CN110328733A - A kind of preparation method on the floor construction site Lin She - Google Patents

A kind of preparation method on the floor construction site Lin She Download PDF

Info

Publication number
CN110328733A
CN110328733A CN201910616921.3A CN201910616921A CN110328733A CN 110328733 A CN110328733 A CN 110328733A CN 201910616921 A CN201910616921 A CN 201910616921A CN 110328733 A CN110328733 A CN 110328733A
Authority
CN
China
Prior art keywords
lin
construction site
floor
preparation
wooden unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910616921.3A
Other languages
Chinese (zh)
Inventor
焦保卫
贺凯
郭海鹰
于大洋
郭军
剡晓磊
刘浩
徐兴良
蒲伟
南景涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Work First Construction Group Co Ltd Is Built In Shaanxi
Original Assignee
Work First Construction Group Co Ltd Is Built In Shaanxi
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Work First Construction Group Co Ltd Is Built In Shaanxi filed Critical Work First Construction Group Co Ltd Is Built In Shaanxi
Priority to CN201910616921.3A priority Critical patent/CN110328733A/en
Publication of CN110328733A publication Critical patent/CN110328733A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27DWORKING VENEER OR PLYWOOD
    • B27D1/00Joining wood veneer with any material; Forming articles thereby; Preparatory processing of surfaces to be joined, e.g. scoring
    • B27D1/10Butting blanks of veneer; Joining same along edges; Preparatory processing of edges, e.g. cutting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27GACCESSORY MACHINES OR APPARATUS FOR WORKING WOOD OR SIMILAR MATERIALS; TOOLS FOR WORKING WOOD OR SIMILAR MATERIALS; SAFETY DEVICES FOR WOOD WORKING MACHINES OR TOOLS
    • B27G11/00Applying adhesives or glue to surfaces of wood to be joined
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27MWORKING OF WOOD NOT PROVIDED FOR IN SUBCLASSES B27B - B27L; MANUFACTURE OF SPECIFIC WOODEN ARTICLES
    • B27M3/00Manufacture or reconditioning of specific semi-finished or finished articles
    • B27M3/0013Manufacture or reconditioning of specific semi-finished or finished articles of composite or compound articles
    • B27M3/0026Manufacture or reconditioning of specific semi-finished or finished articles of composite or compound articles characterised by oblong elements connected laterally
    • B27M3/0053Manufacture or reconditioning of specific semi-finished or finished articles of composite or compound articles characterised by oblong elements connected laterally using glue
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27MWORKING OF WOOD NOT PROVIDED FOR IN SUBCLASSES B27B - B27L; MANUFACTURE OF SPECIFIC WOODEN ARTICLES
    • B27M3/00Manufacture or reconditioning of specific semi-finished or finished articles
    • B27M3/04Manufacture or reconditioning of specific semi-finished or finished articles of flooring elements, e.g. parqueting blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/04Flooring or floor layers composed of a number of similar elements only of wood or with a top layer of wood, e.g. with wooden or metal connecting members

Abstract

The invention discloses a kind of preparation methods on the floor construction site Lin She, belong to construction site and face house technical field of floor.The preparation method on the floor Lin She is the following steps are included: take waste and old timber to be cut into wooden unit;Make mold frame;The wooden unit of well cutting is filled in mold frame;Binder is perfused in the gap of wooden unit, forms plate body;The upper and lower surface of plate body is planished;It polishes the upper and lower surface of plate body, demoulds, the construction site floor Lin She is made.The floor construction site Lin She of the present invention it is reasonable in design, it is easy to use, and utilize the leftover bits and pieces energy-saving and emission-reduction of the building-site lumps of wood, material is greatly saved to solve the dismounting complex procedures on traditional ground, turnover rate as nil waste, increase turnover rate, and preparation method is simple to operation, reduce building Lin She builds cost.

Description

A kind of preparation method on the floor construction site Lin She
Technical field
The present invention relates to buildings to face house technical field of floor, and in particular to a kind of preparation side on the construction site floor Lin She Method.
Background technique
The current house activity house floor that faces all uses market finished product floor tile or timber floor, and floor tile cannot reuse, And it can not be recycled after removing, and cleaning rubbish will pay higher cost after dismounting;Timber floor purchase and dismounting cost Height, it is low that equally there is also recycling rates of waterused, therefore there is an urgent need to a kind of novel floors that turnover utilization rate convenient for disassembly and assembly is high to apply Work scene Lin She replaces above two floor.
Summary of the invention
The purpose of the invention is to overcome the problems of the prior art, a kind of construction site Lin She preparation on floor is provided Method.
The present invention provides a kind of preparation methods on the floor construction site Lin She, comprising the following steps:
S1, waste and old timber is taken to be cut into wooden unit;
S2, production mold frame;
S3, the wooden unit of well cutting is filled in mold frame;
S4, binder is perfused in the gap of wooden unit, forms plate body;
S5, the upper and lower surface of plate body planished, is polished, being demoulded, the construction site floor Lin She is made.
Preferably, the size of wooden unit is less than 5 × 5 × 5cm.
Preferably, the size of mold frame is 600 × 600 or 800 × 800cm.
Preferably, solidifying 20-30h after binder is perfused in the gap of wooden unit.
Preferably, the surface spraying abrasion-proof fluorescence varnish in the construction site floor Lin She of step S5 preparation, is then allowed to stand 24h。
Compared with prior art, the beneficial effects of the present invention are: the structure on the floor construction site Lin She of the present invention designs conjunction Reason, it is easy to use, and the leftover bits and pieces energy-saving and emission-reduction of the building-site lumps of wood are utilized, so that the dismounting process for solving traditional ground is multiple Miscellaneous, turnover rate is that nil waste is greatly saved material, increases turnover rate, and preparation method is simple to operation, reduces and build That builds Lin She builds cost.
Specific embodiment
Specific embodiments of the present invention will be described in detail below, it is to be understood that protection scope of the present invention is not It is restricted by specific implementation.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creativeness Every other embodiment obtained, shall fall within the protection scope of the present invention under the premise of labour.
A kind of preparation method on the floor construction site Lin She provided by the invention, comprising the following steps:
S1, waste and old timber is taken to be cut into wooden unit;
S2, production mold frame;
S3, the wooden unit of well cutting is filled in mold frame;
S4, binder is perfused in the gap of wooden unit, forms plate body;
S5, the upper and lower surface of plate body planished, is polished, being demoulded, the construction site floor Lin She is made.
Further, the size of wooden unit is less than 5 × 5 × 5cm.
Further, the size of mold frame is 600 × 600 or 800 × 800cm.
Further, 20-30h is solidified after binder being perfused in the gap of wooden unit.
Further, then quiet in the surface spraying abrasion-proof fluorescence varnish on the construction site floor Lin She of step S5 preparation It sets for 24 hours.
To sum up, the floor construction site Lin She of the present invention is reasonable in design, easy to use, and utilizes building-site side The wooden leftover bits and pieces energy-saving and emission-reduction, to solve the dismounting complex procedures on traditional ground, turnover rate is greatly saved for nil waste Material increases turnover rate, and preparation method is simple to operation, and reduce building Lin She builds cost.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (5)

1. a kind of preparation method on the floor construction site Lin She, which comprises the following steps:
S1, waste and old timber is taken to be cut into wooden unit;
S2, production mold frame;
S3, the wooden unit of well cutting is filled in mold frame;
S4, binder is perfused in the gap of wooden unit, forms plate body;
S5, the upper and lower surface of plate body is planished, polishes, demould, the construction site floor Lin She is made.
2. the preparation method on the floor construction site Lin She as described in claim 1, which is characterized in that the size of the wooden unit is small In 5 × 5 × 5cm.
3. the preparation method on the floor construction site Lin She as described in claim 1, which is characterized in that the size of the mold frame For 600 × 600 or 800 × 800cm.
4. the preparation method on the floor construction site Lin She as described in claim 1, which is characterized in that in the gap of the wooden unit 20-30h is solidified after perfusion binder.
5. the preparation method on the floor construction site Lin She as described in claim 1, which is characterized in that in building for step S5 preparation The surface spraying abrasion-proof fluorescence varnish for building the building site floor Lin She, is then allowed to stand for 24 hours.
CN201910616921.3A 2019-07-09 2019-07-09 A kind of preparation method on the floor construction site Lin She Pending CN110328733A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910616921.3A CN110328733A (en) 2019-07-09 2019-07-09 A kind of preparation method on the floor construction site Lin She

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910616921.3A CN110328733A (en) 2019-07-09 2019-07-09 A kind of preparation method on the floor construction site Lin She

Publications (1)

Publication Number Publication Date
CN110328733A true CN110328733A (en) 2019-10-15

Family

ID=68145182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910616921.3A Pending CN110328733A (en) 2019-07-09 2019-07-09 A kind of preparation method on the floor construction site Lin She

Country Status (1)

Country Link
CN (1) CN110328733A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11157901A (en) * 1997-11-21 1999-06-15 Baa & Pallet Production of insulating material and plank for transportation pallet using wood waste as raw material
CN1458368A (en) * 1999-09-22 2003-11-26 任文林 Building block floor
CN101092043A (en) * 2007-07-26 2007-12-26 信阳木工机械有限责任公司 Method for fabricating artificial boards
CN101724283A (en) * 2008-10-26 2010-06-09 董四清 Technology for processing special materials such as waste plastic and wood
CN108393980A (en) * 2018-02-10 2018-08-14 贵港市万升木业有限公司 A kind of beech discards the recoverying and utilizing method of sawdust

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11157901A (en) * 1997-11-21 1999-06-15 Baa & Pallet Production of insulating material and plank for transportation pallet using wood waste as raw material
CN1458368A (en) * 1999-09-22 2003-11-26 任文林 Building block floor
CN101092043A (en) * 2007-07-26 2007-12-26 信阳木工机械有限责任公司 Method for fabricating artificial boards
CN101724283A (en) * 2008-10-26 2010-06-09 董四清 Technology for processing special materials such as waste plastic and wood
CN108393980A (en) * 2018-02-10 2018-08-14 贵港市万升木业有限公司 A kind of beech discards the recoverying and utilizing method of sawdust

Similar Documents

Publication Publication Date Title
CN206299098U (en) A kind of efficiently automatic Machine for sticking ceramic tile
CN202081641U (en) Hanging mold used for floor prepared hole
CN102259377A (en) Production method and production equipment for reinforced heat insulation template
CN203831566U (en) Robot intelligent panel making system
CN207073278U (en) A kind of building engineering construction formwork for placing
CN206053299U (en) A kind of easy-to-mount concrete-pouring template
CN110328733A (en) A kind of preparation method on the floor construction site Lin She
CN105019675B (en) Repairing construction method for grey brick outer wall of ancient building
CN204691302U (en) Ancient building blue bricks exterior wall repair structure
CN207846875U (en) A kind of beam steel bar colligation supporting rack
CN205975337U (en) Braced chain formula arch ring template system architecture
CN210449616U (en) Stone surface spraying equipment
CN208577945U (en) A kind of tapered pier template multifunctional operating platform
CN105019656A (en) Construction method for floor system concrete post-cast strip suspended formwork
CN207110421U (en) One kind is used to protect frame system outside the working regularization of assembled architecture
CN205369927U (en) Building brick humidification fog room
CN201794184U (en) Fire division wall using clear water
CN201232348Y (en) Environmental protection resin foaming formwork
CN211572683U (en) Finished product protection pedal from formwork erection of cast-in-place concrete stair to final setting of concrete
CN205777500U (en) A kind of for secondary structure constructional column stigma concrete shaping mould plate
CN203293574U (en) Formwork for manufacturing contour plate in pressing mode
CN204414287U (en) A kind of pressure setting of green compact of ceramic tile
CN205777521U (en) A kind of aluminium alloy wooden model gang form system template auxiliary device
CN202937001U (en) Novel wood-plastic compound building formwork
CN105235038B (en) A kind of processing technology for regenerating bamboo glue supporting plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191015

RJ01 Rejection of invention patent application after publication