CN110318792A - A kind of method for protecting support of control back deformation - Google Patents

A kind of method for protecting support of control back deformation Download PDF

Info

Publication number
CN110318792A
CN110318792A CN201910624884.0A CN201910624884A CN110318792A CN 110318792 A CN110318792 A CN 110318792A CN 201910624884 A CN201910624884 A CN 201910624884A CN 110318792 A CN110318792 A CN 110318792A
Authority
CN
China
Prior art keywords
drilling
anchor line
tunnel
iii
terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910624884.0A
Other languages
Chinese (zh)
Other versions
CN110318792B (en
Inventor
徐营
孙峰
周谢康
柏建彪
王朝阳
常庆粮
江澎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201910624884.0A priority Critical patent/CN110318792B/en
Publication of CN110318792A publication Critical patent/CN110318792A/en
Application granted granted Critical
Publication of CN110318792B publication Critical patent/CN110318792B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts

Abstract

The invention discloses a kind of method for protecting support of control back deformation, first on the back of anchor line supporting, any side in roadway's sides is selected to help as starting, drilling I is set in the country rock of the back apart from 100~300mm of the side upwards, drilling II is set to another side along horizontal direction drilling I terminal, then drilling III is set to back in the terminal of drilling II, until the terminal of drilling III is pierced by back;Anchor line is sequentially passed through into drilling I, drilling II and drilling III, then the terminal in the starting point of drilling I and drilling III is all made of anchor line rigging and fixes anchor line and back, completes one group of anchor line supporting;Then it repeats the above steps and completes the anchor line supporting in the tunnel section;Then anchor line supporting is carried out to next tunnel section, the anchor line supporting in entire tunnel is completed after the final each section progress anchor line supporting in tunnel.The present invention can improve the surrouding rock stress state above back, to effectively control the deformation of back.

Description

A kind of method for protecting support of control back deformation
Technical field
The present invention relates to a kind of method for protecting support, the method for protecting support of specifically a kind of control back deformation.
Background technique
With the increasingly reduction of superficial part resource reserve, domestic and international many mines enter deep mining, and South Africa, India's gold mine are most Heavy cut depth is more than 4000m, and Russian metallic ore most heavy cut depth is more than 2000m, and China's coal-mine mining depth is with annual 8 The speed of~12m increases, such as Xuzhou, table mountain, open Luan, new river in Shangdong Province mining area Part Coal Mine mining depth alreadys exceed 1000m.
Coal mine enters after deep mining, is influenced by deep formation complicated stress field, will face complete with shallow mining Different engineering rock mass mechanics problems.Engineering rock mass is from the linear mechanical behaviors of rocks of superficial part to the non-linear rock mechanics row in deep For transformation, the engineering project disaster for generating Deep Mine increases increasingly.Under the high stress of deep, rock is from the brittleness of low confining pressure to height Ductility conversion under confining pressure, causing roadway surrounding rock, not only deflection is big, and deformation velocity is fast;Into after deep, even medium The roadway surrounding rock of intensity, stress state have also reached or approached the long-term strength of rock, and rock mass shows lasting high current and becomes Property, finally with rock tertiary creep, the accident that roadway deformation even tunnel collapses occurs.
Summary of the invention
In view of the above existing problems in the prior art, the present invention provides it is a kind of control back deformation method for protecting support, The surrouding rock stress state above back can be improved, to effectively control the deformation of back.
To achieve the goals above, the technical solution adopted by the present invention is that: it is a kind of control back deformation supporting side Method, the specific steps of this method are as follows:
A, on the back of anchor line supporting, any side in roadway's sides is selected to help as starting, apart from the side 100 The country rock of the back of~300mm upwards sets drilling I, the boring direction of the drilling I and the Vertical Square of back Be 5 °~15 ° to angle, drill I length be 2~6m;
B, drill I terminal along horizontal direction to it is another side set drilling II, drill II length be 600~ Then 1500mm sets drilling III to back in the terminal of drilling II, until the terminal of drilling III is pierced by back, institute The vertical direction angle of the boring direction and back of stating drilling III is 5 °~15 °;
C, anchor line is sequentially passed through into drilling I, drilling II and drilling III, then at the end of the starting point of drilling I and drilling III End is all made of anchor line rigging and fixes anchor line and back, completes one group of anchor line supporting;
D, to the position of 600~1500mm of terminal of another side distance drilling III in tunnel, step A to C is repeated, is completed again One group of anchor line supporting;It is connected between the anchor line of two adjacent groups supporting by horizontally disposed anchor line, is so repeated, until last The anchor line supporting in the tunnel section is completed in group anchor line supporting when reaching another side in tunnel;
E, there are two kinds of situations when last group of anchor line supporting in step D reaches another side in tunnel;
One of which is that the group reaches another side in tunnel after setting drilling I, is walked at this time in I terminal of drilling along tunnel To drilling II is set, drill II length be 600~1500mm, then drilling II terminal set drilling to back III, until the terminal of drilling III is pierced by back, the boring direction of the drilling III and the vertical direction angle of back It is 5 °~15 °;The drilling III of the group is in next tunnel section after the completion, then repeats step A extremely on the tunnel section D completes the anchor line supporting in the tunnel section;
Another kind is that the group reaches another side in tunnel after setting drilling III, moves towards distance drilling III along tunnel at this time The position of 600~1500mm of terminal is the drilling starting point of next group of anchor line supporting, and the position is in next tunnel section, Then step A to D is repeated on the tunnel section, completes the anchor line supporting in the tunnel section;
F, each section in tunnel repeats step E, until completing the anchor line supporting in entire tunnel.
Compared with prior art, the present invention using multiple groups drill combine with anchor line it is fixed by the way of, have the advantages that
(1) there is anchor line stronger tensile capacity roadway roof absciss layer can be effectively controlled;Surface of the anchor line to back Certain restraining force is provided, roadway surrounding rock stress state is improved, improves intensity behind rock peak;Anchor line passes through drilling I, II and of drilling Drilling III can anchor the stabilization rock stratum in deep above top plate, play suspension function to superficial part ravelly ground;Anchor line supporting passes through multiple Anchor line, which is continuously connected with, makes each anchor line supporting form monoblock type supporting, and the ravelly ground in the region is formed a kind of group by this mode Zoarium gives full play to self.By acting on above, the roof deformation of deep tunnel is can be effectively controlled in the present invention;
(2) anchor line is lower compared to anchor pole, anchor cable cost;
(3) construction is simple of the present invention, easy to operate, it is only necessary to by anchor line can supporting larger area back, by It is light-weight in anchor line, so as to reduce the working strength of worker.
Detailed description of the invention
Fig. 1 is the structural schematic diagram after the present invention is implemented;
Fig. 2 is the top view of Fig. 1.
In figure: 1, tunnel, 2, anchor line rigging, 3, anchor line, 4, drilling I, 5, drilling II, 6, drilling III.
Specific embodiment
The present invention will be further described below.
As shown, specific steps of the invention are as follows:
A, on 1 top plate of the tunnel of anchor line supporting, any side in the side of 1 liang of tunnel is selected to help as starting, apart from the side The country rock of the back of 100~300mm upwards sets drilling I 4, the boring direction of the drilling I 4 and hanging down for back Straight angular separation is 5 °~15 °, and the length of drilling I 4 is 2~6m;
B, drill I 4 terminals along horizontal direction to it is another side set drilling II 5, drilling II 5 length be 600~ Then 1500mm sets drilling III 6 to back in the terminal of drilling II 5, until the terminal of drilling III 6 is pierced by tunnel top Plate, the boring direction of the drilling III 6 and the vertical direction angle of back are 5 °~15 °;
C, anchor line 3 is sequentially passed through into drilling I 4, drilling II 5 and drilling III 6, then in the starting point of drilling I 4 and drilling III 6 terminal is all made of anchor line rigging 2 and fixes anchor line and back, completes one group of anchor line supporting;
D, to the position of 600~1500mm of terminal of another side distance drilling III 6 in tunnel 1, step A to C is repeated, it is complete again At one group of anchor line supporting;It is connected between the anchor line 3 of two adjacent groups supporting by horizontally disposed anchor line 3, is so repeated, until most The anchor line supporting in 1 section of tunnel is completed in later group anchor line supporting when reaching 1 another side of tunnel;The anchor line 3 is high tensile, height Shearing resistance, high-elongation high-quality rope;
E, there are two kinds of situations when last group of anchor line supporting in step D reaches 1 another side of tunnel;
One of which is that the group reaches another side in tunnel after setting drilling I 4, at this time in I 4 terminals that drill along tunnel 1 trend sets drilling II 5, and the length of drilling II 5 is 600~1500mm, then sets in the terminal of drilling II 5 to back III 6 are drilled, until the terminal of drilling III 6 is pierced by back, the boring direction of the drilling III 6 and the Vertical Square of back It is 5 °~15 ° to angle;The drilling III 6 of the group is in next 1 section of tunnel after the completion, then the weight on 1 section of tunnel Multiple step A to D, completes the anchor line supporting in 1 section of tunnel;
Another kind is that the group reaches another side in tunnel 1 after setting drilling III 6, moves towards distance drilling along tunnel 1 at this time The position of III 6 600~1500mm of terminal is the drilling starting point of next group of anchor line supporting, and the position is in next tunnel Then section repeats step A to D on the tunnel section, complete the anchor line supporting in the tunnel section;
F, each section in tunnel 1 repeats step E, until completing the anchor line supporting in entire tunnel 1.

Claims (1)

1. a kind of method for protecting support of control back deformation, which is characterized in that the specific steps of this method are as follows:
A, on the back of anchor line supporting, select in roadway's sides it is any side as starting side, apart from the side 100~ The country rock of the back of 300mm upwards sets drilling I, the boring direction of the drilling I and the vertical direction of back Angle is 5 °~15 °, drill I length be 2~6m;
B, drill I terminal along horizontal direction to it is another side set drilling II, drill II length be 600~1500mm, so Drilling III is set to back in the terminal of drilling II afterwards, until the terminal of drilling III is pierced by back, the drilling III Boring direction and the vertical direction angle of back be 5 °~15 °;
C, anchor line is sequentially passed through into drilling I, drilling II and drilling III, then the terminal in the starting point of drilling I and drilling III is equal Anchor line and back are fixed using anchor line rigging, complete one group of anchor line supporting;
D, to the position of 600~1500mm of terminal of another side distance drilling III in tunnel, step A to C is repeated, completes one group again Anchor line supporting;It is connected between the anchor line of two adjacent groups supporting by horizontally disposed anchor line, is so repeated, until last group of anchor The anchor line supporting in the tunnel section is completed in rope supporting when reaching another side in tunnel;
E, there are two kinds of situations when last group of anchor line supporting in step D reaches another side in tunnel;
One of which is that the group reaches another side in tunnel after setting drilling I, is beaten at this time in I terminal of drilling along tunnel trend If drilling II, drill II length be 600~1500mm, then drilling II terminal set drilling III to back, directly Terminal to drilling III is pierced by back, and the boring direction of the drilling III and the vertical direction angle of back be 5 °~ 15°;The drilling III of the group is in next tunnel section after the completion, and step A to D is then repeated on the tunnel section, completes The anchor line supporting in the tunnel section;
Another kind is that the group reaches another side in tunnel after setting drilling III, moves towards the terminal of distance drilling III along tunnel at this time The position of 600~1500mm is the drilling starting point of next group of anchor line supporting, and the position is in next tunnel section, then Step A to D is repeated on the tunnel section, completes the anchor line supporting in the tunnel section;
F, each section in tunnel repeats step E, until completing the anchor line supporting in entire tunnel.
CN201910624884.0A 2019-07-11 2019-07-11 Supporting method for controlling deformation of roadway roof Active CN110318792B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910624884.0A CN110318792B (en) 2019-07-11 2019-07-11 Supporting method for controlling deformation of roadway roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910624884.0A CN110318792B (en) 2019-07-11 2019-07-11 Supporting method for controlling deformation of roadway roof

Publications (2)

Publication Number Publication Date
CN110318792A true CN110318792A (en) 2019-10-11
CN110318792B CN110318792B (en) 2020-08-21

Family

ID=68121953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910624884.0A Active CN110318792B (en) 2019-07-11 2019-07-11 Supporting method for controlling deformation of roadway roof

Country Status (1)

Country Link
CN (1) CN110318792B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4113036A (en) * 1976-04-09 1978-09-12 Stout Daniel W Laser drilling method and system of fossil fuel recovery
CN2911184Y (en) * 2006-04-15 2007-06-13 中国矿业大学 Shed type supporting stable conjunction mechanism
CN101333813A (en) * 2007-06-27 2008-12-31 柳州欧维姆机械股份有限公司 U-shaped anchorage cable
CN101603431A (en) * 2009-07-14 2009-12-16 中国矿业大学 A kind of method for reinforcing outburst-prone coal seam cross-cut coal uncovering

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4113036A (en) * 1976-04-09 1978-09-12 Stout Daniel W Laser drilling method and system of fossil fuel recovery
CN2911184Y (en) * 2006-04-15 2007-06-13 中国矿业大学 Shed type supporting stable conjunction mechanism
CN101333813A (en) * 2007-06-27 2008-12-31 柳州欧维姆机械股份有限公司 U-shaped anchorage cable
CN101603431A (en) * 2009-07-14 2009-12-16 中国矿业大学 A kind of method for reinforcing outburst-prone coal seam cross-cut coal uncovering

Also Published As

Publication number Publication date
CN110318792B (en) 2020-08-21

Similar Documents

Publication Publication Date Title
CN108894787B (en) Leave the pressure break release method of ore pillar stress concentration in Overburden gob area
CN102778182B (en) Beside-roadway topping pressure relief method of roadway driving along gob of small coal pillar influenced by dynamic pressure
CN106150503A (en) The method of tight roof is administered in a kind of fracturing
CN108661646A (en) A kind of false top house column type shrink afterwards filling mining method
CN102606181B (en) Hyperstatic scour prevention four-dimensional roadway support device and support method thereof
CN108868833A (en) A method of it carries out cutting gob side entry retaining in the relieving roadway of top in U-shaped steel supported laneway
CN103216244B (en) Roadway soft and weak top plate anchoring beam-arch combined structure support system and support method
CN104632223B (en) Mining environment reconstructing movable type pumping filling artificial ore pillar shrinkage stoping
CN102635356A (en) Medium-length hole mining method in multiple blasting free faces of high dipping thin veins
CN108894784A (en) A kind of tight roof orientation acid fracturing control top pressure relief method
CN102900449B (en) Support method for underground goaf roof of coal mine
CN105781560A (en) Construction method for ultra-short-distance overlapped line tunnel long-distance guide pit advance control bursting
CN109826628A (en) Presplitting arching without pillar mining method under the conditions of a kind of tight roof
CN108049870B (en) The induction caving mining methods of high-dipping middle thickness orebody of the upper disk containing unstable rock stratum
CN101881167A (en) Coal face stump mining method
CN109441503A (en) A kind of method for protecting support that thin coal pillar is controlled along empty coal road mine pressure inversion
CN101725351A (en) Filling stope pillar recovery mining method
CN202266277U (en) Contractible strut for U-shaped shed support
CN104265294B (en) Coal pillar-free mining method for blasting mining face of steeply dipping seam
CN110318792A (en) A kind of method for protecting support of control back deformation
CN106761742B (en) A kind of deep island working face gob side entry driving surrounding rock stability control method
CN102465706B (en) Digging method for vein-following developing roadway of inclined stratified rock body
CN107227966B (en) Temporary support device for tunnel excavation
CN105040693A (en) End expanding type anti-floating anchor rod
CN201554473U (en) Supporting device for coal mine tunnel cross breaking layer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant