CN110306756A CN201910662176.6A CN201910662176A CN110306756A CN 110306756 A CN110306756 A CN 110306756A CN 201910662176 A CN201910662176 A CN 201910662176A CN 110306756 A CN110306756 A CN 110306756A
Authority
CN
China
Prior art keywords
ventilation duct
water tank
flue gas
assembled architecture
vertical shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910662176.6A
Other languages
Chinese (zh)
Other versions
CN110306756B (en
Inventor
曹鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anqing Guofeng Residential Industrialization Group Co ltd
Original Assignee
Anhui Science And Technology Information Service Co Ltd Feng Tz
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Science And Technology Information Service Co Ltd Feng Tz filed Critical Anhui Science And Technology Information Service Co Ltd Feng Tz
Priority to CN201910662176.6A priority Critical patent/CN110306756B/en
Publication of CN110306756A publication Critical patent/CN110306756A/en
Application granted granted Critical
Publication of CN110306756B publication Critical patent/CN110306756B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A62LIFE-SAVING; FIRE-FIGHTING
    • A62CFIRE-FIGHTING
    • A62C31/00Delivery of fire-extinguishing material
    • A62C31/005Delivery of fire-extinguishing material using nozzles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/02Separating dispersed particles from gases, air or vapours by liquid as separating agent by passing the gas or air or vapour over or through a liquid bath
    • B01D47/021Separating dispersed particles from gases, air or vapours by liquid as separating agent by passing the gas or air or vapour over or through a liquid bath by bubbling the gas through a liquid bath
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/04Air-ducts or air channels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D9/00Adaptations of wind motors for special use; Combinations of wind motors with apparatus driven thereby; Wind motors specially adapted for installation in particular locations
    • F03D9/10Combinations of wind motors with apparatus storing energy
    • F03D9/11Combinations of wind motors with apparatus storing energy storing electrical energy
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D9/00Adaptations of wind motors for special use; Combinations of wind motors with apparatus driven thereby; Wind motors specially adapted for installation in particular locations
    • F03D9/30Wind motors specially adapted for installation in particular locations
    • F03D9/34Wind motors specially adapted for installation in particular locations on stationary objects or on stationary man-made structures
    • F03D9/43Wind motors specially adapted for installation in particular locations on stationary objects or on stationary man-made structures using infrastructure primarily used for other purposes, e.g. masts for overhead railway power lines
    • F03D9/45Building formations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/30Wind power
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Architecture (AREA)
  • Sustainable Development (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Power Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Sustainable Energy (AREA)
  • Public Health (AREA)
  • Health & Medical Sciences (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Ventilation (AREA)
  • Respiratory Apparatuses And Protective Means (AREA)

Abstract

The invention discloses alter device on a kind of pre- flue gas of assembled architecture, including the ventilation duct one being arranged on each floor vertical shaft inner wall, the upper end of ventilation duct one is equipped with the ventilation duct two of connection, ventilation duct one and ventilation duct two are in inverted T-shaped, fan is equipped with inside ventilation duct two, ventilation duct one, which is located on the outer wall of two lower section of ventilation duct, is fixed with motor, the output shaft of motor extends to the inside of ventilation duct one and is equipped with connecting rod, the upper end of connecting rod is equipped with closure plate, the top of ventilation duct one is additionally provided with water tank, the top of ventilation duct two is equipped with the air inlet pipe for extending to water tank bottom, the top of water tank is equipped with escape pipe, the present apparatus adjusts the connected state in floor with vertical shaft by rotatable closure plate, in the case of fire, by the way that flue gas is sucked in water, absorb and filter the solid pollution particle that fire generates, it is a kind of good preventing mean, It when fire not occurring, will be connected in floor with vertical shaft by ventilation duct one, realize cross-ventilation, keep building interior good ventilation state.

Description

Device is altered on a kind of pre- flue gas of assembled architecture
Technical field
The present invention relates to assembled architecture field, particularly relate to alter device on a kind of pre- flue gas of assembled architecture.
Background technique
Assembled architecture is a kind of novel building mode assembled using prefabricated component, and country is wideling popularize at present Assembled architecture, compared to common construction method, assembled architecture is more efficient, energy conservation and environmental protection, standardization and the level of informatization Height, the overall structure of assembled architecture and the structure of existing building are essentially identical, therefore inventor combines the fire having occurred and that Case is associated: in assembled architecture high building, stack effect can be the reason of enabling fire fiercely aggravate.Occur in low layer Hot-air caused by fire is up flowed in lift trough or escape route because density is lower, keeps hot gas continuous It is gathered at the top in channel, the result is that the intensity of a fire is made to manufacture another scene of a fire in the top layer of mansion through the convection current of this air.No Singly make to save and be more difficult from, the life security for the personnel for going to balcony to escape but will be jeopardized.
Summary of the invention
In view of this, it is an object of the invention to propose to alter device on a kind of pre- flue gas of assembled architecture, to solve Whole defects in aforementioned background art or one of.
Device is altered on pre- flue gas based on above-mentioned purpose assembled architecture provided by the invention, including is arranged in every Stall Ventilation duct one on layer vertical shaft inner wall, the upper end of the ventilation duct one are equipped with the ventilation duct two of connection, the ventilation duct one with it is logical Air hose two is in inverted T-shaped, and fan is equipped with inside the ventilation duct two, and the ventilation duct one is located at solid on the outer wall of two lower section of ventilation duct Surely there is motor, the output shaft of the motor extends to the inside of ventilation duct one and is equipped with connecting rod, and the upper end of the connecting rod is equipped with stifled Plate, when connecting rod goes to vertical position upward, the both ends of the closure plate and the two sides inner wall of ventilation duct two are pushed against, when connecting rod turns When to the position of horizontally toward vertical shaft, the both ends of the closure plate and the two sides inner wall of ventilation duct one are pushed against, the ventilation duct one Top is additionally provided with water tank, and the top of the ventilation duct two is equipped with the air inlet pipe for extending to water tank bottom, and the top of the water tank is set There is escape pipe.
It optionally, further include the controller being arranged on vertical shaft inner wall, the motor is electrically connected with the controller.
Optionally, the top of the water tank is equipped with filler pipe.
Optionally, the top of the water tank is equipped with water pump, the water inlet of the water pump be equipped with extend to water tank bottom into Water pipe, the water outlet of the water pump are arranged in the outlet pipe at the top of each floor, are equidistantly distributed on the outlet pipe Multiple applicators.
Optionally, the upper end inside the water tank is equipped with liquid level sensor, and the liquid level sensor is electrically connected with the controller.
Optionally, the inside of the escape pipe is equipped with strainer.
Optionally, the bottom of the water tank is equipped with sewage pipe, and the sewage pipe is equipped with the solenoid valve for controlling its opening and closing, institute Solenoid valve is stated to be electrically connected with the controller.
It optionally, further include the power supply device being arranged on vertical shaft inner wall, the inside of the ventilation duct one is sent out equipped with wind-force Motor, the wind-driven generator are electrically connected with power supply device.
Optionally, the bottom of the ventilation duct one is equipped with inclined support frame, and the bottom of support frame as described above is fixed on vertical shaft Inner wall on.
From the above it can be seen that altering device on the pre- flue gas of assembled architecture provided by the invention, have as follows Advantage: the present apparatus adjusts the connected state in floor with vertical shaft by rotatable closure plate, in the case of fire, by by cigarette Aspiration enters in water, absorbs and filters the solid pollution particle that fire generates, keeps the gas temperature of discharge low, will not alter and make upwards It is a kind of good preventing mean at the secondary sprawling of the intensity of a fire, it, will be in floor and vertical shaft by ventilation duct one when fire does not occur Cross-ventilation is realized in connection, keeps good ventilation state in skyscraper;It is sprayed using the water prestored in fire, It can avoid in the case of fire, the water route of floor is obstructed and can not carry out self fire extinguishing;Pass through the wind being arranged in ventilation duct one Power generator, the wind energy generated when efficiently using cross-ventilation, converts wind energy into electric energy and is stored, be supplied to other electricity consumptions Device, clean and environmental protection.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the schematic internal view of water tank and ventilation duct two of the invention;
Fig. 3 is schematic internal view when ventilation duct one of the invention is not connected to ventilation duct two;
Fig. 4 is schematic internal view when ventilation duct one of the invention is connected to ventilation duct two;
Fig. 5 is the A direction view of closure plate in Fig. 3.
Wherein 1- ventilation duct one, 2- power supply device, 3- support frame, 4- strainer, 5- motor, 6- ventilation duct two, 7- solenoid valve, 8- sewage pipe, 9- air inlet pipe, 10- water tank, 11- filler pipe, 12- water pump, 13- escape pipe, 14- controller, 15- outlet pipe, 16- Applicator, 17- liquid level sensor, 18- wind-driven generator, 19- fan, 20- water inlet pipe, 21- connecting rod, 22- closure plate.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with specific embodiment, and reference Attached drawing, the present invention is described in more detail.
It should be noted that all statements for using " first " and " second " are for differentiation two in the embodiment of the present invention The non-equal entity of a same names or non-equal parameter, it is seen that " first " " second " only for the convenience of statement, does not answer It is interpreted as the restriction to the embodiment of the present invention, the direction and position term that furthermore the present invention is previously mentioned, such as "upper", " in ", " Under ", "front", "rear", "left", "right", "inner", "outside", " side " etc., be only the direction and position with reference to annexed drawings, therefore, The direction and position term used is to illustrate and understand the present invention, rather than to limit subsequent embodiment of the present invention to this not An another explanation.
Device is altered on a kind of pre- flue gas of assembled architecture based on above-mentioned purpose offer, including is arranged in each floor Ventilation duct 1 on vertical shaft inner wall, the upper end of the ventilation duct 1 are equipped with the ventilation duct 26 of connection, the ventilation duct 1 with Ventilation duct 26 is in inverted T-shaped, and 26 inside of ventilation duct is equipped with fan 19, and the ventilation duct 1 is located at 26 lower section of ventilation duct Motor 5 is fixed on outer wall, the output shaft of the motor 5 extends to the inside of ventilation duct 1 and is equipped with connecting rod 21, the connecting rod 21 upper end is equipped with closure plate 22, when connecting rod 21 goes to vertical position upward, both ends and the ventilation duct 26 of the closure plate 22 Two sides inner wall pushes against, when connecting rod 21 goes to the horizontally toward position of vertical shaft, the both ends of the closure plate 22 and the two of ventilation duct 1 Side inner wall pushes against, and the top of the ventilation duct 1 is additionally provided with water tank 10, and the top of the ventilation duct 26, which is equipped with, extends to water tank The top of the air inlet pipe 9 of 10 bottoms, the water tank 10 is equipped with escape pipe 13.
Referring to Fig.1 shown in -5, as one embodiment, device is altered on the pre- flue gas of assembled architecture of the invention, this Device is independently arranged at the inner wall of each floor vertical shaft, can be pre-installed on the mounting plate of vertical shaft longitudinal direction, prestores in water tank 10 There is a certain amount of water, when fire does not occur, connecting rod 21 is maintained at vertical position upward, and the both ends of closure plate 22 are by ventilation duct two 6 two sides inner wall pushes against, as shown in Fig. 2, ventilation duct 26 is not connected to ventilation duct 1, ventilation duct 1 will be in floor and vertical shaft Connection, according to stack effect, the hot-air in floor enters in vertical shaft and moves upwards from ventilation duct 1, shaft top it is cold Air declines along vertical shaft and enters in floor, thus realize gravity-flow ventilation, when a fire, 21 turns of 5 controls connecting rod of motor It moves to the position of horizontally toward vertical shaft, as shown in figure 3, the two sides inner wall of the both ends of closure plate 22 and ventilation duct 1 pushes against at this time, building No longer pass through ventilation duct 1 with vertical shaft in layer to be connected to, flue gas can not avoid fire behavior from creeping up by altering on ventilation duct 1 Danger, while fan 19 in ventilation duct 26 starts, and carries out exhausting operation, and the flue gas in floor is extracted out, flue gas is from ventilation duct One 1 are evacuated to ventilation duct 26, and the inside of water tank 10, the solid into the smog inside water tank 10 are entered further along air inlet pipe 9 Grain is absorbed by the water in water tank 10, and gas part is overflowed from the escape pipe 13 on water tank 10, and smog is filtered absorption of by water Afterwards, the gas temperature of spilling reduces, and is no longer along vertical shaft and floats up, and avoids hot-air rising and the intensity of a fire is caused to creep up, The present apparatus adjusts the connected state in floor with vertical shaft by rotatable closure plate 22, in the case of fire, by by flue gas It sucks in water, absorbs and filters the solid pollution particle that fire generates, keep the gas temperature of discharge low, will not alter and cause upwards The secondary sprawling of the intensity of a fire is a kind of good preventing mean, will be in floor and vertical shaft by ventilation duct 1 when fire does not occur Cross-ventilation is realized in connection, keeps good ventilation state in skyscraper.
It in some optional embodiments, further include the controller 14 being arranged on vertical shaft inner wall, the motor 5 and controller 14 electrical connections, controller 14 can be connect with the sensor for detecting fire generation between corridor is arranged in, and such as smoke sensor device works as sensing When device has detected fire generation, controller 14 simultaneously controls motor 5 closure plate 22 is turned to ventilation duct 1 and ventilation duct 26 and connect Logical position.
In some optional embodiments, the top of the water tank 10 is equipped with filler pipe 11, filler pipe 11 and each floor Water route connection, facilitates and adds water into water tank 10.
In some optional embodiments, the top of the water tank 10 is equipped with water pump 12, and the water inlet of the water pump 12 is equipped with The water inlet pipe 20 of 10 bottom of water tank is extended to, the outlet pipe at the top of each floor is arranged in the water outlet of the water pump 12 15, multiple applicators 16 are equidistantly distributed on the outlet pipe 15, when a fire, water pump 12 passes through water inlet pipe 20 will The water extraction prestored in water tank 10, and given by outlet pipe 15 to each applicator 16, applicator 16 sprays a certain amount of Water put out a fire, sprayed using the water prestored in fire, can avoid in the case of fire, the water route of floor it is obstructed and It can not carry out self fire extinguishing.
In some optional embodiments, the upper end inside the water tank 10 is equipped with liquid level sensor 17, the level sensing Device 17 is electrically connected with controller 14, and liquid level sensor 17 detects the height of water in water tank 10, low after water consumption in water tank 10 When the height of liquid level sensor 17, the hydropenic information of water tank 10 is fed back to backstage by controller 14, and from filler pipe 11 Water is added into water tank 10, until the water in water tank 10 reaches the height of liquid level sensor 17, controller 14 is by the enough letters of water Breath feeds back to backstage, and stops adding water into water tank 10.
In some optional embodiments, the inside of the escape pipe 13 be equipped with strainer 4, flue gas from escape pipe 13 be discharged when by Strainer 4 is filtered it, and the gas of discharge is avoided to pollute other floors.
In some optional embodiments, the bottom of the water tank 10 is equipped with sewage pipe 8, and the sewage pipe 8 is equipped with control Its solenoid valve 7 being opened and closed, the solenoid valve 7 are electrically connected with controller 14, and sewage pipe 8 can be with the living drainage Guan Lian of skyscraper It connects, the water in water tank 10 becomes muddy after absorbing smog, opens solenoid valve 7 by controller 14, the water in water tank 10 is drained into Living drainage pipe is discharged together with sanitary sewage.
It in some optional embodiments, further include the power supply device 2 being arranged on vertical shaft inner wall, the ventilation duct 1 Inside is equipped with wind-driven generator 18, and the wind-driven generator 18 is electrically connected with power supply device 2, in daily life, in floor Hot-air is moved from ventilation duct 1 into vertical shaft, and the hot-air of flowing makes wind-driven generator 18 generate rotation, wind-driven generator 18 Electrical energy for storage is converted wind energy into power supply device 2, power supply device 2 is powered the devices such as motor 5, fan 19, more Remaining electricity can also be used for floor illumination or other power equipments use.
In some optional embodiments, the bottom of the ventilation duct 1 is equipped with inclined support frame 3, support frame as described above 3 Bottom is fixed on the inner wall of vertical shaft, for being supported to ventilation duct 1, keeps the stability of its well-formed.
It should be understood by those ordinary skilled in the art that: the discussion of any of the above embodiment is exemplary only, not It is intended to imply that the scope of the present disclosure (including claim) is limited to these examples;Under thinking of the invention, above embodiments Or can also be combined between the technical characteristic in different embodiments, step can be realized with random order, and be existed such as Many other variations of the upper different aspect of the invention, for simplicity, they are not provided in details.
In addition, to simplify explanation and discussing, and in order not to obscure the invention, it can in provided attached drawing It is connect with showing or can not show with the well known power ground of integrated circuit (IC) chip and other components.Furthermore, it is possible to Device is shown in block diagram form, to avoid obscuring the invention, and this has also contemplated following facts, i.e., about this The details of the embodiment of a little block diagram arrangements be height depend on will implementing platform of the invention (that is, these details should It is completely within the scope of the understanding of those skilled in the art).Elaborating that detail (for example, circuit) is of the invention to describe In the case where exemplary embodiment, it will be apparent to those skilled in the art that can be in these no details In the case where or implement the present invention in the case that these details change.Therefore, these descriptions should be considered as explanation Property rather than it is restrictive.
Although having been incorporated with specific embodiments of the present invention, invention has been described, according to retouching for front It states, many replacements of these embodiments, modifications and variations will be apparent for those of ordinary skills.Example Such as, discussed embodiment can be used in other memory architectures (for example, dynamic ram (DRAM)).
The embodiment of the present invention be intended to cover fall into all such replacements within the broad range of appended claims, Modifications and variations.Therefore, all within the spirits and principles of the present invention, any omission, modification, equivalent replacement, the improvement made Deng should all be included in the protection scope of the present invention.

Claims (9)

1. altering device on a kind of pre- flue gas of assembled architecture, which is characterized in that including being arranged in each floor vertical shaft inner wall On ventilation duct one (1), the upper end of the ventilation duct one (1) is equipped with the ventilation duct two (6) of connection, the ventilation duct one (1) with Ventilation duct two (6) is in inverted T-shaped, is equipped with fan (19) inside the ventilation duct two (6), the ventilation duct one (1) is located at ventilation duct It is fixed on outer wall below two (6) motor (5), the output shaft of the motor (5) extends to the inside of ventilation duct one (1) and sets Have connecting rod (21), the upper end of the connecting rod (21) is equipped with closure plate (22), described when connecting rod (21) goes to vertical position upward The both ends of closure plate (22) and the two sides inner wall of ventilation duct two (6) push against, when connecting rod (21) goes to the horizontally toward position of vertical shaft, The both ends of the closure plate (22) and the two sides inner wall of ventilation duct one (1) push against, and the top of the ventilation duct one (1) is additionally provided with water tank (10), the top of the ventilation duct two (6), which is equipped with, extends to the air inlet pipe (9) of water tank (10) bottom, the water tank (10) it is upper Portion is equipped with escape pipe (13).
2. altering device on the pre- flue gas of assembled architecture according to claim 1, which is characterized in that further include that setting exists Controller (14) on vertical shaft inner wall, the motor (5) are electrically connected with controller (14).
3. altering device on the pre- flue gas of assembled architecture according to claim 2, which is characterized in that the water tank (10) Top be equipped with filler pipe (11).
4. altering device on the pre- flue gas of assembled architecture according to claim 3, which is characterized in that the water tank (10) Top be equipped with water pump (12), the water inlet of the water pump (12) is equipped with the water inlet pipe (20) for extending to water tank (10) bottom, institute Outlet pipe (15) at the top of each floor is arranged in the water outlet for stating water pump (12), equidistantly divides on the outlet pipe (15) It is furnished with multiple applicators (16).
5. altering device on the pre- flue gas of assembled architecture according to claim 4, which is characterized in that the water tank (10) Internal upper end is equipped with liquid level sensor (17), and the liquid level sensor (17) is electrically connected with controller (14).
6. altering device on the pre- flue gas of assembled architecture according to claim 1, which is characterized in that the escape pipe (13) inside is equipped with strainer (4).
7. altering device on the pre- flue gas of assembled architecture according to claim 5, which is characterized in that the water tank (10) Bottom be equipped with sewage pipe (8), the sewage pipe (8) be equipped with control its opening and closing solenoid valve (7), the solenoid valve (7) with Controller (14) electrical connection.
8. altering device on the pre- flue gas of assembled architecture according to claim 7, which is characterized in that further include that setting exists The inside of power supply device (2) on vertical shaft inner wall, the ventilation duct one (1) is equipped with wind-driven generator (18), the wind-power electricity generation Machine (18) is electrically connected with power supply device (2).
9. altering device on the pre- flue gas of assembled architecture according to claim 1, which is characterized in that the ventilation duct one (1) bottom is equipped with inclined support frame (3), and the bottom of support frame as described above (3) is fixed on the inner wall of vertical shaft.
CN201910662176.6A 2019-07-22 2019-07-22 Prevention flue gas of prefabricated building is scurried device on Active CN110306756B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910662176.6A CN110306756B (en) 2019-07-22 2019-07-22 Prevention flue gas of prefabricated building is scurried device on

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910662176.6A CN110306756B (en) 2019-07-22 2019-07-22 Prevention flue gas of prefabricated building is scurried device on

Publications (2)

Publication Number Publication Date
CN110306756A true CN110306756A (en) 2019-10-08
CN110306756B CN110306756B (en) 2021-05-11

Family

ID=68080388

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910662176.6A Active CN110306756B (en) 2019-07-22 2019-07-22 Prevention flue gas of prefabricated building is scurried device on

Country Status (1)

Country Link
CN (1) CN110306756B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111214780A (en) * 2020-03-05 2020-06-02 极度智慧展览(上海)有限公司 Fireproof system of exhibition hall
CN114470543A (en) * 2022-01-04 2022-05-13 阜阳舟乾建筑劳务有限公司 Wind-power self-power-generation type high-rise building safety fireproof escape device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005106363A (en) * 2003-09-30 2005-04-21 Daiwa House Ind Co Ltd Water filter type air cleaner with humidifying function
JP2006292344A (en) * 2005-04-08 2006-10-26 Tomoko Shinohara Smoke exhaust device for cooker
CN202017275U (en) * 2011-04-01 2011-10-26 沈福昌 Fire hazard prevention structure for public entertainment places
CN203123805U (en) * 2013-03-11 2013-08-14 都怡安 Fume purifier
CN203514732U (en) * 2013-10-09 2014-04-02 沈阳新经济产业园开发有限公司 Attached building flue
CN108088023A (en) * 2017-11-16 2018-05-29 南宁晟景工程咨询有限公司 A kind of exhausting system applied to building constructions

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005106363A (en) * 2003-09-30 2005-04-21 Daiwa House Ind Co Ltd Water filter type air cleaner with humidifying function
JP2006292344A (en) * 2005-04-08 2006-10-26 Tomoko Shinohara Smoke exhaust device for cooker
CN202017275U (en) * 2011-04-01 2011-10-26 沈福昌 Fire hazard prevention structure for public entertainment places
CN203123805U (en) * 2013-03-11 2013-08-14 都怡安 Fume purifier
CN203514732U (en) * 2013-10-09 2014-04-02 沈阳新经济产业园开发有限公司 Attached building flue
CN108088023A (en) * 2017-11-16 2018-05-29 南宁晟景工程咨询有限公司 A kind of exhausting system applied to building constructions

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111214780A (en) * 2020-03-05 2020-06-02 极度智慧展览(上海)有限公司 Fireproof system of exhibition hall
CN114470543A (en) * 2022-01-04 2022-05-13 阜阳舟乾建筑劳务有限公司 Wind-power self-power-generation type high-rise building safety fireproof escape device

Also Published As

Publication number Publication date
CN110306756B (en) 2021-05-11

Similar Documents

Publication Publication Date Title
CN105649242B (en) A kind of double-layered glass facade intelligent control method
AU2015101968A4 (en) Mobile house utilising renewable energy
CN110578969B (en) Self-cleaning fresh air inlet system and operation method
CN110306756A (en) Device is altered on a kind of pre- flue gas of assembled architecture
CN201567700U (en) Keel ventilation type double-layer glass curtain wall
JP2014062727A (en) Cooling and heating system of building
KR101558041B1 (en) A heating apparatus using solar heat
CN108476987A (en) A kind of environment-friendly temperature-reducing pig house
CN216424127U (en) Electric automobile that can rain-proof dehumidification fills electric pile
CN113338531A (en) House building wall structure and construction method thereof
CN209697312U (en) A kind of indoor temperature control damping water landscape using solar energy
KR20180043865A (en) Movable toilet
CN205744132U (en) A kind of sand-proof generating set
CN107829381A (en) Possesses the charging pile device of shared parking stall lock function
CN110345589B (en) Passive energy-saving environment-friendly system and house
CN208441141U (en) Level land formula water proof type pipe gallery ventilation shaft
CN208407380U (en) A kind of nanometer of mist generation device
CN103061660B (en) Water curtain window
CN206847329U (en) A kind of portable heat pump dryer
CN206198505U (en) A kind of novel road tunnel fire extinguishing device
JP2678539B2 (en) Control device of air flow in air cycle house
CN205560134U (en) Domestic emergency generator
KR102395578B1 (en) Indoor temperature control device for vehicles equipped with air sterilization function using sunlight
CN214564734U (en) Marine boats and ships fill electric pile
CN210921652U (en) Air circulation device of trade goods storage area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 236700 Lixin Science and Technology Enterprise Incubator of Detong Green Food Science and Technology Park at the junction of Century Avenue and Chundian Road, Lixin County, Bozhou City, Anhui Province

Applicant after: Anhui Jiangqiao Financial Consulting Service Co.,Ltd.

Address before: 236700, Anhui, Bozhou province Lixin Fuxing Road on the north side of a vocational family hospital

Applicant before: ANHUI FENGYAXUAN SCIENCE & TECHNOLOGY INFORMATION SERVICE Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220808

Address after: No. 2, Pinghu Road, Economic Development Zone, Yingjiang District, Anqing City, Anhui Province, 246000

Patentee after: Anqing Guofeng Housing Industrialization Co., Ltd.

Address before: 236700 Lixin technology business incubator of Detong green food science and Technology Park, intersection of Century Avenue and chundian Road, Lixin County, Bozhou City, Anhui Province

Patentee before: Anhui Jiangqiao Financial Consulting Service Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A device for preventing smoke from escaping upward in prefabricated buildings

Effective date of registration: 20230307

Granted publication date: 20210511

Pledgee: Huaining Anhui rural commercial bank Limited by Share Ltd.

Pledgor: Anqing Guofeng Housing Industrialization Co.,Ltd.

Registration number: Y2023980034132

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230411

Granted publication date: 20210511

Pledgee: Huaining Anhui rural commercial bank Limited by Share Ltd.

Pledgor: Anqing Guofeng Housing Industrialization Co.,Ltd.

Registration number: Y2023980034132

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 2, Pinghu Road, Economic Development Zone, Yingjiang District, Anqing City, Anhui Province, 246000

Patentee after: Anqing Guofeng Residential Industrialization Group Co.,Ltd.

Country or region after: China

Address before: No. 2, Pinghu Road, Economic Development Zone, Yingjiang District, Anqing City, Anhui Province, 246000

Patentee before: Anqing Guofeng Housing Industrialization Co.,Ltd.