CN110296436A - Computer improves boiler pressuring fire and restarts success rate and starting stationarity method - Google Patents

Computer improves boiler pressuring fire and restarts success rate and starting stationarity method Download PDF

Info

Publication number
CN110296436A
CN110296436A CN201910614709.3A CN201910614709A CN110296436A CN 110296436 A CN110296436 A CN 110296436A CN 201910614709 A CN201910614709 A CN 201910614709A CN 110296436 A CN110296436 A CN 110296436A
Authority
CN
China
Prior art keywords
air quantity
fire
bed
boiler
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910614709.3A
Other languages
Chinese (zh)
Other versions
CN110296436B (en
Inventor
李治儒
杨虹
施治学
王琳琳
高战胜
高超
曲波
武振剑
赵国明
杨忠全
万发光
秦立国
王海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weiliya (harbin) Thermoelectric Co Ltd
Original Assignee
Weiliya (harbin) Thermoelectric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weiliya (harbin) Thermoelectric Co Ltd filed Critical Weiliya (harbin) Thermoelectric Co Ltd
Priority to CN201910614709.3A priority Critical patent/CN110296436B/en
Publication of CN110296436A publication Critical patent/CN110296436A/en
Application granted granted Critical
Publication of CN110296436B publication Critical patent/CN110296436B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23CMETHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN  A CARRIER GAS OR AIR 
    • F23C10/00Fluidised bed combustion apparatus
    • F23C10/18Details; Accessories
    • F23C10/28Control devices specially adapted for fluidised bed, combustion apparatus
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23CMETHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN  A CARRIER GAS OR AIR 
    • F23C10/00Fluidised bed combustion apparatus
    • F23C10/18Details; Accessories
    • F23C10/28Control devices specially adapted for fluidised bed, combustion apparatus
    • F23C10/30Control devices specially adapted for fluidised bed, combustion apparatus for controlling the level of the bed or the amount of material in the bed
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N1/00Regulating fuel supply
    • F23N1/02Regulating fuel supply conjointly with air supply
    • F23N1/022Regulating fuel supply conjointly with air supply using electronic means

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Fluidized-Bed Combustion And Resonant Combustion (AREA)

Abstract

Boiler pressuring fire, which is improved, the present invention relates to a kind of computer restarts success rate and starting stationarity method, the present invention automatically records the air quantity and compartment pressure numerical value when banking fire with computer, the slope for carrying out homologous thread calculates, when greatest gradient being taken to occur, corresponding air quantity is as best air quantity, as the Fluidization wind rate raised when fire starts.Circulating fluidized bed boiler pressure, to raise fire be a kind of important operation, it is higher to the operation level requirement of operator, if between in operation, wind, coal dosage are grasped bad, easily cause accident, therefore pass through Cold simulating test and multiple banking fire, raise the data that fire obtains, is controlled by computer, a possibility that avoiding artificial maloperation improves safety, economy that boiler is operated when raising fire.

Description

Computer improves boiler pressuring fire and restarts success rate and starting stationarity method
Technical field:
Boiler pressuring fire, which is improved, the present invention relates to a kind of computer restarts success rate and starting stationarity method.
Background technique:
Relative to coal-powder boiler, circulating fluidized bed boiler has the function of banking fire stand-by heat, but the Yang Huocao after banking fire Make, if the fluidisation situation of single consideration bed material, is grasped to the control of primary air flow, coal-supplying amount bad, operation adjustment opportunity It is not right, it just has heat and takes away too much, bed temperature mentions to come up, and causes the case where raising fire failure;It is existing to raise ignition method, it is only single One relies on cooling fluiditing test, and the incipient fluidization air quantity obtained is as air quantity when raising fire, and there is no when consideration boiler thermal-state Air quantity and air quantity when cold conditions compare, temperature is different, and atmospheric density is different, and institute's required airflow is different, even if there is experience Operator consider supercooled state, hot difference, but air quantity actually required is also by virtue of experience to judge, there is no reliable Theory, test basis, and everyone experience is not identical, also different to the understanding of equipment working state, operating method, Opportunity is also different, and it is high in start-up operation failure rate that this results in banking fire, raises during fire that the parameter fluctuations such as bed temperature are big, increases and raises The risk of oil consumption and the coking of bed of material overtemperature, detonation of fire.
Summary of the invention:
The object of the present invention is to provide a kind of guarantees to raise fiery starting, reduces the accident risk of bed of material coking, has saved and raised A kind of computer of fire starting oil consumption improves boiler pressuring fire and restarts success rate and starting stationarity method.Technical solution of the present invention It is:
A kind of computer improves boiler pressuring fire and restarts success rate and starting stationarity method:
1), in boiler cold-state fluidization tests, with primary air flow FltIncrease, compartment pressure PltIt increase accordingly, in wind Measure FltIncrease in a certain amount of situation, compartment pressure will appear a moment downward trend, i.e., passes through in fixed bed material When gas flow rate is very low, with the increase of wind speed, bed pressure drop increase in direct ratio, and when wind speed reaches certain value, bed Lamination drop reaches maximum value, which is slightly larger than bed static pressure, if continuing growing wind speed, bed pressure drop can be down to the quiet of bed Pressure, this phenomenon are known as " the unlock phenomenon " of circulating fluidized bed boiler, and record unlocks air quantity F when phenomenon at this timeltjsIt is corresponding Compartment pressure Pltjs;As shown in Figure 1.
2), after starting operation, boiler working condition is switched to hot by cold conditions, encounters the opportunity of banking fire, it may be assumed that fluidized-bed combustion boiler cutting Fuel stops blower, will be out of service in the boiler short time;On the basis of parameter when occurring unlocking phenomenon, by primary air flow FrtyhIt is decreased to less than the unlock air quantity F of cold testltjs, it is further continued for increasing primary air flow Frtyh, air compartment P at this timertyhPressure meeting Appearance first increases, rear to reduce, then the variation tendency increased, that is, the unlock phenomenon point of hot banking fire occurs, as shown in Figure 2;
3) after unlock phenomenon point when, finding hot, hot unlock air quantity F is recordedrtjsAnd hot unlocking pressure Prtjs, With hot unlock air quantity FrtjsAs air quantity when raising fire, and record blower frequency f at that timertAnd it records in normal table When operation, the ratio K of coal amount and air quantitymf(ton/when)/(cube m/hour), as coal amount corresponding under certain air quantity, i.e. coal Measure Nml=F1rt*Kmf, meanwhile, the coal amount N of hot unlock point is calculatedmlrtjs=Frtjs*Kmf
4), Yang Huoshi, i.e., after the banking fire in completion step 2), bed temperature is lower than before 600 degree, starting blower, investment fuel, By boiler quick start;The successively automatic starting in order of each blower, increases primary air fan frequency f1 until primary air flow F1rtReach Hot unlock air quantity FrtjsWhen, stablize primary air fan frequency f1, feeder self-starting increases coal-supplying amount Nml, and make coal-supplying amount Nml Reach the corresponding coal amount N of hot unlock point corresponding to the air quantitymlrtjs, at this point, bed temperature rises, according to bed temperature TcwRaising speed rate kcw Variation, to bed temperature TcwRise to 650 degrees Celsius or more, and bed temperature heating rate kcwBe always held at 3 centigrade per minutes with On, oxygen content O2Do not go up within 3 seconds lower than 4% delay, primary air fan frequency f1 increases automatically at this time, increases process according to bed temperature liter Rate kcwVariation, if raising speed rate kcwOn a declining curve, primary air fan frequency f1 stops rising, while increaseing accordingly coal-supplying amount Nml, according to air quantity F1rtCorresponding coal amount NmlAutomatically F1 is increased tort*Kmf, guarantee bed temperature TcwIt is in rising trend, when bed temperature is higher than At 850 degrees Celsius, air quantity and coal amount should be matched to a temperature rise rate kcwRegion is steadily no more than 1 degree Celsius of floating up and down, this When raise igneous function.
Working principle of the present invention:
It is tested by boiler cold-state, obtains air quantity when circulating fluidized bed boiler occurs under cold conditions state " unlock phenomenon "; In boiler thermal-state operating status, the opportunity of banking fire is encountered, when " unlock phenomenon " occurs in circulating fluidized bed boiler when finding out hot Air quantity;Corresponding to air quantity when hot when circulating fluidized bed boiler appearance " unlock phenomenon ", air quantity, coal-supplying amount, blower Frequency parameter raises automatic adjustment foundation when fire as boiler, and during raising fire, by computer controlled automatic, tracking contains Oxygen amount and bed temperature variation rate automatically adjust air quantity, coal-supplying amount, realize and raise fire automatically, and guarantee to raise the success rate and stability of fire.
The technology of the present invention effect:
The present invention automatically records the air quantity and compartment pressure numerical value when banking fire with computer, carries out the slope meter of homologous thread It calculates, when greatest gradient being taken to occur, corresponding air quantity is as best air quantity, as the Fluidization wind rate raised when fire starts;And with this wind On the basis of when the ratio of meter calculating coal feeding amount, air quantity and coal amount is to operate normally, automatically engages and calculate after starting blower Coal amount;Optimal Fluidization wind rate and corresponding coal amount, two means combine the storage for then remaining the banking fire bed of material to the maximum extent Accumulated heat amount, and the heat entered into new ribbing is replenished in time, guarantee that the bed of material steadily heats up, it is ensured that raise the success of fire.It is ciculation fluidized During bed boiler raises fire, the cause for taking away heat is known as the heat absorption before air quantity, quantity of circulating water, as-fired coal burn, and circulating ash takes away Heat etc., the heat that wherein First air is taken away is maximum.Since at this moment bed temperature is lower, one time air temperature is also low, if First air Amount control is bad, and air quantity is excessive, and amount of heat is taken away, and bed temperature will sharply decline;If coal-supplying amount is inadequate simultaneously, volatile matter Amount of precipitation is few, and the shortage of heat of releasing is to improve bed temperature, and coal amount is excessive, and the caloric receptivity for entering furnace initial stage is excessive, and oxygen amount is inadequate, bed temperature Also should not rise, as-fired coal will be inadequate because of temperature, causes to put out a fire, can only throw oil it is combustion-supporting, fuel gas was assembled when serious The accidents such as detonation, coking can mostly be caused, very negative impact is generated to boiler safety, economical operation.It is directed to this point, we Best coal amount and air quantity are obtained by experiment, and the probability of success for improving boiler and raising fire is controlled by computer.After the present invention, raise Fire starting is ensured, the accident risk of bed of material coking is reduced, and has been saved and has been raised fire starting oil consumption.Before the present invention is directed to banking fire Actual condition, provide optimal Fluidization wind rate and raise fiery starting, guarantee that the success for raising fire starting and bed temperature are smoothly promoted.
Detailed description of the invention:
Fig. 1 cold test flow chart
Unlock phenomenon flow chart is found in the hot banking fire of Fig. 2
Fig. 3 raises fiery flow chart automatically
Specific embodiment:
A kind of computer improves boiler pressuring fire and restarts success rate and starting stationarity method:
1), as shown in Figure 1, in boiler cold-state fluidization tests, with primary air flow FltIncrease, compartment pressure PltPhase It should increase, in air quantity FltIncrease in a certain amount of situation, compartment pressure will appear a moment downward trend, i.e., in fixation When the gas flow rate that bed material passes through is very low, with the increase of wind speed, bed pressure drop increase in direct ratio, and when wind speed reaches one When definite value, bed pressure drop reaches maximum value, which is slightly larger than bed static pressure, if continuing growing wind speed, bed pressure drop can be down to The static pressure of bed, this phenomenon are known as " the unlock phenomenon " of circulating fluidized bed boiler, and record unlocks air quantity when phenomenon at this time FltjsCorresponding compartment pressure Pltjs
2), as shown in Fig. 2, boiler working condition is switched to hot by cold conditions after starting operation, the opportunity of banking fire is encountered, it may be assumed that fluidisation Bed boiler fuel shutoff, stops blower, will be out of service in the boiler short time;On the basis of parameter when occurring unlocking phenomenon, By primary air flow FrtyhIt is decreased to less than the unlock air quantity F of cold testltjs, it is further continued for increasing primary air flow Frtyh, air compartment at this time PrtyhPressure, which will appear, first to be increased, rear to reduce, then the variation tendency increased, that is, the unlock phenomenon point of hot banking fire occurs;
3) after unlock phenomenon point when, finding hot, hot unlock air quantity F is recordedrtjsAnd hot unlocking pressure Prtjs, With hot unlock air quantity FrtjsAs air quantity when raising fire, and record blower frequency f at that timertAnd it records in normal table When operation, the ratio K of coal amount and air quantitymf(ton/when)/(cube m/hour), as coal amount corresponding under certain air quantity, i.e. coal Measure Nml=F1rt*Kmf, meanwhile, the coal amount N of hot unlock point is calculatedmlrtjs=Frtjs*Kmf
4), as shown in figure 3, Yang Huoshi, i.e., after the banking fire in completion step 2), bed temperature is lower than before 600 degree, starts wind Machine, investment fuel, by boiler quick start;The successively automatic starting in order of each blower, increases primary air fan frequency f1 until one Secondary air quantity F1rtReach hot unlock air quantity FrtjsWhen, stablize primary air fan frequency f1, feeder self-starting increases coal-supplying amount Nml, And make coal-supplying amount NmlReach the corresponding coal amount N of hot unlock point corresponding to the air quantitymlrtjs, at this point, bed temperature rises, according to bed Warm TcwRaising speed rate kcwVariation, to bed temperature TcwRise to 650 degrees Celsius or more, and bed temperature heating rate kcw3 are always held to take the photograph More than family name's degree is per minute, oxygen content O2Do not go up within 3 seconds lower than 4% delay, primary air fan frequency f1 increases automatically at this time, increases Journey is according to bed temperature rise rate kcwVariation, if raising speed rate kcwOn a declining curve, primary air fan frequency f1 stops rising, same to phase Coal-supplying amount N should be increasedml, according to air quantity F1rtCorresponding coal amount NmlAutomatically F1 is increased tort*Kmf, guarantee bed temperature TcwBecome in rising Gesture, when bed temperature is higher than 850 degrees Celsius, air quantity and coal amount should be matched to a temperature rise rate kcwRegion is steadily no more than 1 up and down and takes the photograph Igneous function is raised in the floating of family name's degree at this time.
Air quantity and compartment pressure numerical value when banking fire, the slope for carrying out homologous thread calculates, right when greatest gradient being taken to occur The air quantity answered is as best air quantity, as the Fluidization wind rate raised when fire starts;And coal feeding amount, amount and coal amount are calculated with this air volume meter Ratio to operate normally when on the basis of, calculated coal amount is automatically engaged after starting blower;Optimal Fluidization wind rate and right The coal amount answered.
Point on the basis of the air quantity parameter that the present invention passes through cold test, in hot operation, according to the air quantity of cold test Parameter, incipient fluidization air quantity when finding out hot, while acquiring coal-supplying amount, air quantity, wind corresponding to hot incipient fluidization air quantity Unit frequency, the most banking fire are controlled by computer, are become according to the variation of bed temperature, oxygen amount in the accurate and reliable parameter foundation of starting Gesture, automatically adjust air quantity, coal-supplying amount, these adjusting because there is reliable test parameters, make boiler raise fire operation success rate and Stability greatly improves.

Claims (1)

1. a kind of computer, which improves boiler pressuring fire, restarts success rate and starting stationarity method, it is characterized in that:
1), in boiler cold-state fluidization tests, with primary air flow FltIncrease, compartment pressure PltIt increase accordingly, in air quantity Flt Increase in a certain amount of situation, compartment pressure will appear a moment downward trend, i.e., the gas passed through in fixed bed material When flow velocity is very low, with the increase of wind speed, bed pressure drop increase in direct ratio, and when wind speed reaches certain value, bed pressure Drop reaches maximum value, which is slightly larger than bed static pressure, if continuing growing wind speed, bed pressure drop can be down to the static pressure of bed, this Kind phenomenon is known as " the unlock phenomenon " of circulating fluidized bed boiler, and record unlocks air quantity F when phenomenon at this timeltjsCorresponding air compartment Pressure Pltjs
2), after starting operation, boiler working condition is switched to hot by cold conditions, encounters the opportunity of banking fire, it may be assumed that fluidized-bed combustion boiler cutting combustion Material stops blower, will be out of service in the boiler short time;On the basis of parameter when occurring unlocking phenomenon, by primary air flow FrtyhIt is decreased to less than the unlock air quantity F of cold testltjs, it is further continued for increasing primary air flow Frtyh, air compartment P at this timertyhPressure meeting Appearance first increases, rear to reduce, then the variation tendency increased, that is, the unlock phenomenon point of hot banking fire occurs;
3) after unlock phenomenon point when, finding hot, hot unlock air quantity F is recordedrtjsAnd hot unlocking pressure Prtjs, with heat State unlocks air quantity FrtjsAs air quantity when raising fire, and record blower frequency f at that timertAnd it records and is run in normal table When, the ratio K of coal amount and air quantitymf(ton/when)/(cube m/hour), as coal amount corresponding under certain air quantity, i.e. coal amount Nml =F1rt*Kmf, meanwhile, the coal amount N of hot unlock point is calculatedmlrtjs=Frtjs*Kmf
4), Yang Huoshi, i.e., after the banking fire in completion step 2), bed temperature is lower than before 600 degree, starting blower, investment fuel, by pot Furnace quick start;The successively automatic starting in order of each blower, increases primary air fan frequency f1 until primary air flow F1rtReach hot Unlock air quantity FrtjsWhen, stablize primary air fan frequency f1, feeder self-starting increases coal-supplying amount Nml, and make coal-supplying amount NmlReach The corresponding coal amount N of hot unlock point corresponding to the air quantitymlrtjs, at this point, bed temperature rises, according to bed temperature TcwRaising speed rate kcwBecome Change, to bed temperature TcwRise to 650 degrees Celsius or more, and bed temperature heating rate kcwBe always held at 3 centigrade per minutes with On, oxygen content O2Do not go up within 3 seconds lower than 4% delay, primary air fan frequency f1 increases automatically at this time, increases process according to bed temperature liter Rate kcwVariation, if raising speed rate kcwOn a declining curve, primary air fan frequency f1 stops rising, while increaseing accordingly coal-supplying amount Nml, according to air quantity F1rtCorresponding coal amount NmlAutomatically F1 is increased tort*Kmf, guarantee bed temperature TcwIt is in rising trend, when bed temperature is higher than At 850 degrees Celsius, air quantity and coal amount should be matched to a temperature rise rate kcwRegion is steadily no more than 1 degree Celsius of floating up and down, this When raise igneous function.
CN201910614709.3A 2019-07-09 2019-07-09 Method for improving success rate and starting stability of boiler fire suppression restart by computer Active CN110296436B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910614709.3A CN110296436B (en) 2019-07-09 2019-07-09 Method for improving success rate and starting stability of boiler fire suppression restart by computer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910614709.3A CN110296436B (en) 2019-07-09 2019-07-09 Method for improving success rate and starting stability of boiler fire suppression restart by computer

Publications (2)

Publication Number Publication Date
CN110296436A true CN110296436A (en) 2019-10-01
CN110296436B CN110296436B (en) 2020-07-07

Family

ID=68030765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910614709.3A Active CN110296436B (en) 2019-07-09 2019-07-09 Method for improving success rate and starting stability of boiler fire suppression restart by computer

Country Status (1)

Country Link
CN (1) CN110296436B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110887038A (en) * 2019-12-26 2020-03-17 哈尔滨工业大学中远工控有限公司 Combustion self-adaptive control system and method for circulating fluidized bed boiler

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60233418A (en) * 1984-05-07 1985-11-20 Nippon Kokan Kk <Nkk> Refuse incinerator
CN1045856A (en) * 1990-03-30 1990-10-03 郝瑞骥 Peaking regulation with no steam by sliding parameter for small thermal generating set
CN102168273A (en) * 2011-03-15 2011-08-31 昆明醋酸纤维有限公司 Maintaining and energy-saving method for blowout stand-by boiler
CN202719599U (en) * 2012-08-16 2013-02-06 济南市琦泉热电有限责任公司 Slagging anti-blocking device of circulating fluidized bed boiler
CN104061571A (en) * 2014-07-03 2014-09-24 安徽安纳达钛业股份有限公司 Banking fire method for circulating fluidized bed coal-fired boiler

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60233418A (en) * 1984-05-07 1985-11-20 Nippon Kokan Kk <Nkk> Refuse incinerator
CN1045856A (en) * 1990-03-30 1990-10-03 郝瑞骥 Peaking regulation with no steam by sliding parameter for small thermal generating set
CN102168273A (en) * 2011-03-15 2011-08-31 昆明醋酸纤维有限公司 Maintaining and energy-saving method for blowout stand-by boiler
CN202719599U (en) * 2012-08-16 2013-02-06 济南市琦泉热电有限责任公司 Slagging anti-blocking device of circulating fluidized bed boiler
CN104061571A (en) * 2014-07-03 2014-09-24 安徽安纳达钛业股份有限公司 Banking fire method for circulating fluidized bed coal-fired boiler

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李寿军: "300 MW 循环流化床锅炉压火及热态启动操作方法探讨", 《内蒙古电力技术》 *
肖湘海: "循环流化床锅炉压火与扬火中的安全问题及措施", 《黑龙江科技信息》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110887038A (en) * 2019-12-26 2020-03-17 哈尔滨工业大学中远工控有限公司 Combustion self-adaptive control system and method for circulating fluidized bed boiler
CN110887038B (en) * 2019-12-26 2021-05-28 哈尔滨中远控制工程有限公司 Combustion self-adaptive control system and method for circulating fluidized bed boiler

Also Published As

Publication number Publication date
CN110296436B (en) 2020-07-07

Similar Documents

Publication Publication Date Title
CN104676574B (en) Supercritical CFB Boiler main steam pressure control method based on the energy balance
US11344155B2 (en) Charcoal grill system and method for managing temperature within the same charcoal grill system
CN102453792B (en) Method and equipment for controlling furnace pressure of continuous annealing furnace
CN110296436A (en) Computer improves boiler pressuring fire and restarts success rate and starting stationarity method
CN103892697A (en) Control method, control device and steam cooking device
CN110986110B (en) Control method and control device for gas stove and gas stove
CN101256400A (en) Control method for delay coking stove
CN104172903B (en) Steam cooking apparatus and cooking control method thereof and system
CN110307651B (en) Control method and control system of gas water heater
US20150345387A1 (en) Plant control apparatus and plant starting-up method
JP2014114994A (en) Device and method for temperature control of crushing plant, and computer program
CN110285404B (en) Method for reducing boiler hearth abrasion through computer control
CN108019954A (en) A kind of control method of gas heater
RU2011130889A (en) METHOD AND SYSTEM OF CONTROL OF WORK OF INSTALLATION FOR DRYING CARBON BLOCKS
CN105648130B (en) A kind of hot blast stove burning automatic ignition control system and method
US8904971B2 (en) Method of controlling combustion of gas appliance
CN106958833B (en) A kind of biomass suspension-combustion furnace autocontrol method
JP5423443B2 (en) Method for calculating fuel flow rate in continuous heating furnace, method for producing steel material, and continuous heating furnace
JP2003302003A (en) Number control device for multiple can installed boiler
CN109882830B (en) Operation method for adjusting steam temperature of biomass circulating fluidized bed boiler
CN113028392A (en) Micro-fluidization cold-state ignition starting method for circulating fluidized bed boiler
KR101557591B1 (en) Method and apparatus for controlling flow rate of fuel in drum boiler
CN209706137U (en) Dry combustion method cutoff gas-cooker
CN107893986A (en) A kind of autocontrol method of Large-scale fire-electricity unit stopping HP heater
CN111102610B (en) Operation control method, device, cooking appliance and computer readable storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant