CN108060804A CN201711421700.8A CN201711421700A CN108060804A CN 108060804 A CN108060804 A CN 108060804A CN 201711421700 A CN201711421700 A CN 201711421700A CN 108060804 A CN108060804 A CN 108060804A
Authority
CN
China
Prior art keywords
aluminium sheet
floor
mold
trapezoidal
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711421700.8A
Other languages
Chinese (zh)
Inventor
罗胜
张云金
王德
曹春红
潘勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Chemical Engineering Third Construction Co Ltd
Original Assignee
China National Chemical Engineering Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Chemical Engineering Third Construction Co Ltd filed Critical China National Chemical Engineering Third Construction Co Ltd
Priority to CN201711421700.8A priority Critical patent/CN108060804A/en
Publication of CN108060804A publication Critical patent/CN108060804A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/10Buildings forming part of cooling plants
    • E04H5/12Cooling towers
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

A kind of installation method of steel construction indirect cool tower peripheral protective aluminium sheet, includes the following steps:Floor group is made to mold, including pedestal, supporting rod and trapezoidal positioning seat;Cover board installation mold is made, including support leg, transverse slat and trapezoidal protrusion;Aluminium sheet positioning mold is made, including positioning plate and locating plate, the dovetail groove of several handstand is equipped at the top of positioning plate, has trapezoidal positioning protrusion between adjacent trapezoidal slot;Make fixture;Aluminium sheet positioning mold is mounted on purlin by fixture, it is ensured that the dovetail groove of front and rear aluminium sheet positioning mold is concordant;The floor piece of cutting is put into group pair on trapezoidal positioning seat, forms floor;Floor is put into trapezoidal protrusion, cover board is placed on both sides starts group pair, forms floor component;Floor component is put on aluminium sheet positioning mold;It is mounted on purlin using screw, removes fixture and aluminium sheet positioning mold;Tripod purlin is lifted into the predetermined installation position of indirect cool tower by tower crane to install.Construction efficiency of the present invention is high, and installation positioning is reliable.

Description

The installation method of steel construction indirect cool tower peripheral protective aluminium sheet
Technical field
The present invention relates to steel construction indirect cool tower construction fields, are especially a kind of peace of steel construction indirect cool tower peripheral protective aluminium sheet Dress method.
Background technology
The structure type and size of the steel construction indirect cool tower of our company's hot work in progress are as follows:Tower height 170m, tower outlet are outer Footpath 84m, tower exit inside diameter 82m, tower bottom diameter 129.44m, cone section height 55m;Total 18 layers of number of plies, comprising 5 layers of cone section and 13 layers of straight section, every layer of each 36 triangle, single triangle weight about 5.5T;Reinforcing ring quantity haves three layers, and every layer of 36 triangle add The position of strong ring is respectively 90.08m, 125.16m, 160.23m.
For the steel construction indirect cool tower of said structure, it is desirable that bore section, broadening platform and the 13rd layer of straight tube at the 4th~5 layer External all arrangement peripheral protective aluminium sheets of section.Due to needing to arrange that the number of plies of peripheral protective aluminium sheet is more, and area is big, existing to apply Work method can not be met the requirements, therefore, in order to ensure to install alignment quality, improve installation effectiveness, it is necessary to be designed a set of complete New arrangement and method for construction is fixed with completing the installation of peripheral protective aluminium sheet.
The content of the invention
The technical problem to be solved by the present invention is to, a kind of installation method of steel construction indirect cool tower peripheral protective aluminium sheet is provided, Construction efficiency is high, and installation positioning is reliable.
The technical solution of the present invention is to provide a kind of installation method of steel construction indirect cool tower peripheral protective aluminium sheet, including Following steps:
1) floor group is made to mold, which includes mold pedestal, supporting rod and mounted on support bar top Trapezoidal positioning seat, the external dimensions of trapezoidal positioning seat is identical with chamber size in the floor of preforming peripheral protective aluminium sheet, described Supporting rod bottom is connected with pedestal;
2) make cover board installation mold, the cover board installation mold include support leg, the transverse slat at the top of support leg with And the chamber size in transverse slat middle part and the trapezoidal protrusion arranged along transverse slat length direction, the external dimensions and floor of trapezoidal protrusion Identical, the lateral dimension of the bottom edge of trapezoidal protrusion apart from transverse slat edge is equal with preforming cover board width;
3) aluminium sheet positioning mold is made, which includes positioning plate and determine on positioning plate side wall Bit slice, positioning plate top equidistantly offer the dovetail groove of several handstand along its length direction, are equipped between adjacent trapezoidal slot Trapezoidal positioning protrusion, the external dimensions of trapezoidal positioning protrusion are identical with chamber size in floor;
4) fixture is made, which includes U-shaped snap-gauge and fastening screw, and the open both sides of U-shaped snap-gauge have that one is long and the other is short two Block plate, fastening screw and this two boards are perpendicular, and are threaded at the top of short slab, the afterbody face long slab side of fastening screw Wall;
5) aluminium sheet positioning mold is mounted on the monolithic triangular frame purlin of pre-production by fixture, front and rear the two of purlin There is aluminium sheet positioning mold at end, it is ensured that the dovetail groove flush of rear and front end aluminium sheet positioning mold;
6) three pieces of floor pieces of pre-cut are placed into floor group to starting group pair on the trapezoidal positioning seat of mold, are formed Floor;
7) floor to complete is placed into the trapezoidal protrusion of cover board installation mold, pre-cut cover board is placed In the both sides of trapezoidal protrusion, start group pair, three is made to become an entirety, form floor component;
8) several floor components to complete are placed on aluminium sheet positioning mold, it is ensured that floor is caught in trapezoidal convex The cover board risen in upper, adjacent floor component is overlapped in dovetail groove;
9) floor component is fixed on tripod purlin using hex bolts and self-tapping screw, then removes fixture With aluminium sheet positioning mold;
10) the tripod purlin in step 9) is lifted by the predetermined installation position of indirect cool tower by tower crane, by screw and Welding is installed;
11) step 5)~10 are repeated), complete the installation of remaining position peripheral protective aluminium sheet.
After more than structure, compared with prior art, a kind of installation of steel construction indirect cool tower peripheral protective aluminium sheet of the present invention Method has the following advantages:The mode that this sub-module of the present invention assembles peripheral protective aluminium sheet, greatly reduces large scale computer The frequency of use of tool installs more stable, safety;The floor group of making is to mold, cover board installation mold, aluminium sheet positioning mould Tool and fixture are reusable and easy to operate, and therefore, integral construction cost of the invention is relatively low, and construction efficiency is high, Neng Gouchong Divide the requirement for meeting peripheral protective aluminium sheet construction quality.
Description of the drawings
Fig. 1 be in the present invention floor group to the side structure schematic view of mold;
Fig. 2 is the side structure schematic view of cover plate installation mold of the present invention;
Fig. 3 is the main structure diagram of aluminium sheet positioning mold in the present invention;
Fig. 4 is the side view enlarged structure schematic diagram of fixture in the present invention.
Specific embodiment
With reference to the accompanying drawings and detailed description to a kind of installation side of steel construction indirect cool tower peripheral protective aluminium sheet of the present invention Method is described in further detail:
In this embodiment, a kind of installation method of steel construction indirect cool tower peripheral protective aluminium sheet of the present invention, including such as Lower step:
1) floor group is made to mold, and referring to Fig. 1, which includes mold pedestal 12, supporting rod 11 and installation Trapezoidal positioning seat 10 at 11 top of supporting rod, the external dimensions of trapezoidal positioning seat 10 and the floor of preforming peripheral protective aluminium sheet Chamber size is identical in 30, and 11 bottom of supporting rod is connected with pedestal 12;
2) cover board installation mold is made, referring to Fig. 2, which includes support leg 13, mounted on support leg 13 The transverse slat 14 at top and arranged positioned at the middle part of transverse slat 14 and along 14 length direction of transverse slat trapezoidal raised 15, trapezoidal raised 15 External dimensions is identical with chamber size in floor 30, lateral dimension of trapezoidal raised 15 bottom edge apart from 14 edge of transverse slat with it is pre- Molding 31 width of cover board is equal;
3) aluminium sheet positioning mold is made, referring to Fig. 3, which includes positioning plate 16 and mounted on positioning plate Locating plate 17 on 16 side walls, 16 top of positioning plate equidistantly offer the dovetail groove 161 of several handstand along its length direction, Trapezoidal positioning protrusion 162, external dimensions and the 30 inner cavity ruler of floor of trapezoidal positioning protrusion 162 are equipped between adjacent trapezoidal slot 161 It is very little identical;
4) fixture is made, referring to Fig. 4, which includes U-shaped snap-gauge 18 and fastening screw 19, the opening two of U-shaped snap-gauge 18 Side has that one is long and the other is short two boards, fastening screw 19 and this two boards are perpendicular, and are threaded in 182 top of short slab, hold out against spiral shell 181 side wall of afterbody face long slab of bar 19;
5) aluminium sheet positioning mold is mounted on the monolithic triangular frame purlin of pre-production by fixture, is specially:Positioning Piece 17 is located on purlin top surface, and long slab 181 is pressed on locating plate 17, and the afterbody of fastening screw 19 is withstood on purlin bottom surface, from And aluminium sheet positioning mold is fixed, there is aluminium sheet positioning mold in the rear and front end of purlin, it is ensured that rear and front end aluminium sheet positions 161 flush of dovetail groove of mold;
6) referring to Fig. 1, three pieces of floor pieces 301 of pre-cut are placed into floor group on the trapezoidal positioning seat 10 of mold Start group pair, form floor 30;
7) referring to Fig. 2, the floor 30 to complete is placed on trapezoidal raised the 15 of cover board installation mold, will be cut in advance The cover board 31 cut is placed on trapezoidal raised 15 both sides, starts group pair, and three is made to become an entirety, forms floor component 3;
8) referring to Fig. 3, several floor components 3 to complete are placed on aluminium sheet positioning mold, it is ensured that floor 30 blocks Enter the overlapping in dovetail groove 161 of the cover board 31 on trapezoidal positioning protrusion 162, in adjacent floor component 3;
9) floor component 3 is fixed on tripod purlin using hex bolts and self-tapping screw, then removes card Tool and aluminium sheet positioning mold;
10) the tripod purlin in step 9) is lifted by the predetermined installation position of indirect cool tower by tower crane, by screw and Welding is installed;
11) step 5)~10 are repeated), complete the installation of remaining position peripheral protective aluminium sheet.
The mode that this sub-module of the present invention assembles peripheral protective aluminium sheet, greatly reduce big machinery uses frequency Rate installs more stable, safety;The floor group of making can to mold, cover board installation mold, aluminium sheet positioning mold and fixture It reuses, and it is easy to operate, therefore, integral construction cost of the invention is relatively low, and construction efficiency is high, can fully meet periphery Protect the requirement of aluminium sheet construction quality.
Embodiment described above is only that the preferred embodiment of the present invention is described, not to the model of the present invention It encloses and is defined, on the premise of design spirit of the present invention is not departed from, those of ordinary skill in the art are to the technical side of the present invention The various modifications and improvement that case is made, should all fall within the scope of protection of the present invention.

Claims (1)

1. a kind of installation method of steel construction indirect cool tower peripheral protective aluminium sheet, which is characterized in that include the following steps:
1) floor group is made to mold, which includes mold pedestal (12), supporting rod (11) and mounted on supporting rod (11) the trapezoidal positioning seat (10) at the top of, the external dimensions of trapezoidal positioning seat (10) and the floor of preforming peripheral protective aluminium sheet (30) interior chamber size is identical, and supporting rod (11) bottom is connected with pedestal (12);
2) cover board installation mold is made, which includes support leg (13), the horizontal stroke at the top of support leg (13) Plate (14) and trapezoidal raised (15) arranged in the middle part of transverse slat (14) and along transverse slat (14) length direction, trapezoidal protrusion (15) External dimensions it is identical with floor (30) interior chamber size, transverse direction of the bottom edge apart from transverse slat (14) edge of trapezoidal protrusion (15) Size is equal with preforming cover board (31) width;
3) aluminium sheet positioning mold is made, which includes positioning plate (16) and on positioning plate (16) side wall Locating plate (17), the dovetail grooves (161) of several handstand, phase are equidistantly offered at the top of positioning plate (16) along its length direction Trapezoidal positioning protrusion (162), external dimensions and the floor (30) of trapezoidal positioning protrusion (162) are equipped between adjacent dovetail groove (161) Interior chamber size is identical;
4) fixture is made, which includes U-shaped snap-gauge (18) and fastening screw (19), and the open both sides of U-shaped snap-gauge (18) have one A long short two boards, fastening screw (19) and this two boards are perpendicular, and are threaded at the top of short slab (182), fastening screw (19) afterbody face long slab (181) side wall;
5) aluminium sheet positioning mold is mounted on the monolithic triangular frame purlin of pre-production by fixture, the rear and front end of purlin is equal There is aluminium sheet positioning mold, it is ensured that dovetail groove (161) flush of rear and front end aluminium sheet positioning mold;
6) three pieces of floor pieces (301) of pre-cut are placed into floor group to starting group on the trapezoidal positioning seat (10) of mold It is right, form floor (30);
7) floor to complete (30) is placed on trapezoidal raised (15) of cover board installation mold, by pre-cut cover board (31) both sides of trapezoidal raised (15) are placed on, start group pair, three is made to become an entirety, form floor component (3);
8) several floor components (3) to complete are placed on aluminium sheet positioning mold, it is ensured that it is trapezoidal fixed that floor (30) is caught in On position raised (162), the overlapping in dovetail groove (161) of the cover board (31) in adjacent floor component (3);
9) floor component (3) is fixed on tripod purlin using hex bolts and self-tapping screw, then removes fixture With aluminium sheet positioning mold;
10) the tripod purlin in step 9) is lifted by the predetermined installation position of indirect cool tower by tower crane, passes through screw and welding It is installed;
11) step 5)~10 are repeated), complete the installation of remaining position peripheral protective aluminium sheet.
CN201711421700.8A 2017-12-25 2017-12-25 The installation method of steel construction indirect cool tower peripheral protective aluminium sheet Pending CN108060804A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711421700.8A CN108060804A (en) 2017-12-25 2017-12-25 The installation method of steel construction indirect cool tower peripheral protective aluminium sheet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711421700.8A CN108060804A (en) 2017-12-25 2017-12-25 The installation method of steel construction indirect cool tower peripheral protective aluminium sheet

Publications (1)

Publication Number Publication Date
CN108060804A true CN108060804A (en) 2018-05-22

Family

ID=62140015

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711421700.8A Pending CN108060804A (en) 2017-12-25 2017-12-25 The installation method of steel construction indirect cool tower peripheral protective aluminium sheet

Country Status (1)

Country Link
CN (1) CN108060804A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110328743A (en) * 2019-08-02 2019-10-15 福建省泷澄建筑工业有限公司 A kind of precast beam end installation mold and its construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001049886A (en) * 1999-08-06 2001-02-20 Toshiba Plant Kensetsu Co Ltd Assembling method of cooling tower with water tank
CN204238352U (en) * 2014-07-11 2015-04-01 广东精工钢结构有限公司 The syndeton of a kind of purlin and straight brace
CN205955307U (en) * 2016-08-23 2017-02-15 中国五洲工程设计集团有限公司 Steel construction hyperbolic cooling tower
CN106767117A (en) * 2016-12-05 2017-05-31 中建钢构有限公司 A kind of protector of steel structure cooling tower

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001049886A (en) * 1999-08-06 2001-02-20 Toshiba Plant Kensetsu Co Ltd Assembling method of cooling tower with water tank
CN204238352U (en) * 2014-07-11 2015-04-01 广东精工钢结构有限公司 The syndeton of a kind of purlin and straight brace
CN205955307U (en) * 2016-08-23 2017-02-15 中国五洲工程设计集团有限公司 Steel construction hyperbolic cooling tower
CN106767117A (en) * 2016-12-05 2017-05-31 中建钢构有限公司 A kind of protector of steel structure cooling tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110328743A (en) * 2019-08-02 2019-10-15 福建省泷澄建筑工业有限公司 A kind of precast beam end installation mold and its construction method

Similar Documents

Publication Publication Date Title
CN205685511U (en) A kind of prefabricated components assembling die
CN205766745U (en) A kind of prefabricated components mould exempting from out muscle hole
CN105881716B (en) A kind of prefabricated components mould
CN206202587U (en) A kind of ship bulkhead attachment structure
CN108060804A (en) The installation method of steel construction indirect cool tower peripheral protective aluminium sheet
CN106930192B (en) Assembled variable cross-section contracture sliding mode system and its construction method
CN204152231U (en) Socket type safety guard rail
CN204088923U (en) Modularization support frame
CN207761334U (en) A kind of adjustable late poured band support device
CN201792043U (en) Large saw blade storage rack
CN207048305U (en) A kind of shear wall, which dissipates, spells formwork support structure
CN203939238U (en) For a flask board of epirelief concrete member formwork device
CN204590640U (en) A kind of prefabricated concrete structure longitudinal reinforcement location adjustment jig
CN104196263A (en) Supporting system for concrete precast component
CN206032944U (en) Steel construction derrick of villa elevator
CN205238603U (en) A big beam mold steelframe for preparation of aerogenerator blade
CN203129626U (en) Early-removal supporting device for beam template
CN104525584B (en) A kind of beam device for hot-rolled steel section guide and guard
CN208201654U (en) A kind of full assembled combined steel formwork of bridge variable cross-section hollow pier abnormity
CN203961295U (en) The two formulas of shooting down of adjusting of a kind of hollow lead screw are early torn supporting member open
CN204059943U (en) A kind of formwork for placing structure of non-standard layers structure
CN208357708U (en) A kind of sealed planker girder steel of quick forging machine
CN206528765U (en) A kind of support holder structure
CN207314821U (en) A kind of new aluminum alloy pattern plate
CN206308809U (en) A kind of building built-in part installs fixed structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 230000 East Fozhang Road and North Tingyun Road Office Building, Hefei Economic and Technological Development Zone, Anhui Province

Applicant after: China National Chemical Engineering Third Construction Co., Ltd.

Address before: 232038 No. 98 Dongshan Road, Tianjiaan District, Huainan City, Anhui Province

Applicant before: China National Chemical Engineering Third Construction Co., Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20180522

RJ01 Rejection of invention patent application after publication