CN110322157A - A kind of distribution planning overall process assessment system - Google Patents

A kind of distribution planning overall process assessment system Download PDF

Info

Publication number
CN110322157A
CN110322157A CN201910617839.2A CN201910617839A CN110322157A CN 110322157 A CN110322157 A CN 110322157A CN 201910617839 A CN201910617839 A CN 201910617839A CN 110322157 A CN110322157 A CN 110322157A
Authority
CN
China
Prior art keywords
distribution
data
management
module
assessment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910617839.2A
Other languages
Chinese (zh)
Inventor
杨金东
刘红文
王科
聂鼎
关静恩
董涛
黄明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Yunnan Power System Ltd
Original Assignee
Electric Power Research Institute of Yunnan Power System Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Yunnan Power System Ltd filed Critical Electric Power Research Institute of Yunnan Power System Ltd
Priority to CN201910617839.2A priority Critical patent/CN110322157A/en
Publication of CN110322157A publication Critical patent/CN110322157A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/26Visual data mining; Browsing structured data
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Databases & Information Systems (AREA)
  • Marketing (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

This application discloses a kind of distributions to plan overall process assessment system, including system management module, for carrying out organization, system, caching and the management of process, and extraction tool is arranged;Management module is extracted, for extracting business datum according to extraction tool, obtains business datum mapping relations;Modeling and visual analysis module, for assessing modeling tool, and progress data visualization process;Distribution planning appraisal module, for constructing distribution problem base assessment strategy model, distribution project library assessment strategy model and distribution project construction recruitment evaluation Policy model according to modeling tool.The technical solution of the application plans that control requires according to distribution, based on multi-specialized Data Integration distribution business datum, assessment strategy is calculated to distribution planning problem library and distribution planned project, hereafter, it can carry out and distribution planning problem, distribution planned project and planned project construct effects of biology are assessed, the effectively overall process of assessment distribution planning, improves the quality of distribution planning.

Description

A kind of distribution planning overall process assessment system
Technical field
This application involves technical field of power systems more particularly to a kind of distribution to plan overall process assessment system.
Background technique
Current Yunnan Power System distribution planning problem library, project library are by prefectures and cities' unit related personnel's manual construction, districts and cities Planning personnel is difficult to efficiently assess to the authenticity of basic data;Provincial company, districts and cities personnel carry out problem base and planned project When library examines, all by being accomplished manually time and effort consuming, and cannot utilize power grid actual power efficiency index (such as: three-phase imbalance, Low-voltage, heavy-overload, line loss per unit etc.) and power supply reliability index carry out the automatic assessment of intelligence, accuracy cannot ensure, thus The quality for reducing distribution planned project library is adversely affected to distribution planning.
In addition, not carrying out in districts and cities' level part power supply bureau planned project Effect on construction evaluation work, partly cause is Due to lacking effective means, qualitative analysis is only carried out, effect is not ideal enough.Plan that supervision and examination overall process is needed by artificial It carries out, is exported there are data and import difficulty, difficult problem is quantitatively evaluated in problem base and planned project library.
Summary of the invention
This application provides a kind of distributions to plan overall process assessment system, can effectively assess the process of distribution planning.
This application provides a kind of distributions to plan overall process assessment system, comprising:
For carrying out organization, system, caching and the management of process, and extraction tool is arranged in system management module;
Management module is extracted, for extracting the business datum according to the extraction tool, business datum mapping is obtained and closes System;
Modeling and visual analysis module, for assessing modeling tool, and progress data visualization process;
Distribution planning appraisal module, for constructing distribution problem base assessment strategy model, distribution project according to modeling tool Library assessment strategy model and distribution project construction recruitment evaluation Policy model.
Optionally, in the system management module, the management of system includes that management shows theme, managerial data library, pipe Manage service list and management global parameter;The management of organization include to tissue, personnel, system authorization and the definition of role and Storage, the management of caching and the management of process include the management of data buffer storage and process queue.
Optionally, the extraction management module, including Service Data Management module, the Service Data Management module are used for Manage the business datum, the business datum includes: mid & low-voltage line geography information, is set mid & low-voltage line rack wiring diagram Data, mesolow distribution production plan, platform area operation data, SCADA system are maked an inspection tour in standby account, technical parameter, mesolow distribution Flow data, business data model, mesolow distribution O&M overhaul data;The Service Data Management module is also used to generate rule It draws problem base, generate planned project library and construction project library.
Optionally, the Service Data Management module further includes defect management module and fault management module.
Optionally, the extraction management module, further includes data extraction module, for multisystem data fusion, fusion work Make stream scheduling, data pick-up script debugging, data pick-up monitoring operation, data storage sum number it is investigated that seeing.
Optionally, the modeling and visual analysis module include: evaluation module, data visualization module and result's management mould Block;The evaluation module is used for planning appraisal strategy modeling, sees clearly assessment strategy model, deployment evaluation Policy model and management mould Type;The data visualization module, for preparing assessment visualized data, design evaluation result visualization and publication visualization; The result's management module, for classify assessment achievement, check assessment achievement, management service, management custom algorithm, monitoring at Fruit and publication examination & approval achievement.
Optionally, the modeling and visual analysis module are also used to administrative relationships data connection, interface data, data point Class, data permission and personal data.
Optionally, the distribution planning appraisal module is also used to show the assessment of distribution the problem base achievement, distribution project Assess achievement and distribution project construction recruitment evaluation achievement in library.
From the above technical scheme, this application provides a kind of distributions to plan overall process assessment system, including system pipes Module is managed, for carrying out organization, system, caching and the management of process, and extraction tool is set;Management module is extracted, For extracting business datum according to extraction tool, business datum mapping relations are obtained;Modeling and visual analysis module, for assessing Modeling tool, and carry out data visualization process;Distribution planning appraisal module, for constructing distribution problem according to modeling tool Library assessment strategy model, distribution project library assessment strategy model and distribution project construction recruitment evaluation Policy model.The application's Technical solution plans that control requires according to distribution, multi-specialized Data Integration distribution business datum is based on, to distribution planning problem library Hereafter calculating assessment strategy with distribution planned project can carry out and build to distribution planning problem, distribution planned project and planned project If effect is assessed, the overall process of distribution planning is effectively assessed, improves the quality of distribution planning.
Detailed description of the invention
In order to illustrate more clearly of the technical solution of the application, attached drawing needed in case study on implementation will be made below Simply introduce, it should be apparent that, for those of ordinary skills, in the premise of not making the creative labor property Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural block diagram that overall process assessment system is planned in a kind of distribution provided by the embodiments of the present application.
Specific embodiment
In order to make those skilled in the art better understand the technical solutions in the application, below in conjunction with attached drawing, it is right Technical solution in the embodiment of the present application is clearly and completely described.
Fig. 1 is the structural block diagram that overall process assessment system is planned in a kind of distribution provided by the embodiments of the present application.Such as Fig. 1 institute Show, the system comprises:
For carrying out organization, system, caching and the management of process, and extraction tool is arranged in system management module;
Management module is extracted, for extracting the business datum according to the extraction tool, business datum mapping is obtained and closes System;
Modeling and visual analysis module, for assessing modeling tool, and progress data visualization process;
Distribution planning appraisal module, for constructing distribution problem base assessment strategy model, distribution project according to modeling tool Library assessment strategy model and distribution project construction recruitment evaluation Policy model.
Specifically, will be according to prefectures and cities' efficiency data, power supply reliability number when building distribution problem base assessment strategy model According to, distribution rack data data, all kinds of aspect of model analytic approach supported in conjunction with system, machine learning algorithm, deep learning algorithm Deng.It can be with observing system to the assessment information of assessment strategy model, simultaneously in distribution problem base assessment strategy model construction process The results of intermediate calculations of a certain node in assessment strategy model can also be observed.
Specifically, will be according to prefectures and cities' efficiency data, power supply reliability number when building distribution project library assessment strategy model According to, distribution rack data data, all kinds of aspect of model analytic approach supported in conjunction with system, machine learning algorithm, deep learning algorithm Deng.It can be with observing system to the assessment information of assessment strategy model, simultaneously in distribution project library assessment strategy model construction process The results of intermediate calculations of a certain node in assessment strategy model can also be observed.
Specifically, will be according to according to prefectures and cities' efficiency data, confession when building distribution project construction recruitment evaluation Policy model Electric reliability data, distribution rack data data, all kinds of aspect of model analytic approach supported in conjunction with system, machine learning algorithm, depth Spend learning algorithm etc..Distribution project construction recruitment evaluation Policy model can be with observing system to assessment strategy mould during constructing The assessment information of type, while the results of intermediate calculations of a certain node in assessment strategy model can also be observed.
Further, in the system management module, the management of system include management show theme, managerial data library, Management service list and management global parameter;The management of organization includes to tissue, personnel, system authorization and the definition of role And storage, the management of caching and the management of process include the management of data buffer storage and process queue.
Further, the extraction management module, including Service Data Management module, the Service Data Management module are used In managing the business datum, the business datum includes: mid & low-voltage line geography information, mid & low-voltage line rack wiring diagram, Data, mesolow distribution production plan, platform area operation data, SCADA system are maked an inspection tour in equipment account, technical parameter, mesolow distribution System flow data, business data model, mesolow distribution O&M overhaul data;The Service Data Management module is also used to generate Planning problem library generates planned project library and construction project library.
Further, the Service Data Management module further includes defect management module and fault management module.
Further, the extraction management module, further includes data extraction module, for multisystem data fusion, fusion Workflow schedule, data pick-up script debugging, data pick-up monitoring operation, data storage sum number are it is investigated that see.
Further, the modeling and visual analysis module include: evaluation module, data visualization module and result's management Module;The evaluation module is used for planning appraisal strategy modeling, sees clearly assessment strategy model, deployment evaluation Policy model and management Model;The data visualization module, it is visual for preparing assessment visualized data, design evaluation result visualization and publication Change;The result's management module for assessment achievement of classifying, checks assessment achievement, management service, management custom algorithm, prison Survey achievement and publication examination & approval achievement.
Further, the modeling and visual analysis module are also used to administrative relationships data connection, interface data, data point Class, data permission and personal data.
Further, the distribution planning appraisal module is also used to show the assessment of distribution the problem base achievement, distribution item Assess achievement and distribution project construction recruitment evaluation achievement in mesh library.
Specifically, according to distribution problem base assessment strategy model, and the model flow management rule of system is combined, it is automatic complete The intelligent evaluation of pairs of distribution problem base.Assessment performance data can carry out visualization exhibition according to statistical form, the chart being pre-designed Show.
Specifically, according to distribution project library assessment strategy model, and binding model workflow management rule, it is automatically performed to matching The intelligent evaluation of net project library.Assessment performance data can be visualized according to certain statistical table, the chart being pre-designed.
Specifically, according to distribution project construction recruitment evaluation strategy mould, and binding model workflow management rule, it is automatically performed To the effect intelligent evaluation of distribution project construction.Assessment performance data can be carried out according to certain statistical table, the chart being pre-designed It visualizes.
In addition, including: using the method for distribution planning overall process assessment system in the application
Step S1: plan that the demand of overall process assessment system develops data extraction tool with having needle according to distribution, the work The functions such as data pick-up frequency, data cleansing filtering, extraction process control can be set in tool.
Step S2: medium-voltage line, defect, platform Qu Yunhang is respectively set according to the demand of distribution planning overall process assessment system Data, SCADA system flow data, equipment account, failure, distribution are maked an inspection tour the business datums such as data, distribution production plan and are extracted Mapping relations.Distribution data acquisition and supervisor control abbreviation SCADA.
Step S3: Allocation Analysis models basic data, and is tracked, adjusted by pilot process of the auxiliary tool to modeling Examination, modification etc..
Step S4: constructing distribution problem base according to distribution data, and correspondingly construct distribution problem base assessment strategy model, Carry out the evaluation work to distribution problem base on this basis.
Step S5: distribution project library is constructed according to distribution problem base, and correspondingly constructs distribution project library assessment strategy mould Type carries out the evaluation work to distribution project library on this basis.
Step S5: distribution project construction recruitment evaluation Policy model is constructed according to distribution project library, is carried out on this basis To the evaluation work of distribution construction project effect.
From the above technical scheme, this application provides a kind of distributions to plan overall process assessment system, including system pipes Module is managed, for carrying out organization, system, caching and the management of process, and extraction tool is set;Management module is extracted, For extracting business datum according to extraction tool, business datum mapping relations are obtained;Modeling and visual analysis module, for assessing Modeling tool, and carry out data visualization process;Distribution planning appraisal module, for constructing distribution problem according to modeling tool Library assessment strategy model, distribution project library assessment strategy model and distribution project construction recruitment evaluation Policy model.The application's Technical solution plans that control requires according to distribution, multi-specialized Data Integration distribution business datum is based on, to distribution planning problem library Hereafter calculating assessment strategy with distribution planned project can carry out and build to distribution planning problem, distribution planned project and planned project If effect is assessed, the overall process of distribution planning is effectively assessed, improves the quality of distribution planning.
Those skilled in the art will readily occur to its of the application after considering specification and practicing application disclosed herein Its embodiment.This application is intended to cover any variations, uses, or adaptations of the application, these modifications, purposes or Person's adaptive change follows the general principle of the application and including the undocumented common knowledge in the art of the application Or conventional techniques.The description and examples are only to be considered as illustrative, and the true scope and spirit of the application are by following Claim is pointed out.
It should be understood that the application is not limited to the precise structure that has been described above and shown in the drawings, and And various modifications and changes may be made without departing from the scope thereof.Scope of the present application is only limited by the accompanying claims.

Claims (8)

1. overall process assessment system is planned in a kind of distribution characterized by comprising
For carrying out organization, system, caching and the management of process, and extraction tool is arranged in system management module;
Management module is extracted, for extracting the business datum according to the extraction tool, obtains business datum mapping relations;
Modeling and visual analysis module, for assessing modeling tool, and progress data visualization process;
Distribution planning appraisal module, for constructing distribution problem base assessment strategy model according to modeling tool, distribution project library is commented Estimate Policy model and distribution project construction recruitment evaluation Policy model.
2. system according to claim 1, which is characterized in that in the system management module, to the management packet of system It includes management and shows theme, managerial data library, management service list and management global parameter;The management of organization includes to group It knits, the definition and storage of personnel, system authorization and role, the management of caching and the management of process include data buffer storage and process team The management of column.
3. system according to claim 1, which is characterized in that the extraction management module, including Service Data Management mould Block, for managing the business datum, the business datum includes the Service Data Management module: mid & low-voltage line geography letter Data, mesolow distribution production meter are maked an inspection tour in breath, mid & low-voltage line rack wiring diagram, equipment account, technical parameter, mesolow distribution It draws, platform area operation data, SCADA system flow data, business data model, mesolow distribution O&M overhaul data;The industry Business data management module is also used to generate planning problem library, generates planned project library and construction project library.
4. system according to claim 3, which is characterized in that the Service Data Management module further includes defect management mould Block and fault management module.
5. system according to claim 4, which is characterized in that the extraction management module, further includes data extraction module, For multisystem data fusion, fusion workflow schedule, data pick-up script debugging, data pick-up monitoring operation, data storage Sum number is it is investigated that see.
6. system according to claim 1, which is characterized in that it is described modeling and visual analysis module include: evaluation module, Data visualization module and result's management module;The evaluation module is used for planning appraisal strategy modeling, sees clearly assessment strategy mould Type, deployment evaluation Policy model and administrative model;The data visualization module, for preparing assessment visualized data, design Assessment result visualization and publication visualization;The result's management module for assessment achievement of classifying, checks assessment achievement, pipe Reason service, management custom algorithm, Monitoring Result and publication examination & approval achievement.
7. system according to claim 6, which is characterized in that the modeling and visual analysis module are also used to administrative relationships Data connection, interface data, data classification, data permission and personal data.
8. system according to claim 1, which is characterized in that the distribution planning appraisal module is also used to show described match Net problem base assesses achievement, distribution project library assessment achievement and distribution project construction recruitment evaluation achievement.
CN201910617839.2A 2019-07-10 2019-07-10 A kind of distribution planning overall process assessment system Pending CN110322157A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910617839.2A CN110322157A (en) 2019-07-10 2019-07-10 A kind of distribution planning overall process assessment system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910617839.2A CN110322157A (en) 2019-07-10 2019-07-10 A kind of distribution planning overall process assessment system

Publications (1)

Publication Number Publication Date
CN110322157A true CN110322157A (en) 2019-10-11

Family

ID=68123104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910617839.2A Pending CN110322157A (en) 2019-07-10 2019-07-10 A kind of distribution planning overall process assessment system

Country Status (1)

Country Link
CN (1) CN110322157A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112149897A (en) * 2020-09-21 2020-12-29 广东电网有限责任公司 Power distribution network planning visual management method and device and storage medium
CN112200458A (en) * 2020-10-12 2021-01-08 贵州电网有限责任公司 Power distribution network planning data application method and system
CN114677112A (en) * 2022-03-25 2022-06-28 国网江西省电力有限公司电力科学研究院 Power distribution network project large-scale evaluation method and system based on big data

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105574652A (en) * 2015-12-10 2016-05-11 国网山东省电力公司经济技术研究院 Planning big data management and control system of smart power distribution network and method
CN106649699A (en) * 2016-12-20 2017-05-10 国电南瑞科技股份有限公司 Visualized display system based on data fusion of multiple service systems
CN106779344A (en) * 2016-11-28 2017-05-31 云南电网有限责任公司大理供电局 A kind of method based on distribution network planning of the battalion with information integration
CN107591833A (en) * 2016-07-08 2018-01-16 华北电力大学(保定) A kind of microgrid reliability estimation method of meter and different operation reserves
CN109447466A (en) * 2018-10-29 2019-03-08 广东电网有限责任公司 Overall process visual management and control system based on power distribution network communication network construction
CN109816161A (en) * 2019-01-14 2019-05-28 中国电力科学研究院有限公司 A kind of power distribution network operation computer-aided decision support System and its application method
CN109980642A (en) * 2019-04-26 2019-07-05 云南电网有限责任公司信息中心 A kind of digital intelligent distribution network planning auxiliary system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105574652A (en) * 2015-12-10 2016-05-11 国网山东省电力公司经济技术研究院 Planning big data management and control system of smart power distribution network and method
CN107591833A (en) * 2016-07-08 2018-01-16 华北电力大学(保定) A kind of microgrid reliability estimation method of meter and different operation reserves
CN106779344A (en) * 2016-11-28 2017-05-31 云南电网有限责任公司大理供电局 A kind of method based on distribution network planning of the battalion with information integration
CN106649699A (en) * 2016-12-20 2017-05-10 国电南瑞科技股份有限公司 Visualized display system based on data fusion of multiple service systems
CN109447466A (en) * 2018-10-29 2019-03-08 广东电网有限责任公司 Overall process visual management and control system based on power distribution network communication network construction
CN109816161A (en) * 2019-01-14 2019-05-28 中国电力科学研究院有限公司 A kind of power distribution network operation computer-aided decision support System and its application method
CN109980642A (en) * 2019-04-26 2019-07-05 云南电网有限责任公司信息中心 A kind of digital intelligent distribution network planning auxiliary system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
姜忠福等: "电网规划综合信息平台架构设计与应用", 《山东电力技术》 *
常亚东: "电网科技项目评价信息系统研究", 《云南电力技术》 *
李雪亮等: "电网规划智能决策平台研究", 《山东电力技术》 *
贺墨琳: "基于多源数据融合的配电网规划基础数据分析与应用平台研究", 《电力大数据》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112149897A (en) * 2020-09-21 2020-12-29 广东电网有限责任公司 Power distribution network planning visual management method and device and storage medium
CN112200458A (en) * 2020-10-12 2021-01-08 贵州电网有限责任公司 Power distribution network planning data application method and system
CN112200458B (en) * 2020-10-12 2023-10-20 贵州电网有限责任公司 Power distribution network planning data application method and system
CN114677112A (en) * 2022-03-25 2022-06-28 国网江西省电力有限公司电力科学研究院 Power distribution network project large-scale evaluation method and system based on big data

Similar Documents

Publication Publication Date Title
CN110322157A (en) A kind of distribution planning overall process assessment system
DE212016000186U1 (en) simulation system
CN104850945A (en) Geological record acquisition system, and management and control method based on network and android system
CN109905885A (en) A kind of method and inspection device of determining inspection station list
Gumbira et al. Decision support system for an eco-friendly integrated coastal zone management (ICZM) in Indonesia
CN103020332A (en) Intelligent virtual maintenance training system for civil aircraft
CN110264095A (en) A kind of Distribution Network Equipment visualization auxiliary O&M method based on GIS-Geographic Information System
CN108508852A (en) isolation management system and isolation management method
CN106708984A (en) Method, apparatus and system for acquiring basic data of cable channel
CN104574218A (en) Modeling method and device for automatically organizing key performance indicators
Edtmayer et al. High-resolution, spatial thermal energy demand analysis and workflow for a city district
Tubis et al. Concept of controlling for maintenance management performance: a case study of passenger transportation company
CN105184523B (en) Grid operation mode data digging method and system based on CART decision tree
CN112884298A (en) Building construction model based on big data and modeling method
CN117313845A (en) Power grid fault detection auxiliary method and system based on knowledge graph
CN116341064A (en) Modeling system and method of intelligent substation cloud system based on 3DMax modeling
CN110310048A (en) A kind of distribution planning overall process appraisal procedure and device
CN112967376B (en) Data-driven transformer substation three-dimensional model establishing method and device
Sivrikaya et al. A GIS-based decision support system for forest management plans in Turkey.
CN109272564B (en) Plant station diagram automatic generation method based on machine learning
Calderon et al. Data availability and repeatability for urban carbon modelling: a CarbonRouteMap for Newcastle upon Tyne
Bai et al. Designing domain work breakdown structure (DWBS) using neural networks
Hall A simulation tool to guide infrastructure decisions: system-of-systems modeling aids prioritization and uncertainty planning
Mencke ViRe-in 2-GP-Methodology for Virtual Reality in Major Industrial and Infrastructural Projects
Wang et al. Application of Artificial Intelligence Technology in Power Equipment Condition Prediction and Maintenance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191011

RJ01 Rejection of invention patent application after publication