CN110298548A - The long-range real-time diagnosis of Rock Tunnel life cycle management engineering information and feedback system - Google Patents

The long-range real-time diagnosis of Rock Tunnel life cycle management engineering information and feedback system Download PDF

Info

Publication number
CN110298548A
CN110298548A CN201910447881.4A CN201910447881A CN110298548A CN 110298548 A CN110298548 A CN 110298548A CN 201910447881 A CN201910447881 A CN 201910447881A CN 110298548 A CN110298548 A CN 110298548A
Authority
CN
China
Prior art keywords
information
tunnel
rock tunnel
engineering
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910447881.4A
Other languages
Chinese (zh)
Inventor
朱合华
武威
陈力康
王熙
张可珅
李晓军
焦亚基
金瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201910447881.4A priority Critical patent/CN110298548A/en
Publication of CN110298548A publication Critical patent/CN110298548A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The present invention relates to a kind of long-range real-time diagnosis of Rock Tunnel life cycle management engineering information and feedback systems, comprising: Rock Tunnel information acquisition module (1), for acquiring Rock Tunnel information;Information remote transmission module (2) inside and outside Rock Tunnel, for forwarding Rock Tunnel information;Engineering information storage and background analysis module (3), for receiving the Rock Tunnel information of forwarding and carrying out data classification and analysis;Engineering information visualization and feedback module (4), data for obtaining engineering information storage and background analysis module (3) analysis are transferred and are shown in information terminal, and information remote transmission module (2) inside and outside Rock Tunnel are forwarded the data to, Rock Tunnel information acquisition module (1) is transmitted to by information remote transmission module (2) inside and outside Rock Tunnel and is shown.Compared with prior art, the present invention has many advantages, such as that information collection is comprehensive, analysis result feedback is timely, transmission capacity is big.

Description

The long-range real-time diagnosis of Rock Tunnel life cycle management engineering information and feedback system
Technical field
The present invention relates to Rock Tunnel infomation detection assembling spheres, more particularly, to a kind of Rock Tunnel life cycle management work The real-time diagnosis of journey information remote and feedback system.
Background technique
With the development and management development of Detection Techniques, can be generated greatly in the construction time of Rock Tunnel and operation phase The real time data of amount just can preferably serve the construction in entire tunnel if these data timely can be collected and be utilized And operation.Since Rock Tunnel building site multidigit is in mountain terrain, remote apart from city and field condition is simple, multi-source number According to being difficult to collect and real-time Transmission to the analysis center for being located at cities and towns;Simultaneously as the development of hardware device, tunnel monitoring date Capacity developed to G grades from K grades, M grades, traditional data-transmission mode has not been suitable for the transmission of large data, needs to build A set of new long-range real-time transmission system is found, realizes the collection and transmission of magnanimity multi-source data.Meanwhile the tunnel full longevity being collected into Information in the life period needs real-time reception and analysis, and analysis result is timely feedbacked and gives tunnel scene, to instruct tunnel Construction and operation.
Chinese patent CN107942859A discloses the intelligent measurement and complex control system of a kind of traffic tunnel, according to tunnel Interaction and influence between each environmental factor in road realize comprehensive assessment to tunnel traffic safe condition, and according to comprehensive The result for closing assessment carries out intelligent control to all types of facilities of tunnel internal.But the system is only used for tunnel operating service Device, and be information one-way transmission, it can not accomplish to timely feedback.
Chinese patent CN106972903A discloses a kind of tunnel information broadcast system, using multiple tunnel loudspeakers, Postpone output information in a manner of sound equipment to mobile vehicle, thus inside the vehicle being capable of clearly confirmation message, it is not only possible to Understanding situation, additionally it is possible to cope with rapidly.But the system is only used for the service after tunnel is built up, in the correlation of constructing tunnel phase Risk timely can not be collected and be fed back;Meanwhile the system is difficult to the disaster to non suddens such as structure convergent deformations Information early warning.
Chinese patent CN203769853U discloses a kind of safety for tunnel engineering monitoring information radio transmitting device comprising Detection device, wireless transmitting system monitor computer.Wherein detection device is connected with wireless transmitting system, detection device handle Contents of a project data to be measured are transferred to monitoring computer by wireless transmitting system, by the tunnel monitoring amount for monitoring computer Interpretation software, integration and analysis data are surveyed, are shown on the screen of computer.Real-time prison is provided for tunnel monitoring personnel Survey data takes appropriate measures to make corresponding judgement.The system is mainly used to transmit the dependency number of constructing tunnel phase It is believed that breath, but it is a lack of information analysis processing and Real-time Feedback, it can not accomplish tunnel scene and the real-time communication of decision-maker. In addition, the system can not accomplish that the data collection in the tunnel operation phase transmits.
Chinese patent CN102460466A discloses a kind of method and apparatus for tunnel transmission information in the communications, With expansion service interface, and the wireless signal comprising type of message is received, wherein the type of message includes expansion service It is segmented and is the extension to industry standard communication protocols, the main portion passes through via described in expansion service interface transmission The expansion service of type of message is segmented, come to the wireless signal for receiving the message comprising being consistent with the type of message It responds.The information transmission system can not transmit the biggish data of capacity of tunnel survey generation, for 3 D laser scanning The point cloud data that instrument disposably generates, RFID technique can not be transmitted.
It is existing to be adopted with similar technology of the invention and system with being directed to Rock Tunnel single construction time or operation issue evidence Collection transmits in the majority, and is difficult to the biggish monomer data of transmission capacity, and can not accomplish Real-time Feedback, and it is complete not to be suitable for tunnel Data information acquisition and remote diagnosis in life cycle.
Summary of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide a kind of Rock Tunnel full longevity Order the long-range real-time diagnosis of period engineering information and feedback system.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of long-range real-time diagnosis of Rock Tunnel life cycle management engineering information and feedback system, comprising:
Rock Tunnel information acquisition module, including display, for acquiring Rock Tunnel information;
Information remote transmission module inside and outside Rock Tunnel is connect, for forwarding rock mass with Rock Tunnel information acquisition module Tunnel information;
Engineering information storage and background analysis module, for receives forwarding Rock Tunnel information and carry out data classification with Analysis;
Engineering information visualization and feedback module are separately connected engineering information storage and background analysis module and Rock Tunnel Inside and outside information remote transmission module, the data for obtaining engineering information storage and background analysis module analysis are in information terminal It is transferred and is shown, and forward the data to information remote transmission module inside and outside Rock Tunnel, inside and outside Rock Tunnel Information remote transmission module is transmitted to Rock Tunnel information acquisition module and is shown.
The Rock Tunnel information acquisition module specifically includes Geological Advanced Prediction equipment, tunnel tunnel face binocular number is shone Phase equipment, tunnel tunnel face 3 D laser scanning equipment, video monitoring equipment, live mechanics experimental equipment, construction and operation phase Safety Monitoring Instruments.
Information remote transmission module specifically includes tunnel tunnel face information receiving device, in tunnel inside and outside the Rock Tunnel Line relaying equipment, tunnel portal trunking in wireless relay apparatus, tunnel.
The engineering information storage and background analysis module specifically include standardized data interface, engineering big data storage battle array Column, project data classification and Data Analysis Software, engineering geology three-dimensional modeling and model automatic software update, graphics process work It stands, engineering calculation work station, serial number software for calculation and discontinuous numerical value software for calculation.
The engineering information visualization and feedback module specifically include fix information terminal, personal digital assistant device and information and hand over Mutual equipment.
The data analysis includes preliminary analysis and explication de texte, and explication de texte is specially according to geological condition analysis knot Fruit is automatically selected described continuous or described discontinuous by the graphics process work station and the engineering calculation work station Numerical software is analyzed.
Show that text, audio and the video feed information of result are whole in the fix information by the information interaction device Remote transmission between end and the personal digital assistant device.
The expert opinion and deposited by the engineering information that the content that the display is shown is obtained by working group outside tunnel The analysis result that storage and background analysis resume module obtain.
Compared with prior art, the invention has the following advantages:
1. information collection is comprehensive, the relevant risk of constructing tunnel phase timely can be collected and be fed back, and effectively avoid structure The disaster of the non suddens such as convergent deformation.
2. system can the biggish monomer data of transmission capacity, the data information in tunnel life cycle management can be carried out Acquisition and remote diagnosis.
3. personal digital assistant device is connected with fix information terminal by information interaction device, tunnel scene and policymaker are realized The real-time communication of member, facilitates and instructs tunnel construction and operation management.
4. in view of from different places, explication de texte being carried out in conjunction with geological conditions, according to reality locating for different Rock Tunnels Border situation judges, and analysis result has more accuracy.
Detailed description of the invention
Fig. 1 is overall structure of the present invention.
Fig. 2 is Rock Tunnel information acquisition module schematic diagram of the present invention.
Fig. 3 is information remote transmission module schematic diagram inside and outside Rock Tunnel of the present invention.
Fig. 4 is engineering information of the present invention storage and background analysis module diagram.
Fig. 5 is engineering information visualization of the present invention and feedback module schematic diagram.
Appended drawing reference:
1 is Rock Tunnel information acquisition module;2 be information remote transmission module inside and outside Rock Tunnel;3 deposit for engineering information Storage and background analysis module;4 be engineering information visualization and feedback module;11 be Geological Advanced Prediction equipment;12 slap for tunnel Sub- face binocular digital photographing apparatus;13 be tunnel tunnel face 3 D laser scanning equipment;14 be video monitoring equipment;15 be scene Mechanics experimental equipment;16 be construction and operation phase Safety Monitoring Instruments;21 be tunnel tunnel face information receiving device;22 be tunnel Interior wireless relay apparatus;23 be line relaying equipment in tunnel;24 be tunnel portal trunking;31 connect for standardized data Mouthful;32 be engineering big data storage array;33 be project data classification and Data Analysis Software;34 be engineering geology three-dimensional modeling And model automatic software update;35 be graphics process work station;36 be engineering calculation work station;37 is soft for serial number calculating Part;38 be discontinuous numerical value software for calculation;41 be fix information terminal;42 be personal digital assistant device;43 be information interaction device.
Specific embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, the detailed implementation method and specific operation process are given, but protection scope of the present invention is not limited to Following embodiments.
A kind of long-range real-time diagnosis of Rock Tunnel life cycle management engineering information and feedback system, comprising:
Rock Tunnel information acquisition module 1, including display, for acquiring Rock Tunnel information;
Information remote transmission module 2 inside and outside Rock Tunnel, connect, for forwarding rock with Rock Tunnel information acquisition module 1 Body tunnel information;
Engineering information storage and background analysis module 3, for receiving the Rock Tunnel information of forwarding and carrying out data classification And analysis;
Engineering information visualization and feedback module 4 are separately connected engineering information storage and background analysis module 3 and rock mass tunnel Information remote transmission module 2 inside and outside road, for engineering information storage and background analysis module 3 to be analyzed obtained data in information Terminal is transferred and is shown, and forwards the data to information remote transmission module 2 inside and outside Rock Tunnel, by Rock Tunnel Inside and outside information remote transmission module 2 is transmitted to Rock Tunnel information acquisition module 1 and is shown.
Rock Tunnel information acquisition module 1 specifically includes Geological Advanced Prediction equipment 11, tunnel tunnel face binocular number is shone Phase equipment 12, tunnel tunnel face 3 D laser scanning equipment 13, video monitoring equipment 14, live mechanics experimental equipment 15, construction And operation phase Safety Monitoring Instruments 16.
Information remote transmission module 2 specifically includes tunnel tunnel face information receiving device 21, in tunnel inside and outside Rock Tunnel Line relaying equipment 23, tunnel portal trunking 24 in wireless relay apparatus 22, tunnel.
Engineering information storage and background analysis module 3 specifically include standardized data interface 31, engineering big data storage battle array At column 32, project data classification and Data Analysis Software 33, engineering geology three-dimensional modeling and model automatic software update 34, figure Manage work station 35, engineering calculation work station 36, serial number software for calculation 37 and discontinuous numerical value software for calculation 38.
Engineering information visualization and feedback module 4 specifically include fix information terminal 41, personal digital assistant device 42 and information Interactive device 43.
Data analysis includes preliminary analysis and explication de texte, and explication de texte is specially according to geological condition analysis as a result, logical The graphics process work station 35 and the engineering calculation work station 36 are crossed, automatically selects described continuous 37 or described discontinuous 38 numerical softwares are analyzed.
Show that text, audio and the video feed information of result pass through information interaction device 43 in 41 and of fix information terminal Remote transmission between personal digital assistant device 42.
Expert opinion that the content that display is shown is obtained by working group outside tunnel and by engineering information storage and backstage The analysis result that analysis module (3) processing obtains.
As shown in Figure 1, Rock Tunnel information acquisition module 1 imports Rock Tunnel after being collected into Various types of data in the present invention Inside and outside information remote transmission module 2.Data are reached engineering by remote transmission by information remote transmission module 2 inside and outside Rock Tunnel Result is believed by engineering after information storage and background analysis module 3, engineering information storage and 3 analysis of background analysis module processing Breath visualization and feedback module 4 show and express.Engineering information visualization and feedback module 4 are again by expert opinion and analysis Data feedback is to information remote transmission module 2 inside and outside Rock Tunnel, and information remote transmission module 2 will receive again inside and outside Rock Tunnel To feedback information be sent to Rock Tunnel information acquisition module 1, to complete entire remote diagnosis process.
As shown in Fig. 2, Geological Advanced Prediction equipment 11, tunnel tunnel face binocular digital photographing apparatus 12, tunnel tunnel face 3 D laser scanning equipment 13 accesses computer by USB interface, and live experiment of machanics equipment 15 after experiment by being manually entered Mode import data to computer.Computer is connected with information remote transmission module 2 inside and outside Rock Tunnel, in data It passes.Video monitoring equipment 14 is directly connected with information remote transmission module 2 inside and outside Rock Tunnel by network interface, construction and operation phase Safety Monitoring Instruments 16 are by Unified Network interface after interchanger, then access information remote transmission module 2 inside and outside Rock Tunnel, Data are by real-time Transmission.
As shown in figure 3, information remote passes inside and outside the data access Rock Tunnel that Rock Tunnel information acquisition module 1 is collected into Wireless relay apparatus 22 in tunnel tunnel face information receiving device 21, tunnel in defeated module 2, line relaying equipment in tunnel 23.The data that tunnel tunnel face information receiving device 21 is collected into are sent to nothing in tunnel by wireless bridge and directional aerial Line trunking 22, in tunnel wireless relay apparatus 22 receive be then forwarded to after data in tunnel line relaying equipment 23 or Tunnel portal trunking 24.After data are transmitted to hole, engineering information is transmitted to by optical fiber or telecommunication server Storage and background analysis module 3.Telecommunication server be for receiving mobile communication signal (4G/5G), receive public network signal with Afterwards by wireless bridge by network transmission to entire tunnel, there is AP to convert WiFi letter for network signal at each trunking Number, so that mobile end equipment may be coupled to internet.
As shown in figure 4, information remote transmission module 2 sends data to engineering information storage and backstage inside and outside Rock Tunnel Analysis module 3, standardized data interface 31 can the entire data structure of specification, convenient for data storage and data transfer.Normalized number According to saving to engineering big data storage array 32, project data classification and 33 called data of Data Analysis Software are analyzed.After analysis It is input to engineering geology three-dimensional modeling and model automatic software update 34, after the completion of modeling, system automatically selects graphics process work Make station 35 or engineering calculation work station 36 carries out data analysis.After processing, automatically select serial number software for calculation 37 or Discontinuous numerical value software for calculation 38 carries out calculating analysis.It is completed to which all data complete processing analysis, it can into engineering information Depending on change and feedback module 4.
As shown in figure 5, data can be sent to fix information after the completion of engineering information storage and background analysis module 3 are handled Terminal 41 and personal digital assistant device 42.In this way, expert and administrative staff can see number by Visualization Platform at the first time According to analysis as a result, and being fed back and being instructed by information interaction device 43.Feedback information and analysis result are sent directly to rock Information remote transmission module 2 inside and outside body tunnel, data are transmitted to tunnel by information remote transmission module 2 inside and outside Rock Tunnel and show , so that Field Force be instructed to construct and manage.

Claims (8)

1. a kind of long-range real-time diagnosis of Rock Tunnel life cycle management engineering information and feedback system, comprising:
Rock Tunnel information acquisition module (1), including display, for acquiring Rock Tunnel information;
Information remote transmission module (2) inside and outside Rock Tunnel are connect, for forwarding rock with Rock Tunnel information acquisition module (1) Body tunnel information;
Engineering information storage and background analysis module (3), for receives forwarding Rock Tunnel information and carry out data classification with Data analysis;
Engineering information visualization and feedback module (4) are separately connected engineering information storage and background analysis module (3) and rock mass tunnel Information remote transmission module (2) inside and outside road, the data for obtaining engineering information storage and background analysis module (3) analysis exist Information terminal is transferred and is shown, and forwards the data to information remote transmission module (2) inside and outside Rock Tunnel, by rock Information remote transmission module (2) is transmitted to Rock Tunnel information acquisition module (1) and is shown inside and outside body tunnel.
2. a kind of long-range real-time diagnosis of Rock Tunnel life cycle management engineering information according to claim 1 and feedback are System, which is characterized in that the Rock Tunnel information acquisition module (1) specifically includes Geological Advanced Prediction equipment (11), the tunnel palm Sub- face binocular digital photographing apparatus (12), tunnel tunnel face 3 D laser scanning equipment (13), video monitoring equipment (14), scene Mechanics experimental equipment (15), construction and operation phase Safety Monitoring Instruments (16).
3. a kind of long-range real-time diagnosis of Rock Tunnel life cycle management engineering information according to claim 1 and feedback are System, which is characterized in that information remote transmission module (2) specifically includes the reception of tunnel tunnel face information and sets inside and outside the Rock Tunnel Wireless relay apparatus (22) in standby (21), tunnel, line relaying equipment (23), tunnel portal trunking (24) in tunnel.
4. a kind of long-range real-time diagnosis of Rock Tunnel life cycle management engineering information according to claim 1 and feedback are System, which is characterized in that the engineering information storage and background analysis module (3) specifically include standardized data interface (31), work Journey big data storage array (32), project data classification and Data Analysis Software (33), engineering geology three-dimensional modeling and model are certainly It is dynamic to update software (34), graphics process work station (35), engineering calculation work station (36), serial number software for calculation (37) and non- Serial number software for calculation (38).
5. a kind of long-range real-time diagnosis of Rock Tunnel life cycle management engineering information according to claim 1 and feedback are System, which is characterized in that the engineering information visualization and feedback module (4) specifically include fix information terminal (41), mobile letter Cease terminal (42) and information interaction device (43).
6. a kind of long-range real-time diagnosis of Rock Tunnel life cycle management engineering information according to claim 4 and feedback are System, which is characterized in that the data analysis includes preliminary analysis and explication de texte, and explication de texte is specially according to geological conditions point Analysis automatically selects described continuous as a result, by the graphics process work station (35) and the engineering calculation work station (36) (37) or discontinuous (38) numerical software is analyzed.
7. a kind of long-range real-time diagnosis of Rock Tunnel life cycle management engineering information according to claim 6 and feedback are System, which is characterized in that show text, audio and the video feed information of result by the information interaction device (43) described Remote transmission between fix information terminal (41) and the personal digital assistant device (42).
8. a kind of long-range real-time diagnosis of Rock Tunnel life cycle management engineering information according to claim 6 and feedback are System, which is characterized in that expert opinion that the content that the display is shown is obtained by working group outside tunnel and by the engineering Information storage and background analysis module (3) handle obtained analysis result.
CN201910447881.4A 2019-05-27 2019-05-27 The long-range real-time diagnosis of Rock Tunnel life cycle management engineering information and feedback system Pending CN110298548A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910447881.4A CN110298548A (en) 2019-05-27 2019-05-27 The long-range real-time diagnosis of Rock Tunnel life cycle management engineering information and feedback system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910447881.4A CN110298548A (en) 2019-05-27 2019-05-27 The long-range real-time diagnosis of Rock Tunnel life cycle management engineering information and feedback system

Publications (1)

Publication Number Publication Date
CN110298548A true CN110298548A (en) 2019-10-01

Family

ID=68027299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910447881.4A Pending CN110298548A (en) 2019-05-27 2019-05-27 The long-range real-time diagnosis of Rock Tunnel life cycle management engineering information and feedback system

Country Status (1)

Country Link
CN (1) CN110298548A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111970692A (en) * 2020-04-02 2020-11-20 中国铁建重工集团股份有限公司 Data transmission method, device, equipment and readable storage medium
CN112330745A (en) * 2020-11-25 2021-02-05 招商局重庆交通科研设计院有限公司 Tunnel portal side and elevation slope stability monitoring and early warning system and method based on binocular vision

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105338112A (en) * 2015-11-25 2016-02-17 广州广隧机电设备有限公司 Internet of Things-based shield tunnel construction refine digit management platform
CN206256930U (en) * 2016-11-24 2017-06-16 西南交通大学 A kind of safety pre-warning system of constructing tunnel
CN106958460A (en) * 2017-05-16 2017-07-18 山东大学 A kind of wisdom sensory perceptual system and method suitable for tunneling and underground engineering monitoring measurement information
CN107067690A (en) * 2017-01-17 2017-08-18 中山大学 A kind of Tunnel automation monitoring system and its monitoring method based on ZigBee
CN109151055A (en) * 2018-09-25 2019-01-04 中铁十二局集团有限公司 The real-time monitoring system and method for real-time monitoring of constructing tunnel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105338112A (en) * 2015-11-25 2016-02-17 广州广隧机电设备有限公司 Internet of Things-based shield tunnel construction refine digit management platform
CN206256930U (en) * 2016-11-24 2017-06-16 西南交通大学 A kind of safety pre-warning system of constructing tunnel
CN107067690A (en) * 2017-01-17 2017-08-18 中山大学 A kind of Tunnel automation monitoring system and its monitoring method based on ZigBee
CN106958460A (en) * 2017-05-16 2017-07-18 山东大学 A kind of wisdom sensory perceptual system and method suitable for tunneling and underground engineering monitoring measurement information
CN109151055A (en) * 2018-09-25 2019-01-04 中铁十二局集团有限公司 The real-time monitoring system and method for real-time monitoring of constructing tunnel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朱合华 等: "基于iS3 平台的岩体隧道信息精细化采集、分析与服务", 《岩石力学与工程学报》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111970692A (en) * 2020-04-02 2020-11-20 中国铁建重工集团股份有限公司 Data transmission method, device, equipment and readable storage medium
CN112330745A (en) * 2020-11-25 2021-02-05 招商局重庆交通科研设计院有限公司 Tunnel portal side and elevation slope stability monitoring and early warning system and method based on binocular vision
CN112330745B (en) * 2020-11-25 2023-06-02 招商局重庆交通科研设计院有限公司 Tunnel portal side elevation slope stability monitoring and early warning system and method based on binocular vision

Similar Documents

Publication Publication Date Title
CN103942941B (en) Mobile monitoring convergence platform based on GIS
CN108090610A (en) Orbit construction system based on BIM technology
CN106595565A (en) BIM-based intelligent monitoring system
CN106026393B (en) A kind of power network line Intelligent line patrolling and operational safety Risk Forecast System and method
CN106710001A (en) Substation inspection robot based centralized monitoring and simulation system and method thereof
CN104486520A (en) Fire scene perception actual combat command platform system based on Beidou
CN100533506C (en) Vehicle monitoring apparatus and realizing method thereof
CN104517432A (en) Monitoring system based on unmanned aerial vehicle and wireless sensor network
CN109274737B (en) C/S technical architecture system for oil field exploration, development and production
CN110866161A (en) Urban underground space three-dimensional information visualization system and method
CN111062504A (en) AR technology-based intelligent power distribution station operation and maintenance system and method
CN202018301U (en) Wireless video monitoring system based on 3S (GPS, RS and GIS) technology
CN107993397A (en) A kind of forest fire preventing monitor system and method based on wireless mesh network
CN110298548A (en) The long-range real-time diagnosis of Rock Tunnel life cycle management engineering information and feedback system
CN107240040A (en) A kind of geography of tourism data acquisition management system
CN102708603A (en) GIS (Geographic Information System)-based vehicle-mounted recorder for monitoring vehicle
CN115456206A (en) BIM + GIS-based tunnel construction visual control method and system
CN204316595U (en) A kind of scene of a fire perception based on Big Dipper commanding platform system under battle conditions
CN110166545B (en) Remote wireless monitoring system based on aviation inertia stable platform and design method
CN113783930B (en) Air-ground network system based on field deployable 5G vehicle-mounted platform and construction method
CN114221978A (en) Urban rail transit cloud platform system
CN205983789U (en) Test of boiler efficiency and control management system based on remote radio transmission technology
CN105991967A (en) Emergency repair vehicle vehicle-mounted monitoring system
CN116863652A (en) Geological disaster early warning method based on Internet adding technology
CN110930703A (en) Intelligent static traffic control service system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191001