opening is finally allowed to seal waterproof.
A plateau can be set in the lower end of elevating mechanism, and the part water avoided enter into influences the operation of elevating mechanism. Simultaneously as sealing top plate and seal base will play sealing function, but it is routed through, therefore is being routed through again Position will carry out sealing, directly be blocked by plugging material.
Master control mechanism includes controlling the microcontroller of each mechanism and to the charge switch that charging mechanism is controlled, filling Electric switch directlys adopt the formula of establishing by cable, can use relay, the control realized to charging mechanism is connect with microcontroller.Communicate mould Block is using wireless communication, and the top of sealing top plate is arranged in signal antenna, convenient for users to manipulating charging pile by mobile terminal, It avoids not communicating because of the Seal Design of equipment cavity.Charging pile is arranged by wall, and although signal antenna is exposed to ground, still Automobile can't roll over from top, and protection mechanism carries out dustproof and waterproof to signal antenna.User is when needing to charge It is directly controlled by mobile terminal if signal is out of question, signal transmission on time can open protection mechanism when slower, convenient logical Letter.The selection of communication module can be very much, such as 2G, 3G, 4G, or as needed can also be using WIFI, bluetooth etc..
Protection mechanism is responsible for protecting signal antenna, transparent cover can be inserted into anchor when not operated In slot, sealing rubber layer has contraction elasticity, its two sidewalls can only squeeze the side wall of transparent cover under the action of elasticity, together When with corrugated male cooperation, good sealing effect may be implemented, in underground garage ponding, can prevent ponding damage letter Number antenna.Certainly when in use if poor signal needs to remove transparent cover, then charging pile is controlled by mobile terminal.
Seal base and sealing top plate and opening can realize sealing, and the sealing mechanism setting for sealing is being open On, no setting is required in this way two be able to seal base and sealing top plate be sealed.Sealing relies on annular air-pocket to realize, In sealing top plate or seal base lifting process, one of lifting is high as opening same level, can booster air pump With the first solenoid valve.It is supplied by air pump so that annular air-pocket expands, hence into sealing top plate and seal base ring side In annular groove, the chamber after expansion requires section to be greater than the section of annular groove, and such air bag can be with annular groove inner sidewall It fits closely, is then shut off the first solenoid valve, so that annular air-pocket constant expanded state, realizes sealing.It is needing to device liter The first solenoid valve is opened when drop, and annular air-pocket is deflated.
Lifting correcting mechanism is whether sealing top plate and seal base are raised to aperture position and are calibrated, in sealing top plate One RF transmitter is set with the lower section of seal base, which connect with microcontroller.Prepare lifting front opening hair Emitter, if the infrared ray of transmitter can be received by the receiver, and microcontroller can receive at this time after lifting to suitable position The signal of calibration, directly pause lifting, so that sealing top plate or seal base are flushed with opening, to facilitate sealing mechanism opposite joint It is blocked at gap.
Existing charging mechanism is very mixed and disorderly for charging cable placement, often tangles together when in use, therefore filling Electric mechanism position is provided with rolling-up mechanism, and multiple arcs frid can be semi-circular shape, and opening up, the axial direction along transverse arm is set It sets, is firstly placed on when placing charging cable on a most arc frid of the inside, then wind a circle and place second arc groove again On plate, repeating step can be wrapped in charging cable on transverse arm, and be fixed by charging cable of the arc frid to each circle, prevent Mixed and disorderly or landing.And be arranged in the end of transverse arm and link up with, after winding, the link on charging gun can be right with hook cooperation Charging gun is fixed, and avoids because charging gun weight is larger, sagging excessive.
Humidity control mechanism includes humidity sensor and desiccant body, and humidity sensor and setting are best in equipment cavity It is arranged in bottom, is connect with microcontroller, humidity information can be fed back into microcontroller in real time.And desiccant body is responsible for wet To dehumidifying in equipment cavity when spending big, it is contemplated that moisture can be deposited to lower part, therefore mini-fan, and wind direction is arranged in upper cylinder On blow, in the lower cylinder of the lower end of upper cylinder connection, main the first strainer of child labourer and the second strainer installation discoloration silica gel particle exist in this way Under the action of mini-fan, the moisture of bottom, by being dehumidified, is discharged out of lower cylinder from the upper end of upper cylinder, realizes dehumidifying effect Fruit.Upper cylinder is threadedly coupled with lower cylinder, very convenient, specifically internal screw thread can be arranged inside the above cylinder lower end, and on the outside of lower cylinder upper end External screw thread is set.Lower cylinder can be clearly seen that whether internal discoloration silica gel changes colour using transparent material product, thus whether It is replaced.
In order to which the second strainer is necessary for detachable, the discoloration silica gel of inside is replaced with this, therefore the second strainer is arranged In mounting ring, external screw thread is arranged in the outside of mounting ring, and internal screw thread is arranged in the lower end inside of lower cylinder, also sets up behaviour in mounting ring Make bar, mounting ring can be rotated by operating stick, so that mounting ring is screwed into inside lower cylinder, realizes that the installation of the second strainer is solid It is fixed.
Plugging mechanism is that desiccant body is avoided still to be used when daily humidity is lower, cause discoloration silica gel replacement frequency compared with Greatly, therefore the upper end to upper cylinder and the lower end of lower cylinder block.Rotating mechanism can drive the holder pivots of L-type, need L-type support rotates so that upper cylinder and lower cylinder are located in U-shaped plugging plate when closure, and U-shaped plugging plate opening is arranged in side, this When on cylinder upper end by plugging plate upper plate cover, and the lower end of lower cylinder by plugging plate lower plate cover, in order to increase block effect Fruit can increase rubber layer on U-shaped plugging plate upper and lower plates.Rotating mechanism is driven by rotating electric machine, and rotating electric machine is set It sets in the lower section of workbench, the output shaft of rotating electric machine is stretched out by the driving hole being arranged on workbench, driven above workbench Rotating disk rotated, to realize the rotation of L-type support, the rotation angle of pre-set rotating electric machine, such as 180 degree, Upper cylinder and lower cylinder can be rotated to U-shaped plugging plate after primary rotation, or rotate outward disengaging plugging plate, therefore revolved Rotating motor can select stepper motor.
Monitoring water level mechanism is mainly that the water that charging process or lifting process enter is monitored and is discharged, water level monitoring The catch basin of mechanism can be cylinder, and level is had in the bottom of equipment cavity here, and water can be introduced into catch basin, by liquid Level sensor monitors, when being lower than safety levels without processing, and is higher than the highest point of safety levels such as catch basin, then it represents that Water can be covered in the bottom of equipment cavity and put aside intensification, and microcontroller can control drainage mechanism and work at this time.Equipment cavity There is reservoir in lower section, and reservoir sealed set is connected to by drain hole with equipment cavity, but drain hole is for installing drainpipe It is managed with ventilation, therefore needs to block in drain hole, cannot there is gap.Drainpipe is responsible for the water in equipment cavity being drained into storage The case where in pond, and air refreshing tube is then the air pressure of balancing equipment chamber and reservoir, therefore pure Seal Design, is not taken a breath is lauched It is difficult to flow into reservoir.So the lower end of ventilation pipe must be at the top of reservoir, and the upper end for pipe of taking a breath is needed in equipment The top of chamber avoids water in ventilation pipe circulation.Second solenoid valve is set on drainpipe, must shut off when not needed, ventilation pipe On be also provided with third solenoid valve, closing when not draining, moisture enters in equipment cavity from pipeline when avoiding having water in reservoir, damage Bad equipment or the operating speed for accelerating discoloration silica gel.And have to install additional the device of draining in reservoir, it is being drained every time Afterwards, water pump is connect with microcontroller, and microcontroller controls water pump starting and the water in reservoir is discharged, and the bottom of reservoir can be with For taper, conveniently catchment.Certainly level monitoring equipment equally can be set in reservoir, if liquid-level floater switchs, in this way Water pump can not be connect with microcontroller, directly be connect with float switch, and after liquid level reaches threshold value, float switch is directly initiated Water pump is drained.Drain header road when tapping pipe can be directly connected to foggara or this charging pile implements on a large scale Water, is directly discharged, to install the 4th solenoid valve additional on tapping pipe by connection, and in non-draining, the 4th solenoid valve is closed, and avoids water It flows backwards.
Present invention is specifically directed to the underground parking charging piles of household to be protected, can be to avoid in underground parking ponding When damage charging pile, improve the protective performance of charging pile, and improve the safety of user, reduce the risk of electric shock.
The present invention is especially suitable for south to take place frequently area for area or coastal typhoon, these local heavy rainfalls in short-term time Number is more, and a point failure of drainage system this may result in underground parking ponding, after can solve ponding using this charging pile The problem of replacing charging pile, greatly reduces the cost used, has facilitation for promoting new-energy automobile.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of charging pile guard system in underground parking of the present invention;
Fig. 2 is that apparatus of the present invention main body takes in equipment cavity and realizes the structural schematic diagram of sealing;
Fig. 3 is the structural schematic diagram of protection mechanism of the present invention;
Fig. 4 is the structural schematic diagram in fixed groove of the present invention;
Fig. 5 is the structural schematic diagram of desiccant body of the present invention;
Fig. 6 is the structural schematic diagram of desiccant body of the present invention and plugging mechanism.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention Attached drawing 1-6, the technical solution of the embodiment of the present invention is clearly and completely described.Obviously, described embodiment is this A part of the embodiment of invention, instead of all the embodiments.Based on described the embodiment of the present invention, the common skill in this field Art personnel every other embodiment obtained, shall fall within the protection scope of the present invention.
Embodiment one, the present invention provides a kind of underground parking charging pile guard systems, including subsurface is arranged in Equipment cavity 9,9 top of chamber of the equipment setting opening 4, elevating mechanism 36, the elevating mechanism 36 is arranged in 9 bottom of equipment cavity Upper end column 6 is set, workbench 22 is arranged in the lower end of the column 6, and master control mechanism is arranged on the workbench 22, described vertical Seal base 19 is arranged in the middle part of column 6, and charging mechanism is arranged above the seal base 19, and the top setting of the column 6 is close Bind plate 5, setting humidity control mechanism, lifting correcting mechanism and monitoring water level mechanism, the master control mechanism in the equipment cavity 9 It is connect with humidity control mechanism, lifting correcting mechanism, monitoring water level mechanism, elevating mechanism 36, charging mechanism, the master control mechanism It is connect by communication module 34 with mobile end signal.
Lifting top plate, lifting bottom plate, workbench are all the disk for the through-hole that intermediate setting is passed through for column, the outer diameter of disk Size compared with the internal diameter of opening, it is smaller little by little because sealing mechanism will be arranged in opening.The inner wall of equipment cavity can use Concreting before pouring on side wall at but will smearing one layer of waterproof material, such as pitch avoids seeping water.
The master control mechanism includes microcontroller 35 and charge switch 33, and the charge switch 33 is connected with charging mechanism. The communication module 34 is arranged on column 6 using wireless communication, the communication module 34, the signal day of the communication module 34 The top of sealing top plate 5 is arranged in line 7, and the protection mechanism for protecting signal antenna 7 is arranged on the sealing top plate 5.
The protection mechanism includes the circle fixed groove 42 being arranged on sealing top plate 5 around signal antenna 7, described solid Determine that U-shaped sealing rubber layer 41 is arranged on the inside of groove 42, corrugated protrusion 43 is set on the inside of the sealing rubber layer 41, it is described solid Determine the tubular transparent cover 39 that covering signal antenna 7 is caught in groove 42, the sidewall thickness of the transparent cover 39 is greater than sealing The spacing of 41 two sidewalls of rubber layer.Fluorescence and reflecting coating are smeared by the transparent cover external world, underground garage can to periphery into Row prompt prevents passerby to be not intended to be tripped.
The charging mechanism includes the charging gun 18 of the charging cable 15 connecting with charge switch 33, the setting of 15 end of charging cable And the rolling-up mechanism of charging cable 15 is accommodated, the rolling-up mechanism includes being located at sealing top plate 5 and seal base 19 in the middle part of column 6 Between the transverse arm 8 that is arranged, multiple arcs frid 14 is arranged above the transverse arm 8, hook is arranged in the end of the transverse arm 8 16, link 17 is set on the charging gun 18.It is connect by a connecting rod with column in the middle part of transverse arm, does not interfere with charging cable Winding on transverse arm.Arc frid can be welded with transverse arm, and elastic protective layer is arranged in upper surface, select rubber material, can To protect to charging cable, wound form is avoided to scratch insulating layer.
Embodiment two
The difference between this embodiment and the first embodiment lies in:
The opening 4, sealing top plate 5, seal base 19 are circle, and sealing mechanism, the sealing top is arranged in 4 inside of opening Annular groove 10 is arranged in the edge side of plate 5 and seal base 19.
The sealing mechanism includes the annular air-pocket 2 of the head and the tail connection of 4 inside edges of opening setting, and the air bag 2 erects Section is circle, and the air bag 2 is connected to by steam line 12 with the air pump 13 being arranged in equipment cavity 9, the steam line First solenoid valve 11 is set on 12, and first solenoid valve 11, air pump 13 are connect with microcontroller 35.Annular groove is led herein To cooperate with annular air-pocket, realize sealing.The side of annular air-pocket and the side wall of opening are directly be bonded, and annular groove is up and down The maximum edge of top plate and bottom plate and opening there are gap, the gap be facilitate top plate and bottom plate opening across without by The influence of annular air-pocket, it is proposed that gap size is 0.5 centimetre.After top plate or bottom plate and register, annular air-pocket inflation, Finally gap is blocked completely so that air bag expands in annular groove, the first solenoid valve is then shut off and air bag is made to keep expansion Sealing can be realized.
The lifting correcting mechanism includes that 4 sides of opening are located at one infrared receiver 1 of setting in equipment cavity 9, described Seal the RF transmitter 3 of the lower section setting and the cooperation of infrared receiver 1 of top plate 5 and seal base 19, the infrared ray Receiver 1 and RF transmitter 3 are connect with microcontroller 35.
Embodiment three
The difference between this embodiment and the first embodiment lies in:
The humidity control mechanism includes the humidity sensor being arranged in equipment cavity 9 and the desiccant body 20 for dehumidifying, The desiccant body 20 includes the L-type support 46 being arranged on workbench 22, the vertically arranged upper cylinder in the upper end of the L-type support 46 44, the inside of the upper cylinder 44 is arranged mini-fan 45, and the lower thread of the upper cylinder 44 connects lower cylinder 48, in the lower cylinder 48 Portion upper end is arranged the first strainer 47, and the lower 48 interior lower end activity of cylinder is arranged the second strainer 50, first strainer 47 and the Setting discoloration silica gel 49 between two strainers 50, the lower cylinder 48 use transparent material product, the humidity sensor and miniature wind Fan 45 is connect with microcontroller 35.For the preferred installation site of humidity sensor in the lower surface of workbench, bottom moisture is maximum, monitoring Effect is best.To up-draught, moisture enters from the bottom of lower cylinder from the upper end of upper cylinder to be blown out mini-fan, passes through the silica gel that changes colour Grain dehumidifies.First strainer and the second strainer all select stainless steel filtering net, and the size of mesh is less than the straight of silica gel particle Diameter.
Second strainer 50 is arranged in mounting ring 51, and the outer diameter of the mounting ring 51 is equal with the internal diameter of lower cylinder 48, institute It states mounting ring 51 to connect with the bottom thread of lower cylinder 48, second strainer 50, the installation is arranged in 51 upper end of mounting ring Operating stick 52 is arranged in 51 lower end of ring.Be screwed into inside lower cylinder because mounting ring will rotate, cannot by the outside of mounting ring into Row rotation can only be arranged operating stick in the inside bottom of mounting ring, rotate mounting ring by operating stick.
Plugging mechanism 21 is arranged in the corresponding desiccant body 20, and the plugging mechanism 21 includes the rotation being arranged on workbench 22 Rotation mechanism 23 is arranged the L-type support 46 on the rotating mechanism 23, U-shaped plugging plate 54, institute is arranged on the workbench 22 The lower end for stating the upper plate 23 of plugging plate 54 and the upper end of upper cylinder 44 are contour, the upper end of the lower plate 55 of the plugging plate 54 and lower cylinder 48 Lower end it is contour, the plugging plate 54 is located on the rotational trajectory of upper cylinder 44 and lower cylinder 48.Plugging mechanism passes through upper cylinder and lower cylinder In rotation to plugging plate, realization blocks the top and bottom of desiccant body, and discoloration silica gel when routine use is avoided to absorb water, Lead to water absorption reduction when something goes wrong.A kind of preferred effect is that rubber layer is arranged in the inside of plugging plate to increase plugging effect, Flat-shaped air bag can be arranged in another embodiment for side inside, and effect can be more preferable.
The rotating mechanism includes the driving hole 58 being arranged on workbench 22, and the lower section of the driving hole 58 is in the work Rotating electric machine 59 is set on the downside of platform 22, and the rotating electric machine 59 is bolted with workbench 22, the output of the rotating electric machine 59 Axis 57 stretches out the driving hole 58, and rotating disk 56 is arranged in the upper end of the output shaft 57, and the L is arranged in 56 center of rotating disk Type bracket 46.The rotating electric machine of rotating mechanism uses stepper motor, and rotation angle is conducive to control.It can be seen that rotation angle in figure Degree is 180 degree, desiccant body can be rotated to plugging plate.
Example IV
The difference between this embodiment and the first embodiment lies in:
The monitoring water level mechanism includes water level monitoring mechanism and drainage mechanism, and the water level monitoring mechanism includes 9 bottom of equipment cavity The catch basin 38 of portion's setting, the catch basin 38 is interior to be arranged liquid level sensor 3, and the liquid level sensor 37 connects with microcontroller 35 It connects.The installation site of liquid level sensor just will set in this way after the trough inner water savings that catchments has been expired in the top of catch basin Standby bottom of chamber portion diffuses, and the monitoring signals of liquid level sensor feed back to microcontroller at this time, and microcontroller controls second solenoid valve row Water.Or the depth of water in catch basin can be monitored in real time using floating-type in liquid level sensor, and threshold value is arranged, after reaching threshold value It is drained.
The drainage mechanism includes the drain hole 26 of 9 bottom of the equipment cavity setting, the lower section setting of the drain hole 26 Reservoir 29, the drain hole 26 is interior to be arranged drainpipe 27 and ventilation pipe 25, and second solenoid valve 28 is arranged on the drainpipe 27, Third solenoid valve 24, the second solenoid valve 28 and third solenoid valve 24 are set on the ventilation pipe 25 and microcontroller 35 connects It connects.Drain hole primarily serves the effect of installation drainpipe and pipe of taking a breath, after installing two pipelines, it is necessary to use and not absorb water Material blocked, only leave drainpipe and ventilation pipe connectivity device chamber and reservoir.
Water pump 30 is arranged in the bottom of the reservoir 29, and the water pump 30 is connected to tapping pipe 31, the tapping pipe 31 and The external world is connected to, and the 4th solenoid valve 32, the 4th solenoid valve 32 and water pump 30 and microcontroller 35 are arranged on the tapping pipe 31 Connection.
Embodiment five
The difference between this embodiment and the first embodiment lies in:
Charging pile in same cell is connect by base station with centralized control center, can be connected by wire, at this time Centralized control center can obtain the information of each charging pile in real time, can remind and repair in time when problem occurs.Such as into After water draining break down, discoloration silica gel color change (here can for setting one camera) etc., master control mechanism can be with It is connect with centralized control center, forms unified operational management, car owner can be facilitated, moreover it is possible to preferably ensure charging pile safety.It is logical Letter line can arrange along electric wire, carry out closure.Wireless communication function can be set in centralized control center, communicates with mobile terminal, in this way Signal antenna can be saved, to simplify the structure of top pressure closure, during installation in reference cell depending on charging number amount.
Embodiment six
The means of defence for present embodiments providing a kind of underground parking charging pile guard system, includes the following steps:
S1, transparent cover is removed, controlling elevating mechanism by mobile terminal promotes seal base, and makes by going up and down correcting mechanism It obtains seal base and opening maintains an equal level, then air pump work is realized between seal base and opening and sealed, at this time to annular air-pocket inflation It can be charged by charging mechanism;
If S2, during the charging process underground garage ponding, directly ponding is avoided to enter equipment by seal base and opening sealing It is intracavitary, if the depth of water is excessively high, instruction is sent by mobile terminal and disconnects charge switch, such ponding covers charging mechanism and will not send out Raw short circuit or electric leakage;
After S3, charging complete, lower apparatus main body is said by elevating mechanism, so that sealing top plate and opening realize sealing, it will be transparent Cover is buckled on signal antenna and is protected;
Humidity control mechanism and monitoring water level mechanism in S4, equipment cavity are monitored simultaneously the ponding or moisture that inadvertently enter Dehumidifying in time or draining, ensure the running environment of equipment.
The above is a preferred embodiment of the present invention, it is noted that for those skilled in the art For, without departing from the principles of the present invention, it can also make several improvements and retouch, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of underground parking charging pile guard system, the equipment cavity including subsurface is arranged in, the equipment cavity top are set Opening is set, elevating mechanism is arranged in the equipment cavity bottom, it is characterised in that: column is arranged in the upper end of the elevating mechanism, described Workbench is arranged in the lower end of column, master control mechanism is arranged on the workbench, seal base is arranged in the middle part of the column, described Charging mechanism is set above seal base, and the top setting sealing top plate of the column, the equipment cavity is interior to be arranged humidity control Mechanism, lifting correcting mechanism and monitoring water level mechanism, the master control mechanism and humidity control mechanism, lifting correcting mechanism, water level Monitor control mechanism, elevating mechanism, charging mechanism connection, the master control mechanism are connect by communication module with mobile end signal.
2. charging pile guard system in underground parking as described in claim 1, it is characterised in that: the master control mechanism includes micro- Controller and charge switch, the charge switch are connected with charging mechanism, and the communication module is using wireless communication, the communication Module is arranged on column, and the top of sealing top plate is arranged in the signal antenna of the communication module, sets on the sealing top plate Set the protection mechanism for protecting signal antenna.
3. charging pile guard system in underground parking as claimed in claim 2, it is characterised in that: the protection mechanism includes enclosing U-shaped sealing rubber layer is arranged in the circle fixed groove being arranged on sealing top plate around signal antenna, the fixed groove inside, Setting corrugated is raised on the inside of the sealing rubber layer, and the tubular translucent cover of covering signal antenna is caught in the fixed groove Body, the sidewall thickness of the transparent cover are greater than the spacing of sealing rubber layer two sidewalls.
4. charging pile guard system in underground parking as claimed in claim 2, it is characterised in that: it is described opening, sealing top plate, Seal base is circle, and sealing mechanism, the edge side setting of the sealing top plate and seal base is arranged in the opening inner side Annular groove, the sealing mechanism include the annular air-pocket of the head and the tail connection of opening inner side edge setting, and the perpendicular of the air bag is cut Face is circle, and the air bag is connected to by steam line with the air pump being arranged in equipment cavity, and the is arranged on the steam line One solenoid valve, first solenoid valve, air pump and microcontroller connect.
5. charging pile guard system in underground parking as claimed in claim 2, it is characterised in that: the lifting correcting mechanism packet Include open side and be located in equipment cavity and an infrared receiver is set, the lower section setting of the sealing top plate and seal base with The RF transmitter of infrared receiver cooperation, the infrared receiver and RF transmitter are connect with microcontroller.
6. charging pile guard system in underground parking as claimed in claim 2, it is characterised in that: the charging mechanism include with The charging cable of charge switch connection, the charging gun of charging thread end setting and the rolling-up mechanism for accommodating charging cable, the winding Mechanism includes being located at the transverse arm being arranged between sealing top plate and seal base in the middle part of column, is arranged above the transverse arm multiple Arc frid, the end of the transverse arm are arranged hook, link are arranged on the charging gun.
7. charging pile guard system in underground parking as claimed in claim 2, it is characterised in that: humidity control mechanism packet The humidity sensor being arranged in equipment cavity and the desiccant body for dehumidifying are included, the desiccant body includes that setting is working L-type support on platform, the vertically arranged upper cylinder in the upper end of the L-type support, the inside of the upper cylinder are arranged mini-fan, it is described on The lower thread of cylinder connects lower cylinder, and the lower cylinder inner upper end is arranged the first strainer, the lower cylinder interior lower end activity setting the Two strainers, setting discoloration silica gel between first strainer and the second strainer, the lower cylinder uses transparent material product, described wet Degree sensor and mini-fan are connect with microcontroller.
8. charging pile guard system in underground parking as claimed in claim 7, it is characterised in that: the second strainer setting peace It fills on ring, the outer diameter of the mounting ring is equal with the internal diameter of lower cylinder, and the mounting ring is connect with the bottom thread of lower cylinder, the peace It fills ring upper end and second strainer is set, operating stick is arranged in the mounting ring lower end.
9. charging pile guard system in underground parking as claimed in claim 7, it is characterised in that: the corresponding desiccant body is set Plugging mechanism is set, the plugging mechanism includes the rotating mechanism being arranged on workbench, and the L-type branch is arranged on the rotating mechanism U-shaped plugging plate is arranged on the workbench in frame, and the lower end of the upper plate of the plugging plate and the upper end of upper cylinder are contour, the envelope The upper end of the lower plate of closure plate and the lower end of lower cylinder are contour, and the plugging plate is located on the rotational trajectory of upper cylinder and lower cylinder, the rotation Rotation mechanism includes the driving hole being arranged on workbench, and rotating electric machine is arranged on the downside of the workbench in the lower section of the driving hole, The rotating electric machine is bolted with workbench, and the output shaft of the rotating electric machine stretches out the driving hole, the output shaft Rotating disk is arranged in upper end, and the L-type support is arranged in the rotation disk center.
10. charging pile guard system in underground parking as claimed in claim 2, it is characterised in that: the monitoring water level mechanism Including water level monitoring mechanism and drainage mechanism, the water level monitoring mechanism includes the catch basin of equipment cavity bottom setting, the collection Liquid level sensor is set in sink, and the liquid level sensor is connect with microcontroller, and the drainage mechanism includes the equipment cavity Reservoir is arranged in the drain hole of bottom setting, the lower section of the drain hole, setting drainpipe and ventilation pipe, institute in the drain hole It states and second solenoid valve is set on drainpipe, third solenoid valve, the second solenoid valve and third electromagnetism are set on the ventilation pipe Valve is connect with microcontroller, and water pump is arranged in the bottom of the reservoir, and the water pump be connected to tapping pipe, the tapping pipe with outside Boundary is connected to, and the 4th solenoid valve is arranged on the tapping pipe, the 4th solenoid valve and water pump are connect with microcontroller.
CN201910677411.7A 2019-07-25 2019-07-25 Underground parking garage fills electric pile protection system Active CN110356275B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910677411.7A CN110356275B (en) 2019-07-25 2019-07-25 Underground parking garage fills electric pile protection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910677411.7A CN110356275B (en) 2019-07-25 2019-07-25 Underground parking garage fills electric pile protection system

Publications (2)

Publication Number Publication Date
CN110356275A true CN110356275A (en) 2019-10-22
CN110356275B CN110356275B (en) 2023-02-28

Family

ID=68221704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910677411.7A Active CN110356275B (en) 2019-07-25 2019-07-25 Underground parking garage fills electric pile protection system

Country Status (1)

Country Link
CN (1) CN110356275B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110994729A (en) * 2019-12-18 2020-04-10 国网山东省电力公司长岛县供电公司 Distributed port bank charging device
CN111845407A (en) * 2020-07-21 2020-10-30 韩阳 Fill electric pile of flood prevention function
CN112519607A (en) * 2020-12-09 2021-03-19 南京深骐电子科技有限公司 Wall-hanging electric pile that fills for electric automobile charging shed
CN112793446A (en) * 2020-12-28 2021-05-14 江苏朝阳电力科技有限公司 Parking space charging pile
CN113266182A (en) * 2021-05-24 2021-08-17 陈家荣 Intelligence over-and-under type watertight car box system
CN114727463A (en) * 2022-04-20 2022-07-08 北京金石视觉数字科技有限公司 Lamplight control method and system based on smart city Internet of things system

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009091745A2 (en) * 2008-01-14 2009-07-23 Aerovironment Sliding conductor transmission cable
CN206231247U (en) * 2016-12-09 2017-06-09 湖北盛弘电力技术开发有限公司 A kind of electric motor car automobile Split type intelligent DC charging all-in-one
CN206250787U (en) * 2016-11-04 2017-06-13 合肥中科智翔自动化技术有限公司 A kind of lifting/lowering type parking lot charging pile
CN207015177U (en) * 2017-07-10 2018-02-16 湖北卓骏自动化工业有限公司 A kind of lift new automobile charging pile
CN207150000U (en) * 2017-09-04 2018-03-27 北京华电瑞通电力工程技术有限公司 A kind of ground-embedded box type transformer station for being available for automobile to charge
CN207241480U (en) * 2017-10-05 2018-04-17 季元吉 A kind of Concealable new-energy automobile charging pile with aerification function
CN108394293A (en) * 2018-01-30 2018-08-14 长乐致远技术开发有限公司 Electric car charging interface structure
CN207875420U (en) * 2017-12-29 2018-09-18 深圳市信德瑞电气科技有限公司 A kind of multi-functional charging pile
CN108638907A (en) * 2018-07-05 2018-10-12 浙江华耀电气科技有限公司 A kind of liftable automobile charging pile
WO2019002868A1 (en) * 2017-06-28 2019-01-03 Trojan Energy Limited Apparatus and system for connecting electric vehicles to an electrical network and method of use
CN109398134A (en) * 2018-11-09 2019-03-01 杨志刚 A kind of underground garage waterproof charging pile
CN208559059U (en) * 2018-06-06 2019-03-01 安徽速电新能源有限公司 A kind of lifting type automobile charging unit and system
CN208615738U (en) * 2018-07-05 2019-03-19 浙江华耀电气科技有限公司 A kind of liftable automobile charging pile
CN109557967A (en) * 2019-01-17 2019-04-02 河南工业职业技术学院 A kind of exchange cabinet temperature and humidity monitoring system
CN208947112U (en) * 2018-10-17 2019-06-07 深圳市青禾新能源有限公司 One kind can automatic lifting charging station
CN109849716A (en) * 2019-04-07 2019-06-07 东莞市光烨节能科技有限公司 A kind of concealed underground garage charging pile and its application method

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009091745A2 (en) * 2008-01-14 2009-07-23 Aerovironment Sliding conductor transmission cable
CN206250787U (en) * 2016-11-04 2017-06-13 合肥中科智翔自动化技术有限公司 A kind of lifting/lowering type parking lot charging pile
CN206231247U (en) * 2016-12-09 2017-06-09 湖北盛弘电力技术开发有限公司 A kind of electric motor car automobile Split type intelligent DC charging all-in-one
WO2019002868A1 (en) * 2017-06-28 2019-01-03 Trojan Energy Limited Apparatus and system for connecting electric vehicles to an electrical network and method of use
CN207015177U (en) * 2017-07-10 2018-02-16 湖北卓骏自动化工业有限公司 A kind of lift new automobile charging pile
CN207150000U (en) * 2017-09-04 2018-03-27 北京华电瑞通电力工程技术有限公司 A kind of ground-embedded box type transformer station for being available for automobile to charge
CN207241480U (en) * 2017-10-05 2018-04-17 季元吉 A kind of Concealable new-energy automobile charging pile with aerification function
CN207875420U (en) * 2017-12-29 2018-09-18 深圳市信德瑞电气科技有限公司 A kind of multi-functional charging pile
CN108394293A (en) * 2018-01-30 2018-08-14 长乐致远技术开发有限公司 Electric car charging interface structure
CN208559059U (en) * 2018-06-06 2019-03-01 安徽速电新能源有限公司 A kind of lifting type automobile charging unit and system
CN108638907A (en) * 2018-07-05 2018-10-12 浙江华耀电气科技有限公司 A kind of liftable automobile charging pile
CN208615738U (en) * 2018-07-05 2019-03-19 浙江华耀电气科技有限公司 A kind of liftable automobile charging pile
CN208947112U (en) * 2018-10-17 2019-06-07 深圳市青禾新能源有限公司 One kind can automatic lifting charging station
CN109398134A (en) * 2018-11-09 2019-03-01 杨志刚 A kind of underground garage waterproof charging pile
CN109557967A (en) * 2019-01-17 2019-04-02 河南工业职业技术学院 A kind of exchange cabinet temperature and humidity monitoring system
CN109849716A (en) * 2019-04-07 2019-06-07 东莞市光烨节能科技有限公司 A kind of concealed underground garage charging pile and its application method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110994729A (en) * 2019-12-18 2020-04-10 国网山东省电力公司长岛县供电公司 Distributed port bank charging device
CN111845407A (en) * 2020-07-21 2020-10-30 韩阳 Fill electric pile of flood prevention function
CN112519607A (en) * 2020-12-09 2021-03-19 南京深骐电子科技有限公司 Wall-hanging electric pile that fills for electric automobile charging shed
CN112519607B (en) * 2020-12-09 2023-11-10 南京深骐电子科技有限公司 Wall-mounted charging pile for electric automobile charging shed
CN112793446A (en) * 2020-12-28 2021-05-14 江苏朝阳电力科技有限公司 Parking space charging pile
CN113266182A (en) * 2021-05-24 2021-08-17 陈家荣 Intelligence over-and-under type watertight car box system
CN114727463A (en) * 2022-04-20 2022-07-08 北京金石视觉数字科技有限公司 Lamplight control method and system based on smart city Internet of things system

Also Published As

Publication number Publication date
CN110356275B (en) 2023-02-28

Similar Documents

Publication Publication Date Title
CN110356275A (en) A kind of underground parking charging pile guard system
CN207801256U (en) A kind of power distribution cabinet with waterproof dehumidification function
CN207633249U (en) Has the charging pile device of shared parking stall lock function
CN105091147A (en) Intelligent self-cleaning composite microporous electrostatic adherence air purifying device and control method
CN108755635A (en) The environmental improvement ship salvaged for river surface, river surface floating refuse
CN103673254B (en) The water discharge control method and dehumidifier of dehumidifier
CN105180323A (en) Haze-removing, dedusting and cooling system for buildings
CN114284912B (en) Intelligent distribution network safety protection cabinet
CN113756409B (en) Environment-friendly drainage device and method for building external wall board
CN104623995A (en) Dust removing device
CN108738280A (en) A kind of good intelligent communication base station of ventilation effect based on Internet of Things
CN215166089U (en) Building roof rainwater collecting and processing equipment based on green energy conservation
CN108157139A (en) A kind of efficient watering Irrigation device of novel garden greening
CN110626199B (en) Energy-saving high-efficient type fills electric pile
CN206626741U (en) New blower fan and VMC
CN112882523B (en) A environmental perception terminal for plant protection unmanned aerial vehicle
CN107278078B (en) A kind of traffic signal controller
CN107829381B (en) Fill electric pile device that possesses sharing parking stall lock function
CN209873937U (en) Rainwater collection device based on building facade structure
CN213243157U (en) Dustproof switch board of antidetonation
CN205208796U (en) Compound micropore static adsorption of air purifier of intelligence automatically cleaning
CN213301768U (en) Unmanned aerial vehicle multichannel water sample collection system
CN209115185U (en) A kind of Water-in proof device of automobile discharge pipe
CN107511258B (en) Haze device is removed in a kind of city with concealed
CN217145696U (en) Fill electric pile heat radiation structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant