CN110328743A - A kind of precast beam end installation mold and its construction method - Google Patents

A kind of precast beam end installation mold and its construction method Download PDF

Info

Publication number
CN110328743A
CN110328743A CN201910713673.4A CN201910713673A CN110328743A CN 110328743 A CN110328743 A CN 110328743A CN 201910713673 A CN201910713673 A CN 201910713673A CN 110328743 A CN110328743 A CN 110328743A
Authority
CN
China
Prior art keywords
gusset
template
side template
precast beam
installation mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910713673.4A
Other languages
Chinese (zh)
Inventor
吴荣坤
范庆祥
洪小飞
黄国良
苏国龙
王峰清
陈华滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Province Longcheng Construction Industry Co Ltd
Original Assignee
Fujian Province Longcheng Construction Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Province Longcheng Construction Industry Co Ltd filed Critical Fujian Province Longcheng Construction Industry Co Ltd
Priority to CN201910713673.4A priority Critical patent/CN110328743A/en
Publication of CN110328743A publication Critical patent/CN110328743A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • B28B7/0014Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/26Assemblies of separate moulds, i.e. of moulds or moulding space units, each forming a complete mould or moulding space unit independently from each other
    • B28B7/266Assemblies of separate moulds, i.e. of moulds or moulding space units, each forming a complete mould or moulding space unit independently from each other for making oblong objects, e.g. girders

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The invention discloses a kind of precast beam end installation mold and its construction methods, belong to building field, precast beam end installation mold, two go out the both ends that muscle Side Template is separately fixed at lower template, the side wall that the both ends of side template go out muscle Side Template with two respectively is fixedly connected, it is fixedly connected between the upper end of two side templates by multiple connectors, above the card slot end of gusset and the card convex end of lower gusset out are mutually clamped out, and U-type groove fits with upper gusset out.Correspondingly, the invention also discloses the construction methods for precast beam end installation mold.Precast beam end disclosed by the invention installation mold and its construction method facilitate the dismounting of mold, limit the shaking displacement of reinforcement component, reduce concrete flash, more clean and environmental protection.By the construction method, make user in the work progress of production PC precast beam, the assembly construction process of mold is known more about, avoid the occurrence of violence demoulding problem, extends die life.

Description

A kind of precast beam end installation mold and its construction method
Technical field
The present invention relates to building field more particularly to a kind of precast beam end installation mold and its construction methods.
Background technique
Traditional beam-ends head mold must open big hole in muscle position out for convenience of demoulding, and when demoulding along reinforcing bar outward It is de-, cause concrete to overflow because aperture is excessive more, and if reinforcing bar go out to often result in out muscle when muscle does not pay attention into V-type, demoulding is made At difficulty, mold attaching/detaching is inconvenient, and through die-filling demoulding operation repeatedly several times, the long-term punching block that taps leads to die deformation, causes to generate Violence demoulding influences component quality, and shortens die life.There is a method in which end directly leave under U slot, It installs after steel reinforcement cage using the stifled slurry of foam, occurs foam often and shaken that a large amount of concrete is caused to flow out out, cause a large amount of in die station Concrete is to be solidified, brings difficulty to production, and waste of resource causes building waste, pollutes environment, and influence component appearance, long Phase, which taps cleaning punching block, leads to die deformation, shortens die life.
Summary of the invention
In order to overcome the drawbacks of the prior art, technical problem to be solved by the present invention lies in propose a kind of precast beam end Installation mold, the split type reinforcing plate structure out using upper gusset out and lower gusset out facilitate mold in conjunction with card slot and card convex structure Dismounting, avoid violence demoulding, and by opening up U-type groove, location and installation carried out to steel reinforcement cage convenient for mold, limits reinforcement component Shaking displacement, reduce concrete and occur the phenomenon that going out the outside overflow in muscle gap from U-type groove, avoid building waste, from And more clean and environmental protection.
With this corresponding, another technical problem to be solved of the invention is to propose a kind of for the installation of precast beam end The construction method of mold, user make user in the work progress of production PC precast beam, to the dress of mold by the construction method It is known more about with construction process, avoids the occurrence of violence demoulding problem, extend die life.
To achieve this purpose, the present invention adopts the following technical scheme:
A kind of precast beam end installation mold provided by the invention, including two go out muscle Side Template, two side templates, lower dies Plate and multiple connectors, two go out the both ends that muscle Side Template is separately fixed at lower template, and two side templates are separately fixed at down The two sides of template, and the side wall that the both ends of side template go out muscle Side Template with two respectively is fixedly connected, the upper end of two side templates Be fixedly connected between portion by multiple connectors, out muscle Side Template include it is upper go out gusset and it is lower go out gusset, the upper card of gusset out Slot end and it is lower go out gusset card convex end be mutually clamped, it is lower go out gusset on offer the U-type groove of perforation, the open end of U-type groove and it is upper go out The lower end of gusset fits, and lower gusset out is fixed on the end of lower template.
The present invention preferably technical solution is that above two side bottoms of gusset offer card slot out, the two sides of lower gusset out Top is equipped with card convex, and card slot is mutually clamped with card convex.
The present invention preferably technical solution is that card slot is configured to trapezoidal card slot, and card convex is configured to trapezoidal card convex, trapezoidal card Slot is adapted with trapezoidal card convex.
The present invention preferably technical solution is, above offers the upper gusset peace out of perforation on the two sidewalls of gusset respectively out Hole is filled, offers the first mounting hole of side template of perforation on the both ends of side template respectively, above gusset mounting hole and side template the out One mounting hole is adapted.
The present invention preferably technical solution is, offers the lower gusset peace out of perforation on the lower two sidewalls of gusset out respectively Fill hole, offer the second mounting hole of side template of perforation on the both ends of side template respectively, it is lower go out gusset mounting hole and side template the Two mounting holes are adapted.
The present invention preferably technical solution is that side template is equipped with the cross reinforcing of horizontal cross distribution, side template It is equipped with the waling of vertical genesis analysis, cross reinforcing is interspersed with waling.
The present invention preferably technical solution is, connector includes connecting square pipes and two connection sheets, connecting square pipes Both ends are separately fixed in two connection sheets, and connection sheet is fixed on side template.
The present invention preferably technical solution is, the both ends of connection sheet open up that there are two the connection sheets being symmetric respectively Mounting hole.
A kind of construction method for precast beam end installation mold provided by the invention, the construction method include following step Rapid: step 1 is separately fixed on the both ends of lower template, step 2, after executing step 1, in lower template by gusset is gone out under two The muscle end that goes out of upper placement steel reinforcement cage, steel reinforcement cage passes through U-type groove, and step 3 after executing step 2, places on lower gusset out Gusset, and the card slot end of gusset out and the card convex end of lower gusset out is made mutually to be clamped fastening, and being fastenedly connected by pin, make The card convex end realization of the upper card slot end of gusset out and lower gusset out is fitted close, step 4, after execution step 3, by side template Both ends respectively with it is upper go out gusset and it is lower go out gusset hole location be aligned, lock bolt and realize positioning fastening, while by side form Plate and lower template are realized by bolt positions fastening, and step 5 after executing step 4, is led between the upper end of two side templates Multiple connectors are crossed to be fastenedly connected.
The present invention preferably technical solution is that the cell wall of U-type groove and the width of steel reinforcement cage gone out between muscle end are not more than 5mm。
The invention has the benefit that
Precast beam end provided by the invention installation mold, including two go out muscle Side Template, two side templates, lower template with And multiple connectors, two go out the both ends that muscle Side Template is separately fixed at lower template, and two side templates are separately fixed at lower template Two sides, and the side wall that the both ends of side template go out muscle Side Template with two respectively is fixedly connected, the upper ends of two side templates it Between be fixedly connected by multiple connectors, out muscle Side Template include it is upper go out gusset and it is lower go out gusset, the upper card slot end of gusset out It is mutually clamped with the card convex end of lower gusset out, the U-type groove of perforation, the open end of U-type groove and upper gusset out is offered on lower gusset out Lower end fit, it is lower go out gusset be fixed on the end of lower template.Compared to the integrally-built muscle out for reserving muscle hole For plate, using the split type reinforcing plate structure out of upper gusset out and lower gusset out, convenient for the location and installation of steel reinforcement cage.U-type groove pair The muscle end that goes out of steel reinforcement cage is limited, and is limited the shaking displacement of reinforcement component, is kept component pouring molding effect more preferable.And U-type groove Through-hole processing is compared in processing, and processing is more simple and convenient, facilitates the size according to different steel reinforcement cages, adjusts build-up tolerance surplus, Make to assemble that location dimension is more accurate, reduces concrete and occur the phenomenon that going out the outside overflow in muscle gap from U-type groove, avoid building Building refuse, thus more clean and environmental protection.Provided by the present invention for the construction method of precast beam end installation mold, applied by this Work method makes user in the work progress of production PC precast beam, knows more about to the assembly construction process of mold, avoids the occurrence of sudden and violent Power demoulding problem extends die life.
Detailed description of the invention
Fig. 1 is the overall structure axonometric drawing of the precast beam end installation mold provided in the specific embodiment of the invention;
Fig. 2 is the schematic enlarged-scale view of the precast beam end installation mold of part A in Fig. 1;
Fig. 3 is the structural schematic diagram of the muscle Side Template out provided in the specific embodiment of the invention;
Fig. 4 is the muscle Side Template structural schematic diagram compatible with steel reinforcement cage out provided in the specific embodiment of the invention;
Fig. 5 is the construction of the construction method for precast beam end installation mold provided in the specific embodiment of the invention Flow diagram.
In figure:
1, go out muscle Side Template;11, above go out gusset;111, card slot;112, above go out gusset mounting hole;12, go out gusset down;121, U-type groove;122, card convex;123, go out gusset mounting hole down;2, side template;21, the first mounting hole of side template;22, side template second Mounting hole;23, cross reinforcing;24, waling;3, lower template;4, connector;41, connecting square pipes;42, connection sheet; 421, connection sheet mounting hole;5, steel reinforcement cage;S1, step 1;S2, step 2;S3, step 3;S4, step 4;S5, step 5.
Specific embodiment
To further illustrate the technical scheme of the present invention below with reference to the accompanying drawings and specific embodiments.
Embodiment one
As shown in Figures 1 to 4, a kind of precast beam end installation mold provided in embodiment one, including two go out muscle end 1, two side template 2 of template, lower template 3 and multiple connectors 4, two go out muscle Side Template 1 and are separately fixed at the two of lower template 3 End, two side templates 2 are separately fixed at the two sides of lower template 3, and the both ends of side template 2 go out muscle Side Template 1 with two respectively Side wall is fixedly connected, and is fixedly connected between the upper end of two side templates 2 by multiple connectors 4, and muscle Side Template 1 includes upper out Gusset 11 and lower gusset 12 out out, above the card slot end of gusset 11 and the card convex end of lower gusset 12 out are mutually clamped out, lower gusset out Offer the U-type groove 121 of perforation on 12, the open end of U-type groove 121 and it is upper go out gusset 11 lower end fit, it is lower go out gusset 12 are fixed on the end of lower template 3.In order to make, precast beam end installation mold is easy to loading and unloading, safety easy to operate.Further Ground, above the card slot end of gusset 11 and the card convex end of lower gusset 12 out are mutually clamped out, convenient for the installation and removal of mold.Go out gusset down 12 need to place steel reinforcement cage 5 in the installation process of mold by opening up the U-type groove 121 of perforation, at this point, steel reinforcement cage 5 goes out After muscle end passes through U-type groove 121, is placed on the open end of U-type groove 121 and gusset 11, make the lower end phase of gusset 11 out Fitting, to realize the location and installation of steel reinforcement cage 5, installation and removal process is simple and convenient, avoids violence demoulding.Compared to reserved Out for the integrally-built gusset out in muscle hole, using the split type reinforcing plate structure out of upper gusset 11 out and lower gusset 12 out, just In the location and installation of steel reinforcement cage 5.U-type groove 121 limits the muscle end that goes out of steel reinforcement cage 5, limits the shaking displacement of reinforcement component, Keep component pouring molding effect more preferable.And through-hole processing is compared in the processing of U-type groove 121, processing is more simple and convenient, facilitates according to difference Steel reinforcement cage 5 size, adjust build-up tolerance surplus, it is more accurate to make to assemble location dimension, reduces concrete from U-type groove 121 The phenomenon that outside overflow in muscle gap, occurs out, building waste is avoided, thus more clean and environmental protection.Meanwhile it preventing more The problem of secondary concrete flash tapped on cleaning mold leads to die deformation, extend die life.
In order to keep gusset 11 out and the assembly of lower gusset 12 out more accurate.Further, the upper two sides bottom of gusset 11 out Portion offers card slot 111, and two lateral roofs of lower gusset 12 out are equipped with card convex 122, and card slot 111 and 122 phase of card convex are clamped.Pass through card It is limited mutually between slot 111 and card convex 122, keeps gusset 11 out and the assembly of lower gusset 12 out more accurate.
In order to keep card slot 111 and the assembling process of card convex 122 more simple and effective, strong operability.Further, card slot 111 are configured to trapezoidal card slot, and card convex 122 is configured to trapezoidal card convex, and trapezoidal card slot is adapted with trapezoidal card convex.Wherein, card slot 111 It is set as trapezium structure, card slot 111 and the square structure equidistant according to cell wall of card convex 122 with card convex 122, then is easy because of tolerance It is stuck in card slot 111 or hard to fit into assembly problems such as positions to there is card convex 122 for problem.Therefore, card slot 111 and card convex 122 It is all made of trapezium structure, for the square structure equidistant compared to cell wall, the cell wall of the trapezium structure size inside by opening It is gradually reduced, facilitates the installation and removal of card slot 111 Yu card convex 122, keep card slot 111 and the assembling process of card convex 122 simpler Effectively, strong operability.
Location and installation is carried out for the ease of upper gusset 11 out and side template 2.Further, above out on the two sidewalls of gusset 11 The upper gusset mounting hole 112 out of perforation is offered respectively, and the side template first for offering perforation on the both ends of side template 2 respectively is pacified Hole 21 is filled, above gusset mounting hole 112 is adapted with the first mounting hole of side template 21 out.By going out gusset mounting hole 112 in setting And the first mounting hole of side template 21, by it is upper go out after gusset mounting hole 112 is aligned with the first mounting hole of side template 21, use Bolt passes through the hole location of alignment, and gusset 11 out and side template 2 is made to realize location and installation.By the above process, convenient for upper muscle out Plate 11 and side template 2 carry out location and installation.
Location and installation is carried out for the ease of lower gusset 12 out and side template 2.Further, on the lower two sidewalls of gusset 12 out The lower gusset mounting hole 123 out of perforation is offered respectively, and the side template second for offering perforation on the both ends of side template 2 respectively is pacified Hole 22 is filled, lower gusset mounting hole 123 out is adapted with the second mounting hole of side template 22.By the way that lower gusset mounting hole 123 out is arranged And the second mounting hole of side template 22, by it is lower go out after gusset mounting hole 123 is aligned with the second mounting hole of side template 22, use Bolt passes through the hole location of alignment, and lower gusset 12 out and side template 2 is made to realize location and installation.By the above process, convenient for lower muscle out Plate 12 and side template 2 carry out location and installation.
In order to improve the intensity of side template 2.Further, side template 2 is equipped with the cross reinforcing of horizontal cross distribution 23, side template 2 is equipped with the waling 24 of vertical genesis analysis, and cross reinforcing 23 and waling 24 staggeredly divide Cloth.By setting cross reinforcing 23 and waling 24, the intensity of side template 2 can be improved.
In order to make connector 4 can connect side template 2, and facilitate processing and manufacturing.Further, connector 4 includes connection Square tube 41 and two connection sheets 42, the both ends of connecting square pipes 41 are separately fixed in two connection sheets 42, and connection sheet 42 is fixed On side template 2.Using connecting square pipes 41 and the structure of connection sheet 42, not only connection effectively can be played to side template 2 Fastening effect, and structure is simple, manufacture easy to process, saves production cost.
Positioning assembly is carried out for the ease of connection sheet 42.Further, the both ends of connection sheet 42 are opened up respectively there are two being in Symmetrical connection sheet mounting hole 421.By opening up connection sheet mounting hole 421, when assembly by connection sheet mounting hole 421 with Described point at installation position on side template 2 carries out hole location alignment, carries out positioning assembly convenient for connection sheet 42 and side template 2.
Embodiment two
As shown in figure 5, a kind of construction method for precast beam end installation mold provided in embodiment two, in order to make User knows more about the assembly construction process of mold, avoids the occurrence of violence demoulding and ask in the work progress of production PC precast beam Topic extends die life.Further, which includes the following steps: step 1 S1, and gusset 12 will be gone out under two It is separately fixed on the both ends of lower template 3, step 2 S2, after executing step 1 S1, steel reinforcement cage 5, reinforcing bar is placed in lower template 3 The muscle end that goes out of cage 5 passes through U-type groove 121, and step 3 S3 after executing step 2 S2, is placed on lower gusset 12 out and gusset 11, And the card slot end of gusset 11 out and the card convex end of lower gusset 12 out is made mutually to be clamped fastening, and being fastenedly connected by pin, make The card convex end realization of the upper card slot end of gusset 11 out and lower gusset 12 out is fitted close, step 4 S4, will after execution step 3 S3 The both ends of side template 2 are aligned with the hole location of upper gusset 11 out and lower gusset 12 out respectively, are locked bolt and are realized positioning tightly Gu while side template 2 and lower template 3 are realized positioning fastening, step 5 S5, after executing step 4 S4, at two by bolt It is fastenedly connected between the upper end of side template 2 by multiple connectors 4.By above-mentioned construction method, producing user In the work progress of PC precast beam, the assembly construction process of mold is known more about, avoids the occurrence of violence demoulding problem, extends mold Service life.
In order to reduce concrete flash problem.Further, between the muscle end out of the cell wall and steel reinforcement cage 5 of U-type groove 121 Width is not more than 5mm.The cell wall of U-type groove 121 and the surplus of steel reinforcement cage 5 gone out between muscle end are smaller, can effectively reduce coagulation Soil occurs the phenomenon that going out the outside overflow in muscle gap from U-type groove 121, building waste is avoided, thus more clean and environmental protection.
The present invention is described with reference to the preferred embodiments, and those skilled in the art know, of the invention not departing from In the case where spirit and scope, various changes or equivalence replacement can be carried out to these features and embodiment.The present invention is not by this The limitation of specific embodiment disclosed in place, other embodiments fallen into claims hereof belong to protection of the present invention Range.

Claims (10)

1. a kind of precast beam end installation mold, including two go out muscle Side Template (1), two side templates (2), lower template (3) with And multiple connectors (4), the both ends that muscle Side Template (1) is separately fixed at the lower template (3), two sides are gone out described in two Template (2) is separately fixed at the two sides of the lower template (3), and the both ends of the side template (2) respectively with go out muscle described in two The side wall of Side Template (1) is fixedly connected, solid by multiple connectors (4) between the upper end of two side templates (2) Fixed connection, it is characterised in that:
Muscle Side Template (1) out includes upper gusset (11) out and goes out gusset (12) down;
The card convex end of the upper card slot end of gusset (11) out and lower gusset (12) out is mutually clamped;
The U-type groove (121) of perforation is offered on lower gusset (12) out;
The open end of the U-type groove (121) and the lower end of upper gusset (11) out fit;
Lower gusset (12) out are fixed on the end of the lower template (3).
2. precast beam end according to claim 1 installation mold, it is characterised in that:
Two side bottoms of upper gusset (11) out offer card slot (111);
Two lateral roofs of lower gusset (12) out are equipped with card convex (122);
The card slot (111) is mutually clamped with the card convex (122).
3. precast beam end according to claim 2 installation mold, it is characterised in that:
The card slot (111) is configured to trapezoidal card slot;
The card convex (122) is configured to trapezoidal card convex;
The trapezoidal card slot is adapted with the trapezoidal card convex.
4. precast beam end according to claim 1 installation mold, it is characterised in that:
It is described it is upper go out gusset (11) two sidewalls on offer respectively perforation it is upper go out gusset mounting hole (112);
The first mounting hole of side template (21) of perforation is offered on the both ends of the side template (2) respectively;
Upper gusset mounting hole (112) out are adapted with first mounting hole of side template (21).
5. precast beam end according to claim 1 installation mold, it is characterised in that:
It is described it is lower go out gusset (12) two sidewalls on offer respectively perforation it is lower go out gusset mounting hole (123);
The second mounting hole of side template (22) of perforation is offered on the both ends of the side template (2) respectively;
Lower gusset mounting hole (123) out are adapted with second mounting hole of side template (22).
6. precast beam end according to claim 1 installation mold, it is characterised in that:
The side template (2) is equipped with the cross reinforcing (23) of horizontal cross distribution;
The side template (2) is equipped with the waling (24) of vertical genesis analysis;
The cross reinforcing (23) is interspersed with the waling (24).
7. precast beam end according to claim 1 installation mold, it is characterised in that:
The connector (4) includes connecting square pipes (41) and two connection sheets (42);
The both ends of the connecting square pipes (41) are separately fixed on two connection sheets (42);
The connection sheet (42) is fixed on the side template (2).
8. precast beam end according to claim 7 installation mold, it is characterised in that:
The both ends of the connection sheet (42) open up that there are two the connection sheet mounting holes (421) that are symmetric respectively.
9. a kind of construction method for precast beam end installation mold described in any one of claims 1 to 8, feature exist In: the construction method includes the following steps:
Two lower gusset (12) out are separately fixed on the both ends of the lower template (3) by step 1 (S1);
Step 2 (S2) after executing the step 1 (S1), places steel reinforcement cage (5) on the lower template (3), the steel reinforcement cage (5) the muscle end that goes out passes through the U-type groove (121);
Step 3 (S3) after executing the step 2 (S2), goes out on gusset (12) to place on described down out gusset (11) described, And the card convex end of the upper card slot end of gusset (11) out and lower gusset (12) out is set mutually to be clamped fastening, and pass through pin It is fastenedly connected, the card convex end of the upper card slot end of gusset (11) out and lower gusset (12) out is made to realize tight fit;
The both ends of the side template (2) after executing the step 3 (S3), are above gone out gusset with described respectively by step 4 (S4) (11) and it is described it is lower go out gusset (12) hole location be aligned, lock bolt and realize positioning fastening, while by the side template (2) positioning fastening is realized by bolt with the lower template (3);
Step 5 (S5) after executing the step 4 (S4), passes through multiple institutes between the upper end of two side templates (2) Connector (4) is stated to be fastenedly connected.
10. construction method according to claim 9, it is characterised in that:
The cell wall of the U-type groove (121) and the width of the steel reinforcement cage (5) gone out between muscle end are not more than 5mm.
CN201910713673.4A 2019-08-02 2019-08-02 A kind of precast beam end installation mold and its construction method Pending CN110328743A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910713673.4A CN110328743A (en) 2019-08-02 2019-08-02 A kind of precast beam end installation mold and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910713673.4A CN110328743A (en) 2019-08-02 2019-08-02 A kind of precast beam end installation mold and its construction method

Publications (1)

Publication Number Publication Date
CN110328743A true CN110328743A (en) 2019-10-15

Family

ID=68148602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910713673.4A Pending CN110328743A (en) 2019-08-02 2019-08-02 A kind of precast beam end installation mold and its construction method

Country Status (1)

Country Link
CN (1) CN110328743A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113183291A (en) * 2021-05-13 2021-07-30 中建一局集团建设发展有限公司 End plate for precast beam column mould with difficulty in throwing ribs and using method of end plate

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090123388A (en) * 2008-05-28 2009-12-02 주식회사 대흥 Mold for manufacturing pc beam
CN105773833A (en) * 2016-03-25 2016-07-20 陈芳斌 T-shaped sheet pile forming die and production of T-shaped sheet piles
KR101705270B1 (en) * 2016-07-26 2017-02-10 주식회사베스트엔지니어링 A variable beam mold for manufacturing a precast concrete
AU2015322424A1 (en) * 2014-09-23 2017-04-06 Hae Young Park Prefabricated mold for constructing kerb stones and method for constructing kerb stones by using same
CN107571391A (en) * 2017-10-25 2018-01-12 长沙远大住宅工业集团股份有限公司 Composite beam particular manufacturing craft and composite beam production method
CN107584635A (en) * 2017-09-13 2018-01-16 长沙远大住宅工业集团股份有限公司 A kind of template for concrete prefabricated element shaping
CN207327246U (en) * 2017-08-31 2018-05-08 广东广达建设集团有限公司 A kind of precast beam molding die
CN108060804A (en) * 2017-12-25 2018-05-22 中国化学工程第三建设有限公司 The installation method of steel construction indirect cool tower peripheral protective aluminium sheet
CN109318347A (en) * 2018-11-15 2019-02-12 长沙英平机械制造有限责任公司 Beam column mold
CN110027093A (en) * 2019-04-19 2019-07-19 锦萧建筑科技有限公司 A kind of production technology of the composable mold and application of doubles the beam column composable mold

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090123388A (en) * 2008-05-28 2009-12-02 주식회사 대흥 Mold for manufacturing pc beam
AU2015322424A1 (en) * 2014-09-23 2017-04-06 Hae Young Park Prefabricated mold for constructing kerb stones and method for constructing kerb stones by using same
CN105773833A (en) * 2016-03-25 2016-07-20 陈芳斌 T-shaped sheet pile forming die and production of T-shaped sheet piles
KR101705270B1 (en) * 2016-07-26 2017-02-10 주식회사베스트엔지니어링 A variable beam mold for manufacturing a precast concrete
CN207327246U (en) * 2017-08-31 2018-05-08 广东广达建设集团有限公司 A kind of precast beam molding die
CN107584635A (en) * 2017-09-13 2018-01-16 长沙远大住宅工业集团股份有限公司 A kind of template for concrete prefabricated element shaping
CN107571391A (en) * 2017-10-25 2018-01-12 长沙远大住宅工业集团股份有限公司 Composite beam particular manufacturing craft and composite beam production method
CN108060804A (en) * 2017-12-25 2018-05-22 中国化学工程第三建设有限公司 The installation method of steel construction indirect cool tower peripheral protective aluminium sheet
CN109318347A (en) * 2018-11-15 2019-02-12 长沙英平机械制造有限责任公司 Beam column mold
CN110027093A (en) * 2019-04-19 2019-07-19 锦萧建筑科技有限公司 A kind of production technology of the composable mold and application of doubles the beam column composable mold

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113183291A (en) * 2021-05-13 2021-07-30 中建一局集团建设发展有限公司 End plate for precast beam column mould with difficulty in throwing ribs and using method of end plate
CN113183291B (en) * 2021-05-13 2022-07-12 中建一局集团建设发展有限公司 End plate for precast beam column mould with difficulty in throwing ribs and using method of end plate

Similar Documents

Publication Publication Date Title
CN110328743A (en) A kind of precast beam end installation mold and its construction method
CN209723595U (en) Cast in situ concrete shear wall template reinforcing system that punches of exempting from
CN110439279B (en) Floating window template reinforcing system and construction method thereof
CN207682622U (en) A kind of layer-stepping ring muscle fastening anchor concrete shear force wall mold
CN210622313U (en) Constructional column pouring template
CN206144109U (en) Wear muscle line box precasting structure
CN209099770U (en) A kind of end sealing up screw that can partially reuse
CN209190965U (en) A kind of adjustable prefabricated board die
CN211389324U (en) Precast beam end installation mould
CN209341178U (en) The prefabricated dedicated wire box of superimposed sheet
CN213654236U (en) Mortise-tenon type reserved pipe groove die
CN209478458U (en) The steel hoop prefabricated components baffle of light wear-resistant and mold including the baffle
CN208088138U (en) A kind of suitable bridge is to large size, thin walled hollow vase pier steel form
CN106965298A (en) Precast concrete mould
CN209011571U (en) It wears muscle positioning formula wall and pours aluminum alloy pattern plate carrier location structure
CN106639097A (en) Construction method for cast-in-situ reinforced concrete floor and floor structure
CN218541507U (en) Reinforcing device for reverse ridge pouring template
CN206703246U (en) Precast concrete mould
CN107009508B (en) Method for producing prefabricated member and prefabricated member
CN221799157U (en) Effectively resist protruding board aluminium template come-up instrument on bay window
CN106738307B (en) The prefabricated components production method of band connection reinforcing bar
CN212897683U (en) Be used for built-in fitting installation fixing device
CN214696824U (en) Overflow hole template of large steel template
CN218117231U (en) Screw type embedded sleeve for penetrating column cap
CN214169921U (en) Hole template is reserved to floor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191015