CN110322126A - A kind of project scheduling method, equipment, server and computer readable storage medium - Google Patents
A kind of project scheduling method, equipment, server and computer readable storage medium Download PDFInfo
- Publication number
- CN110322126A CN110322126A CN201910534678.0A CN201910534678A CN110322126A CN 110322126 A CN110322126 A CN 110322126A CN 201910534678 A CN201910534678 A CN 201910534678A CN 110322126 A CN110322126 A CN 110322126A
- Authority
- CN
- China
- Prior art keywords
- employee
- subset
- target
- proficiency
- project
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 43
- 238000003860 storage Methods 0.000 title claims abstract description 18
- 230000002123 temporal effect Effects 0.000 claims abstract description 36
- 238000004590 computer program Methods 0.000 claims description 12
- 238000010586 diagram Methods 0.000 description 8
- 230000004438 eyesight Effects 0.000 description 8
- 230000005540 biological transmission Effects 0.000 description 5
- 238000001914 filtration Methods 0.000 description 5
- 239000012141 concentrate Substances 0.000 description 3
- 238000009956 embroidering Methods 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 238000012549 training Methods 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012827 research and development Methods 0.000 description 2
- 238000012216 screening Methods 0.000 description 2
- 229910005543 GaSe Inorganic materials 0.000 description 1
- 210000004556 brain Anatomy 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063112—Skill-based matching of a person or a group to a task
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The embodiment of the invention discloses a kind of project scheduling method, equipment, server and computer readable storage mediums, this method comprises: receiving the project scheduling request that terminal is sent;Gather from the employee to match with performance information required by project task is filtered out in employee database;According to the skill proficiency of each employee in employee set, the working efficiency of each employee is determined;According to the goal task amount of the working efficiency of each employee and the project task, at least one employee's subset that the goal task amount is completed in the temporal information of the project task is determined;Calculate the sum of the skill proficiency of each employee in each employee's subset, obtain the target skill proficiency of the employee of each employee's subset, and target employee's subset is determined according to the target skill proficiency of the employee of each employee's subset, to call the employee of the target employee subset to execute the project task, to realize project scheduling task, to improve the efficiency of project scheduling.
Description
Technical field
The present invention relates to technical field of data processing more particularly to a kind of project scheduling method, equipment, server and calculating
Machine readable storage medium storing program for executing.
Background technique
What project task scheduling system on the market was directed at present mainly guarantees employee skill and skill needed for project task
The matching of energy, Consideration is excessively single, thus leads to not correctly provide related to project task other influences factor
The scheduling scheme of connection, it is lower so as to cause the accuracy of project scheduling, influence the execution of project task.Therefore how more effectively
The efficiency and accuracy that improve project scheduling become the emphasis of research.
Summary of the invention
The embodiment of the invention provides a kind of project scheduling method, equipment, server and computer readable storage mediums, can
It is identified project scheduling scheme according to skill proficiency, improves the efficiency of project scheduling.
In a first aspect, the embodiment of the invention provides a kind of project scheduling methods, this method comprises:
Receive the project scheduling request that terminal is sent, wherein carry project task in the project scheduling request and wanted
Performance information, temporal information and the goal task amount asked;
Gather from the employee to match with performance information required by the project task is filtered out in employee database, institute
Stating in employee's set includes at least one employee identification;
Determine the skill proficiency of each employee in employee's set, and according to each employee in employee set
Skill proficiency determines the working efficiency of each employee in employee's set;
According to the working efficiency of each employee and the goal task amount of the project task in employee set, determine
At least one employee's subset of the goal task amount is completed in the temporal information of the project task;
The sum of the skill proficiency for calculating each employee in each employee's subset obtains the target of the employee of each employee's subset
Skill proficiency, and target employee's subset is determined according to the target skill proficiency of the employee of each employee's subset, to adjust
The project task is executed with the employee of the target employee subset.
Further, in determination employee set each employee skill proficiency, comprising:
Obtain the grade of skill of each employee and length of service in employee's set;
According to the grade of skill and preset work of each employee in preset grade of skill weight and employee set
The length of service for making each employee in time limit weight and employee set determines the technical ability of each employee in employee's set
Proficiency.
Further, the technical ability etc. according to each employee in preset grade of skill weight and employee set
The length of service of each employee in grade and preset length of service weight and employee set, determine employee's set
In each employee skill proficiency, comprising:
According to the grade of skill of each employee in preset grade of skill weight and employee set, determine described each
The sum of grade of skill of employee is the target grade of skill of employee set;And
According to the length of service of each employee in preset length of service weight and employee set, determine described each
The sum of length of service of employee is the target operation time limit of employee set;
According to the target grade of skill and the target operation time limit, the skill of each employee in employee's set is determined
It can proficiency.
Further, described according to the working efficiency of each employee and the target of the project task in employee set
Task amount determines at least one employee's subset that the goal task amount is completed in the temporal information of the project task, packet
It includes:
According to the working efficiency of each employee in employee set, determine that each employee is in unit in employee's set
The task amount completed in time;
According to the task amount that each employee completes within the unit time in employee set, determine in the project task
Temporal information in complete at least one employee's subset of the goal task amount.
Further, the target technical ability that the employee according to each employee's subset completes the goal task amount is ripe
White silk degree determines target employee's subset, comprising:
Obtain the target skill proficiency of employee in each employee's subset;
The target skill proficiency of employee in each employee's subset is compared, from least one employee
It concentrates and determines the maximum target employee subset of target skill proficiency.
Further, the method also includes:
Detect the target skill proficiency of employee in each employee's subset;
If the target skill proficiency for detecting the presence of employee at least two employee's subsets is greater than default proficiency threshold
Value then obtains the target skill proficiency and is greater than each employee's completion mesh in each employee's subset of default proficiency threshold value
Mark the original wage of task amount;
The target skill proficiency is calculated to be greater than in each employee's subset of default proficiency threshold value described in each employee's completion
The sum of original wage of goal task amount obtains the wage cost that each employee's subset completes the goal task amount, and really
Make the minimum target employee's subset of the wage cost.
Further, the method also includes:
Detect the target skill proficiency of employee in each employee's subset;
If the target skill proficiency for detecting the presence of employee at least two employee's subsets is greater than default proficiency threshold
Value then obtains the target skill proficiency and is greater than each employee's completion mesh in each employee's subset of default proficiency threshold value
Mark the operating time of task amount;
It calculates the target skill proficiency and is greater than each employee's completion institute in each employee's subset of default proficiency threshold value
The sum of the operating time for stating goal task amount obtains each employee that the target skill proficiency is greater than default proficiency threshold value
The employee of collection completes the time cost of the goal task amount;
It is determined from each employee's subset that the target skill proficiency is greater than default proficiency threshold value and completes the target
The smallest target employee subset of the time cost of task amount.
Second aspect, the embodiment of the invention provides a kind of project scheduling equipment, which includes for holding
The unit of the project scheduling method of the above-mentioned first aspect of row.
The third aspect, the embodiment of the invention provides a kind of server, including processor, input equipment, output equipment and
Memory, the processor, input equipment, output equipment and memory are connected with each other, wherein the memory is for storing branch
The computer program that project scheduling equipment executes the above method is held, the computer program includes program instruction, the processor
It is configured for calling described program instruction, the method for executing above-mentioned first aspect.
Fourth aspect, the embodiment of the invention provides a kind of computer readable storage medium, the computer storage medium
It is stored with computer program, the computer program includes program instruction, and described program instruction makes institute when being executed by a processor
State the method that processor executes above-mentioned first aspect.
The embodiment of the present invention, by being filtered out from employee database required by the project scheduling sent with terminal request
Employee's set that performance information matches determines the employee according to the skill proficiency of each employee in employee set
The working efficiency of each employee in set, according to the working efficiency and the project task of each employee in employee set
Goal task amount determines at least one employee that the goal task amount is completed in the temporal information of the project task
Collection, and target employee's subset is determined according to the target skill proficiency of the employee of each employee's subset, to call the mesh
The employee for marking employee's subset executes the project task, so that project scheduling task is realized, to improve the efficiency of project scheduling.
Detailed description of the invention
Technical solution in order to illustrate the embodiments of the present invention more clearly, below will be to needed in embodiment description
Attached drawing is briefly described, it should be apparent that, drawings in the following description are some embodiments of the invention, general for this field
For logical technical staff, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of schematic flow diagram of project scheduling method provided in an embodiment of the present invention;
Fig. 2 is the schematic flow diagram of another project scheduling method provided in an embodiment of the present invention;
Fig. 3 is a kind of schematic block diagram of project scheduling equipment provided in an embodiment of the present invention;
Fig. 4 is a kind of schematic block diagram of server provided in an embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are some of the embodiments of the present invention, instead of all the embodiments.Based on this hair
Embodiment in bright, every other implementation obtained by those of ordinary skill in the art without making creative efforts
Example, shall fall within the protection scope of the present invention.
Project scheduling method provided in an embodiment of the present invention can be executed by a kind of project scheduling system, wherein the item
It includes project scheduling equipment and terminal that mesh, which dispatches system, and in certain embodiments, the project scheduling equipment can be set in hand
On the intelligent terminals such as mechanical, electrical brain, plate, smartwatch.In certain embodiments, the project scheduling equipment and the terminal it
Between can establish communication connection, to carry out two-way communication.In certain embodiments, the project scheduling equipment may be mounted at institute
It states in terminal, in certain embodiments, the project scheduling equipment can be spatially independently of the terminal, in certain implementations
In example, the project scheduling equipment can be the component of the terminal, i.e., the described terminal includes project scheduling equipment.In certain realities
It applies in example, the terminal may include: the intelligent terminals such as mobile phone, computer, plate, smartwatch.
It, can be to item when the terminal in the project scheduling system needs to carry out project scheduling in the embodiment of the present invention
Mesh controlling equipment sends project scheduling request, so that the project scheduling that the project scheduling equipment can receive terminal transmission is asked
It asks.In certain embodiments, carried in the project scheduling request performance information required by project task, temporal information and
Goal task amount.The project scheduling equipment, can be from employee's data after receiving the project scheduling request of terminal transmission
The employee to match with performance information required by the project task is filtered out in library to gather, and includes extremely in employee's set
A few employee identification.The project scheduling equipment can determine the skill proficiency of each employee in employee's set, and
According to the skill proficiency of each employee in employee set, the working efficiency of each employee in employee's set is determined.
The project scheduling equipment can be according to the working efficiency of each employee and the target of the project task in employee set
Task amount determines at least one employee's subset that the goal task amount is completed in the temporal information of the project task.Institute
The sum of the skill proficiency of each employee in each employee's subset can be calculated by stating project scheduling equipment, obtain each employee's subset
The target skill proficiency of employee, and target employee is determined according to the target skill proficiency of the employee of each employee's subset
Subset, to call the employee of the target employee subset to execute the project task.
The project scheduling method of the embodiment of the present invention is schematically illustrated with reference to the accompanying drawing.
Referring to Figure 1, Fig. 1 is a kind of schematic flow diagram of project scheduling method provided in an embodiment of the present invention, such as Fig. 1 institute
Show, this method can be executed by project scheduling equipment, and the specific explanations of the project scheduling equipment are as previously mentioned, no longer superfluous herein
It states.Specifically, described method includes following steps for the embodiment of the present invention.
S101: the project scheduling request that terminal is sent is received, wherein carry project task in the project scheduling request
Required performance information, temporal information and goal task amount.
In the embodiment of the present invention, project scheduling equipment can receive the project scheduling request of terminal transmission, wherein the item
Performance information required by project task, temporal information and goal task amount are carried in mesh scheduling request.In some embodiments
In, the temporal information be require to complete time range, beginning and ending time, deadline of the project task etc. any one or
A variety of temporal informations.
S102: collect from the employee to match with performance information required by the project task is filtered out in employee database
It closes, includes at least one employee identification in employee's set.
In the embodiment of the present invention, project scheduling equipment can be filtered out from employee database and be wanted with the project task
The employee that the performance information asked matches gathers, and includes at least one employee identification in employee's set.In some embodiments
In, the employee database is used to store the employee identification and employee information corresponding with employee identification of multiple employees;At certain
In a little embodiments, the corresponding employee of an employee identification, the employee identification may include employee name, employee number, member
Work gender, worker demonstrate,prove number, employee's age etc. any one or more.
For example, it is assumed that the project scheduling request that the project scheduling equipment is got is Expert English language training by qualified teachers task, the English
Performance information required by the needs of the training programmes is English language skills, then the project scheduling equipment can be filtered out from employee database
At least one employee identification that the English language skills of the requirement described in the Expert English language training by qualified teachers task match, if the project scheduling
Equipment filtered out from the employee database with English language skills include employee identification 1, employee identification 2 and employee identification 3,
It can then determine that forming the employee to match with the English language skills by employee identification 1, employee identification 2 and employee identification 3 gathers.
In one embodiment, the project scheduling equipment is filtering out and the project task institute from employee database
It is required that employee's set for matching of performance information before, can detecte the corresponding member of each employee identification in the employee database
Whether work has received to execute sundry item task, has received to execute sundry item if detecting in the employee database and existing
The employee identification of task then filters out at least one employee identification for not receiving to execute sundry item task, and from described
Do not have to filter out at least one employee identification for receiving to execute sundry item task in project task required time information
Gather with the employee that performance information required by the project task matches.
In one embodiment, the project scheduling equipment is filtering out and the project task institute from employee database
It is required that performance information match employee set before, it is corresponding that each employee identification in the employee database can also be detected
Whether employee includes asking false information, if detecting in the employee database that existing includes the employee identification for asking false information,
At least one employee identification for not asking false information is filtered out, and from described at least one employee identification for not asking false information
The employee to match with performance information required by the project task is filtered out to gather.
In one embodiment, the project scheduling equipment is filtered out from employee database is wanted with the project task
After employee's set that the performance information asked matches, the type of the project task can also be obtained, and according to the project
The type of task, determines corresponding with the type of project task employee's characteristic information, and from filtering out with the project
In employee's set that performance information required by task matches, the characteristic information of each employee is acquired, and determine to meet institute
State employee's set of employee's characteristic information.In certain embodiments, employee's characteristic information includes but is not limited to face characteristic
The information such as information, eyesight characteristic information.In certain embodiments, the type of the project task includes but is not limited to market pin
The types such as sell, plan, investigating, researching and developing, making.
In one embodiment, the project scheduling equipment is from filtering out and technical ability required by the project task
When determining the employee's set for meeting employee's characteristic information in employee that information matches set, can to the project
Each employee in employee that performance information required by task matches set carries out recognition of face, and analyze identify it is each
The face characteristic of employee carries out the face characteristic of each employee employee's characteristic information corresponding with the type of the project task
Comparison determines the face characteristic that employee's characteristic information corresponding with the type of the project task matches, and according to the people
Face feature determines employee's set corresponding with the face characteristic.
For example, it is assumed that the type of the project task is the type of market sale, if the type with the market sale
Corresponding employee's characteristic information includes face characteristic information that is happy, optimistic, having passion, then the project scheduling equipment can be right
The each employee in employee's set to match with performance information required by the project task carries out recognition of face, identifies
The face characteristic (such as expressive features) of each employee in employee set.During the project scheduling equipment can gather the employee
The face characteristic of each employee identified is analyzed, and determines to meet people that is happy, optimistic, having passion in employee set
The employee of face characteristic information, so that it is determined that going out by meeting member that is happy, optimistic, being made of the employee of the face characteristic information of passion
Work set.
In another example, it is assumed that the type of the project task is the type of research and development, if corresponding with the type of the research and development
Employee's characteristic information includes conscientious, rigorous, introvert's face characteristic information, then the project scheduling equipment can to the item
Each employee in employee's set that performance information required by mesh task matches carries out recognition of face, identifies that the employee collects
The face characteristic (such as expressive features) of each employee in conjunction.What the project scheduling equipment identified in can gathering the employee
The face characteristic of each employee is analyzed, and determines that meeting face characteristic that is happy, optimistic, having passion in employee set believes
The employee of breath is gathered so that it is determined that going out by meeting the employee that conscientious, rigorous, introvert's face characteristic information employee forms.
In one embodiment, the project scheduling equipment is from filtering out and technical ability required by the project task
When determining the employee's set for meeting employee's characteristic information in employee's set that information matches, if it is determined that go out the item
The type of mesh task be such as hand embroidering item types relevant to eyesight, then can to required by the project task
Each employee in employee's set that performance information matches carries out eyesight testing, and analyzes the eyesight for identifying each employee,
The employee for determining that eyesight feature required by eyesight and the type of the project task matches gathers.
For example, it is assumed that the type of the project task be hand embroidering project, then project scheduling equipment can from institute
The eye feature that each employee is acquired in employee's set that performance information required by project task matches is stated, and according to eye
Signature analysis identifies the eyesight information of each employee.If the visual demand of preset hand embroidering is 4.5, can from
Determine that employee of the eyesight more than or equal to 4.5 collects in employee's set that performance information required by the project task matches
It closes.
In one embodiment, the project scheduling equipment is in the type according to the project task, the determining and item
When the corresponding employee's characteristic information of the type of mesh task, it can detecte that preset project task is corresponding with employee's characteristic information to close
It whether there is employee's characteristic information corresponding with the project task type in system, if it does not exist, then appointing according to the project
The type of business crawls employee's characteristic information relevant to the type of the project task from network.In other embodiments, institute
Employee's characteristic information corresponding with the type of the project task can also be obtained using other modes by stating project scheduling equipment,
The embodiment of the present invention is not specifically limited.
S103: the skill proficiency of each employee in employee's set is determined, and according to each in employee set
The skill proficiency of employee determines the working efficiency of each employee in employee's set.
In the embodiment of the present invention, project scheduling equipment can determine that the technical ability of each employee in employee's set is skilled
Degree, and according to the skill proficiency of each employee in employee set, determine the work of each employee in employee's set
Efficiency.
In one embodiment, the technical ability of the project scheduling equipment each employee in determining employee's set is skilled
When spending, the grade of skill of each employee and length of service in available employee's set, and according to preset grade of skill
In weight and employee set in the grade of skill and preset length of service weight and employee set of each employee
The length of service of each employee determines the skill proficiency of each employee in employee's set.
For example, it is assumed that including employee 1 and employee 2 in employee's set, preset grade of skill weight is 60%, is preset
Length of service weight be 40%, if it is 1 that the project scheduling equipment, which gets the employee to gather the grade of skill of employee 1,
Grade, length of service are 1 year, and the grade of skill of employee 2 is 3 grades, and the length of service is 4 years, then the project scheduling equipment can root
According to the grade of skill and preset length of service of employee 1 and employee 2 in preset grade of skill weight and employee set
The length of service of employee 1 and employee 2 in weight and employee set determine that the technical ability of employee 1 in employee's set is ripe
White silk degree are as follows: 1*60%+1*40%=1;And determine the skill proficiency of employee 2 in employee's set are as follows: 3*60%+4*
40%=3.4.
In one embodiment, the project scheduling equipment can be corresponding with working efficiency according to default skill proficiency
Relationship determines the working efficiency of each employee in employee's set.
S104: according to the employee set in the working efficiency of each employee and the goal task amount of the project task,
Determine at least one employee's subset that the goal task amount is completed in the temporal information of the project task.
In the embodiment of the present invention, project scheduling equipment can according to the employee gather in each employee working efficiency and
The goal task amount of the project task, determination complete the goal task amount extremely in the temporal information of the project task
Few zooid's brigade collection.
In one embodiment, the project scheduling equipment can be imitated according to the work of each employee in employee set
Rate determines the task amount that each employee completes within the unit time in employee's set, and according to every in employee set
The goal task is completed in the task amount that a employee completes within the unit time, determination in the temporal information of the project task
At least one employee's subset of amount.
Continue to use above-mentioned example citing, it is assumed that the working efficiency for the employee 1 for including in employee's set is 0.4 case/hour,
The working efficiency of the employee 2 is 1.36 casees/hour, and the temporal information of the project task is 150 hours, if the mesh
Mark task amount is 200 casees products, then can determine time cost needed for the employee 1 and employee 2 complete 200 casees products
Are as follows: 200/ (0.4+1.36)=114 hour, the temporal information 150 for being less than the project task due to 114 can then determine
The employee 1 and employee 2 form zooid's brigade collection.
According to employee's cost of each employee in employee set, determine to complete institute from the employee that the employee gathers
The employee's cost for stating goal task amount is less than at least one employee's subset of employee's cost threshold value.
It continues to use above-mentioned example to illustrate, it is assumed that employee 1 and employee 2 complete the goal task amount in employee's set
Employee's cost of 200 casees products are as follows: 3*A+22000*B, if employee's cost threshold value be 18000, A 20%, B 80%, then
It can determine employee's cost of employee 1 and the 200 casees products of completion of employee 2 in employee's set are as follows: 3*20%+22000*80%
=17600.48, since 17600.48 less than 18000, then it can determine that employee 1 and employee 2 form zooid's brigade collection.
In one embodiment, the time cost of the project task can be carried in the project scheduling request, it is described
The working efficiency of each employee in the available employee's set of project scheduling equipment, and according to each in employee set
The working efficiency of employee and the goal task amount determine that the employee of employee's set completes the time of the goal task amount
Cost, and determine that the employee of employee set completes the time cost of the goal task amount and is less than the project scheduling and asks
Seek at least one employee's subset of the time cost of the project task of middle carrying.
For example, it is assumed that the time cost of the project task carried in the project scheduling request is 210 hours, mesh
Mark task amount is 200 casees products, if in employee set including 2 employees, the working efficiency of employee 1 is 0.48 case/small
When, the working efficiency of employee 2 is 0.5 case/hour, then the project scheduling equipment can determine the employee 1 of employee's set
The time cost of described 200 casees products of goal task amount is completed with employee 2 are as follows: 200/ (0.48+0.5)=204 hour, due to
204 are less than the time cost 210 of the project task carried in project scheduling request, then can determine the employee 1
The employee's subset formed with employee 2.
In one embodiment, the work of each employee is imitated in the available employee's set of the project scheduling equipment
Rate, and obtain the grade of skill of each employee in employee set, thus according to preset grade of skill and working efficiency
Corresponding relationship, it is determining gather with the employee in the corresponding working efficiency of the grade of skill of each employee, so as to from the employee
Determine to complete at least one employee's subset of the goal task amount in set.For example, it is assumed that employee 1 in employee's set
Grade of skill be 1 grade, the grade of skill of employee 2 is 2 grades, then the project scheduling equipment can be according to preset grade of skill
With the corresponding relationship of working efficiency, determining working efficiency 0.48 corresponding with 1 grade of grade of skill of employee 1 in employee set
Case/hour determines 0.5 case of working efficiency/hour corresponding with 2 grades of grade of skill of the employee 2.
In one embodiment, the working efficiency of the project scheduling equipment each employee in determining employee's set
When, the length of service of each employee in available employee set, and according to the work of each employee in employee set
The grade of skill for making each employee in the time limit and employee set determines that the technical ability of each employee in employee's set is skilled
Degree, thus according to the corresponding relationship of preset skill proficiency and working efficiency, each employee in determining and employee set
The corresponding working efficiency of skill proficiency.In certain embodiments, the working efficiency of the employee with the technical ability it is skilled
The increase of degree and improve.
For example, it is assumed that including employee identification 1, employee identification 2 and employee identification 3 in employee's set, if the item
Mesh controlling equipment when the working efficiency of each employee, gets employee's mark in employee's set in determining employee's set
The length of service for knowing 1 corresponding employee is 1 year, grade of skill is 2 grades, and the length of service of the corresponding employee of employee identification 2 is 2 years, skill
Energy grade is 3 grades, and it is 4 grades that the length of service of the corresponding employee of employee identification 3, which is 5 years corresponding grades, then the project scheduling equipment
It can be according to the grade of skill of each employee in the length of service of each employee in employee set and employee set, really
The skill proficiency for making the corresponding employee of employee identification 1 is 50%, and the skill proficiency of the corresponding employee of employee identification 2 is 60% member
The skill proficiency of the corresponding employee of work mark 3 is 80%, to close according to preset skill proficiency is corresponding with working efficiency
System determines the working efficiency of the corresponding each employee of employee identification 1, employee identification 2, employee identification 2 in employee set.
S105: calculating the sum of the skill proficiency of each employee in each employee's subset, obtains the employee of each employee's subset
Target skill proficiency, and target employee is determined according to the target skill proficiency of the employee of each employee's subset
Collection, to call the employee of the target employee subset to execute the project task.
In the embodiment of the present invention, project scheduling equipment can calculate each employee in each employee's subset skill proficiency it
With obtain the target skill proficiency of the employee of each employee's subset, and the target of the employee according to each employee's subset
Skill proficiency determines target employee's subset, to call the employee of the target employee subset to execute the project task.
In one embodiment, project scheduling equipment completes the goal task according to the employee of each employee's subset
When the target skill proficiency of amount determines target employee's subset, the employee of available each employee's subset completes the mesh
The target skill proficiency of task amount is marked, and mesh needed for the employee of each employee's subset is completed the goal task amount
Mark skill proficiency compares, and the maximum target of target skill proficiency is determined from least one described employee's subset
Employee's subset.
For example, it is assumed that first employee's subset includes employee 1 and employee 2, the skill proficiency of employee 1 is 1, the skill of employee 2
Energy proficiency is 2, and second employee's subset includes employee 3 and employee 4, and the skill proficiency of employee 3 is 1, and the technical ability of employee 4 is skilled
Degree is 3, then can determine the target skill proficiency of employee in the first employee subset are as follows: 1+2=3 and described second
The target skill proficiency of employee in employee's subset are as follows: 1+3=4, since 4 greater than 3, thus may determine that second employee is sub
Integrate as target employee's subset.
In one embodiment, project scheduling equipment can detecte the employee of each employee's subset target technical ability it is ripe
White silk degree, if the target skill proficiency for detecting the presence of the employee of at least two employee's subsets is greater than default proficiency threshold value,
Then the available target skill proficiency is greater than in each employee's subset of default proficiency threshold value described in each employee's completion
The original wage of goal task amount, and calculate the target skill proficiency and be greater than in each employee's subset of default proficiency threshold value
Each employee completes the sum of the original wage of the goal task amount, obtains each employee's subset and completes the goal task amount
Wage cost, so that it is determined that the minimum target employee's subset of the wage cost out.
For example, it is assumed that default proficiency threshold value is 2, goal task amount is 200 casees products, and first employee's subset includes employee
1 and employee 2, the skill proficiency of employee 1 is 1, and the skill proficiency of employee 2 is 2, and second employee's subset includes employee 3 and member
Work 4, the skill proficiency of employee 3 are 2, and the skill proficiency of employee 4 is 1, then can determine member in the first employee subset
The target skill proficiency of work are as follows: the target skill proficiency of employee in 1+2=3 and the second employee subset are as follows: 2+1
=3,3 are greater than 2, thus may determine that the original wage that the employee 1 of first employee's subset completes 200 casees products is 10000 yuan, member
It is 14000 yuan and the original of the 200 casees products of completion of employee 3 of second employee's subset that work 2, which completes the original wage of 200 casees products,
Beginning wage is 13000 yuan, and the original wage that employee 4 completes 200 casees products is 12000 yuan.The first employee can then be calculated
Concentrating each employee to complete the sum of original wage of 200 casees products is 24000 yuan, and the employee of second employee's subset completes 200 casees productions
The sum of original wage of product is 25000 yuan, so that it is determined that first minimum employee's subset of the wage cost is target employee out
Subset.
In one embodiment, project scheduling equipment can be according to the working efficiency of each employee in each employee's subset
With the goal task amount, determine that the employee of each employee's subset completes the time cost of the goal task amount, and according to every
The employee of the original wage of a employee and each employee's subset completes the time cost of the goal task amount, described in calculating
The employee of each employee's subset completes the sum of the original wage of the goal task amount, obtains the employee of each employee's subset
Complete the wage cost of the goal task amount.
For example, it is assumed that goal task amount is 200 casees products, in the employee set working efficiency of employee 1 be 0.48 case/
Hour, the working efficiency of employee 2 is 0.5 case/hour, and project scheduling equipment can determine the employee being made of employee 1 and employee 2
Subset completes the time cost of described 200 casees products of goal task amount are as follows: 200/ (0.48+0.5)=204 hour, if institute
The original wage for stating employee 1 and employee 2 is 10000 yuan, then can calculate employee 1 and employee 2 in employee's subset and complete institute
It states the sum of original wage of 200 casees products and completes the target for 20000 yuan to get to the employee 1 of employee's subset and employee 2
The wage cost of task amount is 20000 yuan.
In one embodiment, the overtime of the available each employee of the project scheduling equipment, and according to each
The overtime of each employee in employee's subset determines that the employee of each employee's subset completes needed for the goal task amount
Overtime work cost, and according to the working time of employee in each employee's subset, determine that the employee of each employee's subset completes
Wage cost needed for the goal task amount.
In one embodiment, the project scheduling equipment is in the overtime according to each employee in each employee's subset,
It, can be according to each employee when determining overtime work cost needed for the employee of each employee's subset completes the goal task amount
The overtime of each employee in subset determines that the employee of each employee's subset completes total needed for the goal task amount add
Class's time, and according to the corresponding relationship of preset overtime and overtime cost, the determining employee with each employee's subset
Complete the corresponding overtime work cost of total overtime needed for the goal task amount.
For example, it is assumed that the corresponding relationship of preset overtime and overtime cost is 100 pieces/hour, if the employee
In subset the overtime of employee 1 be 10 hours, the work hours be 190 hours, employee 2 be overtime be 20 hours,
Work hours are 188 hours, then the project scheduling equipment can determine that the employee 1 of employee's subset and employee 2 complete
Total overtime needed for described 200 casees products of goal task amount are as follows: 10+20=30 hour.The project scheduling equipment can
With according to 100 piece/hour of corresponding relationship of preset overtime and overtime cost, determination is complete with the employee of employee's subset
At overtime work cost needed for 30 hours of total overtime needed for described 200 casees products of goal task amount are as follows: 100*30=
3000 yuan.Assuming that the original wage of the employee 1 and employee 2 are 10000 yuan, then it can determine that the employee 1 and employee 2 are complete
At the wage cost of 100 casees products are as follows: 10000+10000=20000 member.
In one embodiment, project scheduling equipment can detecte the employee of each employee's subset target technical ability it is ripe
White silk degree, if the target skill proficiency for detecting the presence of the employee of at least two employee's subsets is greater than default proficiency threshold value,
Then the available target skill proficiency is greater than in each employee's subset of default proficiency threshold value described in each employee's completion
The operating time of goal task amount, and calculate the target skill proficiency and be greater than in each employee's subset of default proficiency threshold value
Each employee completes the sum of the operating time of the goal task amount, obtains the target skill proficiency and is greater than default proficiency
The employee of each employee's subset of threshold value completes the time cost of the goal task amount, thus big from the target skill proficiency
The smallest target employee of time cost for completing the goal task amount is determined in each employee's subset of default proficiency threshold value
Subset.
For example, it is assumed that default proficiency threshold value is 1, goal task amount is 200 casees products, and first employee's subset includes employee
1 and employee 2, the skill proficiency of employee 1 is 1, the working efficiency of employee 1 is 0.4 case/hour, and the skill proficiency of employee 2 is
2, the working efficiency of employee 2 is 0.8 case/hour, and second employee's subset includes employee 3 and employee 4, the skill proficiency of employee 3
Working efficiency for 1, employee 3 is 0.4 case/hour, the skill proficiency of employee 4 is 1, the working efficiency of employee 4 be 0.4 case/
Hour, then it can determine the target skill proficiency of employee in the first employee subset are as follows: 1+2=3 and second member
The target skill proficiency of brigade concentration employee are as follows: 1+1=2,3 are greater than 1, thus may determine that the employee 1 of first employee's subset
The time cost of 200 casees products is completed with employee 2 are as follows: 200/ (0.4+0.8)=167 hour and second employee's subset
Employee 3 and employee 4 complete the time cost of 200 casees products are as follows: 200/ (0.4+0.4)=250 hour was less than due to 167
250, thus may determine that the smallest first employee subset of time cost for completing 200 casees products is target employee subset.
In one embodiment, the employee of each employee's subset can be completed the target times by the project scheduling equipment
The wage cost of business amount compares, and determines at least one employee of the wage cost within the scope of default wage cost
Collection, and the employee of each employee's subset by the wage cost within the scope of default wage cost complete the goal task
The technical ability cost of amount compares, and determines the highest target employee subset of technical ability cost for completing the goal task amount, to adjust
The project task is executed with the employee of the target employee subset.
For example, it is assumed that default wage cost range is the employee 1 and member of first employee's subset in 22000 to 23000 ranges
The wage cost that work 2 completes 200 casees products is 22000 yuan, and the technical ability cost of employee 1 and employee 2 are 3, second employee's subset
The wage cost that employee 3 and employee 4 complete 200 casees products is 22500 yuan, and the technical ability cost of employee 3 and employee 4 are 4, then described
The employee of first employee's subset can be completed 22000 yuan of the wage cost and second of the goal task amount by project scheduling equipment
The employee of employee's subset complete the goal task amount 22500 yuan of wage cost compare, due to 22000 and 22500
Within the scope of default wage cost, thus may determine that first employee of the wage cost within the scope of default wage cost
Collection and second employee's subset.The project calls equipment can be by the employee of the employee of first employee's subset and second employee's subset
The technical ability cost for completing the goal task amount compares, since 4 greater than 3, thus may determine that completing the goal task
The highest second employee subset of the technical ability cost of amount is target employee subset, to call the employee of the second employee subset to execute
The project task.
In one embodiment, project cost threshold value can be carried in the project scheduling request, the project scheduling is set
It is standby in the wage cost for completing the goal task amount according to the employee of each employee's subset, according to preset rules from described
When determining target employee's subset at least one employee's subset, it can be determined from least one described employee's subset described
Wage cost is less than or equal at least one employee's subset of the project cost threshold value, and the detection wage cost is less than
Or the time cost of the goal task amount is completed equal to the employee of at least one employee's subset of the project cost threshold value, and
Determine the smallest target employee subset of the time cost.
For example, it is assumed that project cost threshold value is 30000 yuan, employee's subset is made of employee 1 and employee 2,1 He of employee
The overtime work cost of employee 2 is 3000 yuan, and wage cost is 20000 yuan, then the employee that can calculate employee's subset completes mesh
Mark the project cost of 200 casees products of task amount are as follows: 20000+3000=23000, since 23000 less than the project cost threshold value
30000, then it can determine that employee's subset that employee 1 and employee 2 form is target employee subset.
In one embodiment, project scheduling equipment can detecte the project cost less than the project cost threshold value
The project cost of each employee's subset, and determine that the project cost is at least one association employee's being preset in this section
Collection, and the overtime of each employee in each association employee's subset is obtained, and calculate each in each association employee's subset
The sum of overtime of employee, obtain each association employee's subset employee complete the overtime work of the goal task amount at
This, to determine target employee's subset of the overtime work cost minimization from least one described association employee's subset.
In one embodiment, project scheduling equipment can complete the target according to the employee of each employee's subset
Time cost needed for task amount determines target employee's subset from least one described employee's subset, to call the mesh
The employee marked in employee's subset executes the project task.In certain embodiments, project scheduling equipment can detecte described every
Time cost needed for the employee of zooid's brigade collection completes the goal task amount obtains needed for completing the goal task amount
At least one the employee's subset of time cost in preset time range, and obtain the time cost in preset time range
Each employee's subset in each employee grade of skill, to calculate each employee of the time cost in preset time range
The sum of the grade of skill of each employee in subset, and maximum target employee subset of the sum of determining the grade of skill.
For example, it is assumed that determining that first employee's subset, second employee's subset and third employee's subset, preset time range are
26 days, if the project scheduling equipment detect the first employee subset employee complete goal task amount needed for the time
Cost is 24 days, and time cost needed for detecting employee's completion goal task amount of the second employee subset is 25 days, inspection
Time cost needed for measuring employee's completion goal task amount of the third employee subset is 28 days, then the project scheduling is set
First employee subset of the time cost in preset time range 26 days needed for the standby available completion goal task amount
With second employee's subset.Then in the available first employee subset of the project scheduling equipment each employee grade of skill
And the grade of skill of each employee in the second employee subset is obtained, if calculating each member in the first employee subset
The sum of grade of skill of work is 10, calculates the sum of grade of skill of each employee 9 in the second employee subset, is greater than due to 10
9, then it can determine that the maximum first employee subset of the sum of described grade of skill is target employee subset.
In one embodiment, the employee that project scheduling equipment can detecte each employee's subset completes the target
Time cost needed for task amount obtains time cost needed for completing the goal task amount in preset time range extremely
Few zooid's brigade collection, obtains at least one of time cost in preset time range needed for completing the goal task amount
Each employee completes the original wage of the goal task amount in employee's subset, and the employee for calculating each employee's subset completes the target
The sum of original wage of task amount obtains the wage cost that each employee's subset completes the goal task amount, so that it is determined that
The smallest target employee subset of wage cost of the goal task amount is completed out.
For example, it is assumed that determining that first employee's subset, second employee's subset and third employee's subset, preset time range are
26 days, if the project scheduling equipment detect the first employee subset employee complete goal task amount needed for the time
Cost is 24 days, and time cost needed for detecting employee's completion goal task amount of the second employee subset is 25 days, inspection
Time cost needed for measuring employee's completion goal task amount of the third employee subset is 28 days, then the project scheduling is set
First employee subset of the time cost in preset time range 26 days needed for the standby available completion goal task amount
With second employee's subset.Then in the available first employee subset of the project scheduling equipment each employee original work
Money, and the original wage of each employee in the second employee subset is obtained, if calculated in the first employee subset
The sum of original wage of each employee is 30000, calculates the sum of the original wage of each employee in the second employee subset
28000, since 30000 are greater than 28000, then it can determine that the minimum second employee subset of the sum of described original wage is target
Employee's subset.
In one embodiment, the employee of the available each employee's subset of project scheduling equipment completes the target
Time cost needed for task amount and wage cost, and the goal task amount is completed according to the employee of each employee's subset
The employee of required time cost and preset time weighting and each employee's subset completes the goal task amount institute
The wage cost and preset wage weight needed determines project needed for each employee's subset completes the goal task amount
Cost, to determine the minimum target employee's subset of the project cost from each employee's subset.
For example, it is assumed that time cost needed for first employee's subset completes the goal task amount is 22 days, wage cost
It is 2.5 ten thousand, time cost needed for second employee's subset completes the goal task amount is 24 days, wage cost is 2.6 ten thousand, the
Time cost needed for three employee's subsets complete the goal task amount is 23 days, wage cost is 2.8 ten thousand, if when preset
Between weight be 40%, preset wage weight is 60%, then the project scheduling equipment can calculate first employee
Collection completes the project cost of the goal task amount are as follows: 22*40%+2.5*60%=10.3 calculates the second employee
Collection completes the project cost of the goal task amount are as follows: 24*40%+2.6*60%=11.16 calculates third employee
Collection completes the project cost of the goal task amount are as follows: 23*40%+2.8*60%=10.88.Therefore the project scheduling equipment
It can determine the project cost minimum 10.3, i.e., the described project scheduling equipment can determine that the first employee subset is
Target employee's subset.
In the embodiment of the present invention, project scheduling equipment can filter out the project tune sent with terminal from employee database
Employee's set that the required performance information of degree request matches, the technical ability according to each employee in employee set are skilled
Degree determines the working efficiency of each employee in employee's set, according to the working efficiency of each employee in employee set
With the goal task amount of the project task, the goal task amount is completed in determination in the temporal information of the project task
At least one employee's subset, and target employee's is determined according to the target skill proficiency of the employee of each employee's subset
Collection, to call the employee of the target employee subset to execute the project task, so that project scheduling task is realized, to improve item
The efficiency of mesh scheduling.
Fig. 2 is referred to, Fig. 2 is the schematic flow diagram of another project scheduling method provided in an embodiment of the present invention, such as Fig. 2
Shown, this method can be executed by project scheduling equipment, and the specific explanations of the project scheduling equipment are as previously mentioned, no longer superfluous herein
It states.The difference of the embodiment of the present invention and embodiment described in above-mentioned Fig. 1 is that the embodiment of the present invention is to the project scheduling method
Specific implementation process schematically illustrated.Specifically, described method includes following steps for the embodiment of the present invention.
S201: the project scheduling request that terminal is sent is received, wherein carry project task in the project scheduling request
Required performance information, temporal information and goal task amount.
In the embodiment of the present invention, project scheduling equipment can receive the project scheduling request of terminal transmission, wherein the item
Performance information required by project task, temporal information and goal task amount are carried in mesh scheduling request, specific implementation is for example
Preceding described, details are not described herein again.
S202: collect from the employee to match with performance information required by the project task is filtered out in employee database
It closes, includes at least one employee identification in employee's set.
In the embodiment of the present invention, project scheduling equipment can be filtered out from employee database and be wanted with the project task
The employee that the performance information asked matches gathers, and includes at least one employee identification in employee's set, specific implementation is for example
Preceding described, details are not described herein again.
S203: the grade of skill of each employee and length of service in employee's set are obtained.
In the embodiment of the present invention, in the available employee set of project scheduling equipment the grade of skill of each employee and
Length of service.For example, the available grade of skill for gathering employee 1 to the employee of the project scheduling equipment is 1 grade, work
Year is limited to 1 year, and the grade of skill of employee 2 is 3 grades, and the length of service is 4 years.
S204: according to the grade of skill of each employee in preset grade of skill weight and employee's set and preset
The length of service of each employee in length of service weight and employee set, determine the skill of each employee in employee's set
It can proficiency.
In the embodiment of the present invention, project scheduling equipment can be according in preset grade of skill weight and employee set
The length of service of each employee in the grade of skill of each employee and preset length of service weight and employee set,
Determine the skill proficiency of each employee in employee's set.Specific embodiment is illustrated as previously mentioned, details are not described herein again.
S205: according to the skill proficiency of each employee in employee set, every zooid in employee's set is determined
The working efficiency of work.
In the embodiment of the present invention, project scheduling equipment can be skilled according to the technical ability of each employee in employee set
Degree determines the working efficiency of each employee in employee's set.
For example, it is assumed that the skill proficiency of employee 1 is 1 in employee's set, the skill proficiency of employee 2 is 3.4, such as
Fruit project task is the product calculated by case, and the corresponding relationship for presetting skill proficiency and working efficiency is 1 grade of skill proficiency
Working efficiency be 0.4 case/hour, then the project scheduling equipment can determine the employee 1 working efficiency be 0.4 case/
Hour, the working efficiency of the employee 2 are as follows: 0.4*3.4=1.36 case/hour.
S206: according to the employee set in the working efficiency of each employee and the goal task amount of the project task,
Determine at least one employee's subset that the goal task amount is completed in the temporal information of the project task.
In the embodiment of the present invention, project scheduling equipment can according to the employee gather in each employee working efficiency and
The goal task amount of the project task, determination complete the goal task amount extremely in the temporal information of the project task
Few zooid's brigade collection, specific embodiment is as previously mentioned, details are not described herein again.
S207: calculating the sum of the skill proficiency of each employee in each employee's subset, obtains the employee of each employee's subset
Target skill proficiency, and target employee is determined according to the target skill proficiency of the employee of each employee's subset
Collection, to call the employee of the target employee subset to execute the project task.
In the embodiment of the present invention, project scheduling equipment can calculate each employee in each employee's subset skill proficiency it
With obtain the target skill proficiency of the employee of each employee's subset, and the target of the employee according to each employee's subset
Skill proficiency determines target employee's subset, to call the employee of the target employee subset to execute the project task, specifically
Embodiment is as previously mentioned, details are not described herein again.
In the embodiment of the present invention, project scheduling equipment can filter out the project tune sent with terminal from employee database
Employee's set that the required performance information of degree request matches, the technical ability according to each employee in employee set are skilled
Degree determines the working efficiency of each employee in employee's set, according to the working efficiency of each employee in employee set
With the goal task amount of the project task, the goal task amount is completed in determination in the temporal information of the project task
At least one employee's subset, and target employee's is determined according to the target skill proficiency of the employee of each employee's subset
Collection, to call the employee of the target employee subset to execute the project task, so that project scheduling task is realized, to improve item
The efficiency of mesh scheduling.
The embodiment of the invention also provides a kind of project scheduling equipment, the project scheduling equipment is any one of aforementioned for executing
The unit of the method.It specifically, is a kind of signal of project scheduling equipment provided in an embodiment of the present invention referring to Fig. 3, Fig. 3
Block diagram.The project scheduling equipment of the present embodiment includes: receiving unit 301, screening unit 302, the first determination unit 303, second
Determination unit 304 and call unit 305.
Receiving unit 301, for receiving the project scheduling request of terminal transmission, wherein taken in the project scheduling request
With performance information, temporal information and goal task amount required by project task;
Screening unit 302, for from being filtered out in employee database and performance information phase required by the project task
Matched employee gathers, and includes at least one employee identification in employee's set;
First determination unit 303, for determining the skill proficiency of each employee in employee's set, and according to described
The skill proficiency of each employee in employee's set determines the working efficiency of each employee in employee's set;
Second determination unit 304, for being appointed according to the working efficiency of each employee and the project in employee set
The goal task amount of business determines at least one employee that the goal task amount is completed in the temporal information of the project task
Subset;
Call unit 305 obtains each employee for calculating the sum of the skill proficiency of each employee in each employee's subset
The target skill proficiency of the employee of subset, and mesh is determined according to the target skill proficiency of the employee of each employee's subset
Employee's subset is marked, to call the employee of the target employee subset to execute the project task.
Further, when first determination unit 303 determines the skill proficiency of each employee in employee's set,
It is specifically used for:
Obtain the grade of skill of each employee and length of service in employee's set;
According to the grade of skill and preset work of each employee in preset grade of skill weight and employee set
The length of service for making each employee in time limit weight and employee set determines the technical ability of each employee in employee's set
Proficiency.
Further, first determination unit 303 is according to every in preset grade of skill weight and employee set
The length of service of each employee in the grade of skill of a employee and preset length of service weight and employee set, really
In fixed employee's set when the skill proficiency of each employee, it is specifically used for:
According to the grade of skill of each employee in preset grade of skill weight and employee set, determine described each
The sum of grade of skill of employee is the target grade of skill of employee set;And
According to the length of service of each employee in preset length of service weight and employee set, determine described each
The sum of length of service of employee is the target operation time limit of employee set;
According to the target grade of skill and the target operation time limit, the skill of each employee in employee's set is determined
It can proficiency.
Further, second determination unit 304 is according to the working efficiency of each employee and institute in employee set
The goal task amount of project task is stated, determination completes the goal task amount at least in the temporal information of the project task
When one zooid's brigade collection, it is specifically used for:
According to the working efficiency of each employee in employee set, determine that each employee is in unit in employee's set
The task amount completed in time;
According to the task amount that each employee completes within the unit time in employee set, determine in the project task
Temporal information in complete at least one employee's subset of the goal task amount.
Further, the call unit 305 completes the goal task amount according to the employee of each employee's subset
Target skill proficiency when determining target employee's subset, be specifically used for:
Obtain the target skill proficiency of employee in each employee's subset;
The target skill proficiency of employee in each employee's subset is compared, from least one employee
It concentrates and determines the maximum target employee subset of target skill proficiency.
Further, the call unit 305 is also used to:
Detect the target skill proficiency of employee in each employee's subset;
If the target skill proficiency for detecting the presence of employee at least two employee's subsets is greater than default proficiency threshold
Value then obtains the target skill proficiency and is greater than each employee's completion mesh in each employee's subset of default proficiency threshold value
Mark the original wage of task amount;
The target skill proficiency is calculated to be greater than in each employee's subset of default proficiency threshold value described in each employee's completion
The sum of original wage of goal task amount obtains the wage cost that each employee's subset completes the goal task amount, and really
Make the minimum target employee's subset of the wage cost.
Further, the call unit 305 is also used to:
Detect the target skill proficiency of employee in each employee's subset;
If the target skill proficiency for detecting the presence of employee at least two employee's subsets is greater than default proficiency threshold
Value then obtains the target skill proficiency and is greater than each employee's completion mesh in each employee's subset of default proficiency threshold value
Mark the operating time of task amount;
It calculates the target skill proficiency and is greater than each employee's completion institute in each employee's subset of default proficiency threshold value
The sum of the operating time for stating goal task amount obtains each employee that the target skill proficiency is greater than default proficiency threshold value
The employee of collection completes the time cost of the goal task amount;
It is determined from each employee's subset that the target skill proficiency is greater than default proficiency threshold value and completes the target
The smallest target employee subset of the time cost of task amount.
In the embodiment of the present invention, project scheduling equipment can filter out the project tune sent with terminal from employee database
Employee's set that the required performance information of degree request matches, the technical ability according to each employee in employee set are skilled
Degree determines the working efficiency of each employee in employee's set, according to the working efficiency of each employee in employee set
With the goal task amount of the project task, the goal task amount is completed in determination in the temporal information of the project task
At least one employee's subset, and target employee's is determined according to the target skill proficiency of the employee of each employee's subset
Collection, to call the employee of the target employee subset to execute the project task, so that project scheduling task is realized, to improve item
The efficiency of mesh scheduling.
Referring to fig. 4, Fig. 4 is a kind of schematic block diagram of server provided in an embodiment of the present invention.This implementation as shown in the figure
Server in example may include: one or more processors 401;One or more input equipments 402, one or more output
Equipment 403 and memory 404.Above-mentioned processor 401, input equipment 402, output equipment 403 and memory 404 pass through bus
405 connections.Memory 404 is for storing computer program, and the computer program includes program instruction, and processor 401 is used for
Execute the program instruction that memory 404 stores.Wherein, processor 401 is configured for calling described program instruction execution:
Receive the project scheduling request that terminal is sent, wherein carry project task in the project scheduling request and wanted
Performance information, temporal information and the goal task amount asked;
Gather from the employee to match with performance information required by the project task is filtered out in employee database, institute
Stating in employee's set includes at least one employee identification;
Determine the skill proficiency of each employee in employee's set, and according to each employee in employee set
Skill proficiency determines the working efficiency of each employee in employee's set;
According to the working efficiency of each employee and the goal task amount of the project task in employee set, determine
At least one employee's subset of the goal task amount is completed in the temporal information of the project task;
The sum of the skill proficiency for calculating each employee in each employee's subset obtains the target of the employee of each employee's subset
Skill proficiency, and target employee's subset is determined according to the target skill proficiency of the employee of each employee's subset, to adjust
The project task is executed with the employee of the target employee subset.
Further, it is specific to use when the processor 401 determines the skill proficiency of each employee in employee's set
In:
Obtain the grade of skill of each employee and length of service in employee's set;
According to the grade of skill and preset work of each employee in preset grade of skill weight and employee set
The length of service for making each employee in time limit weight and employee set determines the technical ability of each employee in employee's set
Proficiency.
Further, the processor 401 is according to each employee in preset grade of skill weight and employee set
Grade of skill and preset length of service weight and the employee set in each employee length of service, determine described in
In employee's set when the skill proficiency of each employee, it is specifically used for:
According to the grade of skill of each employee in preset grade of skill weight and employee set, determine described each
The sum of grade of skill of employee is the target grade of skill of employee set;And
According to the length of service of each employee in preset length of service weight and employee set, determine described each
The sum of length of service of employee is the target operation time limit of employee set;
According to the target grade of skill and the target operation time limit, the skill of each employee in employee's set is determined
It can proficiency.
Further, the processor 401 is according to the working efficiency of each employee and the project in employee set
The goal task amount of task determines at least one member that the goal task amount is completed in the temporal information of the project task
When brigade collection, it is specifically used for:
According to the working efficiency of each employee in employee set, determine that each employee is in unit in employee's set
The task amount completed in time;
According to the task amount that each employee completes within the unit time in employee set, determine in the project task
Temporal information in complete at least one employee's subset of the goal task amount.
Further, the processor 401 completes the goal task amount according to the employee of each employee's subset
When target skill proficiency determines target employee's subset, it is specifically used for:
Obtain the target skill proficiency of employee in each employee's subset;
The target skill proficiency of employee in each employee's subset is compared, from least one employee
It concentrates and determines the maximum target employee subset of target skill proficiency.
Further, the processor 401 is also used to:
Detect the target skill proficiency of employee in each employee's subset;
If the target skill proficiency for detecting the presence of employee at least two employee's subsets is greater than default proficiency threshold
Value then obtains the target skill proficiency and is greater than each employee's completion mesh in each employee's subset of default proficiency threshold value
Mark the original wage of task amount;
The target skill proficiency is calculated to be greater than in each employee's subset of default proficiency threshold value described in each employee's completion
The sum of original wage of goal task amount obtains the wage cost that each employee's subset completes the goal task amount, and really
Make the minimum target employee's subset of the wage cost.
Further, the processor 401 is also used to:
Detect the target skill proficiency of employee in each employee's subset;
If the target skill proficiency for detecting the presence of employee at least two employee's subsets is greater than default proficiency threshold
Value then obtains the target skill proficiency and is greater than each employee's completion mesh in each employee's subset of default proficiency threshold value
Mark the operating time of task amount;
It calculates the target skill proficiency and is greater than each employee's completion institute in each employee's subset of default proficiency threshold value
The sum of the operating time for stating goal task amount obtains each employee that the target skill proficiency is greater than default proficiency threshold value
The employee of collection completes the time cost of the goal task amount;
It is determined from each employee's subset that the target skill proficiency is greater than default proficiency threshold value and completes the target
The smallest target employee subset of the time cost of task amount.
In the embodiment of the present invention, server can filter out the project scheduling sent with terminal from employee database and request
Employee's set that required performance information matches is determined according to the skill proficiency of each employee in employee set
The working efficiency of each employee in employee's set, according to the working efficiency and the item of each employee in employee set
The goal task amount of mesh task determines at least one that the goal task amount is completed in the temporal information of the project task
Employee's subset, and target employee's subset is determined according to the target skill proficiency of the employee of each employee's subset, to call
The employee of the target employee subset executes the project task, so that project scheduling task is realized, to improve project scheduling
Efficiency.
It should be appreciated that in embodiments of the present invention, alleged processor 401 can be central processing unit (CenSral
Processing UniS, CPU), which can also be other general processors, digital signal processor (DigiSal
Signal Processor, DSP), specific integrated circuit (ApplicaSion Specific InSegraSed CircuiS,
ASIC), ready-made programmable gate array (Field-Programmable GaSe Array, FPGA) or other programmable logic
Device, discrete gate or transistor logic, discrete hardware components etc..General processor can be microprocessor or this at
Reason device is also possible to any conventional processor etc..
Input equipment 402 may include Trackpad, microphone etc., output equipment 403 may include display (LCD etc.),
Loudspeaker etc..
The memory 404 may include read-only memory and random access memory, and to processor 401 provide instruction and
Data.The a part of of memory 404 can also include nonvolatile RAM.
In the specific implementation, processor 401 described in the embodiment of the present invention, input equipment 402, output equipment 403 can
Execute realization side described in embodiment of the method described in Fig. 1 or Fig. 2 of project scheduling method provided in an embodiment of the present invention
The implementation of project scheduling equipment described in Fig. 3 of the embodiment of the present invention also can be performed in formula, and details are not described herein.
A kind of computer readable storage medium is additionally provided in the embodiment of the present invention, the computer readable storage medium is deposited
Computer program is contained, the computer program realizes item described in embodiment corresponding to Fig. 1 or Fig. 2 when being executed by processor
Mesh dispatching method can also realize the project scheduling equipment of embodiment corresponding to Fig. 3 of the present invention, and details are not described herein.
It deposits the inside that the computer readable storage medium can be project scheduling equipment described in aforementioned any embodiment
Storage unit, such as the hard disk or memory of project scheduling equipment.The computer readable storage medium is also possible to the project tune
Spend the External memory equipment of equipment, such as the plug-in type hard disk being equipped in the project scheduling equipment, intelligent memory card (SmarS
Media Card, SMC), secure digital (Secure DigiSal, SD) card, flash card (Flash Card) etc..Further,
The computer readable storage medium can also both include the internal storage unit of the project scheduling equipment or deposit including outside
Store up equipment.The computer readable storage medium is for storing needed for the computer program and the project scheduling equipment
Other programs and data.The computer readable storage medium, which can be also used for temporarily storing, have been exported or will export
Data.
The above, some embodiments only of the invention, but scope of protection of the present invention is not limited thereto, and it is any
Those familiar with the art in the technical scope disclosed by the present invention, can readily occur in various equivalent modifications or replace
It changes, these modifications or substitutions should be covered by the protection scope of the present invention.
Claims (10)
1. a kind of project scheduling method characterized by comprising
Receive the project scheduling request that terminal is sent, wherein carry required by project task in the project scheduling request
Performance information, temporal information and goal task amount;
Gather from the employee to match with performance information required by the project task is filtered out in employee database, the member
It include at least one employee identification in work set;
Determine the skill proficiency of each employee in employee's set, and according to the technical ability of each employee in employee set
Proficiency determines the working efficiency of each employee in employee's set;
According to the working efficiency of each employee and the goal task amount of the project task in employee set, determine described
At least one employee's subset of the goal task amount is completed in the temporal information of project task;
The sum of the skill proficiency for calculating each employee in each employee's subset obtains the target technical ability of the employee of each employee's subset
Proficiency, and target employee's subset is determined according to the target skill proficiency of the employee of each employee's subset, to call
The employee for stating target employee's subset executes the project task.
2. the method according to claim 1, wherein in determination employee set each employee technical ability
Proficiency, comprising:
Obtain the grade of skill of each employee and length of service in employee's set;
According to the grade of skill of each employee and preset working year in preset grade of skill weight and employee set
The length of service for limiting each employee in weight and employee set determines that the technical ability of each employee in employee's set is skilled
Degree.
3. according to the method described in claim 2, it is characterized in that, described according to preset grade of skill weight and the employee
In set the grade of skill of each employee and preset length of service weight and the employee set in each employee work
The time limit determines the skill proficiency of each employee in employee's set, comprising:
According to the grade of skill of each employee in preset grade of skill weight and employee set, each employee is determined
The sum of grade of skill for employee set target grade of skill;And
According to the length of service of each employee in preset length of service weight and employee set, each employee is determined
The sum of length of service for employee set the target operation time limit;
According to the target grade of skill and the target operation time limit, determine that the technical ability of each employee in employee's set is ripe
White silk degree.
4. the method according to claim 1, wherein the work according to each employee in employee set
The goal task is completed in the goal task amount of efficiency and the project task, determination in the temporal information of the project task
At least one employee's subset of amount, comprising:
According to the working efficiency of each employee in employee set, determine that each employee is in the unit time in employee's set
The task amount of interior completion;
According to the task amount completed within the unit time of each employee in employee set, determine the project task when
Between at least one employee's subset of the goal task amount is completed in information.
5. the method according to claim 1, wherein described complete institute according to the employee of each employee's subset
The target skill proficiency for stating goal task amount determines target employee's subset, comprising:
Obtain the target skill proficiency of employee in each employee's subset;
The target skill proficiency of employee in each employee's subset is compared, from least one described employee's subset
Determine the maximum target employee subset of the target skill proficiency.
6. according to the method described in claim 5, it is characterized in that, the method also includes:
Detect the target skill proficiency of employee in each employee's subset;
If the target skill proficiency for detecting the presence of employee at least two employee's subsets is greater than default proficiency threshold value,
It obtains the target skill proficiency and is greater than each employee's completion target times in each employee's subset of default proficiency threshold value
The original wage of business amount;
It calculates the target skill proficiency and is greater than each employee's completion target in each employee's subset of default proficiency threshold value
The sum of original wage of task amount obtains each employee's subset and completes the wage cost of the goal task amount, and determines
The minimum target employee's subset of the wage cost.
7. according to the method described in claim 5, it is characterized in that, the method also includes:
Detect the target skill proficiency of employee in each employee's subset;
If the target skill proficiency for detecting the presence of employee at least two employee's subsets is greater than default proficiency threshold value,
It obtains the target skill proficiency and is greater than each employee's completion target times in each employee's subset of default proficiency threshold value
The operating time of business amount;
It calculates the target skill proficiency and is greater than each employee's completion mesh in each employee's subset of default proficiency threshold value
The sum of the operating time for marking task amount obtains the target skill proficiency and is greater than each employee's subset for presetting proficiency threshold value
Employee completes the time cost of the goal task amount;
It is determined from each employee's subset that the target skill proficiency is greater than default proficiency threshold value and completes the goal task
The smallest target employee subset of the time cost of amount.
8. a kind of project scheduling equipment, which is characterized in that including for executing as described in any one of claim 1-7 claim
Method unit.
9. a kind of server, which is characterized in that including processor, input equipment, output equipment and memory, the processor,
Input equipment, output equipment and memory are connected with each other, wherein the memory is for storing computer program, the calculating
Machine program includes program instruction, and the processor is configured for calling described program instruction, is executed as claim 1-7 is any
Method described in.
10. a kind of computer readable storage medium, which is characterized in that the computer storage medium is stored with computer program,
The computer program includes program instruction, and described program instruction makes the processor execute such as right when being executed by a processor
It is required that the described in any item methods of 1-7.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910534678.0A CN110322126A (en) | 2019-06-18 | 2019-06-18 | A kind of project scheduling method, equipment, server and computer readable storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910534678.0A CN110322126A (en) | 2019-06-18 | 2019-06-18 | A kind of project scheduling method, equipment, server and computer readable storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110322126A true CN110322126A (en) | 2019-10-11 |
Family
ID=68119885
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910534678.0A Pending CN110322126A (en) | 2019-06-18 | 2019-06-18 | A kind of project scheduling method, equipment, server and computer readable storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110322126A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111123869A (en) * | 2019-12-24 | 2020-05-08 | 北京理工大学 | Flexible job shop scheduling method and device based on worker operation experience |
CN111429036A (en) * | 2020-04-24 | 2020-07-17 | 广东电网有限责任公司 | Monitoring method and device for work efficiency of auditors |
CN113283749A (en) * | 2021-05-26 | 2021-08-20 | 深圳前海微众银行股份有限公司 | Task distribution method, device, equipment, storage medium and program product |
CN114493357A (en) * | 2022-02-17 | 2022-05-13 | 中国工商银行股份有限公司 | Abnormal service processing method and device |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107958317A (en) * | 2016-10-17 | 2018-04-24 | 腾讯科技(深圳)有限公司 | A kind of method and apparatus that crowdsourcing participant is chosen in crowdsourcing project |
CN109658050A (en) * | 2018-11-12 | 2019-04-19 | 深圳壹账通智能科技有限公司 | A kind of management method and equipment of wage report |
-
2019
- 2019-06-18 CN CN201910534678.0A patent/CN110322126A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107958317A (en) * | 2016-10-17 | 2018-04-24 | 腾讯科技(深圳)有限公司 | A kind of method and apparatus that crowdsourcing participant is chosen in crowdsourcing project |
CN109658050A (en) * | 2018-11-12 | 2019-04-19 | 深圳壹账通智能科技有限公司 | A kind of management method and equipment of wage report |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111123869A (en) * | 2019-12-24 | 2020-05-08 | 北京理工大学 | Flexible job shop scheduling method and device based on worker operation experience |
CN111429036A (en) * | 2020-04-24 | 2020-07-17 | 广东电网有限责任公司 | Monitoring method and device for work efficiency of auditors |
CN113283749A (en) * | 2021-05-26 | 2021-08-20 | 深圳前海微众银行股份有限公司 | Task distribution method, device, equipment, storage medium and program product |
CN113283749B (en) * | 2021-05-26 | 2024-05-28 | 深圳前海微众银行股份有限公司 | Task distribution method, device, equipment, storage medium and program product |
CN114493357A (en) * | 2022-02-17 | 2022-05-13 | 中国工商银行股份有限公司 | Abnormal service processing method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110322126A (en) | A kind of project scheduling method, equipment, server and computer readable storage medium | |
CN108984418A (en) | Software testing management method, device, electronic equipment and storage medium | |
CN109670936A (en) | Loan examination & approval processing method, platform, equipment and computer readable storage medium | |
CN109298998A (en) | Workload assessment and model training method, electronic equipment and storage medium | |
CN110310023A (en) | A kind of project scheduling method, equipment, server and computer readable storage medium | |
CN107547759A (en) | A kind of quality detecting method and device to contact staff's call | |
CN107908548A (en) | A kind of method and apparatus for generating test case | |
CN110322127A (en) | A kind of project scheduling method, equipment, server and computer readable storage medium | |
CN110334921A (en) | A kind of project scheduling method, equipment, server and computer readable storage medium | |
CN113342939B (en) | Data quality monitoring method and device and related equipment | |
CN110378712A (en) | A kind of complaint handling method and device | |
CN106408325A (en) | User consumption behavior prediction analysis method based on user payment information and system | |
CN109461067A (en) | A kind of detection method of foreign exchange quotation abnormal data, apparatus and system | |
CN110009012A (en) | A kind of risk specimen discerning method, apparatus and electronic equipment | |
CN110909129B (en) | Abnormal complaint event identification method and device | |
CN112765463A (en) | Data management method for big data and user requirements and cloud computing server | |
CN111652711A (en) | Pre-credit analysis method, device, equipment and storage medium based on collection data | |
CN111190817A (en) | Method and device for processing software defects | |
KR20090002243A (en) | Evaluation method for r&d projects supported by government | |
CN108921433B (en) | Risk quantitative analysis system based on business continuity | |
CN110362470A (en) | Test data collection method, device, electronic equipment and storage medium | |
CN110334920A (en) | A kind of project scheduling method, equipment, server and computer readable storage medium | |
CN109801394A (en) | A kind of staff's Work attendance method and device, electronic equipment and readable storage medium storing program for executing | |
CN108960111A (en) | Face identification method, system and terminal device | |
CN114936160A (en) | Method and device for analyzing test requirement range of product |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20191011 |