CN110306934A - The construction method and supporting drilling tool of double branch's top plate major diameter high position directional long boreholes - Google Patents

The construction method and supporting drilling tool of double branch's top plate major diameter high position directional long boreholes Download PDF

Info

Publication number
CN110306934A
CN110306934A CN201910589446.5A CN201910589446A CN110306934A CN 110306934 A CN110306934 A CN 110306934A CN 201910589446 A CN201910589446 A CN 201910589446A CN 110306934 A CN110306934 A CN 110306934A
Authority
CN
China
Prior art keywords
hole
branch
section
sidetracking
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910589446.5A
Other languages
Chinese (zh)
Other versions
CN110306934B (en
Inventor
刘建林
李泉新
赵江鹏
方俊
王传留
王四一
姜磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Research Institute Co Ltd of CCTEG
Original Assignee
Xian Research Institute Co Ltd of CCTEG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Research Institute Co Ltd of CCTEG filed Critical Xian Research Institute Co Ltd of CCTEG
Priority to CN201910589446.5A priority Critical patent/CN110306934B/en
Publication of CN110306934A publication Critical patent/CN110306934A/en
Application granted granted Critical
Publication of CN110306934B publication Critical patent/CN110306934B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • E21B10/46Drill bits characterised by wear resisting parts, e.g. diamond inserts
    • E21B10/54Drill bits characterised by wear resisting parts, e.g. diamond inserts the bit being of the rotary drag type, e.g. fork-type bits
    • E21B10/55Drill bits characterised by wear resisting parts, e.g. diamond inserts the bit being of the rotary drag type, e.g. fork-type bits with preformed cutting elements
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/28Enlarging drilled holes, e.g. by counterboring
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

A kind of construction method and supporting drilling tool of double branch's top plate major diameter high position directional long boreholes, the directional long borehole includes sealing of hole casing section, strata penetration hole section and double branch's extraction hole sections, and the strata penetration hole section includes the S-shaped profile footprint section between working face coal seam and roof fracture band.Method is sealing of hole casing section of first constructing, down tube solid hole;Then construction strata penetration hole section and top set bore the minor diameter pilot hole of reaming and bore enlarged diameter hole;Then enlarged diameter hole is simultaneously bored in sidetracking, Qiang Kai minor diameter branch in the S-shaped profile footprint section of major diameter strata penetration hole section, construction guidance hole.The number of openings can be greatly decreased in the present invention, reduce complementary project amount, improve integrated construction efficiency and High Position Drilling utilization rate, be conducive to improve pressure relief gas pumping mining effect.Matched drill bit is equipped with sidetracking branch column tooth, can impact under the effect of gravity-cutting-up large diameter hole on the downside of hole wall, quickly make step, hanging sidetracking minor diameter branch, it is consistent with conventional lead bit function during directional drilling.

Description

The construction method and supporting drilling tool of double branch's top plate major diameter high position directional long boreholes
Technical field
The present invention relates to the construction methods and supporting drilling tool of a kind of double branch's top plate major diameter high position directional long boreholes, especially Relate to the use of large diameter hole ideal hole wall section circle minor diameter sidetracking branch drill bit desired cut circle between curvature difference, by Sidetracking branch drill bit hanging sidetracking, the strong double branches for opening minor diameter oriented branch hole and reaming in the large diameter hole after reaming The construction method and supporting drilling tool of top plate major diameter high position directional long borehole.
Background technique
The mine for exploiting single coal bed and coal seam group, during working face extraction, this coal seam, adjacent layer release are largely unloaded Gas is pressed, these gas will gather in work face goaf, upper corner and roof fracture band, in the distinguished and admirable pressure oscillation shadow in the face of adopting Under sound, easily gush out and return aircourse, gas at upper corner is caused to be transfinited, seriously threatens shaft production safety, restricts mine volume increase Synergy.
Top plate major diameter high position directional long borehole be carry out working face adopt pressure relief gas pumping mining desirable technique means it One, by arranging drill site in coal road, surrounded using measurement while-drilling instrument system, mating directional technology equipment control drilling trajectory Planned course drilling faces upward and enters estimated mining induced fissure band and concordant extension across Roof Rock Strata of Coal Seam.Top plate major diameter is high It is obvious that position directional long borehole extraction working face adopts gas pressure relief potential advantages: compared with conventional High Position Drilling, in destination layer Effective extended distance is long, layer position is controllable, and utilization rate is high, and space cloth pitch of holes is uniform, and drilling hole amount is few;It is high compared with suction road Position directional long borehole is constructed in coal road, and drill site flexible arrangement, the back works amount such as driving, supporting is few, short construction period, comprehensive It is at low cost.
Currently, top plate high position directional drilling extraction working face is adopted gas pressure relief technology and quickly grown, and has and gradually substitute The trend of suction road.However, due to being matched by underground coal mine directional drilling machine ability, mating slush pump (vehicle) discharge capacity, drilling tool restricted class, The many factors such as drilling rod intensity limitation, top plate high position major diameter (>=Φ 153mm) directional drilling can only take " orientation pilot hole+ The method pore-forming of reaming " (i.e. " Kong Yikuo "), the cloth hole in the form of the group that drills, i.e., first directional drilling minor diameter (≤Φ 120mm) Pilot hole to predetermined design depth, mention brill replacement drilling tool after again to pilot hole carry out reaming, ultimately form major diameter (>=Φ 153mm) drainage holes, one group of (usual 5~10) hole of being constructed in a drill site with same method.Using " Kong Yikuo " Method construction top plate major diameter high position directional drilling can only be drilled to the single extraction channel without branch, and laying drilling group, which exists, to open Hole number is more, sealing of hole, setting of casing heavy workload, and the problems such as logical, hole quality is difficult to control easily is altered between hole.In addition, top plate is high-order Directional long borehole can be subdivided into sealing of hole casing section as extraction channel, according to layer position relationship, extraction in strata penetration hole section and destination layer Hole section three parts, wherein strata penetration hole section is connection, the changeover portion of effective extraction hole section and sealing of hole casing section in destination layer, is belonged to auxiliary Helping property hole section is generally mostly faced upward with 10 °~30 ° of chance layer angle, tiltedly wears stratum between coal seam and target fissure zone, and it is special to have Property: functionally, strata penetration hole section belongs to auxiliary extraction channel, and the fewer its drilling footage amount the better in principle;In terms of construction, Strata penetration hole section has " Non-selectivity ", that is, has to pass through whole stratum between coal seam and target fissure zone;In terms of stabilization, Strata penetration hole hole wall overall stability is poor, accordingly, there exist strata penetration hole hole wall easily collapse blocking channel, influence extracting result, The problems such as subsequent guard aperture project amount is big.
For this purpose, designer of the invention is in view of drawbacks described above, it is comprehensive to be engaged in correlation for many years by concentrating on studies and designing The experience and achievement of industry, researching and designing go out the construction method of a kind of double branch's top plate major diameter high position directional long boreholes and mating Drilling tool, to overcome drawbacks described above.
Summary of the invention
The purpose of the present invention is to provide a kind of construction method of double branch's top plate major diameter high position directional long boreholes and match Drilling tool is covered, the single extraction channel that can only be drilled to without branch can be effectively overcome in the prior art, when laying drilling group, The number of openings is more, sealing of hole, lower orifice sleeve and later period guard aperture heavy workload, wears and easily alters logical, hole quality between interval hole and be difficult to control The problems such as processed.
To solve the above problems, the invention discloses a kind of construction parties of double branch's top plate major diameter high position directional long boreholes Method, double branch's top plate major diameter high position directional long boreholes are from working face coal seam drill site to the orientation of roof fracture belt construction Long drilled holes, it includes 1 section of sealing of hole casing section, 1 section of strata penetration hole section and 2 sections of extraction hole section three parts, it is characterised in that:
The sealing of hole casing section is connected to the lower end of strata penetration hole section, 2 sections of drainage holes sections from working face coal seam drill site In the upper end for being connected to strata penetration hole section in roof fracture band and in the form of double branches, the strata penetration hole section is included in working face coal Layer roof fracture band between S-shaped profile footprint section, the S-shaped profile footprint section include inclination angle dullness increase section, inflection point and Inclination angle monotone decreasing segment, double branch's extraction hole sections bore reaming under comprising the top set of Parallel Design and upper and lower layered arrangement Reaming is bored by branch, and reaming is bored by the top set and strata penetration hole section is coaxially connected, and the inferior division bores reaming and is connected to S-shaped section rail On the sidetracking branch point of mark inclination angle monotone decreasing segment;
The construction method are as follows: sealing of hole casing section of first constructing, down tube solid hole;Then construction strata penetration hole section and top set, which bore, expands The minor diameter pilot hole of hole section, and bore expansion and form major diameter strata penetration hole section and top set's extraction hole section;Then layer is worn in major diameter The hanging sidetracking inferior division of hole section S-shaped profile footprint latter end bores the minor diameter pilot hole of reaming section, and bores expansion and formed under major diameter Branch's extraction hole section;Finally, forming double branches major diameter high position directional long borehole.
Wherein comprise the following steps:
Step 1: the brill for carrying out sealing of hole casing section from working face coal seam drill site expands construction, uses rotary drilling technique;
Step 2: the down tube solid hole of sealing of hole casing section is carried out;
Step 3: the minor diameter pilot hole for boring reaming to strata penetration hole section and top set carries out measurement while drilling directional drilling, institute Strata penetration hole section is stated to creep into along S-shaped profile footprint;
Step 4: it carries out boring expansion and forms the strata penetration hole section and top set's brill reaming of major diameter, the brill expansion passes through replacement Borehole-enlarging drilling tool combination, the pilot hole formed along step 3 are oriented reaming drilling, expand to bottom hole backed off after random borehole-enlarging drilling tool group It closes;
Step 5: sidetracking point is selected on the monotone decreasing segment suitable position of major diameter strata penetration hole section S-shaped profile footprint inclination angle Fulcrum, then tripping in is incorporated into branch point position with the directional tool of sidetracking branch drill bit, adjust the tool of deflecting drilling tool towards Between 175 ° to 190 °, turn on pump inputs high pressure washing liquid drive hole bottom screw motor into hole and drives sidetracking branch drill bit on angle circle Revolution sidetracking opens branch, realizes the lower part for entering roof fracture band after the interior sidetracking under hole wall of large diameter hole opens minor diameter branched hole Layer position is oriented drilling, completes the pilot hole construction that inferior division bores reaming;
Step 6: carrying out brill expansion to the pilot hole of inferior division, and the inferior division for forming major diameter bores reaming, and the brill expansion passes through Tripping in borehole-enlarging drilling tool is incorporated into branch point, and the inferior division pilot hole formed along step 5 is oriented reaming drilling, expands to hole The combination of bottom backed off after random borehole-enlarging drilling tool.
Directional tool combination includes sidetracking branch drill bit used by the pilot hole that inferior division bores reaming is constructed, by sidetracking Hole wall, the curvature difference based on different-diameter circular order quickly make platform on the downside of sidetracking branch column tooth impact cutting-up on branch's drill bit Rank realizes that hanging sidetracking in the S-shaped profile footprint hole section of major diameter goes out branch's pilot hole of minor diameter.
A kind of supporting drilling tool of double branch's top plate major diameter high position directional long borehole construction methods is also disclosed, comprising special Directional tool combination, it is characterised in that:
The particular orientation drill assembly include sidetracking branch drill bit, single bend PDM motor, measurement-while-drilling system, without magnetic bore Tool and logical cable drill string, sidetracking branch drill bit include that four PDC cut the wing, and four PDC cutting wing 13 is in 90 ° of angles Arrangement, the drill bit head periphery of the PDC cutting wing between any two are inlaid with a sidetracking branch column tooth, the sidetracking branch Column tooth is pyramid shape cutting edge, the maximum cutting circle of the outer ring PDC composite sheet of the theoretical diameter and PDC cutting wing for sword of going out Diameter is identical, so that sidetracking branch drill bit is identical as conventional lead bit function, and sidetracking branch column tooth is not in normal drilling process It works;It is poor based on different circumferential curvatures in large diameter hole in the branching process of sidetracking minor diameter, with bit, sidetracking point Pillar tooth successively, intermittently hole wall on the downside of impact cutting-up, gradually form step surface, secondary outer PDC composite sheet side cutting, Realize hanging sidetracking, the straight branched hole of Qiang Kai little in the S-shaped profile footprint hole of major diameter, and can normal orientation drilling branch guiding Hole.
Wherein: the sidetracking branch column tooth of sidetracking branch drill bit is embedded in the angle plane of symmetry position of two corresponding PDC cutting wings It sets, and chisel edge is equipped at least two water holes, so that flushing liquor is cooling simultaneously after drill bit water hole is flowed out in drilling process PDC composite sheet and sidetracking branch column tooth.
As can be seen from the above description, the construction method of double branch's top plate major diameter high position directional long boreholes of the invention and match Set drilling tool has the effect that
1, the length for taking out hole section in mining induced fissure band can be effectively increased, it is public to realize double branches major diameter extraction hole section Same strata penetration hole section, casing sealing section can reduce the number of openings 1/ in the case where guaranteeing equivalent amount drainage holes in destination layer 3~1/2, while the drilling workload of strata penetration hole section is greatly reduced, make the synthesis pore-forming of single drill site high position directional drilling group 20% or more cycle time.
2, under the premise of identical interfloor distance (the distance between coal seam and target fissure zone), double branch's top plate major diameters are high The strata penetration hole section of position directional long borehole is conducive to shorten the floor projection length of invalid extraction hole section using S-shaped profile footprint, makes The coverage area of extraction hole section increases by 10% or more;In addition, strata penetration hole section using S-shaped profile footprint increase eyelet and stratum it Between angle, be conducive to improve wall stability, reduce collapsing etc. complex situations occurrence probability.
3, double branch's top plate major diameter high position directional long boreholes reduce the number of openings of single drilling holes at the drilling yard group, therefore, The spacing that tapping point and strata penetration hole section can artificially be increased in identical scale drill site is advantageously used for drilling is reduced or avoided and wears layer The generation of logical phenomenon is altered between hole section, improves hole quality.
4, double branch's top plate major diameter high position directional long borehole constructions realize big straight by special sidetracking branch drill bit Sidetracking minor diameter pilot hole in diameter strata penetration hole section expands into major diameter drainage holes again;Based on major diameter drainage holes and minor diameter guide Hole cross-sectional periphery curvature of curve is poor, and dedicated Zhu Chishikai branch, sidetracking branch success rate reaches 90% or more, and it is comprehensive to open branch Efficiency improves 60% or so.
5, double branch's top plate major diameter high position directional long boreholes can the tripping in guard aperture screen casing in strata penetration hole section as needed, with The unimpeded of extraction channel is maintained, compared with " one, which bores one, expands " method work order branch drilling, (the target crack under same extraction scale Band internal drilling drilling depth amount is suitable), double branch hole guard aperture screen insertion amounts can reduce 40% to 50%.
Detailed content of the invention can be obtained by aftermentioned explanation and institute's attached drawing.
Detailed description of the invention
Fig. 1 shows the schematic diagram of the construction method of double branch's top plate major diameter high position directional long boreholes of the invention.
Figure 1A and Figure 1B shows the branch point schematic diagram of sidetracking in large diameter hole of the present invention, Qiang Kai minor diameter branch.
Fig. 2A and Fig. 2 B shows the structural schematic diagram of sidetracking branch drill bit in the present invention.
Fig. 3 shows that sidetracking branch drill bit of the invention opens the schematic illustration of branch.
Appended drawing reference:
The coal seam 1- drill site, 2- sealing of hole casing section, 3- strata penetration hole section, 4- working face coal seam, the bis- branch's extraction hole sections of 5-, the side 6- Brill branch point, 7-S shape profile footprint section, 8- roof fracture band, the brill reaming of 9- top set, 10- top set pilot hole, lower point of 11- Branch bores reaming, 12- inferior division pilot hole, and 13-PDC cuts the wing, 14- drill bit water hole, 15- sidetracking branch column tooth, the outer ring 16- PDC Composite sheet, 17- encroachment area, 18- sidetracking branch drill bit desired cut circle, 19- large diameter hole ideal hole wall circle.
Specific embodiment
Referring to Fig. 1, Figure 1A and Figure 1B, it is shown that the construction of double branch's top plate major diameter high position directional long boreholes of the invention Method.
Wherein, double branch's top plate major diameter high position directional long boreholes are to construct from coal seam drill site 1 to roof fracture band 8 Directional long borehole, it includes sealing of hole casing section 2, strata penetration hole section 3 and double 5 three parts of branch's extraction hole section, the sealing of hole casings Section 2 is connected to one end of strata penetration hole section 3 from coal seam drill site 1, and double branch's extraction hole sections 5 are located at roof fracture band 8 and connect In the other end of strata penetration hole section 3, wherein the sealing of hole casing section 2 is faced upward design from coal seam drill site 1, the strata penetration hole section 3 includes Connect the S-shaped section between the transition hole section and working face coal seam 4 shown in Fig. 1 and roof fracture band 8 of sealing of hole casing section 2 Orbit segment 7, the S-shaped profile footprint section include that inclination angle dullness increases section, inflection point and inclination angle monotone decreasing segment, and double branches take out It adopts hole section 5 to include Parallel Design and be divided into the top set's brill reaming 9 and inferior division brill reaming 11 of arrangement up and down, the top set bores Reaming and strata penetration hole section are coaxially connected, and the inferior division bores the side that reaming 11 is connected to the reduction of 7 inclination angle dullness of S-shaped profile footprint section It bores on branch point.
In order to smoothly realize the construction of Zhong Shuan branch top plate major diameter high position directional long borehole of the present invention, the reason specifically designed Thought is sealing of hole casing section 2 of first constructing, down tube solid hole;Then reaming 9 is bored by construction strata penetration hole section 3 and top set;Then in strata penetration hole Construction inferior division bores reaming 11 in the S-shaped profile footprint section of section 3.Wherein, it is to utilize sidetracking branch drill bit that inferior division, which bores reaming 11, Sidetracking minor diameter branch's pilot hole and reaming on the sidetracking branch point 6 of the S-shaped profile footprint section of strata penetration hole section 3.
Specifically, the construction method of double branch's top plate major diameter high position directional long boreholes of the invention includes following step It is rapid:
Step 1: the brill for carrying out sealing of hole casing section from coal seam drill site expands construction, and rotary drilling technique can be used, i.e., first apply The pilot hole of work Φ 96mm or Φ 120mm, reaming to Φ 193mm or Φ 220mm again collar aperture, the reaming can pass through classification Bore and expand (reaming drilling is carried out from as low as big classification by the drill bit of different-diameter, wherein can by the reaming of Φ 133mm level-one → Φ 153mm secondary chambering → Φ 193mm three-level reamingThe reaming of Φ 220mm level Four) or once expanded with tower combined drill Hole, the aperture depth of sealing of hole casing section are not less than 12m, and counterbore depth is not less than 10m, bore and carry out circulating flushing after expanding to predetermined depth The time in hole is no less than 15min, excludes completely so that drilling cuttings in hole be effectively ensured, and ensure smooth down tube.
Step 2: the down tube solid hole of sealing of hole casing section, the steel that tripping in Φ 178mm or Φ 194mm and wall thickness are 5mm are carried out Or casing made of organic material, the length of described sleeve pipe are 9.0m~9.5m, described sleeve pipe exposure length≤20cm outside hole, Sealing is carried out after tripping in casing, and " a two stifled notes " band grouting methol technology can be used and carry out sealing casing, when wherein slip casting waits solidifying Between no less than 8 hours.
Step 3: carrying out strata penetration hole section 3 and top set bores 9 minor diameter of reaming (Φ 96mm or Φ 120mm) pilot hole and determines To drilling, it is top set's pilot hole 10 that 9 directional drilling of reaming is bored by the top set, wherein is combined by tripping in directional tool (successively include conventional lead bit, single bend PDM motor, measurement-while-drilling system and without magnetic drilling rod and logical cable drilling rod etc.) determined To drilling, wherein the inflection point top rake dullness of S-shaped profile footprint 7 increases in strata penetration hole section 3, inflection point back rake angle dullness reduces;Into Control top set's pilot hole 10 extends in the upper layer position of roof fracture band after entering destination layer, until projected depth backed off after random orientation group Bench drill tool.
Step 4: carrying out boring expansion and form the strata penetration hole section 3 and top set's brill reaming 9 of major diameter (>=Φ 153mm), described It bores and expands through the combination of tripping in borehole-enlarging drilling tool (including reaming bit, conventional reaming drilling rod and centralizer etc.), formed along step 3 Pilot hole be oriented reaming drilling, expand to bottom hole backed off after random reaming way-type drilling unit, to form the strata penetration hole section 3 in Fig. 1 Reaming 9 is bored with top set.
Step 5: referring to Figure 1A, suitable position selectes 6 (institute of sidetracking branch point on S-shaped profile footprint 7 in strata penetration hole section 3 State sidetracking branch point 6 be preferably S-shaped profile footprint inclination angle dullness reduce hole section and with the subsurface of roof fracture band hang down away from 1.5m~2m), then the combination of tripping in sidetracking directional tool is (including sidetracking branch drill bit (diameter of phi 96mm or Φ 120mm), single curved Screw motor, measurement-while-drilling system, without magnetic drilling rod and logical cable drilling rod etc.), adjust tools for angle circle of deflecting tool in 175 ° To between 190 °, turn on pump inputs high pressure washing liquid drive hole bottom screw motor into hole and the revolution of sidetracking branch drill bit is driven laterally to open Branch, slowly, at the uniform velocity, sliding feed;Based on the curvature difference of different-diameter circular order, by the sidetracking on sidetracking branch drill bit Branch's column tooth impact cutting-up downside hole wall quickly makes step, realizes that sidetracking opens the branch of minor diameter under hole wall in large diameter hole Hole subsequently enters roof fracture band, is oriented drilling in the lower layer position of roof fracture band 8 according to design control track, until Projected depth backed off after random sidetracking directional tool group, which merges, completes the construction of inferior division pilot hole 12 that inferior division bores reaming 11.
Step 6: referring to Figure 1B, brill expansion is carried out to inferior division pilot hole 12, forms lower point of major diameter (>=Φ 153mm) Branch bores reaming 11, and the brill expands through the combination of tripping in borehole-enlarging drilling tool (including enlarging aiguille, conventional reaming drilling rod and centralizer etc.), edge The inferior division pilot hole 12 formed in step 5 is oriented reaming drilling, expands to bottom hole backed off after random borehole-enlarging drilling tool and combines, thus The inferior division formed in Fig. 1 bores reaming 11.
Also may include step 7: complete hole extraction, based on relevant characterization information in drilling process (including feed pressure, revolution Torque, pump pressure variation and card resistance situation) overall merit top plate formation stability, it as needed can be in strata penetration hole section tripping in guard aperture Pipe, tubing string front end (respective branches point position) use circular hole or bar shaped slit screen pipes;Connection extraction pipeline waits extraction to adopt release Gas.
Supporting drilling tool in the present invention may include the combination of sidetracking directional tool used in step 5, the sidetracking Directional Drilling Tool combination includes sidetracking branch drill bit, single bend PDM motor, measurement-while-drilling system, non-magnetic drilling tool and logical cable drill string etc., referring to Fig. 2A and Fig. 2 B, sidetracking branch drill bit include that four PDC cut the wing 13, and four PDC cutting wing 13 is in 90 ° of angle cloth It sets, the drill bit head periphery of the PDC cutting wing 13 between any two is inlaid with a sidetracking branch column tooth 15, the sidetracking branch Column tooth 15 is pyramid shape cutting edge, the maximum of the outer ring PDC composite sheet 16 of the theoretical diameter and PDC cutting wing 13 for sword of going out It is identical to cut diameter of a circle, and is equipped at least two drill bit water holes 14 in chisel edge, so that flushing liquor is through boring in drilling process Head water hole 14 cools down PDC composite sheet and sidetracking branch column tooth after flowing out simultaneously.
Existing knot can be used in other single bend PDM motors, measurement-while-drilling system, non-magnetic drilling tool and logical cable drill string etc. Structure is stated without tired herein.
Referring to Fig. 3, sidetracking branch drill bit hanging sidetracking small diameter bore in the 7 strata penetration hole section of S-shaped profile footprint of major diameter Basic principle are as follows: each PDC cutting wing 13 is contacted with downside hole wall cycle alternation in drilling process, due to sidetracking branch drill bit There are curvature differences between desired cut circle 18 and large diameter hole ideal hole wall circle 19, when two PDC cutting wings contact hole wall simultaneously When just form " encroachment area " 17, the sidetracking branch column tooth between each PDC cutting wing 13 exactly utilizes curvature difference, in turning course In on the downside of " impact-cutting-up " hole wall and form step surface and then combine side together with the outer ring PDC composite sheet 16 on the cutting wing 13 It bores, Qiang Kai branch, therefore, the present invention is by this specially designed drill bit structure, the major diameter extraction that can be formed using reaming The round curvature difference with minor diameter sidetracking branch drill bit desired cut circular curve in hole section is straight greatly in the top plate that " Kong Yikuo " is drilled to In diameter high position directional long borehole strata penetration hole section (using S-shaped (forward or backwards) profile footprint), opened by force by sidetracking branch drill bit Simultaneously directional drilling then carries out reaming to minor diameter branch pilot hole again, realizes 2 sections of destination layers to hole depth is designed for minor diameter branch Interior effective drainage holes share same strata penetration hole section and sealing of hole casing hole section, and the number of openings is greatly decreased, reduces setting of casing and later period Guard aperture project amount shortens the horizontal footage unpayable of strata penetration hole section, improves pore-forming efficiency and quality, and being conducive to, which improves working face, adopts Dynamic pressure relief gas pumping mining effect.
Wherein, sidetracking branch drill bit with sidetracking branch column tooth (pyramid shape cutting edge), be laid in PDC cutting the wing it Between, sword theoretical diameter of going out is identical as outer ring PDC composite sheet maximum cutting diameter.In normal drilling process, sidetracking branch is bored Head is identical as conventional lead bit function, and sidetracking branch column tooth does not work;In major diameter reaming section sidetracking minor diameter branch mistake Cheng Zhong, poor based on different circumferential curvatures, with bit, sidetracking branch column tooth impacts hole wall on the downside of cutting-up, gradually forms platform Terrace, secondary outer PDC composite sheet side cutting realize hanging sidetracking, the straight branch of Qiang Kai little in major diameter S-shaped strata penetration hole section Hole, and start normal orientation drilling branch's pilot hole.
It is readily apparent that above description and record is only illustrated in the disclosure being not intended to be limiting of the invention Appearance, application or use.Although describing and being described in the accompanying drawings embodiment in embodiment, the present invention is not limited Be described as by attached drawing example and in embodiment it is now recognized that optimal mode to implement the particular case of the teachings of the present invention Son, the scope of the present invention will include any embodiment for falling into the description and appended claims of front.

Claims (5)

1. a kind of construction method of double branch's top plate major diameter high position directional long boreholes, double branch's top plate major diameter high positions are fixed It is from working face coal seam drill site to the directional long borehole of roof fracture belt construction to long drilled holes, it includes 1 section of sealing of hole casing section, 1 Section strata penetration hole section and 2 sections of extraction hole section three parts, it is characterised in that:
The sealing of hole casing section is connected to the lower end of strata penetration hole section from working face coal seam drill site, and 2 sections of drainage holes sections are located at top Be connected to the upper end of strata penetration hole section in plate fissure zone and in the form of double branches, the strata penetration hole section be included in working face coal seam and S-shaped profile footprint section between roof fracture band, the S-shaped profile footprint section include that inclination angle dullness increases section, inflection point and inclination angle Monotone decreasing segment, double branch's extraction hole sections include top set's brill reaming and the inferior division of Parallel Design and upper and lower layered arrangement Reaming is bored, reaming is bored by the top set and strata penetration hole section is coaxially connected, and the inferior division brill reaming is connected to S-shaped profile footprint and inclines On the sidetracking branch point of angle monotone decreasing segment;
The construction method are as follows: sealing of hole casing section of first constructing, down tube solid hole;Then reaming section bores in construction strata penetration hole section and top set Minor diameter pilot hole, and bore expansion and form major diameter strata penetration hole section and top set's extraction hole section;Then in major diameter strata penetration hole section S The hanging sidetracking inferior division of shape profile footprint latter end bores the minor diameter pilot hole of reaming section, and bores and expand the inferior division pumping for forming major diameter Adopt hole section;Finally, forming double branches major diameter high position directional long borehole.
2. the construction method of double branches top plate major diameter high position directional long borehole as described in claim 1, it is characterised in that packet Containing following steps:
Step 1: the brill for carrying out sealing of hole casing section from working face coal seam drill site expands construction, uses rotary drilling technique;
Step 2: the down tube solid hole of sealing of hole casing section is carried out;
Step 3: carrying out measurement while drilling directional drilling to the minor diameter pilot hole that strata penetration hole section and top set bore reaming, described to wear Layer hole section is crept into along S-shaped profile footprint;
Step 4: it carries out boring expansion and forms the strata penetration hole section and top set's brill reaming of major diameter, the brill, which expands, passes through replacement reaming Drill assembly, the pilot hole formed along step 3 are oriented reaming drilling, expand to bottom hole backed off after random borehole-enlarging drilling tool and combine;
Step 5: selecting sidetracking branch point on the monotone decreasing segment suitable position of major diameter strata penetration hole section S-shaped profile footprint inclination angle, Then tripping in is incorporated into branch point position with the directional tool of sidetracking branch drill bit, adjust tools for angle circle of deflecting drilling tool in Between 175 ° to 190 °, turn on pump inputs high pressure washing liquid drive hole bottom screw motor into hole and drives sidetracking branch drill bit revolution side Zuan Kai branch, realize in large diameter hole under hole wall sidetracking open enter after minor diameter branched hole the lower layer position of roof fracture band into The pilot hole construction that inferior division bores reaming is completed in row directional drilling;
Step 6: carrying out brill expansion to the pilot hole of inferior division, and the inferior division for forming major diameter bores reaming, and the brill expansion passes through tripping in Borehole-enlarging drilling tool is incorporated into branch point, and the inferior division pilot hole formed along step 5 is oriented reaming drilling, expands to bottom hole Exit borehole-enlarging drilling tool combination.
3. the construction method of double branches top plate major diameter high position directional long borehole as claimed in claim 2, it is characterised in that: under Directional tool combination includes sidetracking branch drill bit used by the pilot hole that reaming is bored by branch is constructed, by sidetracking branch drill bit Sidetracking branch column tooth impact cutting-up on the downside of hole wall, the curvature difference based on different-diameter circular order quickly make step, realize big Hanging sidetracking goes out branch's pilot hole of minor diameter in the S-shaped profile footprint hole section of diameter.
4. a kind of supporting drilling tool of double branch's top plate major diameter high position directional long borehole construction methods includes particular orientation drill set It closes, it is characterised in that:
The particular orientation drill assembly include sidetracking branch drill bit, single bend PDM motor, measurement-while-drilling system, non-magnetic drilling tool and Logical cable drill string, sidetracking branch drill bit include that four PDC cut the wing, and four PDC cutting wing 13 is in 90 ° of angle cloth It sets, the drill bit head periphery of the PDC cutting wing between any two is inlaid with a sidetracking branch column tooth, sidetracking branch column Tooth is pyramid shape cutting edge, and the maximum cutting circle of the theoretical diameter and the outer ring PDC composite sheet of the PDC cutting wing of sword of going out is straight Diameter is identical, so that sidetracking branch drill bit is identical as conventional lead bit function, and sidetracking branch column tooth does not rise in normal drilling process Effect;It is poor based on different circumferential curvatures in large diameter hole in the branching process of sidetracking minor diameter, with bit, sidetracking branch Column tooth successively, intermittently impacts cutting-up downside hole wall, gradually forms step surface, and secondary outer PDC composite sheet side cutting is real Hanging sidetracking, the straight branched hole of Qiang Kai little in the S-shaped profile footprint hole of present major diameter, and can normal orientation drilling branch guiding Hole.
5. the supporting drilling tool of double branches top plate major diameter high position directional long borehole construction method as claimed in claim 4, special Sign is: the sidetracking branch column tooth of sidetracking branch drill bit is embedded in the angle plane of symmetry position of two corresponding PDC cutting wings, and bores Head front end is equipped at least two water holes, thus in drilling process, flushing liquor cooling PDC composite sheet simultaneously after drill bit water hole is flowed out With sidetracking branch column tooth.
CN201910589446.5A 2019-07-02 2019-07-02 Construction method for large-diameter high-position directional long drill hole of double-branch top plate Active CN110306934B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910589446.5A CN110306934B (en) 2019-07-02 2019-07-02 Construction method for large-diameter high-position directional long drill hole of double-branch top plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910589446.5A CN110306934B (en) 2019-07-02 2019-07-02 Construction method for large-diameter high-position directional long drill hole of double-branch top plate

Publications (2)

Publication Number Publication Date
CN110306934A true CN110306934A (en) 2019-10-08
CN110306934B CN110306934B (en) 2021-03-19

Family

ID=68078301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910589446.5A Active CN110306934B (en) 2019-07-02 2019-07-02 Construction method for large-diameter high-position directional long drill hole of double-branch top plate

Country Status (1)

Country Link
CN (1) CN110306934B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111287656A (en) * 2020-03-24 2020-06-16 中煤科工集团西安研究院有限公司 High-position large-diameter directional drilling construction method for complex roof
CN111677447A (en) * 2020-06-17 2020-09-18 平安煤炭开采工程技术研究院有限责任公司 Directional drilling method for upward rock climbing section
CN111779451A (en) * 2020-07-10 2020-10-16 淮南矿业(集团)有限责任公司 Fixed-point water injection drilling method for goaf
CN113075734A (en) * 2021-03-30 2021-07-06 中煤科工集团西安研究院有限公司 Residual curvature spectrum calculation method and device based on signal-to-noise ratio constraint
CN114412423A (en) * 2021-12-22 2022-04-29 中煤科工集团西安研究院有限公司 Broken soft coal seam gas extraction bedding directional drilling sieve tube running device and method

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020134546A1 (en) * 1998-11-20 2002-09-26 Cdx Gas, Llc, Texas Limited Liability Company Method and system for accessing subterranean deposits from the surface
RU2209305C2 (en) * 2000-04-13 2003-07-27 Ухтинский государственный технический университет Method of coals underground gasification and degassing (versions)
CN202220558U (en) * 2011-09-08 2012-05-16 北京金工万邦石油技术开发有限公司 Drill bit with semicircular patch teeth
WO2013155059A2 (en) * 2012-04-09 2013-10-17 Saudi Arabian Oil Company System and method for forming a lateral wellbore
CN203257330U (en) * 2013-07-25 2013-10-30 中国石油集团川庆钻探工程有限公司 Horizontal section suspending side tracking tool
CN103742188A (en) * 2014-01-07 2014-04-23 中国神华能源股份有限公司 Coal mine pump drainage gas well and drilling method thereof
CN105909254A (en) * 2016-04-29 2016-08-31 中煤科工集团西安研究院有限公司 Outburst coal seam floor pitch-up through-bed directional hole leading area shield coal roadway driving method
US20170044887A1 (en) * 2014-04-14 2017-02-16 Peabody Energy Australia Multi purpose drilling system and method
CN106761406A (en) * 2016-12-02 2017-05-31 淮北矿业(集团)有限责任公司 A kind of ground L-type mash gas pumping drilling
WO2017142815A1 (en) * 2016-02-16 2017-08-24 Extreme Rock Destruction LLC Drilling machine
CN108506037A (en) * 2018-03-19 2018-09-07 中煤科工集团西安研究院有限公司 Coal working face top plate high position directional drilling group's pressure relief gas pumping mining method
CN108518182A (en) * 2018-04-16 2018-09-11 中煤科工集团西安研究院有限公司 Method and device is put in the advanced region water body spy of the dendritic directional drilling of top plate multi-aquifer
CN108643960A (en) * 2018-05-21 2018-10-12 河南工程学院 A kind of ground region band coal mine gas extinction technique
CN109209474A (en) * 2018-09-27 2019-01-15 太原理工大学 A kind of method that dual-lateral well extracts lower coal seam and top more goaf gas and ponding
CN109915197A (en) * 2019-04-11 2019-06-21 河南理工大学 A kind of method that rock gangway km directional long borehole substitution middle part bottom pumping rock gangway is taken out at bottom

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020134546A1 (en) * 1998-11-20 2002-09-26 Cdx Gas, Llc, Texas Limited Liability Company Method and system for accessing subterranean deposits from the surface
RU2209305C2 (en) * 2000-04-13 2003-07-27 Ухтинский государственный технический университет Method of coals underground gasification and degassing (versions)
CN202220558U (en) * 2011-09-08 2012-05-16 北京金工万邦石油技术开发有限公司 Drill bit with semicircular patch teeth
WO2013155059A2 (en) * 2012-04-09 2013-10-17 Saudi Arabian Oil Company System and method for forming a lateral wellbore
CN203257330U (en) * 2013-07-25 2013-10-30 中国石油集团川庆钻探工程有限公司 Horizontal section suspending side tracking tool
CN103742188A (en) * 2014-01-07 2014-04-23 中国神华能源股份有限公司 Coal mine pump drainage gas well and drilling method thereof
US20170044887A1 (en) * 2014-04-14 2017-02-16 Peabody Energy Australia Multi purpose drilling system and method
WO2017142815A1 (en) * 2016-02-16 2017-08-24 Extreme Rock Destruction LLC Drilling machine
CN105909254A (en) * 2016-04-29 2016-08-31 中煤科工集团西安研究院有限公司 Outburst coal seam floor pitch-up through-bed directional hole leading area shield coal roadway driving method
CN106761406A (en) * 2016-12-02 2017-05-31 淮北矿业(集团)有限责任公司 A kind of ground L-type mash gas pumping drilling
CN108506037A (en) * 2018-03-19 2018-09-07 中煤科工集团西安研究院有限公司 Coal working face top plate high position directional drilling group's pressure relief gas pumping mining method
CN108518182A (en) * 2018-04-16 2018-09-11 中煤科工集团西安研究院有限公司 Method and device is put in the advanced region water body spy of the dendritic directional drilling of top plate multi-aquifer
CN108643960A (en) * 2018-05-21 2018-10-12 河南工程学院 A kind of ground region band coal mine gas extinction technique
CN109209474A (en) * 2018-09-27 2019-01-15 太原理工大学 A kind of method that dual-lateral well extracts lower coal seam and top more goaf gas and ponding
CN109915197A (en) * 2019-04-11 2019-06-21 河南理工大学 A kind of method that rock gangway km directional long borehole substitution middle part bottom pumping rock gangway is taken out at bottom

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
方俊: "煤矿井下碎软煤层空气复合定向钻进技术与装备", 《煤炭科学技术》 *
石浩: "大直径高位定向长钻孔瓦斯抽采技术及应用", 《煤炭科学技术》 *
石浩等: "高位定向长钻孔技术在桃园矿采空区瓦斯治理中的应用", 《探矿工程》 *
赵建国: "煤层顶板高位定向钻孔施工技术与发展趋势", 《煤炭科学技术》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111287656A (en) * 2020-03-24 2020-06-16 中煤科工集团西安研究院有限公司 High-position large-diameter directional drilling construction method for complex roof
CN111677447A (en) * 2020-06-17 2020-09-18 平安煤炭开采工程技术研究院有限责任公司 Directional drilling method for upward rock climbing section
CN111779451A (en) * 2020-07-10 2020-10-16 淮南矿业(集团)有限责任公司 Fixed-point water injection drilling method for goaf
CN113075734A (en) * 2021-03-30 2021-07-06 中煤科工集团西安研究院有限公司 Residual curvature spectrum calculation method and device based on signal-to-noise ratio constraint
CN113075734B (en) * 2021-03-30 2024-03-29 中煤科工集团西安研究院有限公司 Residual curvature spectrum calculation method and device based on signal-to-noise ratio constraint
CN114412423A (en) * 2021-12-22 2022-04-29 中煤科工集团西安研究院有限公司 Broken soft coal seam gas extraction bedding directional drilling sieve tube running device and method

Also Published As

Publication number Publication date
CN110306934B (en) 2021-03-19

Similar Documents

Publication Publication Date Title
CN110306934A (en) The construction method and supporting drilling tool of double branch's top plate major diameter high position directional long boreholes
CN102031950B (en) Hole-forming process method for comb gas extraction borehole in coal seam roof
CN102926730B (en) Mining method for support pipe following air liquid spraying and drilling into coal bed gas of radial well
CN105863512B (en) The broken soft seam ladder of underground coal mine is with the compound directional drilling hole-forming device of pipe and method
CN110397428B (en) Displacement coalbed methane yield increasing method for coalbed methane jointly mined by vertical well and U-shaped butt well
CN105113987A (en) Soft-hard interbedding coal seam bedding measurement while drilling (MWD) orientation drilling equipment and construction method thereof
CN103061798B (en) Down-hole concordant long drilled holes consecutive makes cave extraction coal bed gas method
US7493951B1 (en) Under-balanced directional drilling system
CN104895498B (en) Coiled tubing band screen casing sidetracking is drilled well integrated apparatus and method
CN109763857B (en) Water jet dense comb-shaped drilling type outburst elimination pre-extraction treatment method for coal seam gas to be tunneled
CN104912479B (en) Method for drilling and completion of horizontal branched well for coal bed gas
CN101936153A (en) Method for exploiting coal bed gas by water power spray drilling for releasing pressure
CN110566120B (en) Multi-power directional combined drilling tool for hard rock of coal mine underground coal seam bottom plate and hole forming method thereof
PL200785B1 (en) Method and system for enhanced access to a subterranean zone
CN107461186B (en) Branch well reservoir transformation device and transformation method
CN107435541B (en) TBM with pipe shed construction capability and construction method thereof
CN112593999A (en) Directional long-drilling hydraulic permeability increasing method for soft coal seam and/or soft and hard composite coal seam
CN108301866A (en) Mining of closed distance coal seam group adjacent layer gas pressure relief directional drilling stops pumping method
CN112012751B (en) Precise excavation method for gentle slope inclined shaft
CN107288540B (en) A kind of oil/gas drilling volume increase connection makees device and method
CN102312655A (en) Radial hydraulic jetting drilling technology
CN1317483C (en) Method of entering target geologic body and system
CN111980706A (en) Sectional composite coal drawing method for ground horizontal well
CN105422006A (en) Adjustable underground rock breaking tool combining drilling and expanding
CN113107589B (en) Advanced pre-drainage method for coal seam roof aquifer ground

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant