CN110306420A - Pipe bridge interior conduit transport device and its construction method - Google Patents

Pipe bridge interior conduit transport device and its construction method Download PDF

Info

Publication number
CN110306420A
CN110306420A CN201910580832.8A CN201910580832A CN110306420A CN 110306420 A CN110306420 A CN 110306420A CN 201910580832 A CN201910580832 A CN 201910580832A CN 110306420 A CN110306420 A CN 110306420A
Authority
CN
China
Prior art keywords
column
pipeline
support
steel
transport device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910580832.8A
Other languages
Chinese (zh)
Other versions
CN110306420B (en
Inventor
王艳伶
项菲
张丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201910580832.8A priority Critical patent/CN110306420B/en
Publication of CN110306420A publication Critical patent/CN110306420A/en
Application granted granted Critical
Publication of CN110306420B publication Critical patent/CN110306420B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D18/00Bridges specially adapted for particular applications or functions not provided for elsewhere, e.g. aqueducts, bridges for supporting pipe-lines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/0243Laying or reclaiming pipes on land, e.g. above the ground above ground
    • F16L1/0246Laying or reclaiming pipes on land, e.g. above the ground above ground at a certain height off the ground

Abstract

The present invention provides a kind of pipe bridge interior conduit transport device, and fixed mechanism includes that snap-gauge and support are affixed, and snap-gauge is mounted on H profile steel two sides, and connecting plate connects the snap-gauge of two sides;The roller bearing two sides shaft end of its transmission mechanism is connect with column, vertical affixed connection steel on support, column with to connect steel bolt affixed;Coupling beam connection is located at the column of H profile steel two sides, additionally provides the construction method that pipeline transportation is carried out using above-mentioned apparatus, 1) a set of above-mentioned transport device is installed in each H profile steel along pipe bridge, the roller bearing of each transport device is made to constitute a supply line;2) the first root canal road is placed on the transport device of pipe bridge beginning position, pulls pipeline in pipe bridge terminal hoist engine, the pipeline Forward gentle along supply line, all pipeline transportations are in place, and entire pipeline installs;3) first removing column when removing device falls on column on support with the fixing bolt for connecting steel, while pipeline is fallen back on support of pipelines, then removes fixed mechanism.

Description

Pipe bridge interior conduit transport device and its construction method
Technical field
The invention belongs to a kind of pipe bridge construction methods of installation, and in particular to large span cross the river pipe bridge interior conduit means of transport and Construction method.
Background technique
With the development of the society, the development in city, city integrated pipe network also gradually extends outwardly, when pipeline route is through crossing the river Bank washes away the river that serious, Scour and Accretion is irregular, flow velocity is big, riverbed trench digging is difficult or some navigations are frequent and needs often to dredge When road, system of laying is often maked somebody a mere figurehead using pipeline, i.e., sets large-span steel pipe bridge on river.Pipeline is laid in pipe bridge. Pipe bridge construction often makes separate tenders with pipeline construction, carries out pipeline construction after pipe bridge construction is complete.Because of pipeline aerial crossing river distance, Some reach hundred meters of long left and right.Integral hoisting needs the crane of very large-tonnage, and construction cost is high, and the feelings constructed in pipe bridge Under condition, integral hoisting is not easily accomplished.It is pulled according to elevator, because pipeline is long, sliding friction is big along the line, generates to pontic very big It impacts and is easy to destroy the external anti-corrosion layer of pipe.
Summary of the invention
The present invention is to solve the transport of background technique high and medium long range pipe bridge interior conduit, installation inconvenience, pipeline in transport The problem of Wai Fang forum is easily damaged.
To solve the above problems, the present invention one is to provide one kind and can temporarily install, be finished dismountable transport device, second is that The method of this device transport pipeline in pipe bridge is provided.
A kind of pipe bridge interior conduit transport device, it is made of transmission mechanism and fixed mechanism;Fixed mechanism includes support, card Plate and connecting plate, snap-gauge is affixed with support, and snap-gauge is equipped with the card slot shape cooperated with the H profile steel wing plate shape of pipe bridge bottom, Connecting plate connection is located at the snap-gauge of H profile steel two sides;Transmission mechanism includes column, roller bearing, rubber slab and coupling beam, and roller bearing is by round steel Core pachydermia pipe composition, pachydermia pipe movable set is on round steel inner core, one layer of rubber slab of pachydermia pipe outer cladding;Two side axle of round steel inner core End is connect with column, and column bottom is equipped with several bolts hole;Vertical affixed connection steel on the support, connection steel are equipped with several Bolt hole, column with to connect steel bolt affixed;Coupling beam connection is located at the column of H profile steel two sides.
Preferably, strut length is less than the spacing of support of pipelines relative seat, after column is fixed on the support, at the top of column Roller bearing be higher than support of pipelines.
The present apparatus cooperates hoist engine transport pipeline, reduces the frictional force along pipeline traction, ensures the external anti-corrosion layer of pipeline It is not destroyed.
The construction method that pipeline transportation is carried out using above-mentioned pipe bridge interior conduit transport device, is followed the steps below:
1) the backed snap-gauge of two cuffs: being first stuck on the top flange plate of pipe bridge bottom H profile steel by the installation of device, Its card slot and H profile steel top flange plate cooperate, and inner side edge is contacted with H profile steel web, and bottom edge is contacted with H profile steel lower flange;With The snap-gauge of H profile steel two sides is connected and fixed by connecting plate and bolt;Transmission mechanism is installed, coupling beam is fixed on the support of H profile steel two sides The column of two sides;
2) pipeline transportation: installing a set of transport device in upper each H profile steel along pipe bridge installation, all roller bearings constitute one First root canal road, is then placed on the transport device of pipe bridge beginning position by supply line, places in pipe bridge terminal Hoist engine gently pulls pipeline, and pipeline is made to pass through each transport device one by one, and the Forward gentle along supply line then connects second Root, third root are in place to all pipeline transportations, and entire pipeline installs;
3) it removes device: after Pipe installing is complete, first removing the connection bolt and coupling beam of column and connection, it is then light with hand hammer Striking column falls on column on support, falls back to pipeline on support of pipelines;It finally removes connecting plate and unlocks two snap-gauges, use is small Hammer beats the end of snap-gauge, and fixed mechanism is removed.
Horizontal transporter structure disclosed by the invention is simple, and the waste material that construction site can be used is made, cost It is low, and can Reusability, avoid the waste of material.This method is simple to operation, and construction cost is low, does not destroy pipeline configuration, peace Quan Xinggao, working effect are high.
Detailed description of the invention
Fig. 1 is fixed mechanism figure
Fig. 2 is driver composition;
Fig. 3 is rolling shaft structure figure;
Fig. 4 is transport device installation diagram.
In figure: support 1, snap-gauge 2, connecting plate 3, connection steel 4, roller bearing 5, column 6, coupling beam 7, H profile steel 8, support of pipelines 9, Round steel inner core 51, pachydermia pipe 52, rubber slab 53.
Specific embodiment
The present invention will be further described with example with reference to the accompanying drawing.
There is provided a kind of using this device in pipe there is provided a kind of pipe bridge interior conduit transport device, two by the present invention one The method of transport pipeline in bridge.
This transport device is made of transmission mechanism and fixed mechanism two parts.Below with reference to example to pipe bridge of the invention Interior conduit transport device is described in detail:
As shown in Figure 1, fixed mechanism includes: support 1, snap-gauge 2, connecting plate 3 and some fixing bolts.As shown in Fig. 2, every Snap-gauge 2 made of two blocks of 10mmm thick steel plates is arranged in a fixed mechanism, and snap-gauge 2 is equipped with matches with 8 wing plate shape of pipe bridge bottom H profile steel The card slot of conjunction.The gap Ge Liu 20mm facilitates installation as surplus above and below card slot and flange plate.After installation, scene is according to gap situation Add backing plate.Support 1 is using [14 channel steels are made, the transmission device for fixing chuck plate 2 and the present apparatus.Set of device has two groups Fixed mechanism is symmetrically installed respectively at 8 two sides of H profile steel, and snap-gauge 2 is with a 10mm band steel connecting plate 3 and is bolted together.
As shown in Figure 2,3, transmission mechanism includes: roller bearing 5, column 6 and coupling beam 7.5 two sides shaft end of roller bearing is connect with column 6, 6 bottom of column is equipped with several bolts hole;The column 6 of two roller bearings 5 is connected by coupling beam 7.As shown in figure 3, the inner core of roller bearing 5 is one Round steel, round steel inner core 51 are set with pachydermia pipe 52, pachydermia pipe 52 outsourcing, one layer of rubber slab 53 outside.25 round steel of φ is used when production Round steel inner core 51 is made, two sides respectively cover a long 100mm away from the position shaft end head 100mm, diameter phi 38*3.5 seamless steel pipe short circuit is done Collar.Collar and housing φ 108*10 pachydermia seamless pipe are welded together with the gusset of 4 10mm thickness.For protect directly with pipe The roller bearing of road contact, glues one layer of rubber slab, rubber plate thickness 3mm outside pachydermia pipe.Column 6 is using [14 channel steels are made, 1 bottom of column Portion is equipped with several bolts hole, vertical affixed connection steel 4 on support 1, connection steel 4 equipped with several bolts hole, column with connect steel 4 Bolt is affixed.Set of device has two groups of roller bearings, with [the column 6 of the connection of coupling beam 7 made of 14 channel steels 8 two sides of H profile steel.It is entire to pass After motivation structure installs, 5 position support of pipelines 9 of roller bearing is higher by 20-30mm, it is ensured that does not contact support of pipelines 9 in pipeline transportation.It is vertical 6 length of column is less than the spacing of 9 relative seat 1 of support of pipelines, after removing column 6 with the fixing bolt for connecting steel 4, column 6, rolling 5 entire lowering of axis, pipeline can be fallen on support of pipelines 9.
Using the method for above-mentioned transport device transport pipeline in pipe bridge, follow the steps below:
Early-stage preparations: before construction, first understanding pipe bridge field condition, according to 9 height determining device of support of pipelines Stem height;The size of snap-gauge 2, processing and fabricating transport device are determined according to 8 beam size of pipe bridge bottom H profile steel.
(1) installation of device
The backed snap-gauge 2 of two cuffs is first stuck on the top flange plate of pipe bridge bottom H profile steel 8 to (card slot gap is big When can cushioning plate), card slot and H profile steel top flange plate cooperate, and inner side edge is contacted with H profile steel web, bottom edge under H profile steel Edge of a wing contact;After leveling is stablized, the snap-gauge 2 of H profile steel two sides is connected together with bolt and connecting plate 3.Adjust the vertical of column Then degree is fixed roller bearing 5 and column 6 with bolt with steel 4 is connect, guarantee that two roller bearings on a horizontal plane, are consolidated with coupling beam 8 The column for determining two sides, tightens bolt.The transport device installed is as shown in Figure 4.
(2) pipeline transportation
Position and quantity is arranged referring to the laying of pipe bridge bottom H profile steel 8 in transport device, and pipe bridge installs upper each H-type along the line A set of transport device is installed, general two adjacent girder steel distance is no more than 4m on steel 8.Each transport device installs, and checks installation It is whether qualified.Then the first root canal road is placed on pipe bridge head roller bearing 5, one pulley, elevator is set in pipe bridge other end Machine is placed at the ground coaxial with pipeline, and elevator end wirerope is connected on the closure plate that pipe head is set by pulley, passes through elevator Machine gently pulls, and roller bearing 5 rotates, the gentle Forward of pipeline with the movement of pipeline, then connects second, third Root ... .. to entire pipeline until install.During transport, the axle center offset of pipeline is observed at any time, and to along line apparatus It is checked, discovery bolt has loosening to tighten in time.
(3) device is removed
After pipeline installs on pipe bridge, first remove between the fixing bolt, column 6 and coupling beam 7 of column 6 and branch connection steel 4 Bolt, remove coupling beam, then with hand hammer touch column, fall on column on support, the roller bearing on column top also leaves pipeline, After removing transmission mechanism, pipeline bottom surface is fallen back on support of pipelines 9.Connecting plate 3 is finally removed, two snap-gauges 2 is unlocked, will fix Mechanism is removed, and the end of snap-gauge 2 is beaten with hand hammer, unloads fixed mechanism.
Horizontal transporter structure disclosed by the invention is simple, and the waste material that construction site can be used is made, cost It is low, and can Reusability, avoid the waste of material.This method is simple to operation, and construction cost is low, does not destroy pipeline configuration, peace Quan Xinggao, working effect are high.

Claims (4)

1. a kind of pipe bridge interior conduit transport device, it is characterized in that: it is made of transmission mechanism and fixed mechanism;Fixed mechanism includes Support, snap-gauge and connecting plate, snap-gauge is affixed with support, and snap-gauge is equipped with the card cooperated with the H profile steel wing plate shape of pipe bridge bottom Groove shape, connecting plate connection are located at the snap-gauge of H profile steel two sides;Transmission mechanism includes column, roller bearing, rubber slab and coupling beam, roller bearing It is made of round steel inner core pachydermia pipe, pachydermia pipe movable set is on round steel inner core, one layer of rubber slab of pachydermia pipe outer cladding;In round steel Core two sides shaft end is connect with column, and column bottom is equipped with several bolts hole;Vertical affixed connection steel on the support connects on steel Equipped with several bolts hole, column with to connect steel bolt affixed;Coupling beam connection is located at the column of H profile steel two sides.
2. pipe bridge interior conduit transport device according to claim 1, it is characterized in that: strut length is less than, support of pipelines is opposite to be propped up The spacing of seat, after column is fixed on the support, the roller bearing at the top of column is higher than support of pipelines.
3. pipe bridge interior conduit transport device according to claim 2, it is characterized in that: roller bearing is higher than support of pipelines 20mm-30mm.
4. carrying out the construction method of pipeline transportation using pipe bridge interior conduit transport device described in claim 3, according to the following steps It carries out:
1) the backed snap-gauge of two cuffs: being first stuck on the top flange plate of pipe bridge bottom H profile steel by the installation of device, card Slot and H profile steel top flange plate cooperate, and inner side edge is contacted with H profile steel web, and bottom edge is contacted with H profile steel lower flange;With connection The snap-gauge of H profile steel two sides is connected and fixed by plate and bolt;Transmission mechanism, coupling beam fixed two sides are installed on the support of H profile steel two sides Column;
2) pipeline transportation: installing a set of transport device in upper each H profile steel along pipe bridge installation, all roller bearings constitute a transport Then first root canal road is placed on the transport device of pipe bridge beginning position by line, in the hoist engine that pipe bridge terminal is placed Pipeline is gently pulled, pipeline is made to pass through each transport device one by one, the Forward gentle along supply line then connects second, third Root is in place to all pipeline transportations, and entire pipeline installs;
3) it removes device: after Pipe installing is complete, first removing the connection bolt and coupling beam of column and support, then torn open with hand hammer tapping Except transmission mechanism, fall back to pipeline on support of pipelines;Then it removes connecting plate and unlocks two snap-gauges, beat snap-gauge with hand hammer End, fixed mechanism are removed.
CN201910580832.8A 2019-06-29 2019-06-29 Pipe transportation device in pipe bridge and construction method thereof Active CN110306420B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910580832.8A CN110306420B (en) 2019-06-29 2019-06-29 Pipe transportation device in pipe bridge and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910580832.8A CN110306420B (en) 2019-06-29 2019-06-29 Pipe transportation device in pipe bridge and construction method thereof

Publications (2)

Publication Number Publication Date
CN110306420A true CN110306420A (en) 2019-10-08
CN110306420B CN110306420B (en) 2024-04-12

Family

ID=68079563

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910580832.8A Active CN110306420B (en) 2019-06-29 2019-06-29 Pipe transportation device in pipe bridge and construction method thereof

Country Status (1)

Country Link
CN (1) CN110306420B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112496588A (en) * 2020-12-28 2021-03-16 中鼎国际工程有限责任公司 Method and equipment for auxiliary installation of municipal pipeline

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204083499U (en) * 2014-08-29 2015-01-07 重庆工业设备安装集团有限公司 Long distance sealed tube corridor interior conduit installs transmission positioning apparatus
CN105257911A (en) * 2015-09-23 2016-01-20 东南大学建筑设计研究院有限公司 Pipeline roller support and installation method thereof
KR101665626B1 (en) * 2015-06-03 2016-10-14 경희대학교 산학협력단 the construction method of the hybrid steel joint construction
CN206231959U (en) * 2016-10-31 2017-06-09 中冶天工集团有限公司 Lift pipe level conveying arrangement in situ in a kind of pipe gallery
CN207390201U (en) * 2017-09-29 2018-05-22 六安长城钢结构有限公司 A kind of generic transport device for being used to transport steel pipe, steel plate
CN108560591A (en) * 2018-06-21 2018-09-21 中冶京诚工程技术有限公司 The pipeline transportation device used in pipe gallery
CN208326391U (en) * 2018-04-17 2019-01-04 陕西建工安装集团有限公司 A kind of pipeline mounting device
CN208935547U (en) * 2018-08-15 2019-06-04 安徽省工业设备安装有限公司 One kind laying auxiliary device in grid structure workshop interior conduit
CN210238259U (en) * 2019-06-29 2020-04-03 中国二十二冶集团有限公司 Pipeline transportation device in pipe bridge

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204083499U (en) * 2014-08-29 2015-01-07 重庆工业设备安装集团有限公司 Long distance sealed tube corridor interior conduit installs transmission positioning apparatus
KR101665626B1 (en) * 2015-06-03 2016-10-14 경희대학교 산학협력단 the construction method of the hybrid steel joint construction
CN105257911A (en) * 2015-09-23 2016-01-20 东南大学建筑设计研究院有限公司 Pipeline roller support and installation method thereof
CN206231959U (en) * 2016-10-31 2017-06-09 中冶天工集团有限公司 Lift pipe level conveying arrangement in situ in a kind of pipe gallery
CN207390201U (en) * 2017-09-29 2018-05-22 六安长城钢结构有限公司 A kind of generic transport device for being used to transport steel pipe, steel plate
CN208326391U (en) * 2018-04-17 2019-01-04 陕西建工安装集团有限公司 A kind of pipeline mounting device
CN108560591A (en) * 2018-06-21 2018-09-21 中冶京诚工程技术有限公司 The pipeline transportation device used in pipe gallery
CN208935547U (en) * 2018-08-15 2019-06-04 安徽省工业设备安装有限公司 One kind laying auxiliary device in grid structure workshop interior conduit
CN210238259U (en) * 2019-06-29 2020-04-03 中国二十二冶集团有限公司 Pipeline transportation device in pipe bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112496588A (en) * 2020-12-28 2021-03-16 中鼎国际工程有限责任公司 Method and equipment for auxiliary installation of municipal pipeline

Also Published As

Publication number Publication date
CN110306420B (en) 2024-04-12

Similar Documents

Publication Publication Date Title
CN108412505A (en) Jacking construction structure and pipe jacking construction method
CN203922522U (en) A kind of shield machine broken-up and hanging goes out well system
CN107964877A (en) The asymmetric mixing girder stayed-cable bridge horizontal swing structure of super-tonnage and its construction method
CN111472797B (en) Implementation method for detaching TBM in hole
CN103939114A (en) Lining construction method for suspension rail type trolley
CN105839546A (en) Arch rib buckling and hanging installing structure of steel pipe arch bridge
CN109235292A (en) Railroad bridge changes beam process and changes girder system system
CN112031791B (en) Disassembling method of shield machine in limited space
CN208184738U (en) jacking construction structure
CN108487297A (en) The construction method that bracing members are set up in a kind of half lid excavation construction of subway station
CN110306420A (en) Pipe bridge interior conduit transport device and its construction method
CN111852488B (en) Construction method for large-diameter shield tunnel contact net channel of high-speed railway
CN105908752B (en) Formwork supporting and stripping system for pouring concrete on side wall and working process of formwork supporting and stripping system
CN210238259U (en) Pipeline transportation device in pipe bridge
CN103590839B (en) Subway station cast-in-place structural portal support construction technology
CN111828731B (en) Device and method for installing pipelines in long-distance shield tunnel
CN212297912U (en) Reinforcing structure for outlet of pipe jacking receiving well
CN108411806A (en) A kind of structure and its installation method of reinforced steel concrete pipe culvert
CN109403166B (en) Urban rail transit trackless track laying and traveling system
CN208430636U (en) A kind of Urban Underground pipe gallery pre-embedded device
CN105926549A (en) Transportation construction method for in-tunnel pressure steel tube
CN203822330U (en) Supporting system for subway station underground third floor middle plate pouring
CN104743449B (en) It is applied to the railless door machine in circular hole
CN111335191B (en) Construction method for dismantling overpass bridge on expressway
CN207812293U (en) Self-propelled full rotation bridge inspection car

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant