CN110318315A - A kind of place basis of artificial turf and its construction method - Google Patents

A kind of place basis of artificial turf and its construction method Download PDF

Info

Publication number
CN110318315A
CN110318315A CN201910622053.XA CN201910622053A CN110318315A CN 110318315 A CN110318315 A CN 110318315A CN 201910622053 A CN201910622053 A CN 201910622053A CN 110318315 A CN110318315 A CN 110318315A
Authority
CN
China
Prior art keywords
artificial turf
prefabricated
ground
screw rod
top plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910622053.XA
Other languages
Chinese (zh)
Inventor
徐涛
王胜
魏义中
刘强
辛吉波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Chenbo (beijing) Construction Engineering Co Ltd
Original Assignee
China Chenbo (beijing) Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Chenbo (beijing) Construction Engineering Co Ltd filed Critical China Chenbo (beijing) Construction Engineering Co Ltd
Priority to CN201910622053.XA priority Critical patent/CN110318315A/en
Publication of CN110318315A publication Critical patent/CN110318315A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/02Foundations, e.g. with drainage or heating arrangements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/08Surfaces simulating grass ; Grass-grown sports grounds

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention discloses place basis and its construction method of a kind of artificial turf, it is related to the technical field of field construction, it includes ground, ground includes rammed earth layer, concrete cushion and concrete layer, several prefabricated components are fixed on ground, several prefabricated components spell be close together and top formed can laying artificial turf plane;The periphery of several prefabricated components is provided with prefabricated gutter, the bottom of trench in prefabricated gutter is lower than the surface of ground, and the top in prefabricated gutter is lower than the plane.The present invention reduces the dosages of engineering material, shorten the construction time.

Description

A kind of place basis of artificial turf and its construction method
Technical field
The present invention relates to the technical fields of field construction, more particularly, to a kind of subcutaneous place basis of football pitch pedaline And its construction method.
Background technique
Artificial turf is the highest turf of suede density currently on the market, is suitable for baseball, Rugby field, football pitch, hockey stick Court, softball field, stadium of track and field and other kinds athletic ground, while being also playground, training field, physical education, military training and other The movable ideal turf of indoor and outdoor.Artificial turf is of less demanding to ground, can be cement flooring, asphalt floor, is also possible to Hard sand ground face, cement stabilizing level.
The construction on traditional place basis, includes the following steps: 1, excavation of earthwork;2, rammed earth rolls 3, backfill sandstone Material rolls;4, three dirt of backfill roll;5, backfill cement stabilizing layer rolls;6, casting concrete surface layer.According to traditional place Foundation construction method is needed using to a large amount of engineering material, and long construction period.
Summary of the invention
An object of the present invention is to provide a kind of place basis of artificial turf, which reduce the dosage of engineering material, And shorten the construction time.
Above-mentioned purpose of the invention has the technical scheme that
A kind of place basis of artificial turf, including ground, ground include rammed earth layer, concrete cushion and concrete layer, ground Several prefabricated components are fixed on base, several prefabricated components spell be close together and top formed can laying artificial turf it is flat Face;The periphery of several prefabricated components is provided with prefabricated drainage ditch, the top of prefabricated drainage ditch is lower than the plane.
By using above-mentioned technical proposal, because having used prefabricated component to support artificial turf, when can shorten construction Between, and fixed prefabricated component does not need to build the ground of multilayer and complexity, reduces the dosage of engineering material.
The present invention is further arranged to: the prefabricated component includes top plate and bottom plate and the branch between top plate and bottom plate Dagger, the horizontal cross-section of support column are in cross.
By using above-mentioned technical proposal, support column can not only play good support effect to top plate, and can also Enough spaces that non-filler is created between top plate and bottom plate, reduce the usage amount of factory material.
The present invention is further arranged to: several deflector holes are offered on the top plate;The ditch of the prefabricated drainage ditch Bottom is lower than the surface of ground, offers several drainage holes on the side wall of prefabricated drainage ditch canal, and the water energy on ground is enough from row Water hole flows into prefabricated drainage ditch.
By using above-mentioned technical proposal, in precipitation, rainwater can be flowed into the lower section of top plate from deflector hole, and from Drainage hole enters prefabricated gutter, improves the drainability on place basis.
The present invention is further arranged to: the ground anchoring has several groups screw rod, and every group of screw rod runs through the bottom plate, and Screw rod is connected with adjusting nut, and adjusting nut contacts at the lower surface of the bottom plate.
By using above-mentioned technical proposal, because of different places, there is different requirements for the gradient, and top plate is for branch Support artificial turf can change so only needing to change the tilt angle of top plate and meet the needs of different places.It is constructing When, only need to by rotating adjusting nut can controlroof tilt angle, shorten the construction time.
The present invention is further arranged to: on the direction from bottom plate to top plate, the area of the horizontal cross-section of the support column It is gradually increased.
By using above-mentioned technical proposal, increase the bearing area of support column, improves the enabling capabilities of support column.
The present invention is further arranged to: the star section of the support column is arranged along the diagonal line of the top plate.
By using above-mentioned technical proposal, the bearing capacity at the docking of four pieces of adjacent top plates can be improved.
The present invention is further arranged to: the upper surface of the top plate offers several staggered diversion trenches, the water conservancy diversion Hole is opened in the point of intersection of staggered diversion trench.
By using above-mentioned technical proposal, diversion trench can guide the rainwater of cover top surface to be quickly flowed into deflector hole It is interior, it can be improved the drainability on place basis.
The present invention is further arranged to: the screw rod is also connected with clamp nut, and the clamp nut contacts at the bottom The upper surface of plate.
By using above-mentioned technical proposal, etching of concrete surface and prefabricated component caused by falling off incline in order to prevent Tiltedly, after bottom plate is pressed on adjusting nut by clamp nut, it is ensured that the posture of prefabricated component is constant.
The second object of the present invention is to provide a kind of construction method on the place basis of artificial turf, comprising the following steps:
S1: earth excavation is simultaneously tamped and forms rammed earth layer, successively casting concrete bed course and concrete layer on rammed earth layer;
S2: the screw rod being vertically arranged is anchored in concrete layer according to design position;
S3: screwing adjusting nut on screw rod, utilizes the spacing between the bottom end and concrete surface of measurer control nut;
S4: slinging prefabricated component and screw rod is passed through installation through-hole;According to the gradient of design, by the adjusting spiral shell for screwing different location Mother changes the gradient of top plate;
S5: screwing clamp nut on screw rod and clamp nut is against to the upper surface of bottom plate;
S6: it lays prefabricated gutter and forms drainage ditch.
In conclusion advantageous effects of the invention are as follows:
1. supporting artificial turf by using prefabricated component, the construction time is shortened, and fixed prefabricated component does not need to build The ground of multilayer and complexity, reduces the dosage of engineering material;
Deflector hole, diversion trench and drainage hole set by 2. increase the drainability on place basis;
3. need by rotating adjusting nut can controlroof tilt angle, shorten the construction time.
Detailed description of the invention
Fig. 1 is the isometric test chart of prefabricated component;
Fig. 2 is a kind of structural schematic diagram on the place basis of artificial turf;
Fig. 3 is the cross-sectional view in prefabricated gutter.
In figure, 1, ground;11, rammed earth layer;12, concrete cushion;13, concrete layer;2, prefabricated component;21, bottom plate;221, Installation through-hole;22, top plate;221, deflector hole;222, diversion trench;23, support column;3, screw rod;4, adjusting nut;5, spiral shell is compressed It is female;6, prefabricated gutter;61, drainage hole.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment 1
As shown in Fig. 1 to 3, the invention discloses a kind of place of artificial turf bases, including ground 1, are fixed on ground 1 Several prefabricated components 2 of side and the drainage ditch being made of several prefabricated gutters 6.
Ground 1 successively includes rammed earth layer 11, concrete cushion 12 and concrete layer 13 from the bottom to top.
Prefabricated component 2 includes horizontally disposed bottom plate 21 and top plate 22, and top plate 22 is square with bottom plate 21, and bottom The area of plate 21 is less than the area of top plate 22.Be provided with support column 23 between top plate 22 and bottom plate 21, bottom plate 21, top plate 22 with And support column 23 is integrally formed.The horizontal cross-section of support column 23 is in cross, and the star section of support column 23 is along top plate 22 diagonal line setting.On by bottom plate 21 to the direction of top plate 22, the area of the horizontal cross-section of support column 23 is gradually increased.If The dry spelling of prefabricated component 2 is close together, and the upper surface of each top plate 22 be collectively formed can laying artificial turf rectangle plane.
Several screw rods stretched out straight up 3 are fixed in concrete layer 13.Every four screw rods 3 are one group, every group of spiral shell Bar 3 corresponds to a prefabricated component 2.It is opened up on bottom plate 21 there are four installation through-hole 221, the aperture of installation through-hole 221 is greater than screw rod 3 Diameter.Four screw rods 3 run through installation through-hole 221.Screw rod 3 is connected with adjusting nut 4 and clamp nut 5.Adjusting nut 4 with The lower surface of bottom plate 21 offsets and between adjusting nut 4 and concrete layer 13 there are spacing, and clamp nut 5 is upper with bottom plate 21 Surface offsets.
Because prefabricated component 2 has been used to support artificial turf, the construction time can be shortened, and fixed prefabricated component 2 is simultaneously It does not need to build multilayer and complicated ground 1, reduces the dosage of engineering material.
Because of different places, there is different requirements for the gradient, and in construction, it need to only pass through rotating adjusting nut 4 Can controlroof 22 tilt angle, shorten the construction time.
Several deflector holes 221 are offered on top plate 22, deflector hole 221 is through-hole.It is also set in the upper surface of top plate 22 It is equipped with several criss-cross diversion trenches 222.Deflector hole 221 is located at the intersection of criss-cross diversion trench 222.Deflector hole 221 are used for the rainwater diversion under seeping from artificial turf to ground 1 in precipitation.Diversion trench 222 can guide on top plate 22 The rainwater on surface is quickly flowed into deflector hole 221.
The prefabricated component 2 being close together is spelled around several in prefabricated gutter 6, and the top in prefabricated gutter 6 is lower than top plate 22 upper surface, the bottom of trench in prefabricated gutter 6 are lower than the upper surface of ground 1.Draining is offered on the side wall in prefabricated gutter 6 Hole 61.Water energy on ground 1 enough flows into prefabricated gutter 6 from drainage hole 61.
Embodiment 2
Present embodiment discloses a kind of construction method on the place basis of artificial turf as disclosed in embodiment 1, including it is following Step:
S1: earth excavation is simultaneously tamped and forms rammed earth layer 11, successively casting concrete bed course 12 and concrete on rammed earth layer 11 Layer 13;
S2: the screw rod 3 being vertically arranged is anchored in concrete layer 13 according to design position;
S3: screwing adjusting nut 4 on screw rod 3, between 13 surface of bottom end and concrete layer of measurer control nut Away from;
S4: slinging prefabricated component 2 and screw rod 3 is passed through installation through-hole 221;According to the gradient of design, by screwing different location The gradient of the change top plate 22 of adjusting nut 4;
S5: screwing clamp nut 5 on screw rod 3 and clamp nut 5 is against to the upper surface of bottom plate 21;
S6: it lays prefabricated gutter 6 and forms drainage ditch.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (9)

1. a kind of place basis of artificial turf, it is characterised in that: including ground (1), ground (1) includes rammed earth layer (11), mixes Soil padding (12) and concrete layer (13) are coagulated, is fixed with several prefabricated components (2) on ground (1), several prefabricated components (2) are spelled Be close together and top formed can laying artificial turf plane;It is provided in the periphery of several prefabricated components (2) prefabricated The top in gutter (6), prefabricated gutter (6) is lower than the plane.
2. a kind of place basis of artificial turf according to claim 1, it is characterised in that: the prefabricated component (2) includes Top plate (22), bottom plate (21) and the support column (23) between top plate (22) and bottom plate (21), the level of support column (23) Section is in cross.
3. a kind of place basis of artificial turf according to claim 2, it is characterised in that: opened up on the top plate (22) There are several deflector holes (221);The bottom of trench of the prefabricated gutter (6) is lower than the surface of ground (1), prefabricated gutter (6) canal Side wall on offer several drainage holes (61), the water energy on ground (1) is enough to flow into prefabricated gutter from drainage hole (61) (6)。
4. a kind of place basis of artificial turf according to claim 1, it is characterised in that: ground (1) anchoring has Several groups screw rod (3), every group of screw rod (3) runs through the bottom plate (21), and screw rod (3) is connected with adjusting nut (4), adjusts spiral shell Female (4) contact at the lower surface of the bottom plate (21).
5. a kind of place basis of artificial turf as claimed in any of claims 2 to 3, it is characterised in that: certainly On bottom plate (21) to the direction of top plate (22), the area of the horizontal cross-section of the support column (23) is gradually increased.
6. a kind of place basis of artificial turf according to claim 5, it is characterised in that: the ten of the support column (23) Shaped sections are arranged along the diagonal line of the top plate (22).
7. a kind of place basis of artificial turf according to claim 3, it is characterised in that: the upper table of the top plate (22) Face offers several staggered diversion trenches (222), and the deflector hole (221) is opened in the intersection point of staggered diversion trench (222) Place.
8. a kind of place basis of artificial turf according to claim 4, it is characterised in that: the screw rod (3) is also connected with Have clamp nut (5), the clamp nut (5) contacts at the upper surface of the bottom plate (21).
9. a kind of a kind of construction method on the place basis of artificial turf as described in claim 1 to 8 any one, feature It is: the following steps are included:
S1: earth excavation and tamp form rammed earth layer (11), on rammed earth layer (11) successively casting concrete bed course (12) and Concrete layer (13);
S2: the screw rod being vertically arranged (3) is anchored in concrete layer (13) according to design position;
S3: screwing adjusting nut (4) on screw rod (3), using measurer control nut bottom end and concrete layer (13) surface it Between spacing;
S4: slinging prefabricated component (2) and screw rod (3) are passed through installation through-hole (221);According to the gradient of design, by screwing difference The adjusting nut (4) of position changes the gradient of top plate (22);
S5: screwing clamp nut (5) on screw rod (3) and clamp nut (5) is against to the upper surface of bottom plate (21);
S6: prefabricated gutter (6) are laid and form drainage ditch.
CN201910622053.XA 2019-07-10 2019-07-10 A kind of place basis of artificial turf and its construction method Pending CN110318315A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910622053.XA CN110318315A (en) 2019-07-10 2019-07-10 A kind of place basis of artificial turf and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910622053.XA CN110318315A (en) 2019-07-10 2019-07-10 A kind of place basis of artificial turf and its construction method

Publications (1)

Publication Number Publication Date
CN110318315A true CN110318315A (en) 2019-10-11

Family

ID=68123231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910622053.XA Pending CN110318315A (en) 2019-07-10 2019-07-10 A kind of place basis of artificial turf and its construction method

Country Status (1)

Country Link
CN (1) CN110318315A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1986969A (en) * 2005-12-23 2007-06-27 曼顿有限公司 Synthetic grass flooring and method of laying same
CN201473850U (en) * 2009-05-05 2010-05-19 欧阳鹰湘 Prefabricated concrete member of playground drainage ditch
US20130142971A1 (en) * 2007-01-19 2013-06-06 Brock International Base For Turf System
CN204509935U (en) * 2015-04-15 2015-07-29 彭坚 A kind of assembled plate that suspends
CN205242941U (en) * 2015-12-03 2016-05-18 江苏威腾人造草坪有限公司 Concatenation floor file substrate of can dismantle by oneself, tailorring
CN206157522U (en) * 2016-08-29 2017-05-10 陆大伟 Place basis
CN206706503U (en) * 2017-02-08 2017-12-05 泉州市泉港智源商贸有限公司 A kind of high-elastic plastic cement race track filler of four seasons constant temperature

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1986969A (en) * 2005-12-23 2007-06-27 曼顿有限公司 Synthetic grass flooring and method of laying same
US20130142971A1 (en) * 2007-01-19 2013-06-06 Brock International Base For Turf System
CN201473850U (en) * 2009-05-05 2010-05-19 欧阳鹰湘 Prefabricated concrete member of playground drainage ditch
CN204509935U (en) * 2015-04-15 2015-07-29 彭坚 A kind of assembled plate that suspends
CN205242941U (en) * 2015-12-03 2016-05-18 江苏威腾人造草坪有限公司 Concatenation floor file substrate of can dismantle by oneself, tailorring
CN206157522U (en) * 2016-08-29 2017-05-10 陆大伟 Place basis
CN206706503U (en) * 2017-02-08 2017-12-05 泉州市泉港智源商贸有限公司 A kind of high-elastic plastic cement race track filler of four seasons constant temperature

Similar Documents

Publication Publication Date Title
US11225759B2 (en) Support layer for supporting an artificial turf assembly, and artificial turf system
KR101098896B1 (en) Drain block for synthetic turf ground, structure and construction method thereof
US20230228043A1 (en) Support layer for supporting an artificial turf assembly, and artificial turf system
CN107614814B (en) Assemble block
CN110318315A (en) A kind of place basis of artificial turf and its construction method
CN104655822B (en) The integral type Work condition analogue device of highway culvert centrifugal model test and test method
CN209723024U (en) Composite foundation reinforcement counterfort wall structure
CN208701700U (en) A kind of pile foundation protective device close near deep basal pit
CN206916790U (en) A kind of structure of free from flaw, ne-leakage overlarge area basement terrace
AU2008201825A1 (en) Method of constructing building slabs and pavements and storing water
JPH05508204A (en) Infrastructure structures particularly suitable for tennis courts, tennis courts and tennis court construction methods
EP3332066B1 (en) Sports pitch and method of constructing same
CN103590301B (en) The construction method of Cushion-layer-free permeable ecological grassing terrace
CN208917630U (en) Foundation pit levelling device and plastic cement race track
CN204919250U (en) It sets up structure to prevent sining square
CN205475360U (en) Basement secretly buries rubble drainage structures
CN211690399U (en) Basement drainage structure with high supporting strength
KR200235107Y1 (en) Afforestation Retaining-Wall laying Concrete-block
EP3880888B1 (en) Procedure for the creation of playgrounds and prefabricated reinforced concrete curb for such creation of a playground
US10597830B1 (en) Apparatus, system, and method for providing drainage of a surface layer
CN213328545U (en) Garden ground paving structure
CN209798480U (en) Plastic course court material structure for increasing tensile force
CN207919280U (en) Permeable motion ground suitable for outdoor stadium
Mangushev et al. Foundations of unique buildings and structures of St. Petersburg in difficult soil conditions
CN112681059A (en) Construction method for large-area variable-curvature football field

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191011