CN110310449A - For the linkage programmed method and system of fire-fighting equipment - Google Patents
For the linkage programmed method and system of fire-fighting equipment Download PDFInfo
- Publication number
- CN110310449A CN110310449A CN201910629267.XA CN201910629267A CN110310449A CN 110310449 A CN110310449 A CN 110310449A CN 201910629267 A CN201910629267 A CN 201910629267A CN 110310449 A CN110310449 A CN 110310449A
- Authority
- CN
- China
- Prior art keywords
- linkage
- fire
- data
- field components
- fire alarm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- A—HUMAN NECESSITIES
- A62—LIFE-SAVING; FIRE-FIGHTING
- A62C—FIRE-FIGHTING
- A62C37/00—Control of fire-fighting equipment
- A62C37/36—Control of fire-fighting equipment an actuating signal being generated by a sensor separate from an outlet device
- A62C37/38—Control of fire-fighting equipment an actuating signal being generated by a sensor separate from an outlet device by both sensor and actuator, e.g. valve, being in the danger zone
- A62C37/40—Control of fire-fighting equipment an actuating signal being generated by a sensor separate from an outlet device by both sensor and actuator, e.g. valve, being in the danger zone with electric connection between sensor and actuator
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B17/00—Fire alarms; Alarms responsive to explosion
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/02—Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
- H04L67/025—Protocols based on web technology, e.g. hypertext transfer protocol [HTTP] for remote control or remote monitoring of applications
Landscapes
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Alarm Systems (AREA)
Abstract
A kind of linkage programmed method and system for fire-fighting equipment, including fire alarm control unit and the field components being attached thereto.Fire alarm control unit and field components of the invention reports its data, carries out linkage programming by the data that fire alarm control unit or management end or cloud computing platform are reported automatically according to it.System according to linkage programmed to pass through each field components are configured so that each field components after getting trigger signal, are responded according to the linkage programmed result.The present invention can realize long-range linkage programming by internet as a result, avoid operator from hurrying back and forth in each system for field, to improve the efficiency of linkage programming.In addition, the present invention due to that can connect cloud computing platform by internet, can manage wherein data by cloud computing platform, guarantee operation response efficiency and improve the safety of data.
Description
Technical field
The present invention relates to field of fire fighting equipment more particularly to a kind of linkage programing systems of fire-fighting equipment.
Background technique
The linkage control of fire-fighting equipment is the important technology in fire alarm system, and the linkage control of fire-fighting equipment includes disappearing
Fire ties the monitoring of system, the monitoring of spray pump and atomizing pump, the monitoring of positive pressure fan, smoke controlling blower, fire resisting damper, smoke controlling valve
Stateful Inspection, fire emergency power-off system monitoring, elevator forced landing, the monitoring of fire resistance rolling shutter door, fuel gas, urgent broadcast and
The monitoring of fire communication equipment and the monitoring of fire-fighting power supply and route etc..Above-mentioned all monitoring are both needed to pass through fire protection linkage control
Device is completed.However in each building, these above-mentioned all monitored facilities, arrangement is not quite similar, it is therefore necessary to right
Fire protection linkage control device carries out fire alarm linkage programming.In simple terms, fire alarm linkage programming is exactly by above-mentioned these
All monitored facilities carry out operational logic by fire protection linkage control device and write, for example certain is in after fire behavior occurs, with this
The relevant above-mentioned monitored fire fighting device in place region is behaved according to certain step, and the fire fighting device of non-relevant areas is not done
Processing.
There are two types of the realization technical solutions of the programming of fire alarm linkage at present: first is that directly passing through fire alarm control unit
The operating system of (also known as fire protection linkage control device) is programmed.This scheme needs are arranged in fire alarm control unit equipment
Key and display carry out the editor of linkage formula by key and display, including to linkage formula increasing, delete, change, look into
Sequence of operations.The linkage programming of this fire alarm system needs operator directly to operate fire alarm control unit (also known as to disappear
Anti- linkage controller).But since the operating system of fire alarm control unit is usually present the relatively single disadvantage of function,
Therefore, the step of operator operates on it is quite cumbersome, and linkage programming efficiency is not high.
Due to the deficiency of system above, it is also provided with second method at present: directly real by linkage detail programming software
Now the linkage of fire alarm control unit is programmed.The mode of this linkage programming needs first installation on computers and fire alarm control
The corresponding linkage detail programming software of device processed, carries out linkage programming by software, the linkage formula shape that linkage programming is obtained
At the identifiable file of fire alarm control unit, use USB flash disk as transmission medium, this file is passed through fire alarm control unit
Linkage formula is directed into the fire alarm control unit by the data import feature in operating system.This mode can be avoided
Direct-acting controller.Data with existing in controller can also be exported by USB flash disk, then be programmed by the linkage on computer
Debugging software is read out and edits, to achieve the purpose that quickly to carry out linkage programming and maintenance management
The realization technical solution of the linkage programming of 2 kinds of above-mentioned fire alarm systems, is both needed to operator and arrives at fire report
The scene of alert controller setting is operated.In this way, the quantity with fire-fighting equipment adds, the shortcomings that this 2 kinds of technical solutions, will
Further amplified:
Firstly, existing two ways is required to operator to field operation, linkage programming is carried out, this greatly increases
The difficulty of linkage programing operation and maintenance;
Secondly, the demand for the programming that links will necessarily be increasing, the data volume for needing to manage as fire-fighting equipment increases
Can be constantly soaring, now there are two types of needing the mode data obtained for manually reaching scene inevitably to lag, data management difficulty is big;
Two ways is both needed to using tangible media, complex for operation step such as the multiple interaction of key or USB flash disk progress data,
The programming efficiency that links is not high.
Therefore, it is badly in need of a kind of linkage programmed method for being efficiently directed to fire-fighting equipment at present.
Summary of the invention
In order to solve the shortcomings of the prior art, the purpose of the present invention is to provide a kind of linkages for fire-fighting equipment
Programmed method and system.
Firstly, to achieve the above object, proposing a kind of linkage programing system for fire-fighting equipment, comprising: fire alarm
Controller and the field components being attached thereto.The fire alarm control unit obtains the data for the field components being attached thereto;
Wherein, the data of the field components include the address number of each field components, its region, component function;Then basis
The data carry out linkage programming and save linkage programmed result;To which according to the linkage programmed result, field components are being obtained
After getting trigger signal, responded according to the linkage programmed result;
Wherein, the linkage programming follows the steps below:
Step 201, the data of saved field components are obtained;
Step 202, according to the requirement of law stendard each signal of each field components is set corresponding to response
Mode, for example, to spray water in the much radiuses in the region when somewhere kindling is arranged according to legal norm, where want acoustic warning etc..Institute
Stating response modes includes: that the equipment of the response signal determined by the address number or the region and each equipment are held
Corresponding running parameter when row response;The response modes are corresponding with the signal, and group is combined into linkage programmed result;
Step 203;The linkage programmed result is saved, the fire alarm control unit obtains the linkage by network and compiles
Journey result simultaneously saves.
When fire occurs, smoke detector receives smoke signal, and electric signal is transmitted to fire alarm by fire-fighting two lines bus
Controller (abbreviation controller), controller is according to the linkage programmed result being saved, for the electric signal of this smog, judgement
The place (linkage programs contained data) that fire occurs out, the sprinkling equipment for controlling the region spray water etc. a series of dynamic
Make.
It optionally, further include management end in above-mentioned system, the management end is with the fire alarm control unit with wired
Or it wirelessly communicates to connect.The management end is arranged to perform following steps:
The data of field components for obtaining the data of the fire alarm control unit and being attached thereto;For example, position is believed
Breath, functions of the equipments, address number;
Linkage programming is carried out according to the data and saves the linkage programmed result;For example, the A according to corresponding to data
5 floor, 3rd area judges regional scope, according to the rules, is programmed in conjunction with scene or drawing;Such as No. 1 equipment, it is air draft, 3rd area
When kindling, No. 1 equipment air draft signal is given, cannot spray water signal to it;
The linkage programmed result is fed back into the corresponding fire alarm control unit, so that the fire alarming and controlling
Device controls each field components being attached thereto according to the linkage programmed result, and each field components is made to get touching
After signalling, responded according to the linkage programmed result.
It optionally, further include cloud computing platform in above-mentioned system, the cloud computing platform is for storing the fire report
The data of alert controller and the data for the field components being attached thereto, and institute is provided accordingly according to the request of the management end
State the data of fire alarm control unit or the data of the field components.
Optionally, in above-mentioned system, the fire alarm control unit and/or the field components further include having WiFi mould
Block, the WiFi module is for connecting internet;The cloud computing platform also with the fire alarm control unit and/or described existing
Field component passes through internet and connects;Wherein, the fire alarm control unit includes: the control device of automatic fire extinguishing system, indoor
The control device of hydrant system, the control device of Smoke prevention smoke evacuation system and air-conditioning ventilation system, the control device of fire resisting shutter;
The field components include: trigger device and interlocking equipment;Wherein, the trigger device includes various temperature-sensitives, sense cigarette, combustible gas
Bulk detector and manual pull station;The linkage includes combined aural and visual alarm, fire broadcast, fire pump, smoke exhaust fan.
Optionally, in above-mentioned system, the cloud computing platform is also connect with the management end by internet.The cloud
Computing platform is also used to store the linkage programmed result of the management end, the linkage programmed result is fed back to corresponding described
Fire alarm control unit so that the fire alarm control unit be attached thereto according to the linkage programmed result control it is described each
Field components, so that each field components after getting trigger signal, are responded according to the linkage programmed result.
Optionally, in above-mentioned system, the fire alarm control unit further includes having man-machine interactive interface, the man-machine friendship
Mutual interface is used for: receiving the linkage programming data for each field components that operator connects the fire alarm control unit, root
Linkage programmed result is formed according to the linkage programming data so that the fire alarm control unit is according to the linkage programmed result
Control each field components of its connection.
Optionally, in above-mentioned system, the fire alarm control unit further includes having data interaction interface, and the data are handed over
Mutual interface is used for: being received linkage programming data, is formed linkage programmed result so that the fire according to the linkage programming data
Alarm controller controls each field components (500) of its connection according to the linkage programmed result;Wherein, the data are handed over
Mutual interface includes USB interface.
Secondly, to achieve the above object, it is also proposed that a kind of linkage programmed method for fire-fighting equipment, step include:
The first step obtains the data of fire alarm control unit and the field components being attached thereto;Second step, according to the fire alarm
The data of controller and the field components carry out linkage programming and save linkage programmed result;Third step, according to described
Dynamic programmed result controls the field components so that each field components are after getting trigger signal, according to linkage volume
Journey result is responded;Wherein, in the second step, the linkage programming is followed the steps below: step 201, obtaining institute
The address number of the field components of preservation, its region, component function data;Step 202, it is arranged according to code requirement each
Response modes corresponding to each signal of a field components, the response modes include: by the address number or institute
State running parameter corresponding when the equipment for responding the signal and the execution response of each equipment that region determines;By the response
Mode is corresponding with the signal, and group is combined into linkage programmed result;Step 203, the linkage programmed result, the fire report are saved
Alert controller obtains the linkage programmed result by network and saves.
Optionally, in above-mentioned method, in the second step, carry out further include before linkage programming to the account of login into
The step of row authentication, permission of the general account without linkage programming, only specified account can just pass through authentication.Pass through institute
The step 201 just can be performed to 203 after stating authentication;Otherwise it prompts not pass through authentication.
Beneficial effect
The present invention is based on mobile Internet and cloud computing technology, realizes fire alarm system connection automatically or semi-automatically
Dynamic programming.The present invention is by development of Mobile Internet technology, cloud computing technology, operator, fire alarm control unit and scene portion
Part is associated together, formed one can remote control fire alarm system link programing system.Fire alarm control unit is not only
Possess tradition linkage programming mode (i.e. by data interactions interfaces such as man-machine interactive interface or USB), while also may be selected logical
Internet technology is crossed, it is long-range to obtain linkage programming data.
Further, linkage programming data obtained for system, the present invention can also manage sea by cloud computing technology
Measure data.Operator not only can carry out linkage programming by a website application, can also use hand by mobile Internet
Machine APP (or the mobile devices APP such as plate APP) carries out linkage programming, or passes through cell phone application (or mobile devices such as plate APP
APP) or fire alarm control unit realizes linkage programming automatically.
Since the step of data of each unit in linkage programming and system need to pass through authentication could obtain, and carry out
Change, therefore, system provided by the present invention, the security performance of data accesses better guarantee.Present invention preferably employs
It is long-range to realize linkage programming by management end or cloud computing platform, fire report is such as then configured to scene by network configuration
Alert controller and field components.This mode, which is compared through controller, directly to be carried out linkage programming there are following advantages: firstly, by
More in the data that management end or cloud platform can be got, therefore, this linkage programming mode will not be by controller scene
The limitation of component information amount is easy to plan as a whole whole system network.Secondly, being programmed by long-range linkage, after can facilitating
Linkage programming information is obtained long-range when phase safeguards, is conveniently safeguarded remotely, without staff to scene to single
Device is singly checked.Under this mode, operator is without operating fire alarm control unit.In view of to control
The operation of device is relative complex, and long-range linkage programming mode of the present invention can be avoided personnel and carry out complex operations, institute
Can make to link, programming process is simple and convenient.Meanwhile fire alarm control unit can remotely receive linkage programming data, without passing through
Tangible media is transmitted.
Other features and advantages of the present invention will be illustrated in the following description, also, partly becomes from specification
It obtains it is clear that understand through the implementation of the invention.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and constitutes part of specification, and with it is of the invention
Embodiment together, is used to explain the present invention, and is not construed as limiting the invention.In the accompanying drawings:
Fig. 1 is a kind of framework schematic diagram of the linkage programing system according to the present invention for fire-fighting equipment;
Fig. 2 is a kind of process signal of linkage programming of the linkage programing system according to the present invention for fire-fighting equipment
Figure.
Specific embodiment
Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings, it should be understood that preferred reality described herein
Apply example only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
With the rapid development of mobile Internet with it is universal, along with the rise of cloud computing technology, in order to solve above-mentioned fire
Calamity alarm system linkage programming there are the drawbacks of, the application proposes a kind of fire report based on mobile Internet and cloud computing technology
Alert system interlink programmed method and system, make operator that can remotely carry out linkage programming, it is not necessary to enter scene, and depend on
Cloud computing technology can manage mass data concentratedly, while remove the tedious steps that data are transmitted by tangible media from.
Fig. 1 is the linkage programing system according to the present invention for fire-fighting equipment, comprising: management end 200, cloud computing platform
300, fire alarm control unit 400, field components 500, wherein described management end 200, including mobile phone, plate etc. are mobile eventually
End, thereon equipped with management end application.When carrying out linkage programming, operator 100 is by internet (with wired or wireless
Mode) log in management end using 200 (application such as cell phone application or website), management end obtains preservation by internet using 200
Data in cloud computing platform 300 find fire alarm control unit 400 and need to carry out linkage programming, fire-alarm 400
The data of all field components such as field components 500 corresponding with oneself are stored in cloud computing platform 300, operator 100
The corresponding data in cloud computing platform 300, which is obtained, using 200 by management end carries out linkage programming operation according to the actual situation,
Data are uploaded after the completion to cloud computing platform 300, at this time fire alarm control unit 400 can be got from cloud computing platform 300 through
The data for crossing linkage programming, are stored in local, pass through the system of itself, configuration linkage programmed result.So far, operator is long-range
A whole set of fire alarm system linkage programming can be completed.
It is as shown in Figure 2:
The key step that fire alarm control unit is communicated with cloud computing platform includes: (1) fire alarm control unit request connection
Dynamic programming data, (2) cloud computing platform verify the identity of fire alarm control unit, and (3) fire alarm control unit transmits scene portion
Linkage programming data is transferred to fire alarm control device by number of packages evidence, (4) cloud computing platform, must due to being related to each step of authentication
It must be sequentially completed.
Wherein step (1) is the starting point of the process, when fire-fighting field components are installed, fire alarm control unit need through
These field components of linkage programming Control are crossed, fire alarm control unit has got the basic letter of these field components at this time
At this moment breath actively requests linkage programming data to cloud computing platform.
Step (2) cloud computing platform receives request, need to verify to the identity of fire alarm control unit, and verifying is logical
It crosses, cloud computing platform just can receive the data of controller.
Step (3) is the core of this process, and the field components information received is sent to cloud by fire alarm control unit
Computing platform is simultaneously saved, and corresponding with fire alarm control unit foundation, possesses the behaviour of the fire-alarm operating right
Work person carries out linkage programming to above data, and result is saved, and establishes corresponding relationship with the fire-alarm.
The linkage programming data saved is sent to fire alarm control unit to step (4) by cloud computing platform at this time, is carried out
The configuration process of step (5) completes the process of linkage programming.
The fire-fighting equipment being achieved in linkage programming can: operator need not enter fire alarm control unit install
Scene in the case where, linkage volume can be completed by long-range (directly communicate with fire alarm control unit by management end application)
Journey;Fire alarm control unit is not necessarily to that linkage programming data can be obtained by tangible media;Cloud computing platform can be managed effectively
A large amount of linkage programming data.
Under another implementation of the invention:
According to a upper embodiment, the present invention can also apply 200, cloud computing platform 300, fire alarming and controlling by management end
Device 400, field components 500 can also realize fire alarm system linkage programming.
It is flat to cloud computing after fire alarm control unit 400 gets the data of all field components such as field components 500
Platform 300 requests linkage programming data to pass the data to pipe after cloud computing platform 300 verifies the identity of fire alarm control unit
End is managed using 200 (background applications of cloud operation), management end is automatically performed linkage programming using 200 at this time, and linkage is compiled
Number of passes is according to cloud computing platform 300 is uploaded to, and fire alarm control unit 400 can be got from cloud computing platform 300 by connection at this time
The data of dynamic programming, are stored in local, pass through the system of itself, configuration linkage programmed result.So far, operator, this set are detached from
Fire alarm system linkage programmed method and system can be automatically performed a whole set of fire alarm system linkage programming.
Under this mode, fire alarm control unit can be automatically performed linkage programming, that is, in the case where being detached from operator,
This fire alarm system linkage programmed method and system also achievable linkage programming
Under another implementation of the invention:
Management end in above-described embodiment can also be simplified using 200 and cloud computing platform 300, work as fire alarming and controlling
After device 400 gets the data of all field components such as field components 500, according to the system of itself, it is automatically performed linkage programming
And it is stored in local, configuration linkage programmed result.The linkage programming data of this scheme is only stored in controller local, linkage programming
Efficiency significantly improves.
Under another implementation of the invention:
Fire can be also realized using 200, fire alarm control unit 400, field components 500 by operator 100, management end
Alarm system linkage programming.
After fire alarm control unit 400 gets the data of all field components such as field components 500, operator 100
200 (such as cell phone applications) are applied at operational management end, and fire alarm control unit 400 is passed the data to by wired or wireless way
Management end applies 200, and management end is automatically performed linkage programming using 200 at this time, and linkage programming data is given by backtracking
Fire alarm control unit 400, fire alarm control unit 400 store the data in local, and by the system of itself, configuration linkage is compiled
Journey result.So far, it is detached from cloud computing platform, this set fire alarm system linkage programmed method and system can be automatically performed a whole set of fire
The linkage programming of calamity alarm system.
The advantages of technical solution of the present invention is mainly reflected in: the present invention is for mesh first two linkage programming technique scheme, all
It needs operator to enter device context operation, has difficulties to the management of data, fire alarm control unit has a single function, and operates numerous
Trivial problem provides a whole set of fire alarm system linkage programmed method and system.By the system, operator can be long-range
Carry out linkage programming;For operator without operating fire alarm control unit, linkage programming process is simple and convenient;A large amount of linkage is compiled
Number of passes evidence can all obtain significantly more efficient management;Fire alarm control unit can remotely receive linkage programming data, without passing through
Tangible media is transmitted;Linkage programming process can be automatically performed by using APP;Fire alarm control unit can be automatically performed connection
Dynamic programming.
Those of ordinary skill in the art will appreciate that: the foregoing is only a preferred embodiment of the present invention, and does not have to
In the limitation present invention, although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art
For, still can to foregoing embodiments record technical solution modify, or to part of technical characteristic into
Row equivalent replacement.All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should all include
Within protection scope of the present invention.
Claims (9)
1. a kind of linkage programing system for fire-fighting equipment, comprising: fire alarm control unit (400) and what is be attached thereto show
Field component (500), which is characterized in that
The fire alarm control unit (400) obtains the data for the field components (500) being attached thereto;
Wherein, the data of the field components (500) include the address number of each field components, its region, component function;
Linkage programming is carried out according to the data and saves linkage programmed result;
According to the linkage programmed result, field components (500) are after getting trigger signal, according to the linkage programmed result
It is responded;
Wherein,
The linkage programming follows the steps below:
Step 201, the data of saved field components (500) are obtained by network;
Step 202, according to code requirement each signal of each field components is set corresponding to response modes, the sound
Answering mode includes: that the equipment of the response signal determined by the address number or the region and each equipment execute sound
Seasonable corresponding running parameter;The response modes are corresponding with the signal, and group is combined into linkage programmed result;
Step 203;The linkage programmed result is saved, the fire alarm control unit (400) obtains the linkage by network
Programmed result simultaneously saves.
2. being directed to the linkage programing system of fire-fighting equipment as described in claim 1, which is characterized in that further include management end
(200), the management end communicates to connect in a wired or wireless manner with the fire alarm control unit (400),
The management end is arranged to perform following steps:
The data of field components (500) for obtaining the data of the fire alarm control unit (400) and being attached thereto;
Linkage programming is carried out according to the data and saves the linkage programmed result;
The linkage programmed result is fed back into the corresponding fire alarm control unit (400), so that the fire alarm control
Device processed controls each field components (500) being attached thereto according to the linkage programmed result, and each field components is made to exist
After getting trigger signal, responded according to the linkage programmed result.
3. being directed to the linkage programing system of fire-fighting equipment as described in claim 1, which is characterized in that further include cloud computing platform
(300), the cloud computing platform is used for the live portion for storing the data of the fire alarm control unit (400) and being attached thereto
The data of part (500), and the fire alarm control unit (400) is provided accordingly according to the request of the management end (200)
The data of data or the field components (500).
4. the linkage programing system for fire-fighting equipment as described in claims 1 to 3, which is characterized in that the fire alarm
Controller (400) and/or the field components (500) further include having WiFi module, and the WiFi module is for connecting internet;
The cloud computing platform (300) also passes through with the fire alarm control unit (400) and/or the field components (500)
Internet connection;
Wherein,
The fire alarm control unit (400) includes: the control device of automatic fire extinguishing system, the control dress of indoor fire hydrant system
It sets, the control device of Smoke prevention smoke evacuation system and air-conditioning ventilation system, the control device of fire resisting shutter;
The field components (500) include: trigger device and interlocking equipment;
Wherein, the trigger device includes various temperature-sensitives, sense cigarette, combustible gas probe and manual pull station;
The linkage includes combined aural and visual alarm, fire broadcast, fire pump, smoke exhaust fan.
5. the linkage programing system for fire-fighting equipment as described in Claims 1-4, which is characterized in that the cloud computing is flat
Platform (300) is also connect with the management end (200) by internet;
The cloud computing platform (300) is also used to store the linkage programmed result of the management end, by the linkage programmed result
The corresponding fire alarm control unit (400) is fed back to, is tied so that the fire alarm control unit is programmed according to the linkage
Fruit controls each field components (500) for being attached thereto, so that each field components are after getting trigger signal, according to
The linkage programmed result is responded.
6. the linkage programing system for fire-fighting equipment as described in claim 1 to 5, which is characterized in that the fire alarm
Controller (400) further includes having man-machine interactive interface, and the man-machine interactive interface is used for: receiving operator to the fire alarm
The linkage programming data for each field components (500) that controller (400) is connected is formed according to the linkage programming data and is linked
Programmed result is so that the fire alarm control unit (400) controls each scene of its connection according to the linkage programmed result
Component (500).
7. being directed to the linkage programing system of fire-fighting equipment as claimed in claim 6, which is characterized in that the fire alarming and controlling
Device (400) further includes having data interaction interface, and the data interaction interface is used for: linkage programming data is received, according to described
Dynamic programming data forms linkage programmed result so that the fire alarm control unit (400) is controlled according to the linkage programmed result
Its each field components (500) connected;Wherein, the data interaction interface includes USB interface.
8. a kind of linkage programmed method for fire-fighting equipment, which is characterized in that step includes:
The first step obtains the data of fire alarm control unit (400) and the field components (500) being attached thereto;
Second step carries out linkage programming according to the data of the fire alarm control unit (400) and the field components (500)
And save linkage programmed result;
Third step controls the field components according to the linkage programmed result so that each field components are getting triggering
After signal, responded according to the linkage programmed result;
Wherein,
In the second step, the linkage programming is followed the steps below:
Step 201, address number, its region, component function data of saved field components (500) are obtained;
Step 202, according to code requirement each signal of each field components is set corresponding to response modes, the sound
Answering mode includes: that the equipment of the response signal determined by the address number or the region and each equipment execute sound
Seasonable corresponding running parameter;The response modes are corresponding with the signal, and group is combined into linkage programmed result;
Step 203, the linkage programmed result is saved, the fire alarm control unit (400) obtains the linkage by network
Programmed result simultaneously saves.
9. being directed to the linkage programmed method of fire-fighting equipment as claimed in claim 9, which is characterized in that in the second step, into
Further include the steps that authentication before row linkage programming;
By executing the step 201 after the authentication to 203;Otherwise it prompts not pass through authentication.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910629267.XA CN110310449A (en) | 2019-07-12 | 2019-07-12 | For the linkage programmed method and system of fire-fighting equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910629267.XA CN110310449A (en) | 2019-07-12 | 2019-07-12 | For the linkage programmed method and system of fire-fighting equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110310449A true CN110310449A (en) | 2019-10-08 |
Family
ID=68079894
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910629267.XA Pending CN110310449A (en) | 2019-07-12 | 2019-07-12 | For the linkage programmed method and system of fire-fighting equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110310449A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111683123A (en) * | 2020-05-23 | 2020-09-18 | 浙江台谊消防设备有限公司 | Uploading and downloading system and uploading and downloading operation method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1591510A (en) * | 2003-08-28 | 2005-03-09 | 能美防灾株式会社 | Fire alarm |
CN101577814A (en) * | 2009-06-16 | 2009-11-11 | 重庆渝高教育信息技术中心 | Multimedia remote interlocking intelligent monitoring system control method |
CN101819708A (en) * | 2009-11-30 | 2010-09-01 | 广州市聚晖电子科技有限公司 | Access management method of security terminal and security system |
CN105336084A (en) * | 2015-09-02 | 2016-02-17 | 华南师范大学 | Fire alarm linkage controller |
CN106773772A (en) * | 2017-02-10 | 2017-05-31 | 杭州极智科技有限公司 | A kind of ZigBee intelligent domestic gateways scene inter-linked controlling method |
JP2017129975A (en) * | 2016-01-19 | 2017-07-27 | パナソニックIpマネジメント株式会社 | Automatic fire notification system |
CN108508755A (en) * | 2017-02-28 | 2018-09-07 | 美的智慧家居科技有限公司 | Smart home device configuration method and intelligent domestic system |
-
2019
- 2019-07-12 CN CN201910629267.XA patent/CN110310449A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1591510A (en) * | 2003-08-28 | 2005-03-09 | 能美防灾株式会社 | Fire alarm |
CN101577814A (en) * | 2009-06-16 | 2009-11-11 | 重庆渝高教育信息技术中心 | Multimedia remote interlocking intelligent monitoring system control method |
CN101819708A (en) * | 2009-11-30 | 2010-09-01 | 广州市聚晖电子科技有限公司 | Access management method of security terminal and security system |
CN105336084A (en) * | 2015-09-02 | 2016-02-17 | 华南师范大学 | Fire alarm linkage controller |
JP2017129975A (en) * | 2016-01-19 | 2017-07-27 | パナソニックIpマネジメント株式会社 | Automatic fire notification system |
CN106773772A (en) * | 2017-02-10 | 2017-05-31 | 杭州极智科技有限公司 | A kind of ZigBee intelligent domestic gateways scene inter-linked controlling method |
CN108508755A (en) * | 2017-02-28 | 2018-09-07 | 美的智慧家居科技有限公司 | Smart home device configuration method and intelligent domestic system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111683123A (en) * | 2020-05-23 | 2020-09-18 | 浙江台谊消防设备有限公司 | Uploading and downloading system and uploading and downloading operation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106248149B (en) | A kind of fire remote-monitoring system | |
CN106383463B (en) | A kind of construction environment monitoring system and method based on safety cap | |
Morgan et al. | Design methodologies for smoke and heat exhaust ventilation | |
CN106527309A (en) | Firefighting Internet of things system | |
CN102419575B (en) | System for carrying out dynamic monitoring on complete information of firefighting vehicle | |
CN202620548U (en) | Fire extinguishing device capable of giving alarm and being controlled in wireless remote mode | |
CN204390397U (en) | Based on the automatic fire alarm infosystem of BIM | |
CN212516042U (en) | Typical site fire safety intelligence management and control system | |
CN110097728B (en) | Fire-fighting remote monitoring system | |
CN105204474A (en) | Transformer substation environment intelligent monitoring system | |
CN104269936A (en) | Comprehensive monitoring method and system | |
CN103400481A (en) | Detection method used for fire control alarm linkage system as well as system and device thereof | |
CN206626413U (en) | A kind of gas leakage alarm cuts off monitoring system | |
CN110320835B (en) | Building automatic control distributed system and method | |
CN111643833A (en) | Converter station full-scene and multi-dimensional fire-fighting linkage method and system | |
CN111580447A (en) | Intelligent emergency monitoring system applied to totally-enclosed coal yard | |
AU2018354716A1 (en) | Fire detection system, automatic data capture, remote testing, analysis, apparatus and methods | |
CN103985280B (en) | A kind of structural fire protection warning experience system | |
CN110310449A (en) | For the linkage programmed method and system of fire-fighting equipment | |
CA3144056A1 (en) | Safety management and building operational assessment system and method for multiple occupancy buildings | |
CN105107125A (en) | Fire extinguishing system and method based on computer control | |
CN110149383A (en) | Fire alarm installation collecting method, device, electronic equipment and storage medium | |
JP2017068294A (en) | Support system, support device, and terminal device | |
CN106227273B (en) | A kind of remote monitoring system of building environment | |
CN206062255U (en) | A kind of construction environment monitors safety helmet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191008 |