CN110344840A - Outer water circulation system and outer water round-robin method of the TBM with automatic control - Google Patents

Outer water circulation system and outer water round-robin method of the TBM with automatic control Download PDF

Info

Publication number
CN110344840A
CN110344840A CN201910757529.0A CN201910757529A CN110344840A CN 110344840 A CN110344840 A CN 110344840A CN 201910757529 A CN201910757529 A CN 201910757529A CN 110344840 A CN110344840 A CN 110344840A
Authority
CN
China
Prior art keywords
water
ball valve
outlet
pipeline
manual
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910757529.0A
Other languages
Chinese (zh)
Other versions
CN110344840B (en
Inventor
刘永亮
郭付军
俞培德
朱团辉
罗恒星
胡燕伟
姚晶
李东辉
赵康峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Engineering Equipment Group Co Ltd CREG
Original Assignee
China Railway Engineering Equipment Group Co Ltd CREG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Engineering Equipment Group Co Ltd CREG filed Critical China Railway Engineering Equipment Group Co Ltd CREG
Priority to CN201910757529.0A priority Critical patent/CN110344840B/en
Publication of CN110344840A publication Critical patent/CN110344840A/en
Application granted granted Critical
Publication of CN110344840B publication Critical patent/CN110344840B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • E21D9/11Making by using boring or cutting machines with a rotary drilling-head cutting simultaneously the whole cross-section, i.e. full-face machines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D1/00Devices using naturally cold air or cold water
    • F25D1/02Devices using naturally cold air or cold water using naturally cold water, e.g. household tap water
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D17/00Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces
    • F25D17/02Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces for circulating liquids, e.g. brine

Landscapes

  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Devices That Are Associated With Refrigeration Equipment (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses outer water circulation system and outer water round-robin method of a kind of TBM with automatic control, solve in the prior art that coolant-temperature gage is not easy to control, outer hydraulic pressure drop is big, return water difficulty problem.The present invention includes cooler, outer circulation water water inlet system and outer circulation water outlet system is connected on cooler, and cooler is connected with interior circulation water inlet pipe, interior circulating water outlet pipe respectively.The present invention can be used for outer water circulation, tunnel distance under the different operating conditions such as short distance tunnel and long distance tunnel and in short-term, pass through the direct return water of water outlet main road;It when tunnel distance is long, is cached and is discharged using reservoir, effectively solve the problems, such as that outer hydraulic pressure drop is big under long distance tunnel operating condition, return water is difficult.The present invention is used to adjust uninterrupted of the outer water by cooler, and then coolant-temperature gage in control by first manual gate valve, convenient and easy, convenient for control, effectively solves the problems, such as that interior coolant-temperature gage is not easy to control.

Description

Outer water circulation system and outer water round-robin method of the TBM with automatic control
Technical field
The present invention relates to technical field of tunnel construction, particularly relate to a kind of outer water cyclic system of the TBM with automatic control System and outer water round-robin method.
Background technique
With the development of social development needs and development machine, development machine digging diameter is gradually to major diameter and minor diameter two Direction is developed, and is typically all long distance driving for hard rock mole TBM, Excavation Length up to several kilometers even tens kilometers, and A large amount of water is needed in tunneling process, is mainly used to cool down.The existing TBM type of cooling is generally by the internal water of outer water system System is cooling, and for outer water by directly providing outside hole, internal water system system is closed system, and outer water system is open system.For over long distances For TBM, outer water system is had the following problems: 1, interior coolant-temperature gage is difficult to control problem;2, outer hydraulic pressure drops big, return water difficulty and asks Topic.It is generally solved by increasing cold water storage cistern for major diameter TBM, and outer water is only intake no return water, when water tank temperature height When, it directly bleeds off, waste water resource.And for minor diameter TBM, space is limited, and cold water storage cistern is nowhere placed, if increased cold Water need to increase trailer's length, i.e. increase cost.And it solves the above problems simultaneously without effective means in the prior art, and then influence TBM construction efficiency.
Summary of the invention
For the deficiency in above-mentioned background technique, the present invention proposes a kind of outer water cyclic system of the TBM with automatic control System and outer water round-robin method, solve in the prior art that coolant-temperature gage is not easy to control, and outer hydraulic pressure drop is big, return water difficulty problem.
The technical scheme of the present invention is realized as follows: a kind of outer water circulation system of TBM with automatic control, including Cooler, is connected with outer circulation water water inlet system and outer circulation water outlet system on cooler, and cooler respectively with interior circulation Water inlet pipe, interior circulating water outlet pipe are connected.
The outer circulation water water inlet system includes water inlet main line, and series connection is equipped with flowmeter on main line of intaking, pressure passes Sensor, filter and temperature sensor, in parallel on main line of intaking to be equipped with refrigeration pipeline, refrigeration pipeline is equipped with cooling assembly.
The water inlet main line is equipped with the first pneumatic ball valve, and refrigeration pipeline is equipped with the second pneumatic ball valve, and first is pneumatic Ball valve and the second pneumatic ball valve are arranged in parallel;The filter is located on the inlet pipeline of refrigeration pipeline, and temperature sensor is located at On the outlet pipeline of refrigeration pipeline.
The pressure sensor includes first pressure sensor, second pressure sensor and third pressure sensor, and first Pressure sensor and second pressure sensor are located at the two sides of filter, and third pressure sensor is located at temperature sensor Side.
The outer circulation water outlet system includes water outlet main road, and water outlet main pipe road is successively arranged the 4th along water discharging direction Pressure sensor, third pneumatic ball valve, the first check valve and first manual gate valve, third pneumatic ball valve and first manual gate valve it Between it is in parallel be equipped with warm water tank, the inlet pipeline for warming up water tank is equipped with the 4th pneumatic ball valve, warms up and in parallel on water tank is equipped with the first water outlet System and the second outlet system.
The water outlet main road is connected by first manual gate valve with water inlet main line, and first manual gate valve is located at the 4th Between pressure sensor and third pneumatic ball valve;The warm water tank is equipped with liquid level sensor and the 5th manual ball valve.
First outlet system includes the first outlet pipeline, and the first outlet pipeline is connected to cutterhead water pipe, and first First manual ball valve, booster pump, pressure gauge and second one-way valve, the first outlet pipe are set gradually along water discharging direction on outlet pipeline Road is in parallel to be equipped with the second manual gate valve.
Second outlet system includes the second outlet pipeline, and the second outlet pipeline is connected to water outlet main road, and second goes out The second manual ball valve, back water pump, pressure gauge and third check valve, water outlet main pipe road are successively arranged along water discharging direction in water lines Equipped with water return pipeline, water return pipeline is connected with the second outlet pipeline, and water return pipeline is connected to cutterhead water pipe.
The 4th check valve, third manual ball valve and the 4th manual ball are successively arranged along water discharging direction on the water return pipeline Valve, the 4th manual ball valve are connected with detergent line.
A kind of outer water round-robin method of outer water circulation system of the TBM with automatic control, includes the following steps:
S1: when tunnel distance is short, the flow of flowmeter is larger, when backwater distance is less than the H-Max of outer water pump: outer water warp Water inlet main line enters cooler and interior recirculated water carries out heat exchange, opens third pneumatic ball valve and first manual gate valve, closes Back water pump and third manual ball valve, outer water direct return water under the effect of outer water pump;
S2: when tunnel distance is longer, flowmeter flow is smaller, when backwater distance alreadys exceed the H-Max of outer water pump, outer water Main line of being intake enters cooler and interior recirculated water carries out heat exchange, opens the 4th pneumatic ball valve, the second manual ball valve, return water Pump and first manual gate valve close third pneumatic ball valve and third manual ball valve, adjust back water pump flow realize back water pump with The flow matches of outer water pump, outer water are realized through warm water tank under the action of back water pump and outer water pump and are flowed back.
In step S1 and step S2, when temperature sensor detects that outer coolant-temperature gage is higher or outer coolant-temperature gage is unable to satisfy It is required that when, the first pneumatic ball valve is closed, the second pneumatic ball valve is opened, outer water enters back into cooler pair after refrigeration unit is cooling Interior water is cooled down.
In step S1 and step S2, when interior water temperature sensor detects that interior coolant-temperature gage is lower, first manual is opened Gate valve, a part of water in water main line flow into water outlet main road, and the flow that outer water enters cooler is reduced, Wai Shui and interior water Heat exchange is reduced;When interior coolant-temperature gage meter detects that interior coolant-temperature gage is higher, first manual gate valve, the outer water in water main line are closed Cooler is fully entered, the flow that outer water enters cooler increases, and Wai Shui and interior hydrothermal exchange increase, and then adjusts interior water temperature Degree.
Needed in step S1 and step S2 to cutterhead spray water the following steps are included:
S1.1: under normal circumstances, when needing to spray water to cutterhead, first manual ball valve and booster pump is opened, warms up the water in water tank Enter cutterhead water pipe through the first outlet pipeline;
S1.2: when booster pump breaks down, opening third manual ball valve, back water pump and the second manual ball valve, by adjusting the One manual gate valve adjusts the outlet pressure of back water pump, and the water in warm water tank enters cutterhead spray through the second outlet pipeline and water return pipeline Water lines.
The present invention can be used for outer water under the different operating condition such as short distance tunnel and long distance tunnel and recycle, tunnel distance in short-term, Pass through the direct return water of water outlet main road;When tunnel distance is long, is cached and be discharged using reservoir, i.e., it is total by back water pump and outer water pump Same-action return water effectively solves the problems, such as that outer hydraulic pressure drop is big under long distance tunnel operating condition, return water is difficult.The present invention passes through first-hand Dynamic gate valve is used to adjust uninterrupted of the outer water by cooler, and then controls interior coolant-temperature gage, i.e., enters cooler by outer water Water number, control in water cooling temperature, it is convenient and easy, convenient for control, effectively solves the problems, such as in coolant-temperature gage be difficult to control. The present invention is ingenious in design, and whole system safety coefficient is high, easily controllable and operation, is a big wound of constructing tunnel China and foreign countries water circulation Newly, promotional value with higher.
Detailed description of the invention
In order to illustrate the embodiments of the present invention more clearly, attached drawing needed in describing below to embodiment makees letter Singly introduce, it should be apparent that, drawings in the following description are only some embodiments of the invention, skill common for this field For art personnel, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is overall structure schematic diagram of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under that premise of not paying creative labor Embodiment shall fall within the protection scope of the present invention.
As shown in Figure 1, embodiment 1, a kind of outer water circulation system of the TBM with automatic control, including cooler 31, cold But be connected with outer circulation water water inlet system and outer circulation water outlet system on device 31, and cooler 31 respectively with interior circulation water inlet pipe 32, interior circulating water outlet pipe 33 is connected.Outer water enters cooler through outer circulation water water inlet system, and interior water is through interior circulation water inlet pipe 32 enter cooler, and Wai Shui and interior water carry out heat exchange in cooler, realizes internal coolant-temperature gage by the size of inflow Control, then interior water after cooling is drawn through interior circulating water outlet pipe 33, and the outer water in cooler is through outer circulation water outlet system Extraction is recycled.
Further, the outer circulation water water inlet system includes water inlet main line 34, and series connection is equipped with stream on main line 34 of intaking Outer water flow can be monitored in real time in meter 1, pressure sensor, filter 3 and temperature sensor 7, flowmeter 1, guarantees outer water pump Work guarantees warm high water tank more than alarm liquid level within normal lift.Pressure sensor is for monitoring inside and outside pipeline Water pressure, filter 3 are used to filter outer water, and temperature sensor 7 is used to monitor outer inflow temperature.Parallel connection is set on water inlet main line 34 There is refrigeration pipeline 35, refrigeration pipeline 35 is equipped with cooling assembly 6, and refrigeration unit 6 is used to cooling outer water.
More further, the water inlet main line 34 is equipped with the first pneumatic ball valve 9, and it is pneumatic that refrigeration pipeline 35 is equipped with second Ball valve 5, the first pneumatic ball valve 9 and the second pneumatic ball valve 5 are arranged in parallel;First pneumatic ball valve 9 and the second pneumatic ball valve 5 are used to control Make whether outer water passes through refrigeration unit, the first pneumatic ball valve 9 is opened, the second pneumatic ball valve 5 is closed, and outer water is without supercooling group Part;First pneumatic ball valve 9 is closed, the second pneumatic ball valve 5 is opened, and outer water passes through cooling component.The filter 3 is located at refrigerator pipes On the inlet pipeline on road 35, temperature sensor 7 is located on the outlet pipeline of refrigeration pipeline 35.The pressure sensor includes first Pressure sensor 2, second pressure sensor 4 and third pressure sensor 8, first pressure sensor 2 and second pressure sensor 4 The two sides of filter 3 are located at, for monitoring 3 inlet outlet pressure differential of filter, when the two pressure difference is more than setting value, system meeting Alarm, display filter 3 block.Third pressure sensor 8 is located at the side of temperature sensor 7, for monitoring cooler water inlet The pressure of pipe, temperature sensor 7 cooperates the 4th pressure sensor 10 for monitoring the pressure of the outer water entrance of cooler 31, when two When person's pressure difference is more than setting value, system be will call the police, and display cooler 31 blocks.
Embodiment 2, a kind of outer water circulation system of the TBM with automatic control, the outer circulation water outlet system include Water outlet main road 36, in water outlet main road 36 along water discharging direction be successively arranged the 4th pressure sensor 10, third pneumatic ball valve 12, First check valve 13 and first manual gate valve 14, the 4th pressure sensor 10 and third pressure sensor 8 are located at cooler Two sides, for monitoring the pressure of the outer water entrance of cooler 31, when the two pressure difference be more than setting value when, system will call the police, show Show that cooler 31 blocks.It is in parallel between third pneumatic ball valve 12 and first manual gate valve 14 to be equipped with warm water tank 16, warm up water tank 16 Inlet pipeline be equipped with the 4th pneumatic ball valve 15, by the opening and closing of the 4th pneumatic ball valve 15 realize toward warm up water tank in intake whether. In parallel on warm water tank 16 to be equipped with the first outlet system and the second outlet system, the first outlet system is sprayed water for cutterhead, and second goes out Water system is used for cutterhead water spray when the first outlet system failure and recycles for water outer over long distances.
Further, the water outlet main road 36 is connected by first manual gate valve 11 with water inlet main line 34, first-hand Dynamic gate valve 11 is between the 4th pressure sensor 10 and third pneumatic ball valve 12;First manual gate valve 11 is used to adjust outer water logical The uninterrupted of subcooler 31, and then control interior coolant-temperature gage.When interior coolant-temperature gage is high, first manual gate valve 11 is closed, outside Water all through subcooler 31 to interior water cooling but, when interior coolant-temperature gage is low, then by first manual gate valve 11 open certain opening, subtract Few outer water passes through the flow of cooler 31;I.e. by outer water enter cooler water number, control in water cooling temperature, it is convenient It is easy, convenient for control.The warm water tank 16 is equipped with liquid level sensor 22 and the 5th manual ball valve 27;Liquid level sensor is used to supervise The liquid level for surveying warm water tank 22, when in alarm liquid level hereinafter, opening the 4th pneumatic ball valve 15, outer water enters warm water level in warm water tank 22 Water tank 22;When water level closes the 4th pneumatic ball valve 15 more than alarm liquid level in warm water tank 22, outer water does not enter back into warm water tank 22.
Further, first outlet system includes the first outlet pipeline 37, and the first outlet pipeline 37 is connected to cutterhead spray Water lines set gradually first manual ball valve 26, booster pump 25, pressure gauge 23 and along water discharging direction on the first outlet pipeline 37 Two check valves 24, first manual ball valve 26 is opened and closed the on-off of real first outlet pipeline, after the water of warm water tank is pressurized by booster pump 25 It is delivered to cutterhead water spray and cleaning water lines by second one-way valve 24, the secondary use of outer water is realized, reduces waste.First goes out In parallel in water lines 37 to be equipped with the second manual gate valve 21, the second manual gate valve 21 is used to adjust the outlet pressure of booster pump 25.Institute Stating the second outlet system includes the second outlet pipeline 38, and the second outlet pipeline 38 is connected to water outlet main road 36, can be used for it is long away from It is recycled from outer water.The second manual ball valve 17, back water pump 18, pressure gauge 19 are successively arranged along water discharging direction on second outlet pipeline 38 With third check valve 20, back water pump becomes 18 as variable frequency pump, is on the one hand used to return water, on the other hand when booster pump 25 breaks down When, by closing third manual ball valve 29, it can be used to rush to work as booster pump, guarantee that system operates normally.In water outlet main road 36 Equipped with water return pipeline 39, water return pipeline 39 is connected with the second outlet pipeline 38 by water outlet main road, and water return pipeline 39 connects It passes to cutterhead water pipe, is successively arranged the 4th check valve 30, third manual ball valve along water discharging direction on the water return pipeline 39 29 and the 4th manual ball valve 28, the 4th manual ball valve 28 be connected with detergent line, when booster pump 25 breaks down, by beating Third manual ball valve 29 is opened, is sent after the water of warm water tank is pressurized to cutterhead and sprays water and clean water lines, realize the secondary benefit of outer water With reduction waste.
Embodiment 3, as shown in Figure 1, a kind of outer water round-robin method of outer water circulation system of TBM with automatic control, Include the following steps:
S1: when tunnel distance is short, the flow of flowmeter 1 is larger, when backwater distance is less than the H-Max of outer water pump: outer water warp Main line 34 of intaking enters cooler 31 and interior recirculated water carries out heat exchange, opens third pneumatic ball valve 12 and first manual gate valve 14, close back water pump 18 and third manual ball valve 29, outer water direct return water under the effect of outer water pump;
S2: when tunnel distance is longer, 1 flow of flowmeter is smaller, when backwater distance alreadys exceed the H-Max of outer water pump, outer water Enter cooler 31 through water inlet main line 34 and interior recirculated water carries out heat exchange, opens the 4th pneumatic ball valve 15, the second manual ball Valve 17, back water pump 18 and first manual gate valve 14 close third pneumatic ball valve 12 and third manual ball valve 29, adjust back water pump 18 Flow realize the flow matches of back water pump 18 and outer water pump, outer water back water pump 18 and under the action of outer water pump through warm water tank reality Now flow back.
In step S1 and step S2, when interior water temperature sensor detects that interior coolant-temperature gage is lower, first manual is opened Gate valve 11, a part of water in water main line 34 flow into water outlet main road 34, and the flow that outer water enters cooler 34 is reduced, outside Water and interior hydrothermal exchange are reduced;When interior coolant-temperature gage meter detects that interior coolant-temperature gage is higher, first manual gate valve 11, water supervisor are closed Outer water in road 34 fully enters cooler 34, and the flow that outer water enters cooler 34 increases, and Wai Shui and interior hydrothermal exchange increase, And then coolant-temperature gage in adjusting.Interior water temperature sensor is basic configuration in interior water circulation system, identical as being arranged in the prior art.
In step S1 and step S2, when flowmeter 1 is detected it is more into the water in water main line 34 when, open first Manual gate valve 11, a part of water in water main line 34 flow into water outlet main road 34, adjust outer stream of the water through subcooler 34 Amount, and then adjust interior coolant-temperature gage.Flow of the outer water through subcooler 31 can be controlled by controlling first manual gate valve 11, into And coolant-temperature gage in adjusting, interior coolant-temperature gage it is low when, manual gate valve 11 is opened greatly;Conversely, opening small.
Needed in step S1 and step S2 to cutterhead spray water the following steps are included:
S1.1: under normal circumstances, when needing to spray water to cutterhead, first manual ball valve 26 and booster pump 25 is opened, warms up water tank 16 In water through the first outlet pipeline 37 enter cutterhead water pipe;
S1.2: when booster pump 25 breaks down, third manual ball valve 29, back water pump 18 and the second manual ball valve 17 are opened, is led to The outlet pressure that first manual gate valve 14 adjusts back water pump 18 is overregulated, warm up the water in water tank 16 through the second outlet pipeline 38 and is returned Water lines 39 enter cutterhead water pipe.
Other structures are same as Example 2.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (13)

1. a kind of outer water circulation system of TBM with automatic control, it is characterised in that: including cooler (31), cooler (31) be connected with outer circulation water water inlet system and outer circulation water outlet system on, and cooler (31) respectively with interior circulation water inlet pipe (32), interior circulating water outlet pipe (33) is connected.
2. outer water circulation system of the TBM according to claim 1 with automatic control, it is characterised in that: followed outside described Ring water water inlet system include water inlet main line (34), water inlet main line (34) on series connection be equipped with flowmeter (1), pressure sensor, Filter (3) and temperature sensor (7), it is in parallel in water inlet main line (34) to be equipped with refrigeration pipeline (35), on refrigeration pipeline (35) Equipped with cooling assembly (6).
3. outer water circulation system of the TBM according to claim 2 with automatic control, it is characterised in that: the water inlet Main line (34) is equipped with the first pneumatic ball valve (9), and refrigeration pipeline (35) is equipped with the second pneumatic ball valve (5), the first Pneumatic ball Valve (9) and the second pneumatic ball valve (5) are arranged in parallel;The filter (3) is located on the inlet pipeline of refrigeration pipeline (35), temperature Sensor (7) is located on the outlet pipeline of refrigeration pipeline (35).
4. outer water circulation system of the TBM according to claim 3 with automatic control, it is characterised in that: the pressure Sensor includes first pressure sensor (2), second pressure sensor (4) and third pressure sensor (8), first pressure sensing Device (2) and second pressure sensor (4) are located at the two sides of filter (3), and third pressure sensor (8) is located at temperature sensing The side of device (7).
5. outer water circulation system of the TBM according to claim 1 or 4 with automatic control, it is characterised in that: described outer Recirculated water outlet system includes water outlet main road (36), is successively arranged the 4th pressure along water discharging direction in water outlet main road (36) and passes Sensor (10), third pneumatic ball valve (12), the first check valve (13) and first manual gate valve (14), third pneumatic ball valve (12) and In parallel between first manual gate valve (14) to be equipped with warm water tank (16), the inlet pipeline for warming up water tank (16) is equipped with the 4th pneumatic ball valve (15), it warms up in parallel equipped with the first outlet system and the second outlet system on water tank (16).
6. outer water circulation system of the TBM according to claim 5 with automatic control, it is characterised in that: the water outlet Main line (36) is connected by first manual gate valve (11) with water inlet main line (34), and first manual gate valve (11) is located at the 4th Between pressure sensor (10) and third pneumatic ball valve (12);The warm water tank (16) is equipped with liquid level sensor (22) and the 5th Manual ball valve (27).
7. outer water circulation system of the TBM according to claim 6 with automatic control, it is characterised in that: described first Outlet system includes the first outlet pipeline (37), and the first outlet pipeline (37) is connected to cutterhead water pipe, the first outlet pipeline (37) first manual ball valve (26), booster pump (25), pressure gauge (23) and second one-way valve are set gradually along water discharging direction on (24), in parallel on the first outlet pipeline (37) to be equipped with the second manual gate valve (21).
8. outer water circulation system of the TBM according to claim 6 or 7 with automatic control, it is characterised in that: described Two outlet systems include the second outlet pipeline (38), and the second outlet pipeline (38) is connected to water outlet main road (36), the second water outlet It is unidirectional that along water discharging direction the second manual ball valve (17), back water pump (18), pressure gauge (19) and third are successively arranged on pipeline (38) Valve (20), water outlet main road (36) are equipped with water return pipeline (39), and water return pipeline (39) is connected with the second outlet pipeline (38), And water return pipeline (39) is connected to cutterhead water pipe.
9. outer water circulation system of the TBM according to claim 8 with automatic control, it is characterised in that: the return water The 4th check valve (30), third manual ball valve (29) and the 4th manual ball valve are successively arranged along water discharging direction on pipeline (39) (28), the 4th manual ball valve (28) is connected with detergent line.
10. a kind of outer water round-robin method of outer water circulation system of TBM as described in claim 1 or 9 with automatic control, It is characterized by comprising following steps:
S1: when tunnel distance is short, the flow of flowmeter (1) is larger, when backwater distance is less than the H-Max of outer water pump: outer water Enter cooler (31) through water inlet main line (34) and interior recirculated water carries out heat exchange, opens third pneumatic ball valve (12) and first Manual gate valve (14) closes back water pump (18) and third manual ball valve (29), outer water direct return water under the effect of outer water pump;
S2: when tunnel distance is longer, flowmeter (1) flow is smaller, when backwater distance alreadys exceed the H-Max of outer water pump, outside Water enters cooler (31) and interior recirculated water through water inlet main line (34) and carries out heat exchange, opens the 4th pneumatic ball valve (15), the Two manual ball valves (17), back water pump (18) and first manual gate valve (14) close third pneumatic ball valve (12) and the manual ball of third Valve (29), the flow for adjusting back water pump (18) realize the flow matches of back water pump (18) and outer water pump, and outer water is in back water pump (18) It flows back with being realized under the action of outer water pump through warm water tank.
11. the outer water round-robin method of outer water circulation system of the TBM according to claim 10 with automatic control, special Sign is: in step S1 and step S2, when temperature sensor (7) detects that outer coolant-temperature gage is higher or outer coolant-temperature gage can not expire Foot is closed the first pneumatic ball valve (9) when requiring, and is opened the second pneumatic ball valve (5), outer water cooled down by refrigeration unit (6) after again Into cooler (31), internally water is cooled down.
12. the outer water round-robin method of outer water circulation system of the TBM according to claim 11 with automatic control, special Sign is: in step S1 and step S2, when interior water temperature sensor detects that interior coolant-temperature gage is lower, opening first manual lock Valve (11), a part of water in water main line (34) flow into water outlet main road (34), and outer water enters the flow of cooler (34) It reduces, Wai Shui and interior hydrothermal exchange are reduced;When interior coolant-temperature gage meter detects that interior coolant-temperature gage is higher, first manual gate valve is closed (11), the outer water in water main line (34) fully enters cooler (34), and the flow that outer water enters cooler (34) increases, outer water Increase with interior hydrothermal exchange, and then adjusts interior coolant-temperature gage.
13. the outer water circulation of outer water circulation system of 0 ~ 12 described in any item TBM with automatic control according to claim 1 Method, it is characterised in that: needed in step S1 and step S2 to cutterhead spray water the following steps are included:
S1.1: under normal circumstances, when needing to spray water to cutterhead, first manual ball valve (26) and booster pump (25) is opened, warms up water Water in case (16) enters cutterhead water pipe through the first outlet pipeline (37);
S1.2: when booster pump (25) breaks down, third manual ball valve (29), back water pump (18) and the second manual ball valve are opened (17), the outlet pressure of back water pump (18) is adjusted by adjusting first manual gate valve (14), warms up the water in water tank (16) through second Outlet pipeline (38) and water return pipeline (39) enter cutterhead water pipe.
CN201910757529.0A 2019-08-16 2019-08-16 External water circulation system with automatic control for TBM and external water circulation method Active CN110344840B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910757529.0A CN110344840B (en) 2019-08-16 2019-08-16 External water circulation system with automatic control for TBM and external water circulation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910757529.0A CN110344840B (en) 2019-08-16 2019-08-16 External water circulation system with automatic control for TBM and external water circulation method

Publications (2)

Publication Number Publication Date
CN110344840A true CN110344840A (en) 2019-10-18
CN110344840B CN110344840B (en) 2024-04-02

Family

ID=68185208

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910757529.0A Active CN110344840B (en) 2019-08-16 2019-08-16 External water circulation system with automatic control for TBM and external water circulation method

Country Status (1)

Country Link
CN (1) CN110344840B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111795587A (en) * 2020-07-21 2020-10-20 中铁工程装备集团有限公司 Water circulation system and working method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205895243U (en) * 2016-06-27 2017-01-18 中交一公局第三工程有限公司 Outer recirculating cooling water system of single shield TBM
CN106640113A (en) * 2017-03-06 2017-05-10 中铁十八局集团有限公司 Water delivery and cooling system used for TBM
CN206232415U (en) * 2016-12-03 2017-06-09 中国葛洲坝集团基础工程有限公司 A kind of shield machine outer circulation water installations for automatically switching
CN207469352U (en) * 2017-11-13 2018-06-08 中国水利水电第八工程局有限公司 Circulation in TBM
CN109029005A (en) * 2018-09-14 2018-12-18 中国铁建重工集团有限公司 Cooling system and development machine with the cooling system
CN109209416A (en) * 2018-11-16 2019-01-15 中国铁建重工集团有限公司 A kind of cutterhead spray water control system and hard rock tunnel development machine
CN109944598A (en) * 2019-04-19 2019-06-28 中铁工程装备集团有限公司 A kind of development machine circulation water cooling device
WO2019140962A1 (en) * 2018-01-16 2019-07-25 华为技术有限公司 Refrigeration system and control method and controller therefor
CN210440042U (en) * 2019-08-16 2020-05-01 中铁工程装备集团有限公司 TBM is with outer water circulating system who has automatic control

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205895243U (en) * 2016-06-27 2017-01-18 中交一公局第三工程有限公司 Outer recirculating cooling water system of single shield TBM
CN206232415U (en) * 2016-12-03 2017-06-09 中国葛洲坝集团基础工程有限公司 A kind of shield machine outer circulation water installations for automatically switching
CN106640113A (en) * 2017-03-06 2017-05-10 中铁十八局集团有限公司 Water delivery and cooling system used for TBM
CN207469352U (en) * 2017-11-13 2018-06-08 中国水利水电第八工程局有限公司 Circulation in TBM
WO2019140962A1 (en) * 2018-01-16 2019-07-25 华为技术有限公司 Refrigeration system and control method and controller therefor
CN109029005A (en) * 2018-09-14 2018-12-18 中国铁建重工集团有限公司 Cooling system and development machine with the cooling system
CN109209416A (en) * 2018-11-16 2019-01-15 中国铁建重工集团有限公司 A kind of cutterhead spray water control system and hard rock tunnel development machine
CN109944598A (en) * 2019-04-19 2019-06-28 中铁工程装备集团有限公司 A kind of development machine circulation water cooling device
CN210440042U (en) * 2019-08-16 2020-05-01 中铁工程装备集团有限公司 TBM is with outer water circulating system who has automatic control

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111795587A (en) * 2020-07-21 2020-10-20 中铁工程装备集团有限公司 Water circulation system and working method thereof

Also Published As

Publication number Publication date
CN110344840B (en) 2024-04-02

Similar Documents

Publication Publication Date Title
CN107587558B (en) Intelligent control system and method for fire-fighting, anti-freezing and water-supplying of highway tunnel in cold region
CN102619549B (en) Pressure-adjustable mine high- and low-pressure water energy exchange system
CN110344840A (en) Outer water circulation system and outer water round-robin method of the TBM with automatic control
CN205708212U (en) Oil storage tank cooling system
CN208793040U (en) A kind of distributing low-pressure drainage system suitable for the low-lying point of transit tunnel
US9739477B2 (en) Drainage collection system
CN109381830A (en) A kind of overlength vcehicular tunnel water rationing fire-fighting system and water supply fire-fighting method
CN116658831B (en) Intelligent drainage pipeline real-time monitoring and early warning system based on deep learning
CN207702638U (en) The cooling device of new wind cabinet
CN202736508U (en) Emergency water injection system of secondary side of nuclear power plant
CN107084310A (en) Petroleum vapor recovery floating ball one-way valve and device for recovering oil and gas
CN209596464U (en) A kind of overlength vcehicular tunnel water rationing fire-fighting system
CN104555878B (en) Tank vehicle unloading system
CN109798283A (en) One kind remotely controlling more relay protective scheme function central pumping stations
CN205975799U (en) Water supply pipe well with a plurality of suction pumps
CN210440042U (en) TBM is with outer water circulating system who has automatic control
CN208238301U (en) Cold water heat pump unit
CN206770966U (en) Petroleum vapor recovery floating ball one-way valve and device for recovering oil and gas
CN206904587U (en) Air supply system
CN220571206U (en) Intelligent drip irrigation system for central separated green belt of expressway
CN208038076U (en) A kind of filter device
KR100969557B1 (en) Ground source heat exchange system for controlling outward underground water
KR100958059B1 (en) Method for controlling outward underground water for ground source heat exchanger
CN216308278U (en) Heat source tower heat pump moisturizing system of preventing frostbite
JP6139752B1 (en) Drainage equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Liu Yongliang

Inventor after: Zhao Kangfeng

Inventor after: Wu Jun

Inventor after: Guo Fujun

Inventor after: Yu Peide

Inventor after: Zhu Tuanhui

Inventor after: Luo Hengxing

Inventor after: Hu Yanwei

Inventor after: Yao Jing

Inventor after: Li Donghui

Inventor before: Liu Yongliang

Inventor before: Guo Fujun

Inventor before: Yu Peide

Inventor before: Zhu Tuanhui

Inventor before: Luo Hengxing

Inventor before: Hu Yanwei

Inventor before: Yao Jing

Inventor before: Li Donghui

Inventor before: Zhao Kangfeng

GR01 Patent grant
GR01 Patent grant