CN110318315A - A kind of place basis of artificial turf and its construction method - Google Patents
A kind of place basis of artificial turf and its construction method Download PDFInfo
- Publication number
- CN110318315A CN110318315A CN201910622053.XA CN201910622053A CN110318315A CN 110318315 A CN110318315 A CN 110318315A CN 201910622053 A CN201910622053 A CN 201910622053A CN 110318315 A CN110318315 A CN 110318315A
- Authority
- CN
- China
- Prior art keywords
- artificial turf
- prefabricated
- ground
- screw rod
- top plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C13/00—Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
- E01C13/02—Foundations, e.g. with drainage or heating arrangements
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C13/00—Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
- E01C13/08—Surfaces simulating grass ; Grass-grown sports grounds
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The present invention discloses place basis and its construction method of a kind of artificial turf, it is related to the technical field of field construction, it includes ground, ground includes rammed earth layer, concrete cushion and concrete layer, several prefabricated components are fixed on ground, several prefabricated components spell be close together and top formed can laying artificial turf plane;The periphery of several prefabricated components is provided with prefabricated gutter, the bottom of trench in prefabricated gutter is lower than the surface of ground, and the top in prefabricated gutter is lower than the plane.The present invention reduces the dosages of engineering material, shorten the construction time.
Description
Technical field
The present invention relates to the technical fields of field construction, more particularly, to a kind of subcutaneous place basis of football pitch pedaline
And its construction method.
Background technique
Artificial turf is the highest turf of suede density currently on the market, is suitable for baseball, Rugby field, football pitch, hockey stick
Court, softball field, stadium of track and field and other kinds athletic ground, while being also playground, training field, physical education, military training and other
The movable ideal turf of indoor and outdoor.Artificial turf is of less demanding to ground, can be cement flooring, asphalt floor, is also possible to
Hard sand ground face, cement stabilizing level.
The construction on traditional place basis, includes the following steps: 1, excavation of earthwork;2, rammed earth rolls 3, backfill sandstone
Material rolls;4, three dirt of backfill roll;5, backfill cement stabilizing layer rolls;6, casting concrete surface layer.According to traditional place
Foundation construction method is needed using to a large amount of engineering material, and long construction period.
Summary of the invention
An object of the present invention is to provide a kind of place basis of artificial turf, which reduce the dosage of engineering material,
And shorten the construction time.
Above-mentioned purpose of the invention has the technical scheme that
A kind of place basis of artificial turf, including ground, ground include rammed earth layer, concrete cushion and concrete layer, ground
Several prefabricated components are fixed on base, several prefabricated components spell be close together and top formed can laying artificial turf it is flat
Face;The periphery of several prefabricated components is provided with prefabricated drainage ditch, the top of prefabricated drainage ditch is lower than the plane.
By using above-mentioned technical proposal, because having used prefabricated component to support artificial turf, when can shorten construction
Between, and fixed prefabricated component does not need to build the ground of multilayer and complexity, reduces the dosage of engineering material.
The present invention is further arranged to: the prefabricated component includes top plate and bottom plate and the branch between top plate and bottom plate
Dagger, the horizontal cross-section of support column are in cross.
By using above-mentioned technical proposal, support column can not only play good support effect to top plate, and can also
Enough spaces that non-filler is created between top plate and bottom plate, reduce the usage amount of factory material.
The present invention is further arranged to: several deflector holes are offered on the top plate;The ditch of the prefabricated drainage ditch
Bottom is lower than the surface of ground, offers several drainage holes on the side wall of prefabricated drainage ditch canal, and the water energy on ground is enough from row
Water hole flows into prefabricated drainage ditch.
By using above-mentioned technical proposal, in precipitation, rainwater can be flowed into the lower section of top plate from deflector hole, and from
Drainage hole enters prefabricated gutter, improves the drainability on place basis.
The present invention is further arranged to: the ground anchoring has several groups screw rod, and every group of screw rod runs through the bottom plate, and
Screw rod is connected with adjusting nut, and adjusting nut contacts at the lower surface of the bottom plate.
By using above-mentioned technical proposal, because of different places, there is different requirements for the gradient, and top plate is for branch
Support artificial turf can change so only needing to change the tilt angle of top plate and meet the needs of different places.It is constructing
When, only need to by rotating adjusting nut can controlroof tilt angle, shorten the construction time.
The present invention is further arranged to: on the direction from bottom plate to top plate, the area of the horizontal cross-section of the support column
It is gradually increased.
By using above-mentioned technical proposal, increase the bearing area of support column, improves the enabling capabilities of support column.
The present invention is further arranged to: the star section of the support column is arranged along the diagonal line of the top plate.
By using above-mentioned technical proposal, the bearing capacity at the docking of four pieces of adjacent top plates can be improved.
The present invention is further arranged to: the upper surface of the top plate offers several staggered diversion trenches, the water conservancy diversion
Hole is opened in the point of intersection of staggered diversion trench.
By using above-mentioned technical proposal, diversion trench can guide the rainwater of cover top surface to be quickly flowed into deflector hole
It is interior, it can be improved the drainability on place basis.
The present invention is further arranged to: the screw rod is also connected with clamp nut, and the clamp nut contacts at the bottom
The upper surface of plate.
By using above-mentioned technical proposal, etching of concrete surface and prefabricated component caused by falling off incline in order to prevent
Tiltedly, after bottom plate is pressed on adjusting nut by clamp nut, it is ensured that the posture of prefabricated component is constant.
The second object of the present invention is to provide a kind of construction method on the place basis of artificial turf, comprising the following steps:
S1: earth excavation is simultaneously tamped and forms rammed earth layer, successively casting concrete bed course and concrete layer on rammed earth layer;
S2: the screw rod being vertically arranged is anchored in concrete layer according to design position;
S3: screwing adjusting nut on screw rod, utilizes the spacing between the bottom end and concrete surface of measurer control nut;
S4: slinging prefabricated component and screw rod is passed through installation through-hole;According to the gradient of design, by the adjusting spiral shell for screwing different location
Mother changes the gradient of top plate;
S5: screwing clamp nut on screw rod and clamp nut is against to the upper surface of bottom plate;
S6: it lays prefabricated gutter and forms drainage ditch.
In conclusion advantageous effects of the invention are as follows:
1. supporting artificial turf by using prefabricated component, the construction time is shortened, and fixed prefabricated component does not need to build
The ground of multilayer and complexity, reduces the dosage of engineering material;
Deflector hole, diversion trench and drainage hole set by 2. increase the drainability on place basis;
3. need by rotating adjusting nut can controlroof tilt angle, shorten the construction time.
Detailed description of the invention
Fig. 1 is the isometric test chart of prefabricated component;
Fig. 2 is a kind of structural schematic diagram on the place basis of artificial turf;
Fig. 3 is the cross-sectional view in prefabricated gutter.
In figure, 1, ground;11, rammed earth layer;12, concrete cushion;13, concrete layer;2, prefabricated component;21, bottom plate;221,
Installation through-hole;22, top plate;221, deflector hole;222, diversion trench;23, support column;3, screw rod;4, adjusting nut;5, spiral shell is compressed
It is female;6, prefabricated gutter;61, drainage hole.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment 1
As shown in Fig. 1 to 3, the invention discloses a kind of place of artificial turf bases, including ground 1, are fixed on ground 1
Several prefabricated components 2 of side and the drainage ditch being made of several prefabricated gutters 6.
Ground 1 successively includes rammed earth layer 11, concrete cushion 12 and concrete layer 13 from the bottom to top.
Prefabricated component 2 includes horizontally disposed bottom plate 21 and top plate 22, and top plate 22 is square with bottom plate 21, and bottom
The area of plate 21 is less than the area of top plate 22.Be provided with support column 23 between top plate 22 and bottom plate 21, bottom plate 21, top plate 22 with
And support column 23 is integrally formed.The horizontal cross-section of support column 23 is in cross, and the star section of support column 23 is along top plate
22 diagonal line setting.On by bottom plate 21 to the direction of top plate 22, the area of the horizontal cross-section of support column 23 is gradually increased.If
The dry spelling of prefabricated component 2 is close together, and the upper surface of each top plate 22 be collectively formed can laying artificial turf rectangle plane.
Several screw rods stretched out straight up 3 are fixed in concrete layer 13.Every four screw rods 3 are one group, every group of spiral shell
Bar 3 corresponds to a prefabricated component 2.It is opened up on bottom plate 21 there are four installation through-hole 221, the aperture of installation through-hole 221 is greater than screw rod 3
Diameter.Four screw rods 3 run through installation through-hole 221.Screw rod 3 is connected with adjusting nut 4 and clamp nut 5.Adjusting nut 4 with
The lower surface of bottom plate 21 offsets and between adjusting nut 4 and concrete layer 13 there are spacing, and clamp nut 5 is upper with bottom plate 21
Surface offsets.
Because prefabricated component 2 has been used to support artificial turf, the construction time can be shortened, and fixed prefabricated component 2 is simultaneously
It does not need to build multilayer and complicated ground 1, reduces the dosage of engineering material.
Because of different places, there is different requirements for the gradient, and in construction, it need to only pass through rotating adjusting nut 4
Can controlroof 22 tilt angle, shorten the construction time.
Several deflector holes 221 are offered on top plate 22, deflector hole 221 is through-hole.It is also set in the upper surface of top plate 22
It is equipped with several criss-cross diversion trenches 222.Deflector hole 221 is located at the intersection of criss-cross diversion trench 222.Deflector hole
221 are used for the rainwater diversion under seeping from artificial turf to ground 1 in precipitation.Diversion trench 222 can guide on top plate 22
The rainwater on surface is quickly flowed into deflector hole 221.
The prefabricated component 2 being close together is spelled around several in prefabricated gutter 6, and the top in prefabricated gutter 6 is lower than top plate
22 upper surface, the bottom of trench in prefabricated gutter 6 are lower than the upper surface of ground 1.Draining is offered on the side wall in prefabricated gutter 6
Hole 61.Water energy on ground 1 enough flows into prefabricated gutter 6 from drainage hole 61.
Embodiment 2
Present embodiment discloses a kind of construction method on the place basis of artificial turf as disclosed in embodiment 1, including it is following
Step:
S1: earth excavation is simultaneously tamped and forms rammed earth layer 11, successively casting concrete bed course 12 and concrete on rammed earth layer 11
Layer 13;
S2: the screw rod 3 being vertically arranged is anchored in concrete layer 13 according to design position;
S3: screwing adjusting nut 4 on screw rod 3, between 13 surface of bottom end and concrete layer of measurer control nut
Away from;
S4: slinging prefabricated component 2 and screw rod 3 is passed through installation through-hole 221;According to the gradient of design, by screwing different location
The gradient of the change top plate 22 of adjusting nut 4;
S5: screwing clamp nut 5 on screw rod 3 and clamp nut 5 is against to the upper surface of bottom plate 21;
S6: it lays prefabricated gutter 6 and forms drainage ditch.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this
Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it
It is interior.
Claims (9)
1. a kind of place basis of artificial turf, it is characterised in that: including ground (1), ground (1) includes rammed earth layer (11), mixes
Soil padding (12) and concrete layer (13) are coagulated, is fixed with several prefabricated components (2) on ground (1), several prefabricated components (2) are spelled
Be close together and top formed can laying artificial turf plane;It is provided in the periphery of several prefabricated components (2) prefabricated
The top in gutter (6), prefabricated gutter (6) is lower than the plane.
2. a kind of place basis of artificial turf according to claim 1, it is characterised in that: the prefabricated component (2) includes
Top plate (22), bottom plate (21) and the support column (23) between top plate (22) and bottom plate (21), the level of support column (23)
Section is in cross.
3. a kind of place basis of artificial turf according to claim 2, it is characterised in that: opened up on the top plate (22)
There are several deflector holes (221);The bottom of trench of the prefabricated gutter (6) is lower than the surface of ground (1), prefabricated gutter (6) canal
Side wall on offer several drainage holes (61), the water energy on ground (1) is enough to flow into prefabricated gutter from drainage hole (61)
(6)。
4. a kind of place basis of artificial turf according to claim 1, it is characterised in that: ground (1) anchoring has
Several groups screw rod (3), every group of screw rod (3) runs through the bottom plate (21), and screw rod (3) is connected with adjusting nut (4), adjusts spiral shell
Female (4) contact at the lower surface of the bottom plate (21).
5. a kind of place basis of artificial turf as claimed in any of claims 2 to 3, it is characterised in that: certainly
On bottom plate (21) to the direction of top plate (22), the area of the horizontal cross-section of the support column (23) is gradually increased.
6. a kind of place basis of artificial turf according to claim 5, it is characterised in that: the ten of the support column (23)
Shaped sections are arranged along the diagonal line of the top plate (22).
7. a kind of place basis of artificial turf according to claim 3, it is characterised in that: the upper table of the top plate (22)
Face offers several staggered diversion trenches (222), and the deflector hole (221) is opened in the intersection point of staggered diversion trench (222)
Place.
8. a kind of place basis of artificial turf according to claim 4, it is characterised in that: the screw rod (3) is also connected with
Have clamp nut (5), the clamp nut (5) contacts at the upper surface of the bottom plate (21).
9. a kind of a kind of construction method on the place basis of artificial turf as described in claim 1 to 8 any one, feature
It is: the following steps are included:
S1: earth excavation and tamp form rammed earth layer (11), on rammed earth layer (11) successively casting concrete bed course (12) and
Concrete layer (13);
S2: the screw rod being vertically arranged (3) is anchored in concrete layer (13) according to design position;
S3: screwing adjusting nut (4) on screw rod (3), using measurer control nut bottom end and concrete layer (13) surface it
Between spacing;
S4: slinging prefabricated component (2) and screw rod (3) are passed through installation through-hole (221);According to the gradient of design, by screwing difference
The adjusting nut (4) of position changes the gradient of top plate (22);
S5: screwing clamp nut (5) on screw rod (3) and clamp nut (5) is against to the upper surface of bottom plate (21);
S6: prefabricated gutter (6) are laid and form drainage ditch.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910622053.XA CN110318315A (en) | 2019-07-10 | 2019-07-10 | A kind of place basis of artificial turf and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910622053.XA CN110318315A (en) | 2019-07-10 | 2019-07-10 | A kind of place basis of artificial turf and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110318315A true CN110318315A (en) | 2019-10-11 |
Family
ID=68123231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910622053.XA Pending CN110318315A (en) | 2019-07-10 | 2019-07-10 | A kind of place basis of artificial turf and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110318315A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1986969A (en) * | 2005-12-23 | 2007-06-27 | 曼顿有限公司 | Synthetic grass flooring and method of laying same |
CN201473850U (en) * | 2009-05-05 | 2010-05-19 | 欧阳鹰湘 | Prefabricated concrete member of playground drainage ditch |
US20130142971A1 (en) * | 2007-01-19 | 2013-06-06 | Brock International | Base For Turf System |
CN204509935U (en) * | 2015-04-15 | 2015-07-29 | 彭坚 | A kind of assembled plate that suspends |
CN205242941U (en) * | 2015-12-03 | 2016-05-18 | 江苏威腾人造草坪有限公司 | Concatenation floor file substrate of can dismantle by oneself, tailorring |
CN206157522U (en) * | 2016-08-29 | 2017-05-10 | 陆大伟 | Place basis |
CN206706503U (en) * | 2017-02-08 | 2017-12-05 | 泉州市泉港智源商贸有限公司 | A kind of high-elastic plastic cement race track filler of four seasons constant temperature |
-
2019
- 2019-07-10 CN CN201910622053.XA patent/CN110318315A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1986969A (en) * | 2005-12-23 | 2007-06-27 | 曼顿有限公司 | Synthetic grass flooring and method of laying same |
US20130142971A1 (en) * | 2007-01-19 | 2013-06-06 | Brock International | Base For Turf System |
CN201473850U (en) * | 2009-05-05 | 2010-05-19 | 欧阳鹰湘 | Prefabricated concrete member of playground drainage ditch |
CN204509935U (en) * | 2015-04-15 | 2015-07-29 | 彭坚 | A kind of assembled plate that suspends |
CN205242941U (en) * | 2015-12-03 | 2016-05-18 | 江苏威腾人造草坪有限公司 | Concatenation floor file substrate of can dismantle by oneself, tailorring |
CN206157522U (en) * | 2016-08-29 | 2017-05-10 | 陆大伟 | Place basis |
CN206706503U (en) * | 2017-02-08 | 2017-12-05 | 泉州市泉港智源商贸有限公司 | A kind of high-elastic plastic cement race track filler of four seasons constant temperature |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11225759B2 (en) | Support layer for supporting an artificial turf assembly, and artificial turf system | |
KR101098896B1 (en) | Drain block for synthetic turf ground, structure and construction method thereof | |
US11639585B2 (en) | Support layer for supporting an artificial turf assembly, and artificial turf system | |
CN107614814B (en) | Assemble block | |
CN110318315A (en) | A kind of place basis of artificial turf and its construction method | |
CN104655822B (en) | The integral type Work condition analogue device of highway culvert centrifugal model test and test method | |
CN209723024U (en) | Composite foundation reinforcement counterfort wall structure | |
CN208701700U (en) | A kind of pile foundation protective device close near deep basal pit | |
CN206916790U (en) | A kind of structure of free from flaw, ne-leakage overlarge area basement terrace | |
KR20020076530A (en) | Afforestation Retaining-Wall laying Concrete-block | |
AU2008201825A1 (en) | Method of constructing building slabs and pavements and storing water | |
EP3332066B1 (en) | Sports pitch and method of constructing same | |
CN204919250U (en) | It sets up structure to prevent sining square | |
CN205475360U (en) | Basement secretly buries rubble drainage structures | |
CN211690399U (en) | Basement drainage structure with high supporting strength | |
KR200235107Y1 (en) | Afforestation Retaining-Wall laying Concrete-block | |
EP3880888B1 (en) | Procedure for the creation of playgrounds and prefabricated reinforced concrete curb for such creation of a playground | |
US10597830B1 (en) | Apparatus, system, and method for providing drainage of a surface layer | |
CN211314457U (en) | Flood control type wind power generation tower cylinder basis | |
CN213328545U (en) | Garden ground paving structure | |
CN114457781A (en) | Salinized soil foundation reinforcement structure | |
CN112681059A (en) | Construction method for large-area variable-curvature football field | |
JP3174560B1 (en) | Golf course bunker structure | |
CN117211326A (en) | Assembly type anchor rod retaining wall structure capable of accurately controlling assembly precision of components | |
CN117211301A (en) | Soft soil foundation pit reinforcing device for passive zone and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191011 |