CN110344601A - Leakage of buildings blocks new process - Google Patents
Leakage of buildings blocks new process Download PDFInfo
- Publication number
- CN110344601A CN110344601A CN201910471526.0A CN201910471526A CN110344601A CN 110344601 A CN110344601 A CN 110344601A CN 201910471526 A CN201910471526 A CN 201910471526A CN 110344601 A CN110344601 A CN 110344601A
- Authority
- CN
- China
- Prior art keywords
- leakage
- breakthrough
- buildings
- waterproof material
- new process
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0203—Arrangements for filling cracks or cavities in building constructions
Abstract
The present invention relates to leakage of buildings processing technology fields, specifically disclose leakage of buildings and block new process, include the following steps: that (1) prepares construction and needs material and tool;(2) back side leakage range and breakthrough confirmation are carried out;(3) spot and sundries in the breakthrough face having had confirmed that are made an overall screening;(4) leakage of buildings point is blocked using waterproof material;(5) lysimetric test is carried out again, checks closure site and checks to block whether leak except range simultaneously;(6) as occurred leaking again, increase waterproof material and pave area;(7) waterproof material to have paved in place crackle that may be present, gap are closed using sealant, eliminates breakthrough existing for confining bed.The present invention can be rapidly achieved expected plugging effect, and it is small to block thickness, the area that paves, and be conducive to save waterproof material.
Description
Technical field
The present invention relates to leakage of buildings processing technology fields.
Background technique
It is well known that concrete structure is there are a large amount of microcracks, thus concrete floor be with joint working, if this
A little cracking initiation through cracks, it is possible to concrete floor be caused to leak, it may be said that concrete floor leakage is currently civilian builds
One of common quality defect outstanding is built, which not only influences the sense organ of building, it can also shorten the service life of building, concerning
Fabric structure safety problem, it is necessary to cause the attention of the people.
As people constantly pursue quality of life, strict demand of the people to living environment is exacerbated, eliminates building
Very urgent task is leaked, however if carrying out leakage plugging in upstream face using traditional approach, such as slip casting is blocked, is brushed
The methods of water-repellent paint requires to remove original-pack layer of repairing before waterproofing and leakage-stopping, then to upstream face concrete into
Row leakage plugging, in this way construction drawback and disadvantage it is obvious that first remove the surface of a wound it is big, it is also big to structure failure mechanics, secondly waterproof
More using material when restoring after processing, maintenance cycle is long, and because of influence when removing finishing level to structure sheaf, easily leads to
Leak source displacement becomes more, so that waterproof quality is not easy to control after processing.
Summary of the invention
The purpose of the present invention is to provide leakage of buildings to block new process, to solve when upstream face carries out leakage plugging
It is big to structure failure mechanics, more using material when restoring after water-proofing treatment, the long problem of maintenance cycle.
In order to achieve the above object, base case of the invention provides leakage of buildings and blocks new process, including walks as follows
It is rapid:
(1) prepare construction and need material and tool;
(2) back side leakage range and breakthrough confirmation are carried out;
(3) spot and sundries in the breakthrough face having had confirmed that are made an overall screening;
(4) leakage of buildings point is blocked using waterproof material;
(5) lysimetric test is carried out again, checks closure site and checks to block whether leak except range simultaneously;
(6) as occurred leaking again, increase waterproof material and pave area;
(7) waterproof material to have paved in place crackle that may be present, gap are closed using sealant, eliminates envelope
Close breakthrough existing for layer.
Compared with prior art, the beneficial effects of the present invention are:
1, percolating water closure is carried out in back side, therefore, to former upstream face without dismounting, only carries out leakage envelope in back side
Stifled, speed of application is fast, and the period is short;To original structure layer without destruction, system easy to control the quality after waterproofing and leakage-stopping not will cause waste of material,
Change traditional architecture object leakage plugging mode and habit, when blocking efficiency on an equal basis, which can be rapidly achieved expected envelope
Stifled effect, and it is small to block thickness, the area that paves, and is conducive to save waterproof material.
2, in step (2) and step (4) breakthrough, range accurate positionin, help quickly and effectively to cut off leakage approach.
3, in backwater surface construction, the feature that speed is fast, the material solidification time is short, high-efficient, quality stability is good is especially suitable
Quick processing and the rush repair of the leakage of flooring pipe portion position, maintenance are leaked or worn for civil buildings concrete roof, flooring
Period is short.
Further, the material in the step (1) and tool are cloth waste and scoop.
Further, it in the step (2), needs to observe the confirmation for carrying out breakthrough and leaking range by worker.
Further, in the step (3), it need to ensure that joint surface is clean, smooth.
Further, in the step (7), the sealant is glass cement.Plastic film is formed after solidification, elasticity is good, no
Cracky.
Detailed description of the invention
Fig. 1 is the process flow chart of the embodiment of the present invention.
Specific embodiment
Below by the further details of explanation of specific embodiment:
Embodiment as shown in Figure 1, leakage of buildings block new process,
(1) prepare construction and need material and tool, material and tool are cloth waste and scoop;
(2) back side leakage range and breakthrough confirmation are carried out, progress breakthrough is observed by worker and leaks range
Confirmation;The accurate positionin of breakthrough, range helps quickly and effectively to cut off leakage approach, should when blocking efficiency on an equal basis
Technique can be rapidly achieved expected plugging effect, and it is small to block thickness, the area that paves, and be conducive to save waterproof material.In back side
Leak stopping (traditional handicraft is in upstream face leak stopping), construction method is simple, and material is extensive, cheap, and speed of application is fast, material solidification
Time is short, and work efficiency is high, reliable construction quality.
(3) spot and sundries in the breakthrough face having had confirmed that are made an overall screening;
(4) leakage of buildings point is blocked using waterproof material;
(5) carry out lysimetric test again, need to go through blocked waterproof material in place with the presence or absence of breakthrough or
Blocking whether also occur breakthrough other than range, check closure site and is checking to block whether seep except range simultaneously
Leakage, states the waterproof material blocked in place and such as there is breakthrough, illustrate that the waterproof material to pave there are breakthrough, needs to check booth
Thickness or area are spread, is reexamined until there is not leakage.
(6) check blocking other than range whether breakthrough also occur simultaneously, such as occur, need to increase waterproof material and pave
Area.
(7) waterproof material to have paved in place crackle that may be present, gap are closed using sealant, eliminates envelope
Close breakthrough existing for layer.Closed material sealant uses glass cement, it forms plastic film after solidifying, and elasticity is good, not fragile
Damage.Plugging material uses leak stopping king, because its quick solidifying, intensity are high, water-tolerant, good environmental adaptability.
Waterproofing and leakage-stopping is exactly the process of a pressure sealing, since waterproof material intensity itself can not solidify in a short time
It completes, under pressure water action, joint surface can constantly be broken through, and cause to leak, and therefore, waterproofing and leakage-stopping process generally requires to repeat
Repeatedly, until being finally reached joint surface and will not breaking through spilling by pressure water.
Percolating water closure is carried out in back side, changes traditional architecture object leakage plugging mode and habit, blocks effect same
In the case of energy, which can be rapidly achieved expected plugging effect, and it is small to block thickness, the area that paves, and be conducive to save waterproof material
Material.The accurate positionin of breakthrough, range in step (2) and step (4) helps quickly and effectively to cut off leakage approach.In backwater
Surface construction, the feature that speed is fast, the material solidification time is short, high-efficient, quality stability is good, especially suitable for civil buildings coagulation
Earth house face, flooring leakage or wear flooring pipe portion position leakage it is quick handle and rush repair, maintenance cycle it is short.
What has been described above is only an embodiment of the present invention, and the common sense such as well known specific structure and characteristic are not made herein in scheme
Excessive description.It, without departing from the structure of the invention, can be with it should be pointed out that for those skilled in the art
Several modifications and improvements are made, these also should be considered as protection scope of the present invention, these all will not influence what the present invention was implemented
Effect and patent practicability.The scope of protection required by this application should be based on the content of the claims, in specification
The records such as specific embodiment can be used for explaining the content of claim.
Claims (5)
1. leakage of buildings blocks new process, which comprises the steps of:
(1) prepare construction and need material and tool;
(2) back side leakage range and breakthrough confirmation are carried out;
(3) spot and sundries in the breakthrough face having had confirmed that are made an overall screening;
(4) leakage of buildings point is blocked using waterproof material;
(5) lysimetric test is carried out again, checks closure site and checks to block whether leak except range simultaneously;
(6) as occurred leaking again, increase waterproof material and pave area;
(7) waterproof material to have paved in place crackle that may be present, gap are closed using sealant, eliminates confining bed
Existing breakthrough.
2. leakage of buildings according to claim 1 blocks new process, which is characterized in that the material in the step (1)
And tool is cloth waste and scoop.
3. leakage of buildings according to claim 1 blocks new process, which is characterized in that in the step (2), need to lead to
It crosses worker and observes the confirmation for carrying out breakthrough and leaking range.
4. leakage of buildings according to claim 1 blocks new process, which is characterized in that in the step (3), need to ensure
Joint surface is clean, smooth.
5. leakage of buildings according to claim 1 blocks new process, which is characterized in that described close in the step (7)
Sealing is glass cement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910471526.0A CN110344601A (en) | 2019-05-31 | 2019-05-31 | Leakage of buildings blocks new process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910471526.0A CN110344601A (en) | 2019-05-31 | 2019-05-31 | Leakage of buildings blocks new process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110344601A true CN110344601A (en) | 2019-10-18 |
Family
ID=68174551
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910471526.0A Pending CN110344601A (en) | 2019-05-31 | 2019-05-31 | Leakage of buildings blocks new process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110344601A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10046442C1 (en) * | 2000-09-18 | 2002-05-02 | Erwin Strattner | Filling cracks in stone, comprises applying two-component sealant across the crack, piercing packer on sealant with hollow nail, allowing sealant to cure and injecting two component resin into the crack through the nail |
CN107023176A (en) * | 2017-03-29 | 2017-08-08 | 中铁十九局集团有限公司 | A kind of low pressure concrete structural cracks method for repairing and mending and device |
CN108374566A (en) * | 2018-02-06 | 2018-08-07 | 厦门防水博士建筑工程有限公司 | A kind of back side percolating water repairerment technique |
CN108412222A (en) * | 2018-03-13 | 2018-08-17 | 广西金雨伞防水装饰有限公司 | A kind of construction leakage internal maintenance waterproof layer structure and construction technology |
-
2019
- 2019-05-31 CN CN201910471526.0A patent/CN110344601A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10046442C1 (en) * | 2000-09-18 | 2002-05-02 | Erwin Strattner | Filling cracks in stone, comprises applying two-component sealant across the crack, piercing packer on sealant with hollow nail, allowing sealant to cure and injecting two component resin into the crack through the nail |
CN107023176A (en) * | 2017-03-29 | 2017-08-08 | 中铁十九局集团有限公司 | A kind of low pressure concrete structural cracks method for repairing and mending and device |
CN108374566A (en) * | 2018-02-06 | 2018-08-07 | 厦门防水博士建筑工程有限公司 | A kind of back side percolating water repairerment technique |
CN108412222A (en) * | 2018-03-13 | 2018-08-17 | 广西金雨伞防水装饰有限公司 | A kind of construction leakage internal maintenance waterproof layer structure and construction technology |
Non-Patent Citations (1)
Title |
---|
吴民: "《装修之前请你读》", 31 May 2002, 河北科学技术出版社 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106321121A (en) | Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works | |
CN112431990B (en) | Method for repairing trenchless coating lining of large-diameter drainage pipeline | |
CN106640154A (en) | Treatment method and structure for water seepage of tunnel lining circular construction joint crack | |
CN110762331A (en) | Local resin curing construction process for reconstruction and expansion of drainage pipe network | |
KR101804476B1 (en) | Waterproof complex repairing method of concrete structures | |
CN204676714U (en) | Water-stopping steel strip and construction joint structure | |
CN104153392A (en) | Underwater PBM polymer concrete construction method | |
CN110205988A (en) | It is a kind of to be discharged the dual water-stopping system and its construction technology that box culvert is connect with new and old | |
CN105819792B (en) | It is a kind of can the concrete of rapid shaping and the renovation technique at expansion joint | |
CN110344601A (en) | Leakage of buildings blocks new process | |
CN103206093B (en) | Leakage repairing and preventing method for roof settlement joint | |
CN105839522B (en) | A kind of sealant of bridge extension joint saves construction method from damage | |
CN113005997A (en) | Leakage blocking technology for preventing seawater corrosion | |
CN112195970A (en) | River-crossing tunnel engineering waterproof construction method | |
CN110748015A (en) | Novel waterproof structure of toilet and construction process thereof | |
CN109779287A (en) | Microdilatancy water-proof emulsion construction technology | |
RU2669302C1 (en) | Method of repair and sealing of damage in concrete facings of channels | |
CN108221715A (en) | A kind of renovation technique of bridge pavement | |
CN211037568U (en) | Plant vegetation roof waterproof construction | |
CN113982624A (en) | Tunnel water leakage disease treatment method | |
Dimmock et al. | Spray applied waterproofing membranes–key success factors and development of efficient sprayed concrete tunnel linings | |
CN110670894A (en) | Concrete rapid leaking stoppage system and construction process thereof | |
KR100623427B1 (en) | Method of repairing and coating exterior panels of metal of a building | |
KR102472265B1 (en) | Non-excavation sewage conduit repairing method using the underwater non-segregation concrete | |
CN211776003U (en) | Quick leaking stoppage system of concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191018 |