CN110289185A - Arc-chutes level with switching-on resistance is into tank assembly tooling and its assembly method - Google Patents

Arc-chutes level with switching-on resistance is into tank assembly tooling and its assembly method Download PDF

Info

Publication number
CN110289185A
CN110289185A CN201910546981.2A CN201910546981A CN110289185A CN 110289185 A CN110289185 A CN 110289185A CN 201910546981 A CN201910546981 A CN 201910546981A CN 110289185 A CN110289185 A CN 110289185A
Authority
CN
China
Prior art keywords
arc
chutes
support
metal shell
mobile bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910546981.2A
Other languages
Chinese (zh)
Inventor
郭腾腾
孙培庆
贠超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Taikai High Volt Switchgear Co Ltd
Original Assignee
Shandong Taikai High Volt Switchgear Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Taikai High Volt Switchgear Co Ltd filed Critical Shandong Taikai High Volt Switchgear Co Ltd
Priority to CN201910546981.2A priority Critical patent/CN110289185A/en
Publication of CN110289185A publication Critical patent/CN110289185A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01HELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
    • H01H11/00Apparatus or processes specially adapted for the manufacture of electric switches

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chutes (AREA)

Abstract

The present invention relates to the arc-chutes levels with switching-on resistance into tank assembly tooling and its assembly method, assembly docking of the assembly tooling for metal shell and arc-chutes, the connection support bar on the insulating supporting of arc-chutes, support frame is connected in the hydraulic mechanism side of arc-chutes, sliding machine for lifting support rod traveling is installed inside metal shell, side is moved equipped with the mobile bracket in dynamic side for lifting support frame in arc-chutes, the mobile bracket in the quiet side for lifting support rod is equipped in the quiet side of arc-chutes, sliding machine lifts the mobile bracket lifting support frame of support rod and dynamic side and realizes arc extinguishing chamber axis and metal shell axis coaxle.Existing vertical assembly method is changed to horizontal assembly method by the application, and horizontal assembly method is required to equipment automatization level, vertical space, security protection etc. lower, that is, improves assembly efficiency, while also reducing assembly cost.

Description

Arc-chutes level with switching-on resistance is into tank assembly tooling and its assembly method
Technical field
The present invention relates to arc-chutes mounting technology fields, more particularly to the arc-chutes level with switching-on resistance is into canned allotment of labor Dress and its assembly method.
Background technique
With the development of China's power industry, electrical network capacity is also constantly expanding, for the demand for adapting to power network development, voltage Grade is also gradually progressive from 126kV, 252kV to 550kV, 800kV, and 550kV gas-insulated metal enclosed switchgear breaker is super It is widely used in extra-high-voltage alternating current power grid.550kV gas-insulated metal enclosed switchgear breaker mainly includes metal shell and goes out Arc chamber, wherein switching-on resistance is one of the important electric elements of arc-chutes.
With the raising of voltage class, switching-on resistance weight is also being continuously improved, so that the arc-chutes with switching-on resistance Assembly difficulty further increases.Many manufacturers using vertically into tank assembly method, vertical assembly method is horizontal to equipment automatization, Vertical space, security protection etc. are more demanding, and efficiency is lower, and the assembly cost of generation also increases.For convenience of with switching-on resistance Arc-chutes reduce assembly cost into tank, improve assembly efficiency, need to design a kind of arc-chutes with switching-on resistance into canned formula Case.
Summary of the invention
In view of the deficiencies of the prior art, the present invention provides the arc-chutes levels with switching-on resistance into tank assembly tooling and its dress Existing vertical assembly method is changed to horizontal assembly method by method of completing the square, the application, and horizontal assembly method is to equipment automatization water Flat, vertical space, security protection etc. are required to lower, that is, improve assembly efficiency, while also reducing assembly cost.
The arc-chutes level with switching-on resistance of offer is docked into tank assembly tooling for metal shell and arc-chutes assembly, The connection support bar on the insulating supporting of arc-chutes connects support frame in the hydraulic mechanism side of arc-chutes, inside metal shell Sliding machine for lifting support rod traveling is installed, moves side equipped with the mobile branch in dynamic side for lifting support frame in arc-chutes Frame is equipped with the mobile bracket in the quiet side for lifting support rod in the quiet side of arc-chutes, and sliding machine lifts support rod and dynamic sidesway Dynamic bracket lifting support frame realizes that arc extinguishing chamber axis and metal shell axis coaxle, the mobile bracket in quiet side are lifted support rod and moved The mobile bracket lifting support frame in side realizes arc extinguishing chamber axis and metal shell axis coaxle.
Preferably, support rod is connected with insulating supporting by ring flange, support frame and hydraulic mechanism side pass through ring flange Connection.
Preferably, the top surface of the dynamic mobile bracket in side is equipped with and lifts platform, support frame, which is placed on, to be lifted on platform;Quiet sidesway The affixed hydraulic support in top surface of dynamic bracket, hydraulic support include hydraulic cylinder and with hydraulic cylinder piston rod it is affixed for putting Set the card slot of support rod.
Preferably, the sliding machine includes the support with limiting slot, support rod is placed in limiting slot, in support Bottom surface is symmetrical arranged two support arms, and two support arms erect support, and each support arm passes through in idler wheel and metal shell Wall contact.
Assembly method of the arc-chutes level with switching-on resistance of offer into tank assembly tooling, comprising the following steps:
1. the connection support bar on the insulating supporting of arc-chutes connects support frame in the hydraulic mechanism side of arc-chutes, with branch The switching-on resistance mechanism chamber of support and arc-chutes is as lifting point;
2. sliding machine is put into metal shell;
3. arc-chutes level is sling using the switching-on resistance mechanism chamber of support frame and arc-chutes as lifting point, by support rod It protrudes into metal shell and rides in the limiting slot of sliding machine;
4. the mobile bracket in dynamic side is moved to below support frame, the mobile bracket lifting support frame in side is moved, suspender is removed;
5. pushing the mobile bracket in dynamic side to move into arc-chutes gradually in metal shell, when support rod is from the metal shell other end When stretching, the mobile bracket in quiet side is moved to below support rod, support rod is located in card slot, and the mobile bracket in quiet side lifts support Bar removes sliding machine out of metal shell;
6. the mobile bracket in dynamic side is pushed to dock arc-chutes and metal shell completely;
7. installing pressure pin on metal shell, pressure pin lifts arc-chutes, and arc-chutes and metal shell are connected firmly, and removes Support rod, support frame, the mobile bracket of the dynamic mobile bracket in side and quiet side.
The invention has the benefit that
1, existing vertical assembly method is changed to horizontal assembly method by the application, and horizontal assembly method is to equipment automatization Level, vertical space, security protection etc. are required to lower, that is, improve assembly efficiency, while also reducing assembly cost.
2, the tooling component part is simple, eliminates higher equipment purchase cost, simple into tank mode, is assembling and is tearing open Efficiency is higher in solution preocess.
Detailed description of the invention
Fig. 1 is support rod of the present invention, support frame and arc-chutes assembly relation structural schematic diagram;
Fig. 2 is sliding machine of the present invention and metal shell assembly relation structural schematic diagram;
Fig. 3 is sliding machine of the present invention and metal shell inner wall connection relationship structural schematic diagram;
Fig. 4 is support rod of the present invention and sliding machine assembly relation structural schematic diagram;
Fig. 5 is the mobile bracket in the dynamic side of the present invention and support frame assembly relation structural schematic diagram;
Fig. 6 is that the mobile bracket in the dynamic side of the present invention and the mobile bracket of support frame assembly relation and quiet side and support rod assembly are closed Architecture schematic diagram;
Fig. 7 is pressure pin of the present invention, metal shell and arc-chutes assembly relation structural schematic diagram;
Fig. 8 is present invention assembly finished figure;
It is as shown in the figure:
1, insulating supporting, 2, support rod, 3, hydraulic mechanism side, 4, support frame, 5, switching-on resistance mechanism chamber, 6, metal-back Body, 7, sliding machine, 8, limiting slot, 9, support, 10, support arm, 11, idler wheel, 12, the mobile bracket in dynamic side, 13, lift platform, 14, the mobile bracket in quiet side, 15, hydraulic support, 16, pressure pin.
Specific embodiment
In order to clarify the technical characteristics of the invention, being illustrated below by specific embodiment to this programme.
Arc-chutes level with switching-on resistance is into tank assembly tooling, as shown in Fig. 1,2,4,5,6,7,8, in the exhausted of arc-chutes Connection support bar 2 in edge support 1, connects support frame 4 on the hydraulic mechanism side 3 of arc-chutes, installs and uses inside metal shell 6 In the sliding machine 7 for lifting the traveling of support rod 2, side is moved in arc-chutes and moves bracket 12 equipped with the dynamic side for lifting support frame 4, It is equipped with the mobile bracket 14 in the quiet side for lifting support rod 2 in the quiet side of arc-chutes, sliding machine 7 lifts support rod 2 and dynamic side Mobile 12 lifting support frame 4 of bracket realizes that arc extinguishing chamber axis and 6 axis coaxle of metal shell, the mobile bracket 14 in quiet side lift support Mobile 12 lifting support frame 4 of bracket of bar 2 and dynamic side realizes arc extinguishing chamber axis and 6 axis coaxle of metal shell.
In the present embodiment, support rod 2 is connected with insulating supporting 1 by ring flange, and support frame 4 and hydraulic mechanism side 3 are logical Cross ring flange connection.By the way of flanged joint, when the assembly is complete can in order to by support rod 2 and support frame 4 from arc extinguishing It is unloaded on room.
In the present embodiment, the top surface for moving the mobile bracket 12 in side, which is equipped with, lifts platform 13, and support frame 4, which is placed on, lifts platform On 13.The affixed hydraulic support 15 in top surface of the mobile bracket 14 in quiet side, hydraulic support 15 include hydraulic cylinder and and hydraulic cylinder The affixed card slot for being used to place support rod 2 of piston rod.
In the present embodiment, as shown in figure 3, the sliding machine 7 includes the support 9 with limiting slot 8, in limiting slot 8 Support rod 2 is placed, is symmetrical arranged two support arms 10 in the bottom surface of support 9, two support arms 10 erect support 9, Mei Gezhi Brace 10 is contacted by idler wheel 11 with 6 inner wall of metal shell.Each support arm 10 axially all has certain along metal shell 6 Width, therefore sliding machine 7 is placed stabilization in metal shell 6 and will not be toppled over.
Below with reference to embodiment shown in Fig. 1,2,3,4,5,6,7,8 illustrate to provide the arc-chutes level with switching-on resistance into The assembly method of tank assembly tooling, comprising the following steps:
1. the connection support bar 2 on the insulating supporting 1 of arc-chutes connects support frame on the hydraulic mechanism side 3 of arc-chutes 4, using the switching-on resistance mechanism chamber 5 of support frame 4 and arc-chutes as lifting point;
2. sliding machine 7 is put into metal shell 6;
3. slinging arc-chutes level using the switching-on resistance mechanism chamber 5 of support frame 4 and arc-chutes as lifting point, will support Bar 2 is protruded into metal shell 6 and is ridden in the limiting slot 8 of sliding machine 7;
4. the mobile bracket 12 in dynamic side is moved to 4 lower section of support frame, mobile 12 lifting support frame 4 of bracket in side is moved, removal is hung Tool;
5. pushing the mobile bracket 12 in dynamic side to move into arc-chutes gradually in metal shell 6, when support rod 2 is from metal shell 6 When the other end stretches out, the mobile bracket 14 in quiet side is moved to 2 lower section of support rod, support rod 2 is located in card slot, the mobile bracket in quiet side 14 lift support rod 2, and sliding machine 7 is removed out of metal shell 6;
6. the mobile bracket 12 in dynamic side is pushed to dock arc-chutes and metal shell 6 completely;
7. installing pressure pin 16 on metal shell 6, pressure pin 16 lifts arc-chutes, arc-chutes and metal shell 6 is connected jail Gu removing support rod 2, support frame 4, the mobile bracket 14 of the dynamic mobile bracket 12 in side and quiet side.
Certainly, above description is also not limited to the example above, technical characteristic of the present invention without description can by or It is realized using the prior art, details are not described herein;Above embodiments and attached drawing are only used to illustrate the technical scheme of the present invention not It is limitation of the present invention, is described the invention in detail referring to preferred embodiment, the ordinary skill people of this field Member is it should be appreciated that variation, remodeling, the addition that those skilled in the art are made within the essential scope of the present invention Or replacement also should belong to claims of the invention without departure from spirit of the invention.

Claims (5)

1. the arc-chutes level with switching-on resistance is into tank assembly tooling, it is characterised in that: connect on the insulating supporting (1) of arc-chutes Support rod (2) are connect, connect support frame (4) on the hydraulic mechanism side (3) of arc-chutes, installation is used for inside metal shell (6) The sliding machine (7) for lifting support rod (2) traveling moves side equipped with the mobile branch in dynamic side for lifting support frame (4) in arc-chutes Frame (12) is equipped with quiet side movement bracket (14) for lifting support rod (2) in the quiet side of arc-chutes, and sliding machine (7) lifts branch Arc extinguishing chamber axis and metal shell (6) axis coaxle are realized in strut (2) and dynamic side mobile bracket (12) lifting support frame (4), Support rod (2) is lifted in quiet side mobile bracket (14) and dynamic side mobile bracket (12) lifting support frame (4) realize arc extinguishing chamber axis With metal shell (6) axis coaxle.
2. the arc-chutes level according to claim 1 with switching-on resistance is into tank assembly tooling, it is characterised in that: support rod (2) it is connected with insulating supporting (1) by ring flange, support frame (4) is connected with hydraulic mechanism side (3) by ring flange.
3. the arc-chutes level according to claim 2 with switching-on resistance is into tank assembly tooling, it is characterised in that: dynamic sidesway The top surface of dynamic bracket (12) is equipped with and lifts platform (13), and support frame (4), which is placed on, to be lifted on platform (13);The mobile bracket in quiet side (14) the affixed hydraulic support in top surface (15), hydraulic support (15) include hydraulic cylinder and affixed with hydraulic cylinder piston rod For placing the card slot of support rod (2).
4. the arc-chutes level according to claim 1 with switching-on resistance is into tank assembly tooling, it is characterised in that: the cunning Dynamic trolley (7) include the support (9) with limiting slot (8), support rod (2) are placed in limiting slot (8), in the bottom surface of support (9) Two support arms (10) are symmetrical arranged, two support arms (10) erect support (9), and each support arm (10) passes through idler wheel (11) it is contacted with metal shell (6) inner wall.
5. arc-chutes level described in claims 1 or 2 or 3 or 4 with switching-on resistance is into its assembly method packet of tank assembly tooling Include following steps:
1. the connection support bar (2) on the insulating supporting (1) of arc-chutes connects support on the hydraulic mechanism side (3) of arc-chutes Frame (4), using the switching-on resistance mechanism chamber (5) of support frame (4) and arc-chutes as lifting point;
2. sliding machine (7) is put into metal shell (6);
3. being sling arc-chutes level as lifting point using the switching-on resistance mechanism chamber (5) of support frame (4) and arc-chutes, will support Bar (2) is protruded into metal shell (6) and is ridden in the limiting slot (8) of sliding machine (7);
4. dynamic side mobile bracket (12) are moved to below support frame (4), mobile bracket (12) lifting support frame (4) in side is moved, is gone Except suspender;
5. pushing dynamic side mobile bracket (12) to move into arc-chutes gradually in metal shell (6), when support rod (2) is from metal shell (6) when the other end stretches out, quiet side mobile bracket (14) are moved to below support rod (2), support rod (2) is located in card slot, quiet Support rod (2) are lifted in side mobile bracket (14), and sliding machine (7) is removed out of metal shell (6);
6. dynamic side mobile bracket (12) is pushed to dock arc-chutes and metal shell (6) completely;
7. installing pressure pin (16) on metal shell (6), pressure pin (16) lifts arc-chutes, and arc-chutes and metal shell (6) are connected It connects securely, it is mobile bracket (14) to remove support rod (2), support frame (4), dynamic side mobile bracket (12) and quiet side.
CN201910546981.2A 2019-06-24 2019-06-24 Arc-chutes level with switching-on resistance is into tank assembly tooling and its assembly method Pending CN110289185A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910546981.2A CN110289185A (en) 2019-06-24 2019-06-24 Arc-chutes level with switching-on resistance is into tank assembly tooling and its assembly method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910546981.2A CN110289185A (en) 2019-06-24 2019-06-24 Arc-chutes level with switching-on resistance is into tank assembly tooling and its assembly method

Publications (1)

Publication Number Publication Date
CN110289185A true CN110289185A (en) 2019-09-27

Family

ID=68004670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910546981.2A Pending CN110289185A (en) 2019-06-24 2019-06-24 Arc-chutes level with switching-on resistance is into tank assembly tooling and its assembly method

Country Status (1)

Country Link
CN (1) CN110289185A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202172034U (en) * 2011-07-04 2012-03-21 平高集团有限公司 Single-pole assembly jig for tank-type sulphur hexafluoride breaker
CN104143470A (en) * 2013-07-31 2014-11-12 国家电网公司 High-pressure switch shell assembly and manufacturing method thereof
CN205231575U (en) * 2015-12-03 2016-05-11 山东泰开高压开关有限公司 Novel circuit breaker explosion chamber advances jar device
CN107769050A (en) * 2017-09-28 2018-03-06 湖南长高电气有限公司 A kind of 220kV potting breakers arc-chutes overhaul assembly tooling
CN107833797A (en) * 2017-09-27 2018-03-23 中国西电电气股份有限公司 A kind of high-voltage switch circuit breaker assembly system and method
CN208045360U (en) * 2018-04-23 2018-11-02 宁夏凯晨电气集团有限公司 Circuit breaker polar installation auxiliary device
CN109767940A (en) * 2017-11-09 2019-05-17 河南平芝高压开关有限公司 A kind of double acting arc-chutes initiative part assembles tooling

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202172034U (en) * 2011-07-04 2012-03-21 平高集团有限公司 Single-pole assembly jig for tank-type sulphur hexafluoride breaker
CN104143470A (en) * 2013-07-31 2014-11-12 国家电网公司 High-pressure switch shell assembly and manufacturing method thereof
CN205231575U (en) * 2015-12-03 2016-05-11 山东泰开高压开关有限公司 Novel circuit breaker explosion chamber advances jar device
CN107833797A (en) * 2017-09-27 2018-03-23 中国西电电气股份有限公司 A kind of high-voltage switch circuit breaker assembly system and method
CN107769050A (en) * 2017-09-28 2018-03-06 湖南长高电气有限公司 A kind of 220kV potting breakers arc-chutes overhaul assembly tooling
CN109767940A (en) * 2017-11-09 2019-05-17 河南平芝高压开关有限公司 A kind of double acting arc-chutes initiative part assembles tooling
CN208045360U (en) * 2018-04-23 2018-11-02 宁夏凯晨电气集团有限公司 Circuit breaker polar installation auxiliary device

Similar Documents

Publication Publication Date Title
CN110289185A (en) Arc-chutes level with switching-on resistance is into tank assembly tooling and its assembly method
CN116131144A (en) GIS equipment maintenance device and method thereof
CN111029097B (en) Transformer vibration reduction hoisting system and vibration reduction method
CN203998572U (en) A kind of hanging apparatus
CN205087828U (en) Simple and easy lifting device of 35kV circuit breaker
CN214653133U (en) Mutual inductor handling device for electric power
CN206180452U (en) Novel 10kV handcart circuit breaker overhaul platform
CN215681547U (en) Flexible direct current converter station submodule piece replacement device
CN215626226U (en) Remove hoist device
CN209150592U (en) Electric mounting device in a kind of cabinet
CN203173675U (en) Magnetic pole hanger
CN210795599U (en) Electromechanical device transportation installation auxiliary device
CN208226316U (en) Armouring mobile AC metal enclosed switchgear
CN209306856U (en) Small-sized separation type electrical hoisting apparatus
CN212462428U (en) High tension switchgear convenient to hoist and mount
CN208166340U (en) A kind of steel plate lifting special hanger
CN203536826U (en) Portable pneumatic short circuit grounding device of transformer station
CN208292529U (en) A kind of movable switch cubicle hanging device
CN102570325B (en) A kind of light hoisting device for converting station
CN209010032U (en) Substation's lifting structure of fan
CN208861760U (en) A kind of installation tool of current transformer
CN206783184U (en) A kind of transformer suspended core operation eyelid retractor
CN105060154A (en) Suspension installation machine of suspended load type transformer
CN210440859U (en) Mounting protection frame for assembly type communication equipment
CN205786984U (en) Dry type Compound Insulation Wall Bushing electrical insulation properties test lifting platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190927

RJ01 Rejection of invention patent application after publication