CN110296914A - A kind of arenaceous stratum grouting simulation test system - Google Patents

A kind of arenaceous stratum grouting simulation test system Download PDF

Info

Publication number
CN110296914A
CN110296914A CN201910669233.3A CN201910669233A CN110296914A CN 110296914 A CN110296914 A CN 110296914A CN 201910669233 A CN201910669233 A CN 201910669233A CN 110296914 A CN110296914 A CN 110296914A
Authority
CN
China
Prior art keywords
grouting
bucket
pressure
valve
test bucket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910669233.3A
Other languages
Chinese (zh)
Inventor
李慎刚
李伟伟
夏治康
马娇
唐瑞兆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeastern University China
Original Assignee
Northeastern University China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeastern University China filed Critical Northeastern University China
Priority to CN201910669233.3A priority Critical patent/CN110296914A/en
Publication of CN110296914A publication Critical patent/CN110296914A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N13/00Investigating surface or boundary effects, e.g. wetting power; Investigating diffusion effects; Analysing materials by determining surface, boundary, or diffusion effects
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N13/00Investigating surface or boundary effects, e.g. wetting power; Investigating diffusion effects; Analysing materials by determining surface, boundary, or diffusion effects
    • G01N2013/003Diffusion; diffusivity between liquids
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/0014Type of force applied
    • G01N2203/0016Tensile or compressive
    • G01N2203/0019Compressive
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/02Details not specific for a particular testing method
    • G01N2203/022Environment of the test
    • G01N2203/0236Other environments
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/02Details not specific for a particular testing method
    • G01N2203/06Indicating or recording means; Sensing means
    • G01N2203/067Parameter measured for estimating the property
    • G01N2203/0676Force, weight, load, energy, speed or acceleration

Abstract

The invention discloses a kind of arenaceous stratum grouting simulation test systems, including loading system, slurries input system, grouting test bucket and measuring system;Loading system includes jack, reaction frame and load pressing plate;The measuring system includes multiple soil pressure cells being arranged in the grouting test bucket, the load pressing plate matches with the grouting test bucket, and it is arranged in the grouting test bucket, the reaction frame is arranged at the top of the load pressing plate and it is fixedly connected with fixed steel construction, and the both ends of the jack are connect with the reaction frame and the load pressing plate respectively;The side wall of the grouting test bucket is equipped with injected hole, drain hole and inlet opening.The present invention can study the slurries Diffusion Law under the conditions of different angle slip casting, while can simulate the grouting test under dynamic water, hydrostatic or water-less environment, and pilot system possesses loading system, can simulate the grouting test under Different Strata height.

Description

A kind of arenaceous stratum grouting simulation test system
Technical field
The present invention relates to a kind of stratum grouting simulation test system, specifically a kind of arenaceous stratum grouting simulation test System.
Background technique
Currently, the history that slurry injection technique is born existing more than 200 years is widely answered by constantly improving and developing For foundation stabilization, water-stop curtain, impervious leakage-stopping etc..Slip casting is a complicated process, in addition the complexity on stratum, leads Causing slurries diffusion theory, there is a big difference compared with practical engineering application, and grouting parameter often requires to determine by test.Then, room Interior test becomes the important means of research slurries Diffusion Law.But present experimental rig simulated environment is single, can not simulate dynamic The soil layer of state flowing water, and when the presetting period of mixed serum is shorter, it is easy to the phenomenon that causing plugging.
Summary of the invention
According to technical problem set forth above, and provide a kind of arenaceous stratum grouting simulation test system.The present invention uses Technological means it is as follows:
A kind of arenaceous stratum grouting simulation test system, including loading system, slurries input system, grouting test bucket and survey Amount system;
The grouting test bucket does not have bung, and the grouting test bucket is made of transparent material;
Loading system includes jack, reaction frame and load pressing plate;
The measuring system includes multiple soil pressure cells being arranged in the grouting test bucket, the soil pressure cell with adopt Acquisition means connection;
The load pressing plate matches with the grouting test bucket, and it is arranged in the grouting test bucket, described anti- Power frame be arranged at the top of the load pressing plate and its with fixation steel construction be fixedly connected, the both ends of the jack respectively with it is described Reaction frame is connected with the load pressing plate;
Injected hole is equipped in the middle part of the side wall of the grouting test bucket, the side wall of the grouting test bucket is in the injected hole Lower section is equipped with drain hole, and the bottom sidewall of the grouting test bucket is equipped with inlet opening;
Slurries input system includes air compressor, and the inlet end of the air compressor is connected by intake valve and gas source It connects, the outlet side of the air compressor is connected separately with grouting pump A and grouting pump B, and the slip casting by pressure-regulating valve I The pressure gauge A for measuring air pressure in grouting pump A and for measuring air pressure in grouting pump B is connected separately on pump A and grouting pump B Pass through slurry-inlet valve A and slurry-inlet valve B and A liquid agitator respectively with the liquid feeding end of pressure gauge B, grouting pump A and grouting pump B and B liquid stirs Mix bucket connection;The outlet end of the grouting pump A and grouting pump B passes through slurry-inlet valve C and slurry-inlet valve D respectively and one end of Grouting Pipe connects Logical, the other end of the Grouting Pipe is connected to by Multidirectional connector with the injected hole, and the Grouting Pipe penetrates the slip casting examination It tests in bucket;Pipeline between the outlet side of the air compressor and the pressure-regulating valve I is equipped with pressure gauge I;
The outlet side of the air compressor is connect by pressure-regulating valve II with the air inlet of the water tank, the storage Water tank is equipped with the pressure gauge III for measuring pressure in the water tank, the water outlet of the water tank by inlet valve and it is described into Mouth of a river connection, and the pipeline between the inlet valve and the water inlet is equipped with flow meter I;The air compressor with it is described Pipeline between pressure-regulating valve II is equipped with pressure gauge II;
The drain hole is connect by drain valve with drain water circuit, and the drain water circuit is equipped with flow meter II.
The top of the grouting test bucket, bottom outer wall are equipped with hoop constraint device in a ring;The hoop constraint dress The axis set is overlapped with the axis of the grouting test bucket, and is vertically arranged between two hoop constraint devices by multiple Vertical restraint device be fixedly connected, multiple vertical restraint devices are uniformly distributed around the axis of the grouting test bucket.
Be fixedly connected between two toroidal confinement devices by four vertical restraint devices, and it is described it is vertical about The top of bundle device extends straight up;
The reaction frame in cross, and four ends of the reaction frame respectively with four vertical restraint devices Top is fixedly connected, and the upper end of the jack is connect with the center of the reaction frame, and the lower end of the jack adds with described Carry the center connection of pressing plate.
The outer wall of the grouting test bucket is equipped with scale.
It is equipped with sealing rubber ring at the injected hole, the inlet opening and the drain hole, and is set at the drain hole There is filter screen.
The grouting pump A and grouting pump B, which passes through waster valve A and waster valve B respectively and is connected with, lets out slurry pipeline.
Under use state: placement in layers sand and closely knit in Xiang Suoshu grouting test bucket, and meanwhile it is embedded in pre-position Soil pressure cell and the Grouting Pipe is buried by the injected hole;After sand fills design height, sand surface is comforted It is flat, the load pressing plate is covered, the reaction frame and the jack are installed, and load pressing plate using described in the jack pair Pressurization stops load after the pressure of the soil pressure cell reaches preset pressure value, and keeps current pressure value constant; Add water into the water tank, and open the air compressor and the intake valve, then slowly opens the pressure and adjust Valve II makes pressure rise in the water tank, after pressure reaches setting value, opens the inlet valve, Xiang Suoshu grouting test Add water in bucket, to simulated groundwater environment;
If simulating circumstance of flowing water, when grouting test inner bucket water position will reach setting water level, the drain valve is opened, And it is identical with the registration of flow meter II to control the inlet valve and the flow meter I at the drain valve, i.e., control inflow and lets out Water is identical;
If simulating Lentic environment, when grouting test inner bucket water position reaches setting water level, the inlet valve and pressure are closed Power pressure regulator valve II;If simulating water-less environment, ignore herein;
Cement and injecting paste material are respectively put into the A liquid agitator and the B liquid agitator and individually stirred, after stirring The slurry-inlet valve A, slurry-inlet valve B and pressure-regulating valve I are opened, when the registration of the pressure gauge A and pressure gauge B reaches set After grouting pressure, the slurry-inlet valve C and the slurry-inlet valve D are opened, starts grouting test.If simulation is circumstance of flowing water, directly Stop closing the slurry-inlet valve C and slurry-inlet valve D when water outlet substantially to the drain valve, stops slip casting;If simulate Lentic environment or Water-less environment then stops slip casting according to preset slip casting time or grouting amount condition.The waster valve A and waster valve B is opened, clearly Slurries in empty grouting pump A and grouting pump B and in the A liquid agitator and the B liquid agitator, and pour into graduated cylinder, thus Slurry volume used in slip casting is calculated, clears up A liquid agitator and the B liquid agitator and grouting pump A and grouting pump B later; Seed harvest, detection grout spreading range, test consolidating strength are taken out from the grouting test bucket after 24 hours.
The invention has the following advantages:
The present invention can study the slurries Diffusion Law under the conditions of different angle slip casting, while can simulate dynamic water, hydrostatic Or the grouting test under water-less environment, pilot system possess loading system, can simulate the grouting test under Different Strata height. The present apparatus uses two grouting pumps, can simulate the grouting test of slurries under different grout coordinate ratios, can effectively prevent slurries The problems such as plugging caused by due to rapid initial set.
The present invention can be widely popularized in fields such as grouting tests based on the above reasons.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to do simply to introduce, it should be apparent that, the accompanying drawings in the following description is this hair Bright some embodiments for those of ordinary skill in the art without any creative labor, can be with It obtains other drawings based on these drawings.
Fig. 1 is a kind of arenaceous stratum grouting simulation test system structure diagram in the specific embodiment of the invention.
Fig. 2 is grouting system pipeline connecting figure in the specific embodiment of the invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art Every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
A kind of arenaceous stratum grouting simulation test system, including loading system, slurries input system, 1 and of grouting test bucket Measuring system;
The grouting test bucket 1 does not have bung, and the grouting test bucket 1 is made of transparent material;
Loading system includes jack 2, reaction frame 3 and load pressing plate 4;
The measuring system includes multiple soil pressure cells 5 being arranged in the grouting test bucket, the soil pressure cell 5 with Acquisition device for acquiring the pressure value that the soil pressure cell measures connects;
The load pressing plate 4 matches with the grouting test bucket 1, and it is arranged in the grouting test bucket 1, described The top of grouting test bucket 1, bottom outer wall are equipped with hoop constraint device 6 in a ring;The axis of the hoop constraint device 6 with The axis of the grouting test bucket 1 is overlapped, and between two hoop constraint devices 6 by four be vertically arranged it is vertical about Bundle device 7 is fixedly connected, and multiple vertical restraint devices 7 are uniformly distributed around the axis of the grouting test bucket 1.It is described perpendicular Extend straight up to the top of restraint device 7;The reaction frame 3 is in cross, and four ends of the reaction frame 3 are distinguished It is fixedly connected with the top of four vertical restraint devices 7, the center of the upper end of the jack 2 and the reaction frame 3 connects It connects, the lower end of the jack 2 is connect with the center of the load pressing plate 4.
The setting of reaction frame 3 is at the top of the load pressing plate 4 and it is fixedly connected with fixed steel construction, the jack Both ends connect respectively with the reaction frame and the load pressing plate;
Injected hole 8 is equipped in the middle part of the side wall of the grouting test bucket 1, the side wall of the grouting test bucket 1 is in the slip casting The lower section in hole 8 is equipped with drain hole 9, and the bottom sidewall of the grouting test bucket 1 is equipped with inlet opening 10;The grouting test bucket 1 Outer wall be equipped with scale 11.It is equipped with sealing rubber ring 12 at the injected hole 8, the inlet opening 10 and the drain hole 9, And filter screen 13 is equipped at the drain hole 9.
Slurries input system includes air compressor 14, and the inlet end of the air compressor 14 passes through intake valve 15 and gas The outlet side of source connection, the air compressor 14 is connected separately with grouting pump A17 and grouting pump by pressure-regulating valve I 16 B18, and be connected separately on the grouting pump A17 and grouting pump B18 for measuring air pressure in grouting pump A17 and being used to measure note The liquid feeding end of the pressure gauge A19 and pressure gauge B20 of air pressure in stock pump B18, grouting pump A17 and grouting pump B18 are respectively by into slurry Valve A21 and slurry-inlet valve B22 is connected to A liquid agitator 23 and B liquid agitator 24;The grouting pump A17's and grouting pump B18 goes out liquid End is connected to by slurry-inlet valve C25 and slurry-inlet valve D26 with one end of Grouting Pipe 27 respectively, and the other end of the Grouting Pipe 27 passes through more It is connected to connector 28 with the injected hole 8, and the Grouting Pipe 27 penetrates in the grouting test bucket 1;The air compressor Pipeline between 14 outlet side and the pressure-regulating valve I 16 is equipped with pressure gauge I 29;
The outlet side of the air compressor 14 is connect by pressure-regulating valve II 30 with the air inlet of the water tank 31, The water tank 31 is equipped with the pressure gauge III 32 for measuring pressure in the water tank 31, and the water outlet of the water tank 31 passes through Inlet valve 33 is connected to the water inlet 10, and the pipeline between the inlet valve 33 and the water inlet 10 is equipped with flowmeter Ⅰ34;Pipeline between the air compressor 14 and the pressure-regulating valve II 30 is equipped with pressure gauge II 41;
The drain hole 9 is connect by drain valve 35 with drain water circuit 40, and the drain water circuit is equipped with flow meter II 36。
The grouting pump A17 and grouting pump B18 pass through respectively waster valve A37 and waster valve B38 be connected with let out slurry pipe Road 39.
Under use state: placement in layers sand and closely knit in Xiang Suoshu grouting test bucket 1, and meanwhile it is embedded in pre-position Soil pressure cell 5 and the Grouting Pipe 27 is buried by the injected hole 8;After sand fills design height, by sand table Face smooths, and covers the load pressing plate 4, installs the reaction frame 3 and the jack 2, and using the jack 2 to described It loads pressing plate 4 to pressurize, after the pressure of the soil pressure cell 5 reaches preset pressure value, stops load, and keep current pressure Force value is constant;Add water into the water tank 31, and open the air compressor 14 and the intake valve 15, then slowly beats The pressure-regulating valve II 30 is opened, pressure rise in the water tank is made, when the pressure value of the pressure gauge III 32 display reaches After setting value, the inlet valve 33 is opened, adds water in Xiang Suoshu grouting test bucket 1, to simulated groundwater environment;
If simulating circumstance of flowing water, when water level will reach setting water level in grouting test bucket 1, the drain valve is opened 35, and control the inlet valve 33 and the flow meter I 33 at the drain valve 35 is identical with the registration of flow meter II 36, that is, it controls Inflow is identical as water discharged amount;
If simulation Lentic environment, when water level reaches setting water level in grouting test bucket 1, close the inlet valve 33 with Pressure adjusting pressuring valve II 30;If simulating water-less environment, ignore herein;
Cement and injecting paste material are respectively put into the A liquid agitator 23 and the B liquid agitator 24 and individually stirred, is stirred The slurry-inlet valve A21, slurry-inlet valve B22 and pressure-regulating valve I 16 are opened after mixing, when showing for the pressure gauge A19 and pressure gauge B20 After number reaches set grouting pressure, the slurry-inlet valve C25 and the slurry-inlet valve D26 are opened, starts grouting test.If simulation Be circumstance of flowing water, then close the slurry-inlet valve C25 and slurry-inlet valve D26 when the drain valve 35 stops water outlet substantially, stop Only slip casting;If simulating Lentic environment or water-less environment, slip casting is stopped according to preset slip casting time or grouting amount condition.It opens The waster valve A37 and waster valve B38 empties grouting pump A17 and grouting pump B18 interior and the A liquid agitator 23 and the B Slurries in liquid agitator 24, and pour into graduated cylinder, slurry volume used in slip casting is thus calculated, clears up A liquid agitator 23 later With the B liquid agitator 24 and grouting pump A17 and grouting pump B18;Knot is taken out from the grouting test bucket 1 after 24 hours Shi Ti, detection grout spreading range, test consolidating strength.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (6)

1. a kind of arenaceous stratum grouting simulation test system, which is characterized in that including loading system, slurries input system, slip casting Test bucket and measuring system;
The grouting test bucket does not have bung, and the grouting test bucket is made of transparent material;
Loading system includes jack, reaction frame and load pressing plate;
The measuring system includes multiple soil pressure cells being arranged in the grouting test bucket;
The load pressing plate matches with the grouting test bucket, and it is arranged in the grouting test bucket, the reaction frame Be arranged at the top of the load pressing plate and its with fixation steel construction be fixedly connected, the both ends of the jack respectively with the counter-force Frame is connected with the load pressing plate;
Injected hole is equipped in the middle part of the side wall of the grouting test bucket, the side wall of the grouting test bucket is in the lower section of the injected hole Equipped with drain hole, the bottom sidewall of the grouting test bucket is equipped with inlet opening;
Slurries input system includes air compressor, and the inlet end of the air compressor is connect by intake valve with gas source, institute State the outlet side of air compressor and grouting pump A and grouting pump B be connected separately with by pressure-regulating valve I, and the grouting pump A and The pressure gauge A and pressure for measuring air pressure in grouting pump A and for measuring air pressure in grouting pump B are connected separately on grouting pump B The liquid feeding end of power table B, grouting pump A and grouting pump B pass through slurry-inlet valve A and slurry-inlet valve B and A liquid agitator and B liquid agitator respectively Connection;The outlet end of the grouting pump A and grouting pump B passes through slurry-inlet valve C respectively and slurry-inlet valve D is connected to one end of Grouting Pipe, The other end of the Grouting Pipe is connected to by Multidirectional connector with the injected hole, and the Grouting Pipe penetrates the grouting test bucket It is interior;Pipeline between the outlet side of the air compressor and the pressure-regulating valve I is equipped with pressure gauge I;
The outlet side of the air compressor is connect by pressure-regulating valve II with the air inlet of the water tank, the water tank It is equipped with the pressure gauge III for measuring pressure in the water tank, the water outlet of the water tank passes through inlet valve and the water inlet Connection, and the pipeline between the inlet valve and the water inlet is equipped with flow meter I, the air compressor and the pressure Pipeline between regulating valve II is equipped with pressure gauge II;
The drain hole is connect by drain valve with drain water circuit, and the drain water circuit is equipped with flow meter II.
2. a kind of arenaceous stratum grouting simulation test system according to claim 1, it is characterised in that: the grouting test The top of bucket, bottom outer wall are equipped with hoop constraint device in a ring;The axis of the hoop constraint device and the slip casting try The axis for testing bucket is overlapped, and is connected between two hoop constraint devices by the way that multiple vertical restraint devices being vertically arranged are fixed It connects, multiple vertical restraint devices are uniformly distributed around the axis of the grouting test bucket.
3. a kind of arenaceous stratum grouting simulation test system according to claim 2, it is characterised in that: two annulars It is fixedly connected between restraint device by four vertical restraint devices, and the top of the vertical restraint device is straight up Extend;
The reaction frame is in cross, and four ends of reaction frame top with four vertical restraint devices respectively It is fixedly connected, the upper end of the jack is connect with the center of the reaction frame, and the lower end of the jack and the load are pressed The center of plate connects.
4. a kind of arenaceous stratum grouting simulation test system according to claim 1, it is characterised in that: the grouting test The outer wall of bucket is equipped with scale.
5. a kind of arenaceous stratum grouting simulation test system according to claim 1, it is characterised in that: the injected hole, It is equipped with sealing rubber ring at the inlet opening and the drain hole, and is equipped with filter screen at the drain hole.
6. a kind of arenaceous stratum grouting simulation test system according to claim 1, it is characterised in that: the grouting pump A Pass through waster valve A and waster valve B respectively with the grouting pump B and be connected with and lets out slurry pipeline.
CN201910669233.3A 2019-07-24 2019-07-24 A kind of arenaceous stratum grouting simulation test system Pending CN110296914A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910669233.3A CN110296914A (en) 2019-07-24 2019-07-24 A kind of arenaceous stratum grouting simulation test system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910669233.3A CN110296914A (en) 2019-07-24 2019-07-24 A kind of arenaceous stratum grouting simulation test system

Publications (1)

Publication Number Publication Date
CN110296914A true CN110296914A (en) 2019-10-01

Family

ID=68031656

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910669233.3A Pending CN110296914A (en) 2019-07-24 2019-07-24 A kind of arenaceous stratum grouting simulation test system

Country Status (1)

Country Link
CN (1) CN110296914A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201218810Y (en) * 2008-05-12 2009-04-08 董新平 Double-liquid slip-casting simulation device
CN105137048A (en) * 2015-09-28 2015-12-09 北京建筑大学 Stratum grouting simulation system
CN105136641A (en) * 2015-08-07 2015-12-09 山东大学 Model device for simulating permeation grouting diffusion test under flowing water condition
CN106645582A (en) * 2016-12-29 2017-05-10 中国人民解放军63926部队 Test apparatus for simulating stratum uplift in grouting process and test method of test apparatus
CN106840977A (en) * 2017-02-16 2017-06-13 华北科技学院 Slurry filling imitation device
CN107389898A (en) * 2017-07-24 2017-11-24 西安科技大学 Dynamic current Flooding in Borehole consolidation grouting Diffusion Law visual Simulation experimental provision and method
CN108196034A (en) * 2018-01-19 2018-06-22 合肥工业大学 Simulate high-pressure slip-casting device and test method under buried stratum river channels
CN208206964U (en) * 2018-01-19 2018-12-07 合肥工业大学 Simulate high-pressure slip-casting device under buried stratum river channels
CN109975177A (en) * 2019-04-30 2019-07-05 中南大学 A kind of simulation test device and method of horizontal grouting mouth slip casting spreading morphology

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201218810Y (en) * 2008-05-12 2009-04-08 董新平 Double-liquid slip-casting simulation device
CN105136641A (en) * 2015-08-07 2015-12-09 山东大学 Model device for simulating permeation grouting diffusion test under flowing water condition
CN105137048A (en) * 2015-09-28 2015-12-09 北京建筑大学 Stratum grouting simulation system
CN106645582A (en) * 2016-12-29 2017-05-10 中国人民解放军63926部队 Test apparatus for simulating stratum uplift in grouting process and test method of test apparatus
CN106840977A (en) * 2017-02-16 2017-06-13 华北科技学院 Slurry filling imitation device
CN107389898A (en) * 2017-07-24 2017-11-24 西安科技大学 Dynamic current Flooding in Borehole consolidation grouting Diffusion Law visual Simulation experimental provision and method
CN108196034A (en) * 2018-01-19 2018-06-22 合肥工业大学 Simulate high-pressure slip-casting device and test method under buried stratum river channels
CN208206964U (en) * 2018-01-19 2018-12-07 合肥工业大学 Simulate high-pressure slip-casting device under buried stratum river channels
CN109975177A (en) * 2019-04-30 2019-07-05 中南大学 A kind of simulation test device and method of horizontal grouting mouth slip casting spreading morphology

Similar Documents

Publication Publication Date Title
CN106049557B (en) Using the test method of the laboratory testing rig of simulation grout pile end follow-up grouting
CN104165271B (en) Buried oil gas waterpipe Release and dispersion experimental provision and its method of work
CN107796929A (en) Elastic wave aids in cement ejection for water plugging model test apparatus
CN206618664U (en) A kind of concrete sealing material anti-permeability performance evaluation experimental device
CN106706416A (en) Test device capable of simulating basement bottom plate stress under effect of pressure water and use method thereof
CN108120826A (en) A kind of sleeve grouting integrated experiment device and test method
CN110887775A (en) System and method for testing permeability of triaxial slurry of post-peak fractured rock
CN107795303A (en) Hydrate recovery well cased hole gravel packing analogue system and method
CN107515176A (en) Dispersion resistance energy method of testing under a kind of cement base slurry water
CN110514533B (en) Triaxial device suitable for testing mechanical properties of soil body under water circulation permeation effect and application method
CN207457026U (en) A kind of constant head earth pillar permeability intensity device
KR100989630B1 (en) Simulation apparatus for measuring pillar side frictional force of grout and simulation method using the same
CN107782880A (en) Grouting in soil mass simulation test device and its test method in a kind of multifunctional room
CN107703031A (en) A kind of air pressure driving loose media grouting simulation test device and test method
CN110296914A (en) A kind of arenaceous stratum grouting simulation test system
CN107102106B (en) Flow-pressure two-control type indoor test grouting device
CN106768153B (en) A kind of slurry consolidation cubical contraction test device and method of testing
CN216284809U (en) Tunnel secondary grouting model test device for simulating coupling of ground stress and underground seepage field
JP2023539669A (en) Experimental equipment that simulates material exchange between wellbore and geological formations
CN206930645U (en) A kind of flow pressure two controls formula laboratory test grouting device
Zhai et al. Flexible gel (FG) for gas-drainage drilling sealing material based on orthogonal design
CN211122358U (en) Triaxial device for testing mechanical characteristics of soil under water circulation osmosis
CN115901303B (en) Soil pressure balance shield blowout prevention test device capable of simulating modifier injection
CN208622323U (en) A kind of sand gravel foundation grouting experimental provision
CN211086007U (en) High-temperature leaking stoppage experimental device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination