CN110328733A - A kind of preparation method on the floor construction site Lin She - Google Patents
A kind of preparation method on the floor construction site Lin She Download PDFInfo
- Publication number
- CN110328733A CN110328733A CN201910616921.3A CN201910616921A CN110328733A CN 110328733 A CN110328733 A CN 110328733A CN 201910616921 A CN201910616921 A CN 201910616921A CN 110328733 A CN110328733 A CN 110328733A
- Authority
- CN
- China
- Prior art keywords
- lin
- construction site
- floor
- preparation
- wooden unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27D—WORKING VENEER OR PLYWOOD
- B27D1/00—Joining wood veneer with any material; Forming articles thereby; Preparatory processing of surfaces to be joined, e.g. scoring
- B27D1/10—Butting blanks of veneer; Joining same along edges; Preparatory processing of edges, e.g. cutting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27G—ACCESSORY MACHINES OR APPARATUS FOR WORKING WOOD OR SIMILAR MATERIALS; TOOLS FOR WORKING WOOD OR SIMILAR MATERIALS; SAFETY DEVICES FOR WOOD WORKING MACHINES OR TOOLS
- B27G11/00—Applying adhesives or glue to surfaces of wood to be joined
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27M—WORKING OF WOOD NOT PROVIDED FOR IN SUBCLASSES B27B - B27L; MANUFACTURE OF SPECIFIC WOODEN ARTICLES
- B27M3/00—Manufacture or reconditioning of specific semi-finished or finished articles
- B27M3/0013—Manufacture or reconditioning of specific semi-finished or finished articles of composite or compound articles
- B27M3/0026—Manufacture or reconditioning of specific semi-finished or finished articles of composite or compound articles characterised by oblong elements connected laterally
- B27M3/0053—Manufacture or reconditioning of specific semi-finished or finished articles of composite or compound articles characterised by oblong elements connected laterally using glue
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B27—WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
- B27M—WORKING OF WOOD NOT PROVIDED FOR IN SUBCLASSES B27B - B27L; MANUFACTURE OF SPECIFIC WOODEN ARTICLES
- B27M3/00—Manufacture or reconditioning of specific semi-finished or finished articles
- B27M3/04—Manufacture or reconditioning of specific semi-finished or finished articles of flooring elements, e.g. parqueting blocks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/04—Flooring or floor layers composed of a number of similar elements only of wood or with a top layer of wood, e.g. with wooden or metal connecting members
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Wood Science & Technology (AREA)
- Forests & Forestry (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Floor Finish (AREA)
Abstract
The invention discloses a kind of preparation methods on the floor construction site Lin She, belong to construction site and face house technical field of floor.The preparation method on the floor Lin She is the following steps are included: take waste and old timber to be cut into wooden unit;Make mold frame;The wooden unit of well cutting is filled in mold frame;Binder is perfused in the gap of wooden unit, forms plate body;The upper and lower surface of plate body is planished;It polishes the upper and lower surface of plate body, demoulds, the construction site floor Lin She is made.The floor construction site Lin She of the present invention it is reasonable in design, it is easy to use, and utilize the leftover bits and pieces energy-saving and emission-reduction of the building-site lumps of wood, material is greatly saved to solve the dismounting complex procedures on traditional ground, turnover rate as nil waste, increase turnover rate, and preparation method is simple to operation, reduce building Lin She builds cost.
Description
Technical field
The present invention relates to buildings to face house technical field of floor, and in particular to a kind of preparation side on the construction site floor Lin She
Method.
Background technique
The current house activity house floor that faces all uses market finished product floor tile or timber floor, and floor tile cannot reuse,
And it can not be recycled after removing, and cleaning rubbish will pay higher cost after dismounting;Timber floor purchase and dismounting cost
Height, it is low that equally there is also recycling rates of waterused, therefore there is an urgent need to a kind of novel floors that turnover utilization rate convenient for disassembly and assembly is high to apply
Work scene Lin She replaces above two floor.
Summary of the invention
The purpose of the invention is to overcome the problems of the prior art, a kind of construction site Lin She preparation on floor is provided
Method.
The present invention provides a kind of preparation methods on the floor construction site Lin She, comprising the following steps:
S1, waste and old timber is taken to be cut into wooden unit;
S2, production mold frame;
S3, the wooden unit of well cutting is filled in mold frame;
S4, binder is perfused in the gap of wooden unit, forms plate body;
S5, the upper and lower surface of plate body planished, is polished, being demoulded, the construction site floor Lin She is made.
Preferably, the size of wooden unit is less than 5 × 5 × 5cm.
Preferably, the size of mold frame is 600 × 600 or 800 × 800cm.
Preferably, solidifying 20-30h after binder is perfused in the gap of wooden unit.
Preferably, the surface spraying abrasion-proof fluorescence varnish in the construction site floor Lin She of step S5 preparation, is then allowed to stand
24h。
Compared with prior art, the beneficial effects of the present invention are: the structure on the floor construction site Lin She of the present invention designs conjunction
Reason, it is easy to use, and the leftover bits and pieces energy-saving and emission-reduction of the building-site lumps of wood are utilized, so that the dismounting process for solving traditional ground is multiple
Miscellaneous, turnover rate is that nil waste is greatly saved material, increases turnover rate, and preparation method is simple to operation, reduces and build
That builds Lin She builds cost.
Specific embodiment
Specific embodiments of the present invention will be described in detail below, it is to be understood that protection scope of the present invention is not
It is restricted by specific implementation.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creativeness
Every other embodiment obtained, shall fall within the protection scope of the present invention under the premise of labour.
A kind of preparation method on the floor construction site Lin She provided by the invention, comprising the following steps:
S1, waste and old timber is taken to be cut into wooden unit;
S2, production mold frame;
S3, the wooden unit of well cutting is filled in mold frame;
S4, binder is perfused in the gap of wooden unit, forms plate body;
S5, the upper and lower surface of plate body planished, is polished, being demoulded, the construction site floor Lin She is made.
Further, the size of wooden unit is less than 5 × 5 × 5cm.
Further, the size of mold frame is 600 × 600 or 800 × 800cm.
Further, 20-30h is solidified after binder being perfused in the gap of wooden unit.
Further, then quiet in the surface spraying abrasion-proof fluorescence varnish on the construction site floor Lin She of step S5 preparation
It sets for 24 hours.
To sum up, the floor construction site Lin She of the present invention is reasonable in design, easy to use, and utilizes building-site side
The wooden leftover bits and pieces energy-saving and emission-reduction, to solve the dismounting complex procedures on traditional ground, turnover rate is greatly saved for nil waste
Material increases turnover rate, and preparation method is simple to operation, and reduce building Lin She builds cost.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (5)
1. a kind of preparation method on the floor construction site Lin She, which comprises the following steps:
S1, waste and old timber is taken to be cut into wooden unit;
S2, production mold frame;
S3, the wooden unit of well cutting is filled in mold frame;
S4, binder is perfused in the gap of wooden unit, forms plate body;
S5, the upper and lower surface of plate body is planished, polishes, demould, the construction site floor Lin She is made.
2. the preparation method on the floor construction site Lin She as described in claim 1, which is characterized in that the size of the wooden unit is small
In 5 × 5 × 5cm.
3. the preparation method on the floor construction site Lin She as described in claim 1, which is characterized in that the size of the mold frame
For 600 × 600 or 800 × 800cm.
4. the preparation method on the floor construction site Lin She as described in claim 1, which is characterized in that in the gap of the wooden unit
20-30h is solidified after perfusion binder.
5. the preparation method on the floor construction site Lin She as described in claim 1, which is characterized in that in building for step S5 preparation
The surface spraying abrasion-proof fluorescence varnish for building the building site floor Lin She, is then allowed to stand for 24 hours.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910616921.3A CN110328733A (en) | 2019-07-09 | 2019-07-09 | A kind of preparation method on the floor construction site Lin She |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910616921.3A CN110328733A (en) | 2019-07-09 | 2019-07-09 | A kind of preparation method on the floor construction site Lin She |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110328733A true CN110328733A (en) | 2019-10-15 |
Family
ID=68145182
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910616921.3A Pending CN110328733A (en) | 2019-07-09 | 2019-07-09 | A kind of preparation method on the floor construction site Lin She |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110328733A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11157901A (en) * | 1997-11-21 | 1999-06-15 | Baa & Pallet | Production of insulating material and plank for transportation pallet using wood waste as raw material |
CN1458368A (en) * | 1999-09-22 | 2003-11-26 | 任文林 | Building block floor |
CN101092043A (en) * | 2007-07-26 | 2007-12-26 | 信阳木工机械有限责任公司 | Method for fabricating artificial boards |
CN101724283A (en) * | 2008-10-26 | 2010-06-09 | 董四清 | Technology for processing special materials such as waste plastic and wood |
CN108393980A (en) * | 2018-02-10 | 2018-08-14 | 贵港市万升木业有限公司 | A kind of beech discards the recoverying and utilizing method of sawdust |
-
2019
- 2019-07-09 CN CN201910616921.3A patent/CN110328733A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11157901A (en) * | 1997-11-21 | 1999-06-15 | Baa & Pallet | Production of insulating material and plank for transportation pallet using wood waste as raw material |
CN1458368A (en) * | 1999-09-22 | 2003-11-26 | 任文林 | Building block floor |
CN101092043A (en) * | 2007-07-26 | 2007-12-26 | 信阳木工机械有限责任公司 | Method for fabricating artificial boards |
CN101724283A (en) * | 2008-10-26 | 2010-06-09 | 董四清 | Technology for processing special materials such as waste plastic and wood |
CN108393980A (en) * | 2018-02-10 | 2018-08-14 | 贵港市万升木业有限公司 | A kind of beech discards the recoverying and utilizing method of sawdust |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102259377B (en) | Production method and production equipment for reinforced heat insulation template | |
CN203831566U (en) | Robot intelligent panel making system | |
CN207073278U (en) | A kind of building engineering construction formwork for placing | |
CN206053299U (en) | A kind of easy-to-mount concrete-pouring template | |
CN102337783B (en) | Biocolloid composite building template and manufacturing method thereof | |
CN203320760U (en) | Modularization curtain wall | |
CN110328733A (en) | A kind of preparation method on the floor construction site Lin She | |
CN105019675B (en) | Repairing construction method for grey brick outer wall of ancient building | |
CN204691302U (en) | Ancient building blue bricks exterior wall repair structure | |
CN101891446B (en) | Preparation method of novel energy-saving inorganic thermal insulation plate | |
CN207846875U (en) | A kind of beam steel bar colligation supporting rack | |
CN205975337U (en) | Braced chain formula arch ring template system architecture | |
CN205969414U (en) | Block forming machine with shock -absorbing structure | |
CN210449616U (en) | Stone surface spraying equipment | |
CN208577945U (en) | A kind of tapered pier template multifunctional operating platform | |
CN202937002U (en) | Metal net supporting fabricated formwork | |
CN105019656A (en) | Construction method for floor system concrete post-cast strip suspended formwork | |
CN207110421U (en) | One kind is used to protect frame system outside the working regularization of assembled architecture | |
CN205369927U (en) | Building brick humidification fog room | |
CN201794184U (en) | Fire division wall using clear water | |
CN201232348Y (en) | Environmental protection resin foaming formwork | |
CN211572683U (en) | Finished product protection pedal from formwork erection of cast-in-place concrete stair to final setting of concrete | |
CN203293574U (en) | Formwork for manufacturing contour plate in pressing mode | |
CN205777500U (en) | A kind of for secondary structure constructional column stigma concrete shaping mould plate | |
CN204414287U (en) | A kind of pressure setting of green compact of ceramic tile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191015 |
|
RJ01 | Rejection of invention patent application after publication |