CN110318538A - Constructional column pours the loading hopper and constructional column casting method of mold - Google Patents

Constructional column pours the loading hopper and constructional column casting method of mold Download PDF

Info

Publication number
CN110318538A
CN110318538A CN201910722544.1A CN201910722544A CN110318538A CN 110318538 A CN110318538 A CN 110318538A CN 201910722544 A CN201910722544 A CN 201910722544A CN 110318538 A CN110318538 A CN 110318538A
Authority
CN
China
Prior art keywords
constructional column
mold
pours
swivel plate
loading hopper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910722544.1A
Other languages
Chinese (zh)
Inventor
周著平
张东海
韩华侨
吴明良
沈玉
丁慧
高祥光
刘月兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Water Resources Development Co Ltd
Original Assignee
Anhui Water Resources Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Water Resources Development Co Ltd filed Critical Anhui Water Resources Development Co Ltd
Priority to CN201910722544.1A priority Critical patent/CN110318538A/en
Publication of CN110318538A publication Critical patent/CN110318538A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/002Workplatforms, railings; Arrangements for pouring concrete, attached to the form
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention gives the loading hoppers that a kind of constructional column pours mold, bottom deck pours mould openings top with constructional column and fixes, and swivel plate is hinged with bottom deck, and two perpendicular side plates are fixed on opening two sides, there are gap between two perpendicular side plates, lever runs through the through-hole of two perpendicular side plates.The present invention improves the construction efficiency of constructional column, and the surface quality of constructional column is very good.The present invention gives a kind of method for pouring constructional column, comprising the following steps: builds constructional column and pours mold;Loading hopper is built in mold upper end opening;By loading hopper into mold casting concrete, after concrete final set, casting concrete again, stop when concrete height to swivel plate upper end, swivel plate is rotated, another group of through-hole of lever and perpendicular side plate is cooperated, is filled in the gap of bar and swivel plate with voussoir and fixes swivel plate;After concrete final set, mold and loading hopper are removed.This method improves the construction efficiency of constructional column, and the reduction later period carries out chisel to structure and beats.

Description

Constructional column pours the loading hopper and constructional column casting method of mold
Technical field
The present invention relates to a kind of concreting dieparts, in particular to a kind of constructional column pours the charging leakage of mold Bucket.
The invention further relates to a kind of methods that the loading hopper for pouring mold using constructional column pours constructional column.
Background technique
With the development of building trade, Construction Quality is increasingly paid attention to, has the beam built up constructional column is suitable for reading When, all it can be equipped with feed inlet, but the casting method of conventional constructional column in construction column template side, general use pours constructional column Feed inlet also should be completely poured when concrete, chisel concrete outstanding after demoulding, another kind is to pour constructional column to end Also surplus one small section of concrete does not pour, then carries out secondary teeming, and with traditional casting craft, not only working procedure is troublesome, and needs the later period It carries out chisel to structure to beat or secondary construction, not only increasing can't manually be guaranteed with material, quality very well.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of manufacture crafts simply, is fixed conveniently, using flexible, can follow Ring utilizes, the constructional column of the construction efficiency that greatly improves constructional column pours the loading hopper of mold.
The technical problem to be solved by the present invention is to also provide a kind of casting method of constructional column.
In order to solve the above technical problems, the present invention provides the loading hopper that a kind of constructional column pours mold, the constructional column The loading hopper for pouring mold, which is arranged, pours mould upstream opening in constructional column;
The loading hopper that the constructional column pours mold includes that side plate is erected in swivel plate, bottom deck, lever and two sides;
Bottom deck lower part pours mould openings top with constructional column and is fixedly connected, and cuts with scissors between swivel plate lower end and bottom deck It connects, two perpendicular side plates are fixedly connected on the opening both sides of the edge position that constructional column pours mold, and the perpendicular side plate is poured to constructional column Extend on the outside of mold, there are only for the gap of swivel plate rotation between two perpendicular side plates, two perpendicular side plates are provided with two groups and cooperate with lever Through-hole, one group in two groups of through-holes of lever, the side wall of swivel plate is resisted against on lever.
Technology contents of the invention are understood in order to clearer, this constructional column is poured into the loading hopper of mold referred to as below For this loading hopper.
As the preferred of this loading hopper, two groups of through-holes are respectively first group of through-hole and second group of through-hole, second group of through-hole Compared to first group through hole center line of center line, which is in, pours mould upstream aperture position, first group of through hole center line far from constructional column Mould upstream opening is poured close to constructional column.
As the preferred of this loading hopper, this loading hopper further includes at least one voussoir, and the voussoir can protrude into lever Between swivel plate.
As the preferred of this loading hopper, this loading hopper further includes two side wings, and two side wings are fixed respectively to be connected It connects and pours mould upstream opening two sides in constructional column, perpendicular side plate is fixedly connected on side wing.
With such a structure, when casting concrete, bar is inserted into second group of through-hole to support swivel plate, is revolved Rotating plate rotation enters constructional column convenient for concrete slurry and pours in mold with horizontal in inclination angle, when concreting is completed, turns Dynamic swivel plate makes in concrete diapir capital mouthful, when swivel plate pours mold side template close to vertical configuration column to construction Column pours mould openings and is blocked, and bar is removed in first group of through-hole of insertion, is filled between bar and swivel plate with timber wedge Swivel plate is fixed in gap.The configuration of the present invention is simple, it is easy to operate, it is fixed conveniently, using flexible, can be recycled, mention significantly The construction efficiency of high constructional column, and the surface quality of constructional column is very good.
In order to solve the above technical problems, the present invention provides a kind of using the charging leakage for pouring mold such as above-mentioned constructional column Struggle against the method for pouring constructional column, comprising the following steps:
A) constructional column being built in predetermined position and pouring mold, constructional column pours mold upper end and extends to top side rail position, structure It makes column and pours mold upper end side wall equipped with opening, opening extends to constructional column and pours mould upper surface;
B) loading hopper that constructional column pours mold, lever and two perpendicular side plates are built in the opening that constructional column pours mold Second group of through-hole cooperation, between swivel plate and two perpendicular side plates formed be connected to constructional column pour mould inside with outside channel;
C) loading hopper that mold is poured by constructional column pours casting concrete in mold to constructional column, when concrete pours Stop delivering concrete when building to funnel bottom;
D) after the concrete final set after pour in step c), the loading hopper of mold is poured to construction again by constructional column Column pours casting concrete in mold, stops delivering concrete when concrete height to swivel plate upper end, dismantles second group and leads to Lever in hole, rotation swivel plate is to close to pouring mold upper end side wall equipped with aperture position, by the of lever and two perpendicular side plates One group of through-hole cooperation, is filled in the gap of bar and swivel plate with voussoir and fixes swivel plate, at this time swivel plate, two side wings The opening that constructional column pours mold is sealed completely with bottom deck;
E) after the concrete final set after be poured in step d), remove constructional column pour mold and constructional column pour mold into Funnel, that completes constructional column pours operation.
After such method, constructional column is poured using secondary pouring construction, if one-time-concreting blocks, due to concrete Gap suitable for reading is bigger than normal after settlement will lead to molding, and this method is easy to operate, greatly improves the construction efficiency of constructional column, and Reducing the later period carries out chisel to structure and beats or secondary construction, the surface quality of constructional column are very good.
Detailed description of the invention
Fig. 1 is one of the usage state diagram of this loading hopper embodiment.
Fig. 2 is the two of the usage state diagram of this loading hopper embodiment.
Fig. 3 is the left view of Fig. 2.
Specific embodiment
As shown in Figures 1 to 3
This loading hopper includes swivel plate 12, bottom deck 11,15, two side wings 17 of lever, the perpendicular side plate 14 and two in two sides A voussoir 16.
11 lower part of bottom deck pours 2 upper opening portion of mold with constructional column and fixes, and 12 lower end of swivel plate is by hinge 13 under Hinged between board 11, two side wings 17 are fixed on the opening both sides of the edge position that constructional column pours mold 2, two side wings 17, which erect side plate 14 with two sides, corresponds, and each perpendicular side plate is bolted on corresponding side wing 17, erect side plate 14 to Constructional column pours to be extended on the outside of mold 2, and there are the gap only rotated for swivel plate 12 between two perpendicular side plates 14, the width in gap is big About 24cm-44cm is each opened on perpendicular side plate 14 there are two through-hole, and two perpendicular side plates, 14 two through-holes respectively correspond to form two groups The through-hole cooperated with lever 15, two groups of through-holes are respectively in first group of through-hole 14a and second group of through-hole 14b, second group of through-hole 14b Compared to first group through-hole 14a centerline of heart line pours 2 upper opening position of mold, first group of through-hole 14a in separate constructional column Center line pours 2 upper opening of mold close to constructional column.
Lever 15 selects 8mm round steel, after first group of through-hole 14a cooperation of lever 15 and the perpendicular side plate 14, swivel plate 12 It leans against on lever 15, swivel plate 12 levels off to vertically, and two voussoirs 16 can protrude between lever 15 and swivel plate 12, clamps With lever 15 cooperates with first group of through-hole 14a or second group of through-hole 14b, and the angle that can limit the rotation of swivel plate 12 is 0- 45°。
The plate material that side plate 14 is erected in swivel plate 12, bottom deck 11 and two sides is the live plank sheathing used, swivel plate 12 It is connect with bottom deck 11 using hinge 13, remaining is all made of corner brace and is vertically fixedly connected.
The method for pouring constructional column using the loading hopper that above-mentioned constructional column pours mold 2, comprising the following steps:
A) constructional column to be built in predetermined position pour mold 2, constructional column pours 2 upper end of mold and extends to 3 position of top side rail, Constructional column pours 2 upper end side wall of mold and is equipped with opening, and opening extends to constructional column and pours 2 upper surface of mold;
B) loading hopper that constructional column pours mold 2 is built in the opening that constructional column pours mold 2, lever 15 and two erect Second group of through-hole 14b of side plate 14 cooperates, and swivel plate and perpendicular side plate group are with the shape of a horn, between swivel plate 12 and two perpendicular side plates 14 It forms connection constructional column and pours 2 inside of mold and external channel, 13 hole of hinge is sealed into mortar leakage prevention with adhesive tape;
C) loading hopper that mold 2 is poured by constructional column pours casting concrete in mold 2 to constructional column, works as concrete Stop delivering concrete when pouring to funnel bottom;
D) after the concrete final set after pour in step c), the loading hopper of mold 2 is poured to structure again by constructional column It makes column and pours casting concrete in mold 2, stop delivering concrete when concrete height to 12 upper end of swivel plate, at this point, pouring The concrete built dismantles the lever 15 in second group of through-hole 14b apart from top side rail 35cm-10cm, and rotation swivel plate 12 is to close Mold upper end side wall is poured equipped with aperture position, first group of through-hole 14a of lever 15 and two perpendicular side plates 14 is cooperated, with voussoir 16 It fills in the gap of bar and swivel plate 12 and fixes swivel plate 12, at this time 12, two side wings 17 of swivel plate and bottom deck 11 The opening that constructional column pours mold 2 is sealed completely, originally in the coagulation between swivel plate 12 and two perpendicular side plates 14 in channel Soil is squeezed by force to constructional column by swivel plate 12 and is poured in mold 2, so that taking column completely in constructional concrete pours mold 2 Interior space, there is no tomographies between top side rail 3 and constructional column;
E) after the concrete final set after pour in step d), dismounting constructional column pours mold 2 and constructional column pours mold 2 Loading hopper, that completes constructional column pours operation;This loading hopper is removed, recycling is cleaned out.
Above-described is only one embodiment of the present invention, it is noted that for those of ordinary skill in the art For, without departing from the principle of the present invention, several variations and modifications can also be made, these also should be regarded as belonging to this hair Bright protection scope.

Claims (5)

1. a kind of constructional column pours the loading hopper of mold, the loading hopper setting which pours mold is poured in constructional column Mould upstream opening, it is characterized in that:
The loading hopper that the constructional column pours mold includes that side plate is erected in swivel plate, bottom deck, lever and two sides;
Bottom deck lower part pours mould openings top with constructional column and is fixedly connected, hinged between swivel plate lower end and bottom deck, and two Perpendicular side plate is fixedly connected on the opening both sides of the edge position that constructional column pours mold, and the perpendicular side plate pours outside mold to constructional column Side extends, and there are only for the gap of swivel plate rotation between two perpendicular side plates, two perpendicular side plates are provided with the through-hole of two groups with lever cooperation, Lever runs through one group in two groups of through-holes, and the side wall of swivel plate is resisted against on lever.
2. constructional column according to claim 1 pours the loading hopper of mold, it is characterized in that:
Two groups of through-holes are respectively first group of through-hole and second group of through-hole, and second group of through hole center line compares first group of through-hole In pouring mould upstream aperture position far from constructional column, first group of through hole center line pours on mold centerline close to constructional column Portion's opening.
3. constructional column according to claim 1 pours the loading hopper of mold, it is characterized in that:
It further include at least one voussoir, the voussoir can protrude between lever and swivel plate.
4. constructional column according to claim 1 pours the loading hopper of mold, it is characterized in that:
It further include two side wings, two side wings, which are respectively fixedly connected with, pours mould upstream opening two sides in constructional column, erects side Plate is fixedly connected on side wing.
5. a kind of loading hopper for pouring mold using constructional column according to any one of claims 1 to 4 pours constructional column Method, comprising the following steps:
A) constructional column being built in predetermined position and pouring mold, constructional column pours mold upper end and extends to top side rail position, constructional column It pours mold upper end side wall and is equipped with opening, opening extends to constructional column and pours mould upper surface;
B) loading hopper that constructional column pours mold is built in the opening that constructional column pours mold, the of lever and two perpendicular side plates Two groups of through-hole cooperations, form between swivel plate and two perpendicular side plates and are connected to the channel that constructional column pours mould inside and outside;
C) loading hopper that mold is poured by constructional column pours casting concrete in mold to constructional column, when concreting extremely Stop delivering concrete when funnel bottom;
D) it after the concrete final set after be poured in step c), is poured again by the loading hopper that constructional column pours mold to constructional column Casting concrete in mold is built, stops delivering concrete when concrete height to swivel plate upper end, is dismantled in second group of through-hole Lever, rotation swivel plate is to close to pouring mold upper end side wall equipped with aperture position, by first group of lever and two perpendicular side plates Through-hole cooperation, filled in the gap of bar and swivel plate with voussoir and fix swivel plate, at this time swivel plate, two side wings and under Board seals the opening that constructional column pours mold completely;
E) after the concrete final set after pour in step d), the charging leakage that constructional column pours mold and constructional column pours mold is removed Bucket, that completes constructional column pours operation.
CN201910722544.1A 2019-08-06 2019-08-06 Constructional column pours the loading hopper and constructional column casting method of mold Pending CN110318538A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910722544.1A CN110318538A (en) 2019-08-06 2019-08-06 Constructional column pours the loading hopper and constructional column casting method of mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910722544.1A CN110318538A (en) 2019-08-06 2019-08-06 Constructional column pours the loading hopper and constructional column casting method of mold

Publications (1)

Publication Number Publication Date
CN110318538A true CN110318538A (en) 2019-10-11

Family

ID=68125438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910722544.1A Pending CN110318538A (en) 2019-08-06 2019-08-06 Constructional column pours the loading hopper and constructional column casting method of mold

Country Status (1)

Country Link
CN (1) CN110318538A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113293931A (en) * 2021-06-04 2021-08-24 中冶建工集团有限公司 Masonry wall constructional column construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR7600407U (en) * 1996-01-17 1998-06-16 De Oliveira Olienes Goncalves Tulip for concrete
CN101435265A (en) * 2008-11-21 2009-05-20 中国建筑第八工程局有限公司 Binghaw material conveying pipe apparatus and method for pumping, jacking and placing by the same
JP2015014190A (en) * 2014-09-18 2015-01-22 大成建設株式会社 Concrete placement equipment and concrete placement method
CN204983669U (en) * 2015-09-23 2016-01-20 新七建设集团有限公司 Constructional column be connected with collar tie beam pour device
CN207348469U (en) * 2017-10-17 2018-05-11 上海市浦东新区建设(集团)有限公司 A kind of constructional column pours device
CN210421932U (en) * 2019-08-06 2020-04-28 安徽水利开发有限公司 Feeding funnel of constructional column pouring mould

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR7600407U (en) * 1996-01-17 1998-06-16 De Oliveira Olienes Goncalves Tulip for concrete
CN101435265A (en) * 2008-11-21 2009-05-20 中国建筑第八工程局有限公司 Binghaw material conveying pipe apparatus and method for pumping, jacking and placing by the same
JP2015014190A (en) * 2014-09-18 2015-01-22 大成建設株式会社 Concrete placement equipment and concrete placement method
CN204983669U (en) * 2015-09-23 2016-01-20 新七建设集团有限公司 Constructional column be connected with collar tie beam pour device
CN207348469U (en) * 2017-10-17 2018-05-11 上海市浦东新区建设(集团)有限公司 A kind of constructional column pours device
CN210421932U (en) * 2019-08-06 2020-04-28 安徽水利开发有限公司 Feeding funnel of constructional column pouring mould

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113293931A (en) * 2021-06-04 2021-08-24 中冶建工集团有限公司 Masonry wall constructional column construction method

Similar Documents

Publication Publication Date Title
CN106193582A (en) A kind of composite material building mould board combined system
CN208534025U (en) Floor slab back casting band separate support formwork erecting structure
CN210421932U (en) Feeding funnel of constructional column pouring mould
CN205677249U (en) A kind of casting concrete constructional column hopper
CN108638304A (en) A kind of override type stair are with pouring mold
CN110318538A (en) Constructional column pours the loading hopper and constructional column casting method of mold
CN205955191U (en) Constructional column side template device for concreting
CN107419904A (en) Chute mounting structure for concrete column pouring and using method thereof
CN103643798A (en) Pouring device used for constructional column top and large- section beam column closed opening
CN207332309U (en) A kind of support shuttering of post-cast strip
CN114934446B (en) High-precision integrated pouring template for short sides of slag wall and construction method of high-precision integrated pouring template
CN205976472U (en) Pour mould of building post -cast strip
CN206016255U (en) A kind of L-type external angle formwork
CN207920070U (en) It can prevent the hoistway formwork system of the swollen mould of inner corner trim
CN212224625U (en) Structural column casting mold
CN108331343A (en) The construction method of Cantilever Beams and aluminum alloy mould plate lap-joint
CN207206697U (en) A kind of drawing and pulling type hollow plate beam internal model supporting mechanism
CN209990152U (en) Opening-closing type pouring opening structure
CN210002854U (en) concrete tetrahedron pouring templates
CN106481082A (en) A kind of improvement casting method of constructional column
CN206245726U (en) Built for mushroom body of constructing and with the profiled template in hole of vibrating
CN210685380U (en) Hole side wall template device
CN207033471U (en) Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template
CN205908016U (en) Heavy grade cast in situ concrete inclined roof board formwork system
CN207647174U (en) A kind of reinforced concrete member post-cast strip molding machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191011