CN110318402A - A kind of deep basal pit back-pressure soil adds diagonal brace form construction method for supporting - Google Patents

A kind of deep basal pit back-pressure soil adds diagonal brace form construction method for supporting Download PDF

Info

Publication number
CN110318402A
CN110318402A CN201910586088.2A CN201910586088A CN110318402A CN 110318402 A CN110318402 A CN 110318402A CN 201910586088 A CN201910586088 A CN 201910586088A CN 110318402 A CN110318402 A CN 110318402A
Authority
CN
China
Prior art keywords
diagonal brace
bottom plate
support
construction
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910586088.2A
Other languages
Chinese (zh)
Inventor
孙伟
郭志亚
晏立
李笑天
谢常锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Jian Xing Construction Group Co Ltd
Original Assignee
Guangdong Jian Xing Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Jian Xing Construction Group Co Ltd filed Critical Guangdong Jian Xing Construction Group Co Ltd
Priority to CN201910586088.2A priority Critical patent/CN110318402A/en
Publication of CN110318402A publication Critical patent/CN110318402A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench

Abstract

The present invention provides a kind of deep basal pit back-pressure soil and adds diagonal brace form construction method for supporting, includes the following steps: S1, the bottom plate on the inside of construction lattice column engineering pile, fashioned iron force transfer key is arranged between the bottom plate;S2, construct lattice column engineering stake top pile pier and lattice column engineering pile between linking beam;S3, it is supportted in a structure of an essay for lattice column engineering pile and beam;S4, with one or three sections Liang Weiyi, digging machine station cuts the earth on bottom plate, is unearthed;Bottom plate under S5, construction support, changes diagonal brace on the bottom plate after reaching intensity;S6, in stabilization zone setting back-pressure soil, set diagonal brace described in 4-5 root as a construction flowing water section, one by one cross construction.The present invention is directed to the construction in special deep & thick silt matter soil region, the form combined using slope+support, diagonal brace is arranged to support on bottom plate, back-pressure soil is arranged in stabilization zone, reduce subsequent construction difficulty, diagonal brace support is solved in be highly prone to waterlogging disaster on negative layer flooring, influence the progress of project the problem of and saves cost.

Description

A kind of deep basal pit back-pressure soil adds diagonal brace form construction method for supporting
Technical field
The present invention relates to technical field of building construction, and in particular to a kind of deep basal pit back-pressure soil adds diagonal brace form supporting construction Method.
Background technique
In deep & thick silt matter soil area, pattern foundation pit supporting structure generally uses campshed to add inner support or big slope, campshed Jia Neizhi The mode of support is suitable for place is more narrow and periphery adjacent buildings are more situation, and construction period is longer, support replacement trouble and Cost is relatively expensive;And to be suitable for place more broad for the form of big slope, the case where no periphery adjacent buildings, though construction letter Just but it is higher for place area requirement.
It being limited by surrounding enviroment condition and geological conditions, diagonal brace support may result in subsequent construction difficulty on flooring, And working face be limited it is larger, and diagonal brace support in being highly prone to rainy season, waterlogging disaster on negative layer flooring, influence the progress of project.
Due to the limitation of foundation pit surrounding environment condition and geological conditions, many engineerings are brought to the construction of city deep big foundation pit Engineering cost is greatly lowered in order to ensure engineering safety, quality and progress in problem, in deep & thick silt matter soil region, for field Which kind of arrangement and method for construction ground surrounding surrounding building uses actually, lacks the example of comparatively perfect at present apart from different situation, Therefore, the engineering construction method for designing a kind of optimization is particularly important.
Summary of the invention
The object of the present invention is to provide a kind of deep basal pit back-pressure soil to add diagonal brace form construction method for supporting, in special deep silt Shale soil region, which lacks, designs such method under the status of reasonable construction method, solves the current area special deep & thick silt Zhi Tu Domain lacks the status of reasonable construction method;The purpose for realizing simultaneously and saving cost, accelerate construction.
To achieve the above object, the technical solution used in the present invention is:
A kind of deep basal pit back-pressure soil adds diagonal brace form construction method for supporting, applied to building for special deep & thick silt matter soil region Construction is built, applied between the bottom working procedure and main structure construction process of architectural engineering, is included the following steps:
Bottom plate on the inside of S1, construction lattice column, is arranged fashioned iron force transfer key between the bottom plate;
S2, construct lattice column engineering stake top pile pier and lattice column engineering pile between linking beam;
S3, it is supportted in a structure of an essay for lattice column engineering pile and beam;
S4, with one or three sections Liang Weiyi, digging machine station cuts the earth on bottom plate, is unearthed;
Bottom plate under S5, construction support, changes diagonal brace on the bottom plate after reaching intensity;
S6, in stabilization zone, setting back-pressure is native, sets diagonal brace described in 4-5 root as a construction flowing water section, flowing water is applied one by one Work.
Preferably, in the step S1, the base plate thickness is not less than 600mm, the fashioned iron force transfer key and the bottom plate Fit closely setting.
Preferably, in the step S3, support carriers are set on beam and floor, the support is in the support carriers It is arranged in parallel with the beam.
Preferably, in the step S4 and S5, back-pressure soil extremely hole bottom and immediately construction cushion coat and the bottom plate are excavated, it is described It is backfilled between bottom plate and the lattice column using 450mm element concrete, uses sand between the bottom plate other end and the lattice column are high Earthen backfill is closely knit.
Preferably, in the step S5, the diagonal brace other end passes through straight with the pile pier and the lattice column engineering pile It connects connected.
Preferably, described to change during diagonal brace in the step S5, it, can after support replacement pier reaches the 80% of design strength Remove first of support and support carriers and column.
Preferably, between the step S5-S6, in, during constructing back-pressure platform, should simultaneously coordinative construction floor and Reinforced concrete support simultaneously pours.
Preferably, in the step S6, construction direction is to turn left from the right side.
Compared with prior art, the mode of the technical program combination counter-pressure and diagonal brace, has the advantages that
(1) effectively it is directed to the construction in special deep & thick silt matter soil region
The form combined using slope+support, is not set to support, and diagonal brace is arranged on fender post side, and diagonal brace is supportted in basement On bottom plate, back-pressure soil is arranged in stabilization zone, excavates after diagonal brace reaches support replacement condition, can accelerate the bottom of central island regions in this way Plate construction, and can make full use of original ground back-pressure soil reform stabilization of soil in passive area certainly, effectively be directed to special deep & thick silt The construction in matter soil region.
(2) overcome environmental condition and geological conditions bring problem
Construction method of the invention supports script diagonal brace is optimized for diagonal brace in bottom plate on flooring, reduces subsequent construction hardly possible Degree is not limited by working face is excessive, is solved diagonal brace support in being highly prone to rainy season, waterlogging disaster on negative layer flooring, is influenced item The problem of purpose progress.
(3) cost is saved, construction is accelerated
Construction method of the invention, base plate strength is big, and digging machine is directly operated on bottom plate, and simple and easy, diagonal brace reaches Excavate after to support replacement condition, shortens in the teardown phase duration;The construction method for combining and taking full advantage of back-pressure soil again, saves Cost.
Detailed description of the invention
Fig. 1 is that deep basal pit back-pressure soil of the present invention adds diagonal brace form construction method for supporting application schematic diagram;
Fig. 2 is that invention foundation pit back-pressure soil adds diagonal brace and floor structure in diagonal brace form construction method for supporting to illustrate Scheme (movable end);
Fig. 3 is the connection schematic diagram that foundation pit back-pressure soil of the present invention adds diagonal brace form construction method for supporting support and floor;
Fig. 4 is that foundation pit back-pressure soil of the present invention adds the practical application of diagonal brace and bottom plate in diagonal brace form construction method for supporting to illustrate Figure;
In figure: 1, lattice column engineering pile, 2, fashioned iron force transfer key, 3, pile pier, 4, beam, 5, support, 6, bottom plate, 7, stabilization zone, 8, Back-pressure soil, 9, diagonal brace, 10, bed course, 11, floor, 12, support support, 13, reinforced concrete support, 91, vertical muscle, 92, stirrup, 93, curved Muscle.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Firstly, the application background of technical solution of the present invention is for environmental condition compared with severe, difficulty of construction is biggish deep Silt soil region, deep basal pit back-pressure soil provided by the invention adds diagonal brace form construction method for supporting, applied to architectural engineering Between bottom working procedure and main structure construction process, include the following steps:
Bottom plate 6 on the inside of S1, construction lattice column engineering pile 1, is arranged fashioned iron force transfer key 2 between the bottom plate 6;
The linking beam 4 between pile pier 3 and lattice column engineering pile 1 that S2, construction lattice column engineering pile 1 push up;
S3,5 are supportted in a structure of an essay for lattice column engineering pile 1 and beam 4;
S4, with one or three beams 4 for a section, digging machine station cuts the earth on bottom plate, unearthed;
Bottom plate 6 under S5, construction support 5, changes diagonal brace 9 on the bottom plate 6 after reaching intensity;
S6, back-pressure soil 8 is set in stabilization zone 7, setting diagonal brace 9 described in 4-5 root is a construction flowing water section, one by one flowing water Construction.
It can be seen that the technical program from above 6 steps and do not use traditional campshed+inner support or big slope, This is mainly due to both traditional construction methods to be not suitable for site condition, and the technical program is directed to four axis periphery of construction site Building is apart from situation: having adjacent closer building, designs in the case where also having adjacent farther away building, for synthesis As in such a way that slope+support combines, but still there is optimization in concrete operations, is carried out below with reference to specific steps and attached drawing Explanation.
Deep basal pit back-pressure soil of the present invention adds diagonal brace form construction method for supporting application schematic diagram and combines Fig. 2 refering to fig. 1 Diagonal brace 9 of the present invention and 6 structural schematic diagram of bottom plate (movable end), the upper end of lattice column engineering pile 1 are equipped with pile pier 3, and bottom plate 6 is located at lattice The inside of structure column engineering pile 1, in construction method, S1 step is the bottom plate 6 of 1 inside of construction lattice column engineering pile, at the bottom Fashioned iron force transfer key 2 is set between plate 6, and priority processing bottom plate 6 and enclosing covers, and so that bottom plate 6 is had the condition for driving support power transmission, and can make digging machine It works on it, to guarantee that bottom plate 6 has enough intensity, 6 thickness of bottom plate should be not less than 600mm, fashioned iron force transfer key 2 and bottom plate 6 Fit closely setting, it is ensured that the stability of its work.
S2 step is the linking beam 4 between pile pier 3 and lattice column engineering pile 1 that construction lattice column engineering pile 1 pushes up, as oblique The fulcrum of support is to realize the subsequent step being directly connected with diagonal brace 9.
With continued reference to Fig. 2, as shown, fashioned iron force transfer key 2 is arranged in the bottom of bottom plate 6 and is spaced setting, fashioned iron power transmission Key 2 is fitted closely with bottom plate 6, it is ensured that the connection type of the stability of its power transmission function, diagonal brace 9 of the invention and bottom plate 6 is as schemed Shown, in practical applications, diagonal brace 9 and the fixed form of bottom plate 6 are particularly important, this be associated with the stability of construction with can By property, diagonal brace 9 is completely embedded into bottom plate 6, and is fixed by vertical muscle 91 in built-in end Hard link, and diagonal brace 9 just starts in bottom plate 6 Fixed using a succession of stirrup 92, stirrup 92 extends to 9 end of diagonal brace outside bottom plate 6, finally, reusing a curved muscle 93 assist, and realize the connection of diagonal brace 9 and bottom plate 6.
Refering to Fig. 3 and Fig. 1 is combined, to support 5 in a structure of an essay for lattice column engineering pile 1 and beam 4 in S3 step, at this time by support 5 To the effect of support, in this step it is ensured that support 5 reaches enough intensity with associated components, Fig. 3 shows support 5 and floor 11 Setting support support 12,5 framves of the support are flat with the beam 4 on the support support 12 on the schematic diagram of connection, beam 4 and floor 11 Row setting.
Refering to Fig. 4, foundation pit back-pressure soil of the invention adds the reality of diagonal brace and bottom plate in diagonal brace form construction method for supporting to answer With schematic diagram, in S4 step, with one or three beams 4 for a section, digging machine station is cut the earth on bottom plate 6, is unearthed, the bottom of due to 6 thickness 600mm or more of plate, can satisfy wheel pressure request, and be water operation substantially, will not occupy bottom plate for a long time, and S5 step is to apply The lower bottom plate 6 of work support 5 reaches and changes diagonal brace 9 after intensity on the bottom plate 6, and in step S4 and S5, excavation back-pressure soil is to cheating bottom And construction cushion coat 10 and the bottom plate 6 immediately, it is backfilled between the bottom plate 6 and the lattice column 1 using 450mm element concrete, it is described Between 6 other end of bottom plate and the lattice column engineering pile 1 using sand backfill it is closely knit, in step S5,9 other end of diagonal brace by with The pile pier 3 is connected directly with the lattice column engineering pile 1;Described to change during diagonal brace 9 in the step S5, support replacement pier reaches To after the 80% of design strength, first of support and support support and column can be removed, final realize is turned by the application form of Fig. 1 Become diagonal brace on bottom plate 6.
Step S6 is that back-pressure soil 8 is arranged in stabilization zone 7, and setting diagonal brace 9 described in 4-5 root is a construction flowing water section, by One cross construction.This process is to repeat constructing operation, but during construct back-pressure platform, should at the same coordinative construction floor 11 and Reinforced concrete support 13 simultaneously pours, and further, in step S6, construction direction should be turns left from the right side.Technical solution of the present invention is not set To support, and diagonal brace 9 is set on stake side, diagonal brace 9 supports on basement bottom board 6, and back-pressure soil 8 is arranged in stabilization zone 7, reaches in diagonal brace 9 Excavate after support replacement condition, the bottom plate 6 that can accelerate central island regions in this way is constructed, and original ground back-pressure can be made full use of native 8 reform stabilization of soil in passive area certainly, achieve the purpose that save cost, accelerate construction, secondly, the present invention changes conventional drilled pile Add concrete inner support method, using back-pressure soil 8 plus the coefficient method of 9 supporting of diagonal brace.After the back-pressure soil for carrying out deep basal pit, Using 9 supporting of diagonal brace, to resist active earth pressure caused by higher buildings body, sliding is avoided the occurrence of, topples and deforms, improved Overall stability.
It is to be illustrated to preferable implementation of the invention, but the present invention is not limited to the embodiment above, to the greatest extent Invention is explained in detail referring to embodiment for pipe, for those skilled in the art smart without prejudice to the present invention Various equivalent deformation or replacement, such as refluxing unit type and quantity, exhaust pipe connection side can be also made under the premise of mind Formula etc. these equivalent deformations or replacement are all included in the scope defined by the claims of the present application.

Claims (8)

1. a kind of deep basal pit back-pressure soil adds diagonal brace form construction method for supporting, applied to the bottom working procedure of architectural engineering and master Between body structure construction process, which comprises the steps of:
Bottom plate on the inside of S1, construction lattice column engineering pile, is arranged fashioned iron force transfer key between the bottom plate;
S2, construct lattice column engineering stake top pile pier and lattice column engineering pile between linking beam;
S3, it is supportted in a structure of an essay for lattice column engineering pile and beam;
S4, with one or three sections Liang Weiyi, digging machine station cuts the earth on bottom plate, is unearthed;
Bottom plate under S5, construction support, changes diagonal brace on the bottom plate after reaching intensity;
S6, in stabilization zone setting back-pressure soil, set diagonal brace described in 4-5 root as a construction flowing water section, one by one cross construction.
2. deep basal pit back-pressure soil according to claim 1 adds diagonal brace form construction method for supporting, which is characterized in that the step In rapid S1, the base plate thickness is not less than 600mm, and the fashioned iron force transfer key and the bottom plate fit closely setting.
3. deep basal pit back-pressure soil according to claim 1 adds diagonal brace form construction method for supporting, which is characterized in that the step In rapid S3, setting support support, the support are arranged in parallel on the support support with the beam on beam and floor.
4. deep basal pit back-pressure soil according to claim 1 adds diagonal brace form construction method for supporting, which is characterized in that the step In rapid S4 and S5, back-pressure soil extremely hole bottom and immediately construction cushion coat and the bottom plate, the bottom plate and the lattice column engineering are excavated It is backfilled between stake using 450mm element concrete, it is closely knit using sand backfill between the bottom plate other end and the lattice column engineering pile.
5. deep basal pit back-pressure soil according to claim 1 adds diagonal brace form construction method for supporting, which is characterized in that the step In rapid S5, the diagonal brace other end with the pile pier and the lattice column engineering pile by being connected directly.
6. deep basal pit back-pressure soil according to claim 1 adds diagonal brace form construction method for supporting, which is characterized in that the step It is described to change during diagonal brace in rapid S5, after support replacement pier reaches the 80% of design strength, first of support and support branch can be removed Seat and column.
7. deep basal pit back-pressure soil according to claim 1 adds diagonal brace form construction method for supporting, which is characterized in that the step Between rapid S5-S6, in, during constructing back-pressure platform, answers coordinative construction floor and reinforced concrete support simultaneously and pour.
8. deep basal pit back-pressure soil according to claim 1 adds diagonal brace form construction method for supporting, which is characterized in that the step In rapid S6, construction direction is to turn left from the right side.
CN201910586088.2A 2019-07-01 2019-07-01 A kind of deep basal pit back-pressure soil adds diagonal brace form construction method for supporting Pending CN110318402A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910586088.2A CN110318402A (en) 2019-07-01 2019-07-01 A kind of deep basal pit back-pressure soil adds diagonal brace form construction method for supporting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910586088.2A CN110318402A (en) 2019-07-01 2019-07-01 A kind of deep basal pit back-pressure soil adds diagonal brace form construction method for supporting

Publications (1)

Publication Number Publication Date
CN110318402A true CN110318402A (en) 2019-10-11

Family

ID=68122260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910586088.2A Pending CN110318402A (en) 2019-07-01 2019-07-01 A kind of deep basal pit back-pressure soil adds diagonal brace form construction method for supporting

Country Status (1)

Country Link
CN (1) CN110318402A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114970016A (en) * 2022-05-13 2022-08-30 安徽省城建设计研究总院股份有限公司 Pi-shaped support inclined strut displacement calculation method, Pi-shaped support design method and support method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277807A (en) * 2018-04-09 2018-07-13 浙江乔兴建设集团有限公司 Deep basal pit artesian water is prominent to gush decompression control water-bound
CN109183809A (en) * 2018-10-16 2019-01-11 北京建工国际投资有限责任公司 A kind of construction method of Muddy Bottoms clay deep-foundation pit engineering composite support support replacement
CN109403339A (en) * 2018-10-16 2019-03-01 中建局集团建设发展有限公司 The deep basal pit composite supporting construction and its method for protecting support of double-row pile combination method of center island
CN109667273A (en) * 2018-12-22 2019-04-23 广州市天作建筑规划设计有限公司 A kind of construction method of deep foundation pit supporting structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277807A (en) * 2018-04-09 2018-07-13 浙江乔兴建设集团有限公司 Deep basal pit artesian water is prominent to gush decompression control water-bound
CN109183809A (en) * 2018-10-16 2019-01-11 北京建工国际投资有限责任公司 A kind of construction method of Muddy Bottoms clay deep-foundation pit engineering composite support support replacement
CN109403339A (en) * 2018-10-16 2019-03-01 中建局集团建设发展有限公司 The deep basal pit composite supporting construction and its method for protecting support of double-row pile combination method of center island
CN109667273A (en) * 2018-12-22 2019-04-23 广州市天作建筑规划设计有限公司 A kind of construction method of deep foundation pit supporting structure

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
徐天平: "《地基与基础工程施工质量问答》", 30 April 2014, 中国建筑工业出版社 *
徐煌等: "《房屋建筑与装饰工程计量与计价》", 31 May 2018, 西安交通大学出版社 *
王旭东等: "《房屋建筑构造》", 31 January 2017, 北京理工大学出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114970016A (en) * 2022-05-13 2022-08-30 安徽省城建设计研究总院股份有限公司 Pi-shaped support inclined strut displacement calculation method, Pi-shaped support design method and support method

Similar Documents

Publication Publication Date Title
CN101509261B (en) Method for pile plate base for ultra-high voltage electric power line steel tower on soft foundation
CN106522241A (en) Deep foundation pit supporting method of ultrahigh floor height type basement structure
CN202689008U (en) Supporting structure for double-row prefabricated high-strength concrete thin-walled steel pipe pile foundation pit
CN102691300A (en) Construction method of foundation pit earthwork
CN106245927B (en) A kind of method and building suitable for frame structure building underground increasing layer
CN103290847A (en) Inner oblique beam supporting structure for oversized-area deep foundation pit and construction method
CN110486034A (en) Subway station and construction method based on pile foundation in four pilot tunnel of single layer and middle drift
CN110206039B (en) Construction method of Larsen steel sheet pile in pit under complex geological conditions
CN109882209B (en) Bored pile pre-reinforced supporting structure of undersolidified stratum underpass tunnel and construction method
CN112682045B (en) Bearing structure of underground tunnel ultra-shallow buried underpass highway and construction method
CN102493458A (en) Construction method for closing end of deep foundation pit steel sheet pile in soft soil foundation pipe trench and power tunnel engineering
CN110318402A (en) A kind of deep basal pit back-pressure soil adds diagonal brace form construction method for supporting
CN211851850U (en) Little clear distance tunnel supporting construction suitable for collapsible loess
CN210087321U (en) Pile foundation pre-reinforcing and supporting structure for controlling tunnel settlement
CN116122306A (en) Block enclosing isolation method for foundation pit supporting earthwork excavation
CN102787605A (en) Method for inclining bar-type foundation pit support steel sheet pile of soft soil foundation
CN106120853B (en) A kind of inverted construction method of frame bridge
CN106223344B (en) A kind of ground line piled anchor frame foundation pit supporting method
CN105986830A (en) Underground-excavation building method for roadside strip-shaped underground garage
CN109138484B (en) Construction method for connecting jacking layer-added concrete-filled steel tubular column with foundation
CN212642730U (en) Collapsible loess area tunnel passes people's air defense structure
CN212052780U (en) Oblique supporting type deep foundation pit supporting structure
CN209742922U (en) Cast-in-place pile pre-reinforcing supporting structure for underpass tunnel in unconsolidated stratum
CN209923935U (en) Co-location combined pile wall supporting structure in upper-soft and lower-hard stratum
CN113737857A (en) Be used for deep pipe gallery structure and major structure to build connection structure again and worker's method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191011

RJ01 Rejection of invention patent application after publication